Loading...
HomeMy WebLinkAboutSP-22-060 - Plans - Non-Record - 0224 0268 Market Street (2)312312310310309311310308309MARKET STREET RECONSTRUCTIONUNDERWAY - SEE PLANS BY OTHERSFOR FINAL IMPROVEMENTS5.5' CONCRETE S I DEW A L K 10' PAVED P A T H EXISTINGHYDRANTBLDG B3339 GARDEN STREETBLDG B1268 MARKET STREETBLDG B2224 MARKET STREETMARKET STREETGARDEN S TR EE T CITY HALL / SCHOOL DRIVEWAYFUTURE PUBLIC STREET 481'4 3 4 ' 215'430'LOT BTRANSECT T-4TRANSECT T-5TRANSECT T-4TRANSECT T-5BIORETENTIONAREA20'16'22'TYPICAL STRUCTUREFOR TRASH, RECYCLING& COMPOSTING5' WIDE CONCRETE SIDEWALK5' WIDE CONCRETE SIDEWALK5' W I DE CON CRE TE S IDEW A L K5' WIDE CONCRETE SIDEWALK5' WIDE CONCRETE SIDEWALK5' WIDE CONCRETE SIDEWALKN EW 6 ' W ID E CO NC R E T E S ID EW A L KNEW 6 ' W IDE C ON CR E TE S IDEWA L K EXIST. CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW 7' WIDE CONCRETE SIDEWALKNEW 7' WIDE CONCRETE SIDEWALKE X IS T ING P A V ED PA TH E X I S T ING CO NCR E T E S ID EW A L KEXIS T I NG P A V ED PA TH E X I S T ING CON CR E TE S ID EWA L K EXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING PAVED PATHEXISTING PAVED PATH15' R15' R15' R 15' R 15' R15' R 15' R10' R15' R15' R24'24'22'24'24'22'24'24'8'8'8'5'18'9'22'NEW MOUNTABLEGRANITE CURBNEW MOUNTABLEGRANITE CURBNEW MOUNTABLECONCRETE CURB5' R5' R5' R8'8'8'5'9'18'TYP. CAST IRONDETECTABLE WARNINGPLATES(3) BIKE RACKS(6 SPACES)(4) BIKE RACKS(8 SPACES)(4) BIKE RACKS(8 SPACES)(2) BIKE RACKS(4 SPACES)(2) BIKE RACKS(4 SPACES)NEW MOUNTABLECONCRETE CURBNEW MOUNTABLECONCRETE CURBPLAZA AT STREET LEVEL OVERRAMP TO PARKING GARAGENEW CONCRETE SIDEWALKPLAZACONCRETE SIDEWALKCONCRETEPAVED PATHSIDEWALKSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILSSEE PLANS BY TJ BOYLEFOR ADDITIONAL DESIGNDETAILSTYPICAL FENCE ALONG TOPOF RETAINING WALLENCLOSURE FOR TRASH,RECYCLING & COMPOSTEXISTING CHAIN LINK FENCESEE PLANS FOR TJ BOYLEFOR ADDITIONAL DESIGNDETAILS ALONG MARKET &GARDEN STREET FRONTAGESEE PLANS FOR TJ BOYLE FORADDITIONAL DESIGN DETAILS ALONGMARKET & GARDEN STREET FRONTAGEEXISTING CURB CUT TO BE REMOVEDAND REPLACED WITH NEW CONCRETECURB AND ONSTREET PARKINGEXISTING STREET TREE TO BERELOCATED TO GREEN STRIPEXISTING STREET TREE TO BERELOCATED TO 10' OFF EMERGENCYVEHICLE ACCESSEMERGENCY VEHICLEACCESS CONNECTION (SEESHEET 11 FOR SIGNAGE)PROPOSED FUTURE 20' ACCESSEASEMENT FOR THE BENEFIT OFSCHOOL PROPERTYFUTURE PEDESTRIAN ACCESS15'20'SOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN1OVERALL SITE PLAN1-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT PROJECT DATA:ZONING DISTRICT: FORM BASED CODETRANSECT ZONE T4 & TRANSECT ZONE T5LOT DATA:LOT B = 3.20 ACRESPROPOSED BUILDING:BUILDINGS B1 & B2: MIXED USE BUILDINGSBASEMENTPARKING GARAGEFLOOR 1T-4:RESIDENTIAL UNITST-5:NON-RESIDENTIALFLOORS 2-4T-4 & T-5: RESIDENTIAL UNITSBUILDING B3: RESIDENTIALFLOORS 1-4T-4 RESIDENTIAL UNITSBUILDING STANDARDS:SEE TABLE THIS SHEETPARKING STANDARDS (T-4 & T-5)FORM BASED CODE REQUIREMENTS:VEHICLE PARKINGMAXIMUM 2 SPACES PER RESIDENTIAL UNITNO MINIMUM PARKING FOR COMMERCIAL USESBIKE PARKINGSHORT TERM BIKE PARKING1 SHORT TERM SPACE REQUIRED PER 10 DWELLING UNITS1 SHORT TERM SPACE PER 5,000 SF FOR RETAIL / RESTAURANT / OFFICELONG TERM BIKE PARKING1 LONG TERM SPACE PER 1 DWELLING UNITLONG TERM SPACES = 50% OF SHORT TERM SPACES FOR RETAIL / RESTAURANT / OFFICEOPEN SPACE REQUIREMENTS (T-4)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITOPEN SPACE REQUIREMENTS (T-5)RESIDENTIAL, 20 UNITS OR MORE·REQUIRED 60 SF PER UNITNON-RESIDENTIAL, <20,000 SF·5% OF NON-RESIDENTIAL GROSS FLOOR AREAWILLISTON ROADMARKET STREETMIDAS RDINTERSTATE 89HINESBURG ROADMARCOTTECENTRALSCHOOLLOCATION MAPNOT TO SCALEMAR Y S T R E E TDORSET STREETEXIT 14INTERSTATE 89APPLICANTTHE SNYDER-BRAVERMANDEVELOPMENT COMPANY, LLC4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VT 05482LANDOWNERSOUTH BURLINGTON CITY CENTER, LLCP.O. BOX 2204SOUTH BURLINGTON, VT 05407WHITE STSITESHEET INDEX1OVERALL SITE PLAN2EXISTING CONDITIONS PLAN3GRADING PLAN4UTILITY & LAYOUT PLAN5EPSC PLAN6LIGHTING PLAN7DETAILS - SITEWORK7ADETAILS - PUBLIC ROW SIDEWALK8DETAILS - EPSC & SITE9DETAILS - WATER10DETAILS - WATER INSETS11PAVEMENT MARKING & SIGN PLAND2STORMWATER DETAILS (BY VHB)GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.NOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE PROPOSED LAYOUTOF BUILDINGS B1, B2, & B3 ON LOT B AND THE ASSOCIATED SITEIMPROVEMENTS. SEE THE MARKET STREET AND GARDEN STREETDESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY.2.SEE THE SUBDIVISION PLAT FOR DETAILED BOUNDARY INFORMATION.STREETGARDEN#324 GARDEN STREETDOVER PLACELEGENDEXISTING PROPERTY LINE310EXISTING TREELINESIDELINE OF EASEMENTEXISTING CONTOUR#310 MARKET STREETGARDEN APARTMENTS#180 GARDEN STREETCITY HALL & LIBRARY#200 GARDEN STREETCENTRAL SCHOOLBIKE PARKINGBUILDINGDWELLINGUNITSNON-RESIDENTIALSPACESHORT TERM BIKE SPACESLONG TERM BIKE SPACESCHANGINGFACILITYUNISEXSHOWERCLOTHESLOCKERREQUIREDPROVIDEDREQUIREDPROVIDEDB17311,322 SF10 (7.3 + 2.3)1274 (73 + 1.1)76NOTREQUIREDNOTREQUIRED1REQUIREDB26211,353 SF9 (6.2 + 2.3)1263 (62 + 1.1)64NOTREQUIREDNOTREQUIRED1REQUIREDB326NONE362626NOTREQUIREDNOTREQUIREDNOTREQUIREDVEHICLE PARKINGBUILDINGDWELLINGUNITSMAXIMUMPARKINGPROPOSED PARKING SPACESGARAGESURFACETOTALB1731466155116B2621245353106B32652NONE1313TOTAL235OPEN SPACEBUILDINGDWELLINGUNITSNON-RESIDENTIALSPACEOPEN SPACEREQUIREDPROPOSED OPEN SPACELDA O/SCREDITONSITETOTALB17311,322 SF4,946 SF(4,380 + 566)2,473 SF(50% MAX.)3,500 SF RAINGARDEN+ 2,375 SFPOCKET PLAZA+ 1,160 GARDENSPACE+ 1,190 SFSNIPPET /PARKLET13,622 SFB26211,353 SF4,288 SF(3,720 + 568)2,144 SF(50% MAX.)B326NONE1,560 SF780 SF(50% MAX.)TOTAL10,794 SF5,397 SF8,225 SFZONING TRANSECT BOUNDARYEXISTING 4' CHAIN LINK FENCEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLEBUILDING ENVELOPE STANDARDS - FRONTAGE BUILDOUT:REQUIRED FRONTAGE BUILDOUTT-470% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)T-585% MINIMUM FOR PRIMARY STREETS (PRIMARY & SECONDARY BUILDING FACADE)PROPOSEDMARKET STREETTOTAL STREET FRONTAGE = 430 FT (ALL IN T-5)TOTAL FRONTAGE BUILDOUT = 370 FT (BLDG B1 = 185 FT BLDG B2 = 185 FT)TOTAL FRONTAGE BUILDOUT = 86% (370 FT / 430 FT = 86%)CITY HALL/SCHOOL DRIVEWAYTOTAL STREET FRONTAGE = 215.3 FT (T-5 = 150 FT T-4 = 65.3 FT)TOTAL FRONTAGE BUILDOUT = 191 FTTOTAL FRONTAGE BUILDOUT = 88% (191 FT / 215.3 FT = 88%)GARDEN STREETTOTAL STREET FRONTAGE = 433.7 FT (T-5 = 150 FT T-4 = 283.7 FT)TOTAL FRONTAGE BUILDOUT = 350 FT (BLDG B1 = 230 FT BLDG B3 = 120 FT)TOTAL FRONTAGE BUILDOUT = 80.7% (350 FT / 433.7 FT = 80.7%)THE PROPOSED FRONTAGE BUILDOUT FOR GARDEN STREET (350 FT) EXCEEDS THE MINIMUM REQUIRED COMPOSITE BUILDOUT (326.1 FT) FOR THE T-4 & T-5.