Loading...
HomeMy WebLinkAboutSP-22-060 - Supplemental - 0224 0268 Market Street (3)Construction Phasing PlanJanuary 11, 2023NOTE:THIS PLAN IS INTENDED ONLY TO SHOW THE SEQUENCING ASSOCIATEDWITH THE PHASED CONSTRUCTION OF THE THREE BUILDINGS, SITEIMPROVEMENTS, AND LANDSCAPING. REFER TO THE LANDSCAPE PLANSAND CIVIL PLANS FOR DESIGN INFORMATION RELATED TO UTILITIES,GRADING, PLANTINGS, SITE FURNITURE AND AMENITIES.BUILDING CONSTRUCTION & OPEN SPACE SEQUENCING:(1)BUILDING B2REQUIRED OPEN SPACE = 2,473 SF-GARDEN SPACEOPEN SPACE AREA = 1,160 SF-POCKET PLAZAOPEN SPACE AREA = 2,375 SFOPEN SPACE PROVIDED = 3,535 SF(1)BUILDING B1CUMULATIVE REQUIRED OPEN SPACE = 4,617 SF(2,473 SF + 2,144 SF = 4,617 SF)-SNIPPET/PARKLETOPEN SPACE AREA = 1,190 SFCUMULATIVE OPEN SPACE PROVIDED = 4,725 SF(1,160 SF + 2,375 SF + 1,190 SF = 4,725 SF)(3) BUILDING B3CUMULATIVE REQUIRED OPEN SPACE = 5,397 SF(2,473 SF + 2,144 SF + 780 SF = 5,397 SF)-RAIN GARDENOPEN SPACE AREA = 3,500 SFCUMULATIVE OPEN SPACE PROVIDED = 8,225 SF(1,160 SF + 2,375 SF + 1,190 SF + 3,500 SF = 8,225 SF)NOTE: REQUIRED OPEN SPACE NOTED REFLECTS REQUIRED ONSITE OPEN SPACE, ANDDOES NOT INCLUDE THE 50% OFFSITE OPEN SPACE MET WITH THE LDA OPEN SPACE CREDIT.B3B1B2COMPLETION OF THE RAIN GARDEN ANDPLANTINGS WILL BE WITH BUILDING B3POCKET PLAZA TO BE COMPLETEDWITH OCCUPANCY OF BUILDING B2RAIN GARDENGARDENSPACESSNIPPET/PARKLET