HomeMy WebLinkAboutSP-22-060 - Supplemental - 0224 0268 Market Street (32)Catamount Run - Block B
Buildings B1 & B2
PRIMARY FACADE
November 29, 2022
Primary Building
Façade
Requirements
Secondary Building
Façade Requirements
Project
Information
Applicant Sheet # Notes
(B) Lot Standards
(1)Lot Dimensions
(a)Lot size
(b)Lot Width
(2)Lot Occupation
(a)Percentage of Lot Coverage
(b)Units per acre
(C) Building Standards
(1) Building Types
(a)All Types
(2)Building Stories
(a)Principal 4 stories Archictectural Plans
(b)Accessory N/A
(3)Floor-to-Floor Height
(a)First story 14'-15'Elevations A01 & A11 B1 = 14'-15' B2=14'
(b)Upper Stories 10.5'Elevations A01 & A11
(4)Build-to-Zone (see T5 Figures)
(a)Primary Build-to-Zone 0' Min., 6' Max.0' Min., 9' Max.Complies Site Plan Bldg (end) corners are 6' off street ROW
(b)Secondary Build-to-Zone 0' Min., 24' Max.0'. Min., 36' Max.Complies Site Plan
(5)Frontage (see T5 Figures)
(a)Frontage Buildout 85% Min.85% Min. (Note 1)86%A03, A13, Site Plan (2 x 185') / 430' = 86%
(b) Percentage of Frontage Buildout within the
Primary Build-to-Zone
75% Min. 50% Min.
75% A03 & A13 139' / 185' for each B1 & B2
(c ) Percentage of Frontage Buildout within the
Secondary Build-to-Zone
0% Min., 25% Max. 50% Max.
25% A03 & A13
(6)Entrances (see Entrances Figure)
(a) Average frequency of Public Entrances, non-
residential first story use
30' Max. 45' Max.
25.8' A05 & A14
B1: (185' - 30' door width) / 6 doors = 25.8'
B2: (185' - 30' door width) / 6 doors = 25.8'
(b) Maximum distance between Public
Entrances, non-residential first story use
40' Max. 60' Max.
B1: 39.2'
B2: 39.8' A05 & A14 B1:39.2' B2: 39.8'
10' Min., 14' Max.
None
None
None
Permitted
2 Min., 6 Max.
1 Max.
14' Min., 20' Max.
None
T-5 Building Envelope Standards Checklist and Self-Evaluation
Applicant Self-Evaluation
T-5 BES (South Burlington Land Development
Regulations, 8.14)
Primary Building
Façade
Requirements
Secondary Building
Façade Requirements
Project
Information
Applicant Sheet # NotesT-5 BES (South Burlington Land Development
Regulations, 8.14)
(c ) Average Frequency of Operable Entrances,
residential first story use
(d) Maximum distance between Operable
Entrances, residential first story use
(7)Glazing (see Glazing Figure)
(a) First Story Min. 80% of the
Width of the Building,
and Min. 7.5' in
Height
Min. 40% of the Width
of the Building, and
Min 7.5' in Height
Primary
B1: 80%
B2: 80% A03, A13
Primary
B1: 148.25' / 185' = 80%
B2: 148' / 185' = 80%
(b) First Story, percent of glazing required to be
transparent
75% Min. 75% Min.Primary
B1 & B2 = 100% A03, A13
(c ) Upper Stories Primary
B1: 33%
B2: 33% A03, A13
(8)Building Breaks (see Note 3 & Bldg Breaks Figure)
(a)Building Horizontal Façade Min. 3 every 80'Min. 3 every 80'Complies A03, A13
(b) Single Span of Horizontal Facade Without a
Break
Recommend every 24-
48 feet; 60' Max.
Recommend every 24-
48 feet; 60' Max.Complies A03, A13
(9)Supplemental Building Standards
(a)Awnings, Stoops, Vestibules
(D) Block and Street Standards
(1)Blocks (See Section 8.04)
(a)Perimeter
(b)Length
(2)Street and Connection types (see Article 11)
(a)Destination Street
(b)Support Street
(c )Neighborhood Street Narrow
(d)Market Street & Garden Street
(e) Path
(f) Alley
(b) MewPedestrial Pass
(h) All other street types
(3)Curb Cuts
(a)On Market Street Complies None proposed
(b) On Garden Street Complies Existing curbcut in T-4
(c)All other streets Complies None proposed
No subdivision proposed
No subdivision proposed
No street construction proposed
Prohibited
Prohibited
Prohibited
100' Min. distance between curb cuts
Permitted Connection, Not a Street
1,600' Max.