[(150 FT X 0.85) + (283.7 FT X 0.70) = 326.1 FT)]LOT N11-16-22UPDATE B3 FOOTPRINT AND WALKSABRSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILS12-09-22REV SCHOOL ST, NON-RESID SPACE & BIKE/OPEN SPACEABR01-09-23ADD FUT. EASES TO SCHOOL, REV PARK COUNT & SCHOOL STABRNEW CONCRETE SIDEWALK SOUTH BURLINGTON CITY CENTER CATAMOUNT RUN MARKET ST. & GARDEN ST. SOUTH BURLINGTON Date Sheet number Scale Checked Drawn Survey Date Revision By These plans shall only be used for the purpose shown below: Sketch/Concept Final Local Review Construction Record Drawing 11-07-22 KB ABR B&G THE SNYDER GROUP, INC. 4076 SHELBURNE ROAD, SUITE 6 SHELBURNE, VERMONT 05482 802-985-5722 WWW.SNYDERHOMESVT.COM AS SHOWN 7A DETAILS AND SPECIFICATIONS PUBLIC ROW SIDEWALK GARDEN STREET CONCRETE SIDEWALK DETAIL 12-09-22 MARKET STREET CONCRETE SIDEWALK DETAIL MARKET STREET CONCRETE SIDEWALK FINISH AND SAWCUT JOINT DETAIL N.T.S. PROPOSED SIDEWALK EXISTING SIDEWALK CITY HALL / SCHOOL DRIVEWAY CONCRETE SIDEWALK DETAIL CITY HALL / SCHOOL DRIVEWAY CONC. SIDEWALK JOINTS, FINISH AND NOTES GENERAL NOTES: THESE DETAILS APPLY TO THE CONSTRUCTION OF CONCRETE SIDEWALKS WITHIN THE PUBLIC RIGHT OF WAY (ROW). THIS SHALL INCLUDE MARKET STREET, GARDEN STREET, AND THE CITY HALL / SCHOOL DRIVEWAY. THE MARKET STREET SIDEWALK DETAILS AND SPECIFICATIONS WERE TAKEN FROM THE CONSTRUCTION PLANS FOR THE SOUTH BURLINGTON - MARKET STREET STP 5200(17) PROJECT, AS PREPARED BY VHB AND SE GROUP. THE GARDEN STREET SIDEWALK DETAILS AND SPECIFICATIONS WERE TAKEN FROM THE CONSTRUCTION PLANS FOR THE LIBRARY + SENIOR CENTER + CITY HALL PROJECT, 180 MARKET STREET, AS PREPARED BY ENGINEERING VENTURES AND SE GROUP. SOUTH BURLINGTON CITY CENTER CATAMOUNT RUN MARKET ST. & GARDEN ST. SOUTH BURLINGTON Date Sheet number Scale Checked Drawn Survey Date Revision By These plans shall only be used for the purpose shown below: Sketch/Concept Final Local Review Construction Record Drawing 11-07-22 KB ABR B&G THE SNYDER GROUP, INC. 4076 SHELBURNE ROAD, SUITE 6 SHELBURNE, VERMONT 05482 802-985-5722 WWW.SNYDERHOMESVT.COM AS SHOWN PLAN PROFILE TURF ESTABLISHMENT SPECIFICATIONS 1. 3A. 3B. 5. 4. NORTH AMERICAN GREEN N150 OR APPROVED EQUAL 2. 1. EROSION MATTING WILL BE USED ON SLOPES STEEPER THAN 3H:1V OR AS SHOWN ON THE PLANS. 2. PREPARE SOIL BEFORE INSTALLING MATTING, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. SOIL SURFACE SHALL BE GRADED SMOOTH WITHOUT ROOTS, STONES OR OTHER PROTUSIONS THAT WILL PREVENT THE MATTING FROM BEING APPLIED IN FULL CONTACT WITH THE SOIL SURFACE. 3. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE MATTING IN A 6" DEEP X 6" WIDE TRENCH WITH APPROXIMATELY 12" OF MATTING EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE MATTING WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" PORTION OF MATTING BACK OVER SEED AND COMPACTED SOIL. SECURE MATTING OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" PART ACROSS THE WIDTH OF THE MATTING. 4. ROLL THE MATTING (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. INSURE THAT THE APPROPRIATE SIDE OF THE MATTING IS AGAINST THE SOIL SURFACE. ALL MATTING MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE MANUFACTURER'S STAPLE PATTERN GUIDE FOR THE PARTICULAR PRODUCT AND APPLICATION. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE MATTING. 5. THE EDGES OF PARALLEL MATTING MUST BE STAPLED WITH APPROXIMATELY 6" OVERLAP DEPENDING ON MATTING TYPE. 6. CONSECUTIVE MATTING SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE - WITH THE UPPER MATTING PLACED OVER THE TOP OF THE LOWER MATTING) WITH AN APPROXIMATE 12" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE MATTING WIDTH. SEED AT 5 LBS PER 1,000 SQ. FT.100 HOME RUN PERENNIAL RYEGRASS15 BLADERUNNER TALL FESCUE25 CROSSFIRE IV TALL FESCUE30 % OF MIX GRASS SEED MIX TYPE OF SEED TITANIUM TALL FESCUE25 KENTUCKY BLUEGRASS5 CONCRETE CURB (WHERE APPLICABLE) EXTEND 1" MINIMUM AND 3" MAXIMUM FROM EDGE OF GRATE (TYP) SECURE USING 3-1/2" DIA. PRESSURE DISKS AND 175# PLASTIC TIES FASTENED TO INLET GRATE (TYP) THREE DIMENSIONAL NATURAL FIBER INLET PROTECTION DEVICE (VTRANS INLET PROTECTION DEVICE, TYPE 2) INLET CASTING SECTION GRATE TOP LAYER GRATE BAR BOTTOM LAYER ZIP TIE PRESSURE DISK EROSION MATTING INSTALLATION DETAIL STABILIZED CONSTRUCTION EXIT CATCHBASIN INLET PROTECTIONEROSION LOG SECTION WOOD STAKE, DRIVEN A MINIMUM OF 12" INTO THE SOIL AND SPACED A MAXIMUM OF 4' APART EROSION LOG - SEE PLAN FOR LOCATIONS FLOW NOTES: 1.TIGHTLY ABUT THE ENDS OF THE EROSION LOGS - NO GAPS. 2.INSTALL EROSION LOGS PARALLEL TO CONTOURS AS SHOWN ON THE PLANS. 12" THE EROSION LOG SHALL BE EMBEDDED 2" INTO THE SOIL OR SHALL HAVE 3" OF HAY MULCH PLACED ON THE UPSLOPE TOE THE BOTTOM OF THE EROSION LOG SHALL BE IN CONTINUOUS CONTACT WITH THE UNDERLYING GROUND 8 DETAILS AND SPECIFICATIONS EPSC & SITE DETAILS MAINTAIN POSITIVE DRAINAGE TO INLET GRATENEMA 4X (UL LISTED) JUNCTION BOX STAINLESS STEEL PIPE SUPPORT (TYP.) 12" SUMP MONOLITHIC BASE MINIMUM 2' HIGH 3" SCH 40 PVC FM 6 FT X 6 FT X 6 FT (INSIDE DIMENSIONS) PRECAST REINFORCED 5000 PSI CONCRETE STRUCTURE 1/4" WEEP HOLE SECTION PUMP UNION USE WATERPROOF GROUT TO SECURE FRAME TO CONCRETE COVER HEAVY DUTY CAST IRON FRAME AND COVER MARKED STORM LIFT CHAIN OR CABLE PUMP ON MIN. 6" OF 3/4" CRUSHED STONE 4' (WITH INSULATION) 3" SCH 80 PVC PRECAST CONCRETE BLOCKS OR STAND TO SUPPORT PUMP AND PROVIDE A MINIMUM 18" SUMP FOR SEDIMENT PUMP OFF(157 GALLON DOSE) ALARM ON GATE VALVE 30" PROVIDE HOOK FOR CHAIN 24" HEAVY DUTY CAST IRON FRAME AND GRATE UNDISTURBED EARTH FLOAT HANGER NTS PROVIDE 2" THICK RIGID INSULATION OVER THE TOP AND ALL SIDES OF THE TANK TO A DEPTH OF 4 FEET STORMWATER PUMP STATION O-RING RUBBER GASKET IN ACCORDANCE WITH ASTM C-443 AND ASTM C-361 AT ALL JOINTS OR BUTYL ROPE (TYP.) STORMWATER PUMP STATION SPECIFICATIONS 1.THE PUMP STATION TANK SHALL HAVE SUFFICIENT CAPACITY TO ACCOMMODATE THE REQUIRED PUMP(S), AND THE SPECIFIED DOSE VOLUME. 2.THE PUMP STATION STRUCTURE SHALL BE A WATERTIGHT, STEEL-REINFORCED, 5,000 PSI, PRE-CAST CONCRETE STRUCTURE DESIGNED BY H-20 LOADING. 3. CONSTRUCTION OF THE PUMP STATION MAY REQUIRE TEMPORARY SHEETING AND/OR DEWATERING. THE CONTRACTOR SHALL UTILIZE APPROPRIATE METHODS TO INSURE DRY CONDITIONS DURING INSTALLATION OF THE STRUCTURE. THE COST OF TEMPORARY SHEETING AND/OR DEWATERING SHALL BE INCIDENTAL TO THE COST OF THE PUMP STATION. 4.THE PUMP STATION SHALL BE CONSTRUCTED TO MINIMIZE THE RISK OF FREEZING OF EFFLUENT IN THE PIPES OR STRUCTURE. THIS INCLUDES BUT IS NOT LIMITED TO PROVIDING A DRAIN HOLE TO ALLOW THE FORCE MAIN TO DRAIN BACK INTO THE STRUCTURE BETWEEN DOSES. 5.ALL PIPING WITHIN THE PUMP STATION SHALL BE SCHEDULE 80 PVC. THE CONTRACTOR MAY TRANSITION TO SCHEDULE 40 PVC BEYOND THE EXTERIOR OF THE PUMP STATION. 6.ALL PIPE PENETRATIONS IN THE PUMP STATION STRUCTURE SHALL HAVE RUBBER BOOTS FOR WATERTIGHT SEALS AROUND THE PIPES. 7.BACKFILL SIDES AND TOP OF TANK WITH SAND OR GRAVEL. ALL BACKFILL MATERIAL AROUND THE TANK SHALL BE THOROUGHLY COMPACTED TO NOT LESS THAN 95% OF MAXIMUM DRY DENSITY AS DETERMINED BY THE AASHTO-T-99 STANDARD PROCTOR. 8.ALL ELECTRICAL WORK SHALL MEET THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE AND MATERIALS SHALL MEET U.L. APPROVAL. CONDUIT SHALL BE PROVIDED AS REQUIRED BETWEEN THE PUMP STATION, THE ELECTRICAL SOURCE AND THE CONTROL PANEL. 9.AT A MINIMUM, THE FOLLOWING ITEMS SHALL BE INCLUDED WITH THE PUMP STATION: -ALARM, FLOATS, AND DUPLEX PUMP CONTROLS -PUMP RUN TIME METER FOR EACH PUMP -LIGHT AND AUDIBLE ALARMS -MAIN DISCONNECT SWITCH 10.PUMP SPECIFICATIONS HEAD LOSSES 2" PVC @ 75 GPM 100' OF FORCE MAIN = 2 FT STATIC LIFT =14 FT VALVES AND FITTINGS = 1 FT TOTAL HEAD LOSS =17 FT MIN. DISCHARGE RATE =75 GPM USE TWO (2) DUAL ALTERNATING DEWATERING PUMPS, SINGLE PHASE, 208 VOLTS, MINIMUM CAPACITY: 75 GPM @ 17 FT TDH, CAPABLE OF PASSING 2" SPHERICAL SOLIDS. 11.TESTING: THE CONTRACTOR AND THE ENGINEER SHALL BE PRESENT DURING START-UP. THE CONTRACTOR SHALL PROVIDE A WATER SOURCE TO PERFORM A FULL OPERATIONAL CHECK OF THE PUMP STATION, INCLUDING ALL FLOAT FUNCTIONS, ALARMS, AND INDICATOR LIGHTS. THE PUMPS SHALL BE FIELD-TESTED TO INSURE THE PUMPING CAPACITY MEETS THE PROJECT REQUIREMENTS. 6"6" THICK CONCRETE SLAB IN ADDITION TO STANDARD PRECAST STRUCTURE DIMENSIONS NOTE: FOR FLOATATION CALCULATIONS, THE WEIGHT OF THE PRECAST STRUCTURE IS ASSUMED TO BE 21,600 POUNDS (BASED UPON 6" THICK WALLS AND 8" THICK TOP AND BASE). IF THE ACTUAL WEIGHT OF THE STRUCTURE IS LESS, NOTIFY THE ENGINEER, PRIOR TO FABRICATION. 2" RIM = 302.60 7" PLAN VIEW HEAVY DUTY CAST IRON FRAME AND GRATE TYPICAL HEAVY DUTY CAST IRON FRAME AND COVER OR APPROVED EQUAL NEMA 4X (UL LISTED) JUNCTION BOX PVC CONDUIT(S) TO CONTROL PANEL AND POWER SOURCE (SIZE AS REQUIRED) ALARM LIGHT AND HORN TO BE WALL MOUNTED IN PARKING GARAGE. ALARM TO BE ON SEPARATE CIRCUIT BREAKER FROM PUMP. 6 FT X 6 FT SQUARE (INSIDE DIMENSIONS) PRECAST REINFORCED 5000 PSI CONCRETE STRUCTURE 6' 6'RETAINING WALL2' MIN. 6" UD 6" UDUNDERDRAIN INV = 298.60 12" MIN. STAKES TO BE DRIVEN MIN. 12" INTO GROUND HARDWOOD STAKE FILTER FABRIC 6" FABRIC TO BE KEYED 6" INTO GROUND 6" TOP VIEW OF JOINT JOINING TWO ROLLS OF SILT FENCE NOTES 1) SILT FENCE INSTALLED WITHIN 100 FEET OF A WETLAND, STREAM, OR RECEIVING WATER SHALL BE REINFORCED WITH WOVEN WIRE FENCE (MIN. 14 GAUGE WIRE WITH 6" MAX. MESH SPACINGS) 2) USE ONLY MANUAL METHODS OF INSTALLATION AND CLEANING WITHIN WETLAND AND BUFFER ZONE. 3) PRIOR TO BEGINNING OF CONSTRUCTION OR EARTHMOVING, THE CONTRACTOR SHALL INSTALL A CONTINUOUS SILT FENCE AT THE LIMIT OF DISTURBANCE SHOWN ON THE SITE PLAN. 4) FROZEN MATERIAL SHALL NOT BE USED TO KEY IN THE BOTTOM OF THE SILT FENCE. IF NECESSARY, GRANULAR BORROW SHALL BE USED BY THE CONTRACTOR TO KEY IN THE SILT FENCE RATHER THAN FROZEN NATIVE MATERIAL. 5) THE CONTRACTOR SHALL INSTALL SILT FENCE AROUND THE PERIMETER OF TOPSOIL STOCKPILES AND AT OTHER LOCATIONS AS NEEDED. TEMPORARY SILT FENCE GROUND 36" MIN. HARDWOOD STAKE (MAX. 8' O.C.) 4-FT HIGH MIRAFI 100X FILTER FABRIC OR EQUAL SEE NOTE 1 FOR REINFORCING WHERE SILT FENCE IS LOCATED WITHIN 100 FEET OF A WETLAND, STREAM, OR RECEIVING WATER 3" SCH 40 PVC FM 2' 4" TOPSOIL AND SEED TO P S O I L 12" MIN.1 2 1 2 TO P S O I L 3 18" 12" 1 TYPE I STONE PER VAOT 706.04 (MIN. 12" DEEP) MIRAFI 500X FABRIC OR EQUAL UNDER AND TO SIDES OF STONE. STONE SWALE / OUTFALL 6" UD UNDERDRAIN INV = 298.60 UNDERDRAIN INV = 298.60 3" SCH 40 PVC FM COCONUT FIBER INLET PROTECTION SILT SACK INLET PROTECTION NOTES: 1.SILT SACKS SHALL BE INSTALLED IN CATCHBASINS ON STREETS OR DRIVES THAT ARE OPEN TO PUBLIC TRAFFIC. 2.SILT SACKS SHALL REPLACE COCONUT FIBER INLET PROTECTION WHEN THE ADJACENT PAVED OR GRAVEL SURFACE IS SUBJECT TO PLOWING / WINTER MAINTENANCE. 3.THE SILT SACK SHALL BE EMPTIED WHEN SEDIMENT DEPTH REACHES EXPANSION RESTRAINT 4.SILT SACK PRODUCT SHALL BE MANUFACTURED BY ACF ENVIRONMENTAL, DANDY PRODUCTS, TERRAFIX GEOSYNTHETICS, OR APPROVED EQUAL. NOTES: 1.FIBER INLET PROTECTION MANUFACTURERS SHALL BE BLOCKSOM, INDIAN VALLEY INDUSTRIES, ROLANKA, OR APPROVED EQUAL. 2.COCONUT FIBER INLET PROTECTION SHALL NOT BE INSTALLED ON STREETS OPEN TO PUBLIC TRAFFIC. 