Loading...
HomeMy WebLinkAboutSP-22-060 - Supplemental - 0339 Garden Street (50)1 Betsy Brown From:Monika Ingalls <moingalls@southburlingtonvt.gov> Sent:Friday, January 27, 2023 1:46 PM To:Andy Rowe Subject:RE: 'EXTERNAL'RE: Catamount Run - Block B / #SP-22-060 SnyderHomes Security Filter Warning: Sender moingalls@southburlingtonvt.gov is not yet trusted by your organization. Please be careful before replying or clicking on the URLs. powered by Graphus® Hi Andy, I believe you’ve addressed all of our comments, I’m just confirming with others in my department that there are no further questions. Thanks, Monika Ingalls Stormwater Project Manager Department of Public Works City of South Burlington 104 Landfill Road South Burlington, VT 05403 (802) 658-7961 Ext. 6108 Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation. 2 From: Andy Rowe <arowe@snyderhomesvt.com> Sent: Friday, January 27, 2023 10:33 AM To: Monika Ingalls <moingalls@southburlingtonvt.gov> Subject: 'EXTERNAL'RE: Catamount Run - Block B / #SP-22-060 This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hi Monika – I wanted to follow-up on the EPSC Plan edits for Block B at City Center. With Marla Keene returning from vacation, on Monday I am planning to provide responses and revised plans to address all of the comments she provided. If you have any comments on the revised EPSC Plans – or they are acceptable as is, please let me know. Thank you Andy Rowe | PROJECT ENGINEER SNYDER HOMES | SnyderHomesVT.com | 802.985.5722 From: Andy Rowe Sent: Wednesday, January 25, 2023 8:15 AM To: moingalls@southburlingtonvt.gov Subject: Catamount Run - Block B / #SP-22-060 Hi Monika – Marla passed on comments related to EPSC for Block B at City Center. Below are the responses, as well as the revised plans attached. The responses are short, since the information is intended to be on the plans so that it gets implemented in the field. I’d be happy to talk about any thoughts or comments you have. 1. Please revise the plans to specify where/how will dewatering occur. Sheets 5 & 8 have been revised to include dewatering specifications and details. Dewatering discharge will be conveyed to the opposite side of Market Street using existing 3” sleeves. Filter bags and/or overland flow will be used to manage the discharge, which will flow to a stone lined sump and pipe that flows into the storm pond. The stone lined sump and pipe are being installed now for a temporary use (panelizing structure) and gravel storage area adjacent to the storm pond. 3 2. Please coordinate with the Department of Public Works to specify a type of inlet protection to be utilized in Market Street that is more than a piece of fabric under a storm drain grate, but not something that would be problematic for the traveling public (e.g. inlet protection involving stone piled around the grate). The inlet protection detail on sheet 8 has been revised to include silt sacks for use on Garden Street and Market Street. 3. Please revise the plans to include discussion of the additional EPSC related measures and BMPs that are required during the winter construction season. Winter EPSC Plan Requirements have been added to sheet 5. Marla is on vacation this week, so I’m sending these directly to you to review in her absence. I will still provide the responses and revised plans prior to her return by Monday January 30. I’ve marked the plans ‘draft’ only to avoid multiple revision blocks in case there are any edits needed. If the plans are OK as is, I will remove the ‘draft’ and provide them to Marla. Please let me know if the revised plans address the comments, or if you have any questions. Thanks, Andy Rowe | PROJECT ENGINEER SNYDER HOMES | SnyderHomesVT.com | 802.985.5722