400' Max.
Permitted, Qualifies as a Street
Permitted, Qualifies as a Street
Permitted, Qualifies as a Street
Permitted, Qualifies as a Street
Permitted Connection, Not a Street
Permitted Connection, Not a Street
not applicable
not applicable
See Note 2
Encouraged
Primary Building
Façade
Requirements
Secondary Building
Façade Requirements
Project
Information
Applicant Sheet # NotesT-5 BES (South Burlington Land Development
Regulations, 8.14)
(E ) Parking Standards
(1)Parking Amount Requirements
(a)Per Residential Unit Complies 236 spaces/161 units=1.5
(2) Location & Screening
(a)Complies
(b)Complies
(c )N/A
(d)Complies Planting Plan
(e)Complies
(f)
Complies
(g)
(3) Off-Site Parking
(F) Supplemental District Standards
(1)Upper Story setbacks
(a)
N/A
(b)
N/A
(G) Streetscape Standards
(1)General Standards
(a)
Complies
(b)
Complies
(c )
Complies
(d)Proposed development shall comply with all requirement of Article 11 Complies
(2)Streetscape requirements
New parking spaces shall be screened from all streets and the public realm, a minimum of
four (4) feet in height
Parking under structures is encouraged
Parking shall only be permitted in compliance with applicable BES standards for building
frontage
No parking spaces required for ground floor tenants/ uses less than 5,000 sq. ft.
(a) Off-site parking within 600’ may be used to meet parking requirements for Residential uses.
(b) Off-site parking within 1200’ may be used to meet parking requirements for non-Residential
(c) Shared parking may be used to meet parking requirements (See Article 13).
All stories above the fourth story of any building shall be set back a minimum of twelve feet
(12’) from the principal and secondard building facades.
All stories above the fifth story of any building shall be set back a minimum of twelve feet
(12’) from all Alleys.
Non-hardscape, pervious areas within the front yard shall be predominantly planted with
groundcover or flowering vegetation.
All features proposed within an existing, proposed, or planned public ROW shall comply with
requirements of the Department of Public Works.
All streetscape features must be consistent within a project and be
compatible with adjacent features erected following adoption of this
code.
Parking spaces may be leased from the city or a private landowner
2 spaces Max.
New construction resulting in additional non-residential gross floor area or residential units
shall meet T-5 Parking Standards
New surface parking shall be set back from the primary street a minimum of 25'
Primary Building
Façade
Requirements
Secondary Building
Façade Requirements
Project
Information
Applicant Sheet # NotesT-5 BES (South Burlington Land Development
Regulations, 8.14)
(a)Benches
(b) Bicycle Parking or Rack Spaces
(c )Street Tree Spacing, on center
Notes
(1)
(2)Upper Story Glazing Shall comply with the following standards:
No street construction proposed
No street construction proposed
No street construction proposed
(d) Glazing on upper stories shall not be flush with building surface material and shall be
recessed a minimum of 3 inches, except for bay windows and storefronts.
(e) Upper story windows/glazing (not doors) shall be no closer than 30 inches to building
corners (excluding bay windows and storefronts).
May be used to meet short-term
requirements of 13.14
30' Max. average
If a corner lot is 100’ or less in width along the street containing the primary building facade and
greater than two (2) times that width in depth, the required frontage buildout on the BES shall
be reduced by 50% on the street containing the secondary building facade.
(a) Upper story glazing shall be a minimum of 30 percent of the façade on the primary building
facade and 20% on secondary building facades.
(b) 80% of glazing on upper stories shall be taller than wide
(c) The required percentage shall be achieved by multiple openings. Windows may be ganged
horizontally if each grouping (maximum five per group) is separated by a mullion, column, pier
or wall section that is at least 7 inches wide.
Permitted