3.COCONUT FIBER INLET PROTECTION SHALL BE REPLACED WITH SILT SACKS WHEN THE ADJACENT PAVED OR GRAVEL SURFACE IS SUBJECT TO PLOWING. NOMINAL SILT SACK SIZE = 24" X 24" 01-23-23 REV. INLET PROT DET., POLE LT TO LIGHT. PLAN, ADD FILTER BAG ABR FLOW FILTER BAG SLOPE 5% MAX. 8" MIN. MULCH, LEAF/WOOD COMPOST, WOODCHIPS, SAND, OR STRAW BALES CONSTRUCTION SPECIFICATIONS 1.TIGHTLY SEAL SLEEVE AROUND THE PUMP DISCHARGE HOSE WITH A STRAP OR SIMILAR DEVICE. 2.PLACE FILTER BAG ON SUITABLE BASE (E.G., MULCH, LEAF/WOOD COMPOST, WOODCHIPS, SAND, OR STRAW BALES) LOCATED ON A LEVEL OR 5% MAXIMUM SLOPING SURFACE. DISCHARGE TO A STABILIZED AREA. EXTEND BASE A MINIMUM OF 12 INCHES FROM EDGES OF BAG. 3.CONTROL PUMPING RATE TO PREVENT EXCESSIVE PRESSURE WITHIN THE FILTER BAG IN ACCORDANCE WITH THE MANUFACTURER RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE PUMPING RATE. 4.REMOVE AND PROPERLY DISPOSE OF FILTER BAG UPON COMPLETION OF PUMPING OPERATIONS OR AFTER BAG HAS REACHED CAPACITY, WHICHEVER OCCURS FIRST. SPREAD THE DEWATERED SEDIMENT FROM THE BAG IN AN APPROVED UPLAND AREA AND STABILIZE WITH SEED AND MULCH BY THE END OF THE WORK DAY. RESTORE THE SURFACE AREA BENEATH THE BAG TO ORIGINAL CONDITION UPON REMOVAL OF THE DEVICE. 5.USE NONWOVEN GEOTEXTILE WITH DOUBLE STITCHED SEAMS USING HIGH STRENGTH THREAD. SIZE SLEEVE TO ACCOMMODATE A MAXIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE BAG MUST BE MANUFACTURED FROM A NONWOVEN GEOTEXTILE THAT MEETS OR EXCEEDS MINIMUM AVERAGE ROLL VALUES (MARV) FOR THE FOLLOWING: GRAB TENSILE 250 LB ASTM D-4632 PUNCTURE 150 LB ASTM D-4833 FLOW RATE 70 GAL/MIN/FT²ASTM D-4491 PERMITTIVITY (SEC-1)1.2 SEC-1 ASTM D-4491 UV RESISTANCE 70% STRENGTH @ 500 HOURS ASTM D-4355 APPARENT OPENING SIZE (AOS) 0.15-0.18 MM ASTM D-4751 SEAM STRENGTH 90%ASTM D-4632 6.REPLACE FILTER BAG IF BAG CLOGS OR HAS RIPS, TEARS, OR PUNCTURES. DURING OPERATION KEEP CONNECTION BETWEEN PUMP HOSE AND FILTER BAG WATER TIGHT. REPLACE BEDDING IF IT BECOMES DISPLACED. ELEVATION STRAP PUMP DISCHARGE HOSE PLAN VIEW FILTER BAG FLOW STRAP 12 IN MIN. FILTER BAG DETAIL NTS DRAFT 01-24-23 SOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN9DETAILS AND SPECIFICATIONSWATERWATER DISTRIBUTION SPECIFICATIONSALL WORK TO BE PERFORMED IN ACCORDANCE WITH THECHAMPLAIN WATER DISTRICT SPECIFICATIONS AND DETAILS FORTHE INSTALLATION OF WATER LINES AND APPURTENANCES(LATEST VERSION). THE SBWD SHALL BE NOTIFIED PRIOR TOBACKFILLING TO INSPECT ALL JOINTS, FITTINGS, MAIN LINE TAPS,APPURTENANCES AND WATER LINE CROSSINGS.BUILDING SLABBACKFLOW PREVENTIONDEVICESPRINKLER SYSTEM PIPINGSEAL SLAB PENETRATIONWITH WATERSTOPREDUCER(AS REQ'D)CL52 DUCTILE IRONFLANGE & SPIGOT PIECEMECHANICAL JOINT WITHGRIP RING RESTRAINT (TYP.)(2) 3/4" Ø THREADED RODPIPE RESTRAINTSTHRUST BLOCK(SEE DETAIL)MIN. 12" VERTICAL SEPARATIONBETWEEN BOTTOM OF FOOTINGAND TOP OF WATER PIPELAST JOINT TO BE NOCLOSER THAN 5' TOFOUNDATION WALLCL52 DI PIPEFINISH GRADE6' BURY DEPTH OR INSULATE PER TYPICAL WATER TRENCH DETAILUNDER FOOTING / THROUGH SLABCL52 DI PIPE12"<10'BACKFLOW PREVENTION DEVICEDOMESTIC WATER LINEBUILDING SLABSHUT OFFMETER TO BE OBTAINED FROM MUNICIPALWATER DEPARTMENT. CONFIRM SIZE WITHFINAL MECHANICAL PLANSSEAL SLAB PENETRATIONWITH WATERSTOP2" TYPE 'K' COPPERMIN. 12" VERTICAL SEPARATIONBETWEEN BOTTOM OF FOOTINGAND TOP OF WATER PIPEFINISH GRADE6' BURY DEPTH OR INSULATE PER TYPICAL WATER TRENCH DETAILDOMESTIC WATER SERVICE ENTRANCE DETAILNTS12"SEE MECHANICAL PLANS FOR INTERIORPLUMBING DESIGN, INCLUDING PIPE SUPPORT2" TYPE 'K' COPPERWATER SERVICE NOTES:1.REFER TO MECHANICAL PLANS FOR INTERIOR POTABLE WATER AND SPRINKLER PIPING DETAILS ANDSPECIFICATIONS.2.ALL DOMESTIC SERVICES AND FIRE SPRINKLER SYSTEMS THAT ARE CONNECTED TO THE PUBLIC WATER SYSTEMSHALL BE PROTECTED WITH A BACKFLOW PREVENTION ASSEMBLY AND AN APPROPRIATE THERMAL EXPANSIONSYSTEM IN COMPLIANCE WITH THE REQUIREMENTS OF THE SOUTH BURLINGTON WATER DEPT. AND THE VERMONTPLUMBING CODE. THE WATER METER SHALL MEET THE REQUIREMENTS OF THE SOUTH BURLINGTON WATER DEPT.12-16-22REVISE WATER SERVICE DETAILS TO ADD WALL ENTRY OPTIONABRSEAL SLAB PENETRATIONWITH WATERSTOP2" TYPE 'K' COPPERALTERNATE ENTRY OPTIONWITH SERVICE PIPING UNDERFOOTING AND THROUGH SLABBUILDING SLABSEAL SLAB PENETRATIONWITH WATERSTOPREDUCER (AS REQ'D)FINISH GRADE6' BURY DEPTH OR INSULATE PER TYPICAL WATER TRENCH DETAILFIRE PROTECTION SERVICE ENTRANCE DETAILNTSWATER SERVICE NOTES:1.THE WATER SERVICE SHALL ENTER THROUGH THE FOUNDATION WALL UNLESS THE ELEVATION OF THE EXISTINGWATERMAIN IS SUCH THAT THE SERVICE CAN ENTER UNDER THE FOUNDATION FOOTING WITHOUT, OR WITHMINIMAL, VERTICAL BENDS.2.REFER TO MECHANICAL PLANS FOR INTERIOR POTABLE WATER AND SPRINKLER PIPING DETAILS ANDSPECIFICATIONS.3.ALL DOMESTIC SERVICES AND FIRE SPRINKLER SYSTEMS THAT ARE CONNECTED TO THE PUBLIC WATER SYSTEMSHALL BE PROTECTED WITH A BACKFLOW PREVENTION ASSEMBLY AND AN APPROPRIATE THERMAL EXPANSIONSYSTEM IN COMPLIANCE WITH THE REQUIREMENTS OF THE SOUTH BURLINGTON WATER DEPT. AND THE VERMONTPLUMBING CODE. THE WATER METER SHALL MEET THE REQUIREMENTS OF THE SOUTH BURLINGTON WATER DEPT.THROUGH FOUNDATION WALLBACKFLOWPREVENTION DEVICESPRINKLER SYSTEMPIPINGCL52 DUCTILE IRONFLANGE & SPIGOT PIECECL52 DI PIPE(2) 3/4" Ø THREADEDROD PIPE RESTRAINTSDI PIPE RESTAINING GLAND + 313.88WWWTSWWTSWW GSSOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN10DETAILS AND SPECIFICATIONSWATER & INSETSALL WORK TO BE PERFORMED IN ACCORDANCE WITH THECHAMPLAIN WATER DISTRICT SPECIFICATIONS AND DETAILS FORTHE INSTALLATION OF WATER LINES AND APPURTENANCES(LATEST VERSION). THE SBWD SHALL BE NOTIFIED PRIOR TOBACKFILLING TO INSPECT ALL JOINTS, FITTINGS, MAIN LINE TAPS,APPURTENANCES AND WATER LINE CROSSINGS.505101" = 5 FEETNEW CONCRETE SIDEWALK BUILDING B1NEW 2" CORPORATION &TAPPING SADDLENEW 2" CURBSTOPNEW 2" TYPE 'K' COPPERDOMESTIC WATER SERVICE6" CL52 DI WATER SERVICE(FIRE PROTECTION)BUILDING B1WATER SERVICE INSETGARDENSTREETEXISTING 12" CL52 DI WATEREXIST. CONCRETE SIDEWALKEXISTING CONCRETE CURBNOTE: NO CONNECTION OR TAPS SHALL BE LOCATED WITHIN 3 PIPE DIAMETERS OF ANY OTHER FITTING OR PIPE JOINT.505101" = 5 FEETBUILDING B2NEW 2" CORPORATION & TAPPINGSADDLE IN NEW 6" DI WATER LINENEW 2" TYPE 'K' COPPERDOMESTIC WATER SERVICE6" CL52 DI WATER SERVICE(FIRE PROTECTION)BUILDING B2 - WATER SERVICE INSETEXIST. CONCRETESIDEWALKEXISTING 8" DI WATERNOTE: FOR THE WATER SYSTEM, NO CONNECTION OR TAPS SHALL BE LOCATED WITHIN 3 PIPE DIAMETERS OF ANY OTHER FITTING OR PIPE JOINT.EXISTING 6"GATE VALVEEXISTING 6" CL52 DIWATER STUBN E W C O N C R E T E S I D E W A L KNEW CONCRETESIDEWALKEXISTING 6" CL52 DIWATER STUBEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW 45° BEND ANDCONCRETE THRUSTBLOCKEXIST. TELECOM CONDUITNEW 45° BEND ANDCONCRETE THRUST BLOCKNEW 2" CURBSTOP. INSTALLCAST IRON VALVE BOX WITHFLANGE OVER CURB BOXNEW 6" SCH40 PVC THROUGHFOUNDATION WALLSEWER CLEANOUT6" X 6" SDR35 PVC WYE6" SDR35 PVC SEWER SERVICES = 0.01505101" = 5 FEETN EW C O N C R E T E S I D EW A L K BUILDING B3NEW 2" CORPORATION &TAPPING SADDLE IN NEW8" DI WATER LINENEW 2" TYPE 'K'COPPER DOMESTICWATER SERVICE6" CL52 DI WATER(FIRE PROTECTION)BUILDING - B3 WATER SERVICE INSETG A R D E N S T R E E T EXISTING 12" CL52 DI WATER NEW CONCRETE SIDEWALKNEW 6" CL52 DIE X I S T I N G C O N C R E T E C U R BNOTE: NO CONNECTION OR TAPS SHALL BE LOCATED WITHIN 3 PIPE DIAMETERS OF ANY OTHER FITTING OR PIPE JOINT.MIN. 10' SEPARATIONMIN. 10' SEPARATIONCUT & CAP GAS SLEEVE - REMOVEPORTION OF EXIST. GAS SLEEVE INCONFLICT WITH NEW WATER SERVICEAND LIGHT BASE.12"X8" TAPPING SLEEVEAND VALVE8" CL52 DI WATER8"X8" TEETYP. 8"X6" REDUCERAND 6" GATE VALVEEXIST. 8" SDR35 PVC SEWERAPPROXIMATE LOCATION OFEXISTING SEWER SERVICE STUBNEW 8" SDR35 PVC SEWERSEWERCLEANOUT8" SDR35 PVC SEWERNEW 2" CURBSTOP& CURB BOX(TO NEW HYDRANT)11-16-22UPDATE BUILDING B3 FOOTPRINTABRFDCFDCFDC12-09-22ADD FIRE DEPT CONNECTIONSABRAPPROXIMATE LOCATIONOF FIRE DEPT CONNECTIONAPPROXIMATELOCATION OF FIREDEPT CONNECTIONFOR ALL BUILDINGS, THE FIRE DEPARTMENT CONNECTION SHALL BEKEPT CLEAR OF LANDSCAPING OR OTHER OBSTRUCTIONS WITH A 6'WIDE PATH FROM THE PUBLIC WAY, CENTERED ON THE FDCRELOCATED STREETLIGHT12-16-22REV B1 & B2 WATER SERVICES PER SBWD REVIEWABRREMOVE PORTION GAS SLEEVENEW 6" GATE VALVETAPPING SADDLE REQUIREMENTS (3/4” THROUGH 2”):1.BODIES SHALL BE DUCTILE IRON PER ASTM A536.2.BODIES SHALL HAVE A FUSION BONDED EPOXY OR APPROVEDEQUAL FINISH.3.BODY THREADS SHALL BE COUNTERCLOSKWISE PER AWWA C800.4.BANDS ARE TO BE CONSTRUCTED OF GRADE 304 STAINLESSSTEEL AND HAVE A MINIMUM WIDTH OF 2”.5.BOLTS AND NUTS ARE TO BE CONSTRUCTED OF GRADE 304STAINLESS STEEL.6.TAPPING SADDLES SHALL BE USED ONLY FOR THE FOLLOWING:DUCTILE IRON AND CAST IRON PIPE FOR TAPS 1 ½” OR 2” IN SIZE,AND ALL PVC AND AC PIPE. DIRECT TAPS SHALL BE USED FOR ¾”AND 1” TAPS ON DUCTILE IRON AND CAST IRON.7.A CONNECTION MADE TO A PIPE THAT REQUIRES A TAPPINGSADDLE OR THAT IS NOT DUCTILE IRON WILL HAVE A BODY WITH ASUITABLE OUTLET, SEAL, AND SUITABLE MEANS FOR ATTACHMENTTO THE MAIN. THE BODY SHALL BE MADE TO CONFORM TO THEOUTSIDE CONFIGURATION OF THE MAIN. THE SERVICE SADDLESHALL BE DESIGNED TO PROVIDE A DRIP TIGHT CONNECTION. THEBODY SHALL BE TEFLON OR EPOXY COATED WITH STAINLESSSTEEL STRAP(S), BOLTS, NUTS, AND MECHANISM FOR ATTACHINGTO THE PIPE BARREL.8.SERVICE SADDLES WITH A TWO INCH (2”) OUTLET SHALL NOT BEUSED ON A TWO INCH (2”) MAIN.9.SERVICE SADDLES MUST MEET MANUFACTURERS’ GUIDELINESAND RECOMMENDATIONS FOR SPECIFIC PIPE MATERIALS.12" X 8" TAPPING SLEEVE &VALVE (FIRE PROTECTION)SEE NOTE BELOW PT = 48+29.19( + 3 1 2 . 9 0 )310310310UDU D GU D UD F M UD U D U D UDUD UD U D UDU D UD U D UD UD U D UDUDFM FM SOUTH BURLINGTON (SEE NOTE 9)EXISTING EDGE OF PAVEMENTOF SCHOOL DRIVEWAYMARKET STREETMARKET STREET RECONSTRUCTIONUNDERWAY - SEE PLANS BY OTHERSFOR FINAL IMPROVEMENTSGARDEN S TREE T CI TY HA L L / SCHOO L DR I V EWAY SOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN111" = 20'2002040801" = 20 FEETPAVEMENT MARKINGAND SIGN PLAN30" X 30"SIGN R1-1STOPGENERAL NOTES:1.ALL PAVEMENT MARKINGS WITHIN THE GARDEN STREET RIGHT OF WAY SHALL BEDURABLE POLYUREA (SEE VTRANS SPECIFICATION SECTION 708)2.TEMPORARY PAVEMENT MARKINGS ON BASE PAVEMENT MAY BE PAINT.3.ALL SIGNS SHALL BE INSTALLED ON 2" SQUARE STEEL POSTS WITH ANCHORS.4.ALL SIGNS SHALL BE INSTALLED WITH MINIMUM 7 FEET CLEARANCE BETWEEN THEBOTTOM OF THE SIGN AND FINISH GRADE.5.EXCEPT WHERE SHOWN OTHERWISE ON THIS SHEET, WHERE EXISTING PAVEMENTMARKINGS CONFLICT, THEY SHALL BE REMOVED BY GRINDING IN ACCORDANCE WITHVTRANS SPECIFICATION 646.12.SIGN LEGENDASTOP SIGN - STREETSTOP SIGN - STREETPAVEMENT MARKING LEGENDJRESERVED PARKING SYMBOL, WHITE PAINT4" WHITE LINE, PAINT24" WIDE STOP BAR, DURABLE POLYUREAKLMCROSSWALK, DURABLE POLYUREA (24" WIDE, BLOCK STYLE)ABR7-8 (MODIFIED) SIGN (FACING EACH SPACE, SINGLE SIGN POST)SEE DETAIL SHEET 7CR7-8 (MODIFIED) SIGN WITH R7-8A (FACING EACH SPACE, SINGLE POST)SEE DETAIL SHEET 7D'NO PARKING' R8-3 SIGN18" X 18"SIGN R8-3NO PARKING SIGNDPNCROSSWALK, PAINTED (24" WIDE, BLOCK STYLE)JJKKJJJJKKJLNNNNNNNJJKJABBCCCDDDDEDO NOT ENTER & AUTHORIZED VEHICLES ONLY (SINGLE POST)DO NOT ENTER / AUTHORIZED VEHICLES ONLYEDEEDDO NOTENTERR5-130" X 30"R5-1130" X 24"VEHICLESAUTHORIZEDONLY11-16-22REVISE SIGNS AT EMERGENCY ACCESS DRIVEABRL12-09-22ADJ PARKING SIGNS, REV PAVE MARK/SIGNS ON SCHOOL DRIVEABRJSEE INSET FOR SIGN &PAVEMENT MARKINGREMOVALMILL EXISTING PAVEMENT TO A DEPTH OF1" AND REPLACE WITH TYPE IV BITUMINOUSCONCRETE PAVEMENT TO ELIMINATEEXISTING PAVEMENT MARKINGSEXISTING LINESTRIPING TO REMAINJJJJJREMOVE (2) EXISTING SIGNS(NO PARKING ANY TIME)INSET - PAVEMENT MARKING& SIGN REMOVALEXISTING STOPSIGN TO REMAINDEXISTING STREET TREE TO BERELOCATED TO 10' OFF EMERGENCYVEHICLE ACCESSK12-27-22REV SCHOOL DRIVE/ADD ACCESSIBLE SPACE, SW ACROSS DRIVEABRB Typical Section - Bioretention with Infiltration N.T.S.Source: VHB LD_160 1/16 Infiltration System IC-1 N.T.S.Source: VHB LD_ 11/16 INFILTRATION SYSTEM IC-1 ACCEPTABLE FILL MATERIALS MATERIAL LOCATION DESCRIPTION AASHTO MATERIAL CLASSIFICATIONS COMPACTION / DENSITY REQUIREMENT D FINAL FILL: FILL MATERIAL FOR LAYER 'D' STARTS FROM THE TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT PAVEMENT SUBBASE MAY BE PART OF THE 'D' LAYER ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. N/A PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PREPARATION REQUIREMENTS. C INITIAL FILL: FILL MATERIAL FOR LAYER 'C' STARTS FROM THE TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT SUBBASE MAY BE A PART OF THE 'C' LAYER. GRANULAR WELL-GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR PROCESSED AGGREGATE. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS LAYER. AASHTO M145¹ A-1, A-2-4, A-3 - OR - AASHTO M43¹ 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 BEGIN COMPACTION AFTER 12" OF MATERIAL OVER THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN 6" MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR PROCESSED AGGREGATE MATERIALS. ROLLER GROSS VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC FORCE NOT TO EXCEED 20,000 lbs (89 kN). B EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER ABOVE. CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE DISTRIBUTION BETWEEN 3/4-2 INCH AASHTO M43¹ 3, 4 NO COMPACTION REQUIRED. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. CLEAN, CRUSHED, ANGULAR STONE, NOMINAL SIZE DISTRIBUTION BETWEEN 3/4-2 INCH AASHTO M43¹ 3, 4 3/$7(&203$&72552//72$&+,(9($)/$7685)$&(࢖ࢗ 2' MIN 8' MAX 6" MIN 12" TYP 34" 6" MIN 16" 36" (MIN. SEPARATION) 308.0' 311.0' 311.5' STORMTECH SC-310 CHAMBER (TYP) PAVEMENT LAYER (TO BE DESIGNED BY SITE DESIGN ENGINEER) ADS GEOSYNTHETICS 601T NON WOVEN GEOTEXTILE (OR APPROVED EQUAL) WRAPPED AROUND CLEAN, CRUSHED ANGULAR STONE IN LAYERS A & B SC-310 END CAP APPROVED ONSITE NATIVE SAND OR ASTM 33 CONCRETE SAND COMPACTED IN 12" LIFTS SEASONAL HIGH GROUNDWATER TABLE EXISTING NATIVE SUBGRADE 1 3 NOTES: 1.BIORETENTION SOIL MIX SHALL BE "BUCKET TAMPED" ONLY. DO NOT OVER COMPACT. 2.REFER TO PLANTING PLANS FOR PLANTING DETAILS, VARIETIES, AND LOCATIONS. 3.REFER TO THE BIORETENTION SOIL MIXTURE SPECIFICATION - THIS SHEET. 4.PRIOR TO ANY RUNOFF BEING DIRECTED INTO THE BIORETENTION AREA THE ENTIRE CONTRIBUTING DRAINAGE AREA SHALL BE STABILIZED, A DENSE AND VIGOROUS VEGETATIVE COVER SHALL BE ESTABLISHED OVER THE CONTRIBUTING PERVIOUS DRAINAGE AREAS, AND IMPERVIOUS AREA CONSTRUCTION SHALL BE COMPLETED.24" MIN.3 INCHES WOOD MULCH MAINTAIN 6" CURB REVEAL AROUND BIORETENTION AREA GRANULAR BACKFILL PER PROJECT SPECIFICATIONS 18" CONCRETE SAND (ASTM 33) NATIVE SOIL TOPSOIL REMOVED CONCRETE SAND (ASTM 33) OR APPROVED CLEAN NATIVE SANDY SOIL SEASONAL HIGH GROUNDWATER TABLE Bioretention Soil Mixture Specification: 1.DESCRIPTION. 1.1.THIS WORK SHALL CONSIST OF FURNISHING AND INSTALLING SOIL MIXTURE IN THE BIORETENTION BASIN WHERE INDICATED ON THE CONSTRUCTION DOCUMENTS. WORK SHALL BE CONSISTENT WITH VTRANS STANDARD SPECIFICATIONS SECTION 651, WITH THE ADDITIONS AND MODIFICATIONS BELOW. 2.MATERIALS. 2.1.BIORETENTION SOIL SHALL CONSIST OF LOOSE, FRIABLE SOIL, FREE OF ICE, SNOW, AND RUBBISH WITH NO ADMIXTURE OF REFUSE OR MATERIAL TOXIC TO PLANT GROWTH. 2.2.THE FINAL BIORETENTION SOIL MIXTURE SHALL MEET THE FOLLOWING PARAMETERS: PH 5.5 - 7.5 MOISTURE CONTENT 25% - 55% PHOSPHORUS INDEX 4-14 PPM 2.3.PHOSPHORUS INDEX SHALL BE DETERMINED BY MEHLICH -3 TESTING METHOD OR APPROVED EQUIVALENT. 2.4.THE BIORETENTION SOIL MIXTURE SHALL BE A UNIFORM MIX, FREE OF STONES, STUMPS, ROOTS OR OTHER SIMILAR OBJECTS LARGER THAN ONE (1) INCH IN DIAMETER EXCLUDING MULCH. 2.5.NO OTHER MATERIALS OR SUBSTANCES SHALL BE MIXED OR DUMPED WITHIN THE BIORETENTION AREA THAT MAY BE HARMFUL TO PLANT GROWTH, OR PROVE A HINDRANCE TO THE PLANTING OR MAINTENANCE OPERATIONS. 2.6.THE BIORETENTION SOIL MIXTURE SHALL BE FREE OF ALL INVASIVE SPECIES, INCLUDING KNOTWEED, PHRAGMITES, PURPLE LOOSESTRIFE, BERMUDA GRASS, QUACKGRASS, JOHNSON GRASS, MUGWORT, NUTSEDGE, POISON IVY, CANADIAN THISTLE, TEATHUMB, OR OTHER NOXIOUS WEEDS. 2.7.THE BIORETENTION SOIL SHALL MEET THE FOLLOWING REQUIREMENTS BY PERCENT OF TOTAL WEIGHT: SAND 85-88 SILT (0.002 - 0.05 MM)8-12 CLAY (LESS THAN 0.002 MM)0-2 COMPOST 3-5 2.8.SAND - THE SAND SHALL CONSIST OF CLEAN, INERT, HARD, DURABLE GRAINS OF QUARTZ OR OTHER HARD, DURABLE ROCK, FREE FROM LOAM OR CLAY, SURFACE COATINGS AND DELETERIOUS MATERIALS AND MEETING THE GRADATION REQUIREMENTS OF VTRANS SPECIFICATIONS, TABLE 704.01A. 2.9.COMPOST - THE COMPOST SHALL BE DERIVED FROM ORGANIC WASTES SUCH AS LEAF AND YARD WASTE RESIDUES. NO BIO-SOLIDS OR COMPOST DERIVED FROM FOOD WASTES MAY BE USED. COMPOST SHALL BE A HIGHLY ORGANIC DARK BROWN TO BLACK SPONGY RESIDUE RESULTING FROM THE WELL-AERATED COMPOSTING OF DECIDUOUS ORGANIC MATERIALS, FREE OF PLANTS AND THEIR ROOTS, DEBRIS, STONES, OR OTHER OBJECTS LARGER THAN 1-INCH IN ANY DIMENSION. IT SHOULD BE FREE OF OTHER EXTRANEOUS MATTER AND SHALL BE UNCONTAMINATED BY FOREIGN MATTER, SUBSTANCES HARMFUL TO PLANT GROWTH, AND FREE OF PETROLEUM HYDROCARBONS. THE COMPOST SHALL HAVE THE FOLLOWING PROPERTIES: PH 5.5 - 8.0 MOISTURE CONTENT 35% - 55% SOLUBLE SALTS 4.0 MMHOS (DS) C:N RATIO 15 - 30:1 PARTICLE SIZE µ ORGANIC MATTER CONTENT > 25% BULK DENSITY < 1,300 LBS / CUBIC YARD FOREIGN MATTER < 1% (DRY WEIGHT) 3.SUBMITTALS. 3.1.BIORETENTION SOIL TEST REPORTS 3.1.1.PRIOR TO ORDERING BIORETENTION SOIL MIXTURE MATERIALS, SUBMIT SOIL TEST REPORTS FOR TWO SEPARATE SAMPLES TO THE RESIDENT ENGINEER FOR REVIEW AND APPROVAL. DO NOT ORDER MATERIALS UNTIL APPROVAL HAS BEEN OBTAINED. DELIVERED MATERIALS SHALL BE FROM THE SAME SOURCE AS THE TESTED MATERIAL AND VERIFIED AS SUCH. 3.1.2.THE CONTRACTOR SHALL EMPLOY A CERTIFIED TESTING LABORATORY TO TEST THE MATERIAL, AND SHALL SUBMIT BIORETENTION SOIL MIXTURE TEST RESULT REPORTS FOR REPRESENTATIVE SAMPLES TO THE REPRESENTATIVE. REPORTS SHALL INCLUDE: 3.1.3.LOCATION OF SAMPLE SOURCE, DATE OF SAMPLE. 3.1.4.TESTS FOR PHOSPHORUS, POTASSIUM, SOLUBLE SALTS, SOIL PH, MOISTURE CONTENT, ORGANIC MATTER CONTENT, AND SOIL TEXTURE ANALYSIS IN ACCORDANCE WITH THE CURRENT STANDARDS OF THE ASSOCIATION OF OFFICIAL AGRICULTURE CHEMISTS. 3.1.5.TEST SHALL INCLUDE A SOIL PARTICLE GRADATION ANALYSIS AND CLASSIFICATION OF SOIL.24" MIN.NOTE: 1.THE CONTRIBUTING DRAINAGE AREA TO EACH SYSTEM SHALL RECEIVE FINAL STABILIZATION PRIOR TO ACCEPTING RUNOFF. 2.THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR, WASHED STONE. 3.STORMTECH COMPACTION REQUIREMENTS ARE MET FOR 'A' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (MAX) LIFTS FOR SC-310 USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 4.WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 5.FOR ALL MATERIALS, THE CONTRACTOR SHALL SUBMIT A PARTICLE SIZE DISTRIBUTION REPORT TO THE ENGINEER FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. 6."ACCEPTABLE FILL MATERIALS" TABLE ABOVE PROVIDES MATERIAL LOCATIONS, DESCRIPTIONS, GRADATIONS, AND COMPACTION REQUIREMENTS FOR FOUNDATION, EMBEDMENT, AND FILL MATERIALS. 7.PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 8.ONCE LAYER 'C' IS PLACED, ANY SOIL/MATERIAL CAN BE PLACED IN LAYER 'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR 'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. SYSTEM LAYOUT (56) STORMTECH SC-310 CHAMBERS (8) STORMTECH SC-310 END CAPS REFER TO TYPICAL CROSS SECTIONS BASE OF STONE = 311.0' BASE OF CHAMBERS = 311.5' INV. AT CHAMBERS = 311.7' MIN FG = 319.0' PLACE MINIMUM 12.5' OF ADS GEOSYNTHETICS 315WTK WOVEN GEOTEXTILE OVER BEDDING STONE AND UNDERNEATH CHAMBER FEET FOR SCOUR PROTECTION AT ALL CHAMBER INLET AND OUTLET ROWS (TYP) 12"X15" MANIFOLD PROPOSED STORM MANHOLE INV. (IN) = 312.0' INV. (OUT) = 311.9' PROPOSED STORM MANHOLE INV. (IN) = 311.9' INV. (CHAMBER) = 311.9' INV. (OUT) = 313.0' 15" PIPE OUT INSPECTION PORT (TYP) LIMIT OF STONE BASE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate South Burlington City Center South Burlington, Vermont DEC Application Submittal Not Approved for Construction Dec. 12, 2017 13 57943.00 40 IDX Dr Building 100 Suite 200 South Burlington, VT 05403 802.497.6100 TAS PBS Stormwater Details D2 11 Rev. bio-ret soil note 12-05-22 BIORETENTION SOIL MIXTURE SEE SPECIFICATIONS THIS SHEET EXISTINGDETENTION BASIN TRIBUTARY 3 TOPOTASH BROOKTRIBU T A R Y 3 T O POTA S H B R O O K GARDEN STREET GAR D E N S T R E E T MARKET S TREE TMARKET S TREE T BUI LD ING 9MIXED U SE 4 S TORY + PARK ING L EVE L B E LOWBUI LD ING 1 0MIX ED US E 4 STOR Y + PARK ING LEV E L BE LOW CAT H E D R A L S Q U A R E PARKING S TRUC TURE PARKING S TRUC TURE PLAZA MARKET STREET GAR D E N S T R E E T BUILDING 1 RESIDENTIAL 3 STORY + PARKING LEVEL BELOW RIC K M A R C O T T E CE N T R A L S C H O O L BUI LD ING 1 4MI X ED U S E 4 STORY + PARK ING L E VE L BE LOW BUI LD ING 1 1MIXED USE 4 S TORY + P AR K ING LEVE L B E LOW BUIL DI N G 8RESI D E N TI A L 3 STO R Y + P A R KI N G L E V E L B E L O W BUI LD ING 6RESIDEN T I A L 4 S TOR Y + P AR K ING LEVE L B E LOW BUIL DI N G 7RESI D E N TI A L 3 STO R Y + P A R KI N G L E V E L B E L O W BUI LD ING 5RESIDEN T I A L 4 STOR Y + PARK ING LEV E L BE LOW BUILDI N G 12A RESIDE N T I A L 3 STOR Y + P A R K I N G LEVEL B E L O W BUILDI N G 4 RESIDE N T I A L 4 STOR Y + P A R K I N G LEVEL B E L O W BUILDING 12 RESIDENTIAL 3 STORY + PARKING LEVEL BELOW BUILDING 3 RESIDENTIAL 3 STORY + PARKING LEVEL BELOW BUILDING 2RESIDENTIAL3 STORY + PARKING LEVEL BELOWBUI L D I N G 17 RE S I D E N T I A L 2 ST O R Y + P A R K I N G LEV E L B E L O WBUI LD ING 1 5MUNIC I PA L # S TORY + P AR K ING L EVE L BE LOW DUMONT PARK BUILDING 18A RESIDENTIAL 2 STORY 2 STORY RESIDENTIAL BUILDING 18B RESIDENTIAL 2 STORY BUILDING 18C RESIDENTIAL 2 STORY BUILDING 18D RESIDENTIAL 2 STORY Feet14070035 of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate South Burlington City Center South Burlington, Vermont Response to DEC Comments Not Approved for Construction Jan. 08, 2017 13 57943.00 40 IDX Dr Building 100 Suite 200 South Burlington, VT 05403 802.497.6100 TAS PBS Maintenance Plan SW4 4 GRAVEL WETLAND WET POND BIORETENTION BIORETENTION GRAVEL WETLAND GRAVEL WETLAND GRAVEL WETLAND GRAVEL WETLAND · · · · · · · · · · · · rim = 311.4612" cmp in = 306.6312" rcp out = 306.463143133 1 3 3083 0 7 307 3 0 6 3153143123123133143123103123123133133143143153133133123123103143153113 1 2 3133133143143133133133 1 4315 314315G3 0 7 3 0 8 3 1 0 3 1 2 310312 31 2 EXISTING EASEMENT TO CITY OFSOUTH BURLINGTON (SEE NOTE 9)EXISTING EDGE OF PAVEMENTOF SCHOOL DRIVEWAY10'IPSMARKET STLOT BLOT N311310308309TYPICAL FINISH GRADECONTOUR - MAINTAINPOSITIVE DRAINAGE TOSTORM PONDAPPROXIMATE LIMIT OFFILL PLACEMENT AREA.ACCESS FORPLACEMENT OF FILLEXISTING PAVEMENTEXISTING PAVEMENTEXISTING PAVED SIDEWALKEXISTING PAVED SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING PAVED SIDEWALKGARDEN S T E X IS T ING P A V EM EN T E X I S T I N G G R A V E L S U R F A C EEXI S T ING PAVE D PA TH E X IS T ING CONCR E T E S ID EW A LK E X I S T ING P A V ED P A T H E X I S T ING CON CR E TE S IDEW A LK EX I S T I NG CONCR E TE S ID EW A L K EXISTING CONCR E T E S ID EWA L K EXISTING CHAIN LINK FENCESOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN1-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT 155 MARKET ST.LEGENDGRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.310 MARKET ST.324 GARDEN ST.CITY HALL & LIBRARY180 MARKET ST.MARCOTTE CENTRAL SCHOOL200 MARKET ST.EXISTING CONTOUREXISTING PROPERTY LINEEXISTING EDGE OF TREES / SHRUBS3132NOTES:1.THE PURPOSE OF THIS PLAN IS TO PRESENT THE EXISTING CONDITIONS OF LOT B.DATA IS BASED UPON A TOPOGRAPHIC SURVEY PERFORMED BY BARNARD & GERVAISIN OCTOBER 2022, RECORD DRAWINGS FOR MARKET STREET, AND DESIGN DRAWINGSFOR THE CITY HALL PROJECT AT 180 MARKET STREET.2.SEE GARDEN STREET DESIGN PLANS FOR STREET AND UTILITY RELATED INFORMATIONWITHIN THE RIGHT OF WAY. THE NORTH SEGMENT OF GARDEN STREET ISSUBSTANTIALLY COMPLETE, EXCEPT FOR SIDEWALK CONSTRUCTION ON THE NORTHSIDE OF THE STREET.3.SEE MARKET STREET RECORD DRAWINGS FOR ADDITIONAL UTILITY RELATEDINFORMATION WITH THE RIGHT OF WAY.4.SEE THE SUBDIVISION PLAT FOR BOUNDARY RELATED INFORMATION.EXISTINGCONDITIONS PLANEXISTING STREET TREEEXISTING 4' CHAIN LINK FENCETEMPORARY 6' CHAIN LINK FENCEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLE11-16-22REVISE EXIST PAVE MARKINGSABR12-09-22REVISE EXIST SIGNS/MARKINGS ON CITY HALL/SCHOOL DRIVEABR +314.77+3 1 3 . 5 6+314.88+314.14+314.91+313.55+313.93+314.52+3 1 4 . 8 5 314.39 +313.80 +313.45 +314.30 +313.86 +315.10 ++313.67+313.26+3 1 5 . 4 6 +3 1 5 . 8 2 +3 1 6 . 2 7314.41 ++3 1 6 . 1 3 + 3 1 4 . 6 0 +314.60314315314.40 + 315313.20 +313.00 ++ 3 1 3 . 9 0 313.20 ++ 314.00 + + 3 1 3 . 5 0 3 1 3 . 5 0 +302.60 +316316+315.65+315.35+316.25315.65++315.40315+ 3 1 5 . 3 5315 316315 313 314.25 +3 1 3 . 7 5 +3153143153143123103083063043033 1 5 3 1 5 . 4 0 + + 3 1 5 . 2 5 314+ 3 1 3 . 8 5 + 3 1 3 . 5 5 3 1 3 . 6 5 + + 3 1 4 . 2 5 + 314.25 + 314.7 0 + 314.9 5 ++ 314 .45 + 314.60+ 314.33 314 .70+ + 314.00+ 314.60313.45 +314.25 ++ 313.45 + 3 1 3 . 6 5 314.50 +314315+ 315.75316.00 ++ 3 1 5 . 8 5 315.6 5 ++ 314.30314 315314316314 315313314314.55 +314.60 ++314.60 313314+ 315.00 314314FMFM314.93+314313.83+ + 314.33 313.23 +313.40 +314.50+ 31 4 + 3 1 7 . 2 5 + 3 1 4 . 2 5 3 1 5 . 5 0 + + 315.50 + 3 1 5 . 4 0 + 315.25+315.153 1 5 . 5 0 +315313315315+314.80314+ 314.0 + 3 1 4 . 8 0 +314313.75+ 3 1 4 . 5 0 + FM 316.10 ++ 317.07 317.20 + 315.90+ +316.25 316. 2 0 + +316.10 +316.25314.90+314.10++ 314.85+ 314.133 1 3 . 9 5 + 3 1 3 . 9 0 +313.60 ++ 313.88+ 3 1 3 . 8 5 + 3 1 3 . 7 5314.10 +314.15 +3 1 5 . 3 5 + 3 1 4 . 2 5 + 315.15 + +3 1 5 . 4 5 + 3 1 3 . 9 0 313.65+ 313.25 ++ 313.60313.20 +312.69 ++3 1 3 . 2 0 3 1 5 . 0 8 + 3 1 5 . 5 + 3 1 5 . 5 +316.0++3 1 5 . 6 2 + 3 1 6 . 1 0315.10 +315.15 ++3 1 3 . 7 3 + 314.10+ 313.60 3 1 3 . 8 0 + 315 312 312 3 1 3 314312 310 312 312313 3 1 3 314 314 3153133133123123103143153 1 1 312 313313314314 313 313 313314 BLDG B1BLDG B2MARKET STREETGARDEN STREET CITY HALL / SCHOOL DRIVEWAYFUTURE PUBLIC STREET BLDG B3FFE = 314.0FFE = 316.0GARAGESLAB = 303.0GARAGESLAB = 304.10FFE = 315.10FFE = 317.25BASEMENT SLAB = 306.25EXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALKMARKET STREETFFE = 314.0 NEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONC. SIDEWALK NEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALKBIO-RETENTION AREARETAINING WALLTOP WALL = 315.0RETAINING WALLTOP WALL = 315.0FFE = 315.0 EXPOSED FOUNDATION ALONGPORTION OF TRASH /RECYCLING ENCLOSUREBOULDER OR STONEBLOCK RETAININGWALL (MAX. HT = 2')SEE INSET FOR STREETLEVEL PLAZA AREA GRADINGNEW CONCRETESIDEWALK RAMPMAINTAIN POSITIVEDRAINAGE TO EXIST.CATCHBASINEXIST. CB TO REMAINSTONE BLOCKRETAINING WALL(MAX. HT = 1')+314.77+314.14+314.52312+ 314.30 + 315.00+ 315.00NEW CONCRETE SIDEWALK 315.10 +315.10 ++ 315.10+ 315.10+ 315.00314.60 +CONCRETE PLAZASOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN3GRADING PLAN1-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT LEGENDPROJECT BOUNDARY 310EXISTING TREELINEABUTTING PROPERTY LINESIDELINE OF EASEMENTEXISTING CONTOUR#310#200 GARDEN STREETCENTRAL SCHOOLPROPOSED TREELINEEXISTING 4' CHAIN LINK FENCEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLE(IN FEET)GRAPHIC SCALE2002040801" = 20 ft.#324#180 MARKET STCITY HALL & LIBRARY PROPOSED CONTOUR313PROPOSED SPOT GRADE+315.50EXISTING SPOT GRADE+315.46PROPOSED CATCHBASINPROPOSED STONE FILLNOTES:1.COORDINATE THE LOCATION OF THE SIDEWALK ENTRANCES TO EACHBUILDING WITH THE OWNER. UNLESS STEPS ARE PROPOSED, THEMAXIMUM LONGITUDINAL SLOPE ON ANY SIDEWALK SHALL BE LESS THAN5%. THE MAXIMUM LONGITUDINAL SLOPE ON ANY RAMP SHALL BE LESSTHAN 1:12. THE MAXIMUM CROSS SLOPE ON ANY SIDEWALK SHALL BE 2%.2.CAST IRON DETECTABLE WARNING PLATES SHALL BE INSTALLED AT ALLSIDEWALK AND PAVED PATH RAMPS, AT CROSSWALKS, AND ATADDITIONAL LOCATIONS NOTED ON THE PLANS. AT PAVED PATHS,DETECTABLE WARNING STRIPS SHALL BE INSTALLED IN CONCRETE.3.WHERE EXTERIOR STEPS ARE SHOWN, THE CONTRACTOR SHALLCOORDINATE WITH THE OWNER ON THE SELECTION AND INSTALLATIONOF AN ADA COMPLIANT HANDRAIL.4.UTILITY LAYOUTS SHOWN ON THIS PLAN ARE FOR REVIEW PURPOSESONLY. REFER TO DESIGN DRAWINGS BY EACH RESPECTIVE UTILITY FORCONSTRUCTION.5.THESE PLANS PRESENT THE LOCATION AND TYPICAL HEIGHT OFRETAINING WALLS ON THE SITE. THE DESIGN OF THE RETAINING WALLSAND RAILIINGS ARE TO BE PERFORMED BY OTHERS IN CONSULTATIONWITH THE OWNER.PLAZA INSETSCALE: 1" = 20'11-16-22UPDATE B3 FOOTPRINT AND WALKSABR12-09-22REV CURB ALONG CITY HALL /SCHOOL DRIVEABR01-09-23REV CURB ALONG CITY HALL /SCHOOL DRIVE, SW ACROSS DRIVEABR EEE TETEET T 314315315316316 315315316315 313315314315314312310308306304303 3 1 5314UD UD 314315314 315314316314 315313314313314UD UD UD314T ET 314S S WEFMFMSSS WW31431 4 EET315313315315314314EEGFM WWWWTWWWWWWSSSS 315 312 312 3 1 3 314312 310 312 312313 3 1 3 314 314 3153133133123123103143153 1 1 UEUESSSSSSSW W W W W W W WG G GG G GGGG S S S S SSWWWG TTTTT TTTTTS S 312 313313314314 313 313 313314SGG BLDG B1BLDG B2MARKET STREETGARDEN STREET CITY HALL / SCHOOL DRIVEWAYFUTURE PUBLIC STREET BLDG B3FFE = 315.10FFE = 317.25BASEMENT SLAB = 306.25EXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALKMARKET STREETNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALKNEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALK NEW CONCRETE SIDEWALKBIO-RETENTION AREARETAINING WALLTOP WALL = 315.0SEE VHB SHEET D2 FORBIO-RETENTION DETALSTYP. STONE BLOCKRETAINING WALL8" PVC ROOF DRAININV = 313.108" PVC ROOF DRAININV = 313.40NEW 8" CL52 WATERNEW 12"X8" TAPPINGSLEEVE & VALVE6" SDR35 PVC SEWERINV = 305.108" X 6" WYE& SEWER C.O.INV = 304.808" PVC SEWERSTUB INV = 304.7EXISTING 24" PE STUB TO BEREMOVED (FROM EX. CB 14)EX. CB14CB1CB2CB3CB4CB5CB6CB7CB8CB9CB10CB11CB12CB13EXISTING 18" PE STUB TO BEEXTENDED TO CB13. STUBINV = 308.4APPROXIMATE LIMITS OF 5" THICK CONCRETESIDEWALK REPLACEMENT. SEE PUBLIC ROWCONCRETE SIDEWALK DETAIL AND CONC.SIDEWALK JOINTS, FINISH & NOTESAPPROXIMATE LIMITS OF 8" THICK CONCRETESIDEWALK REPLACEMENT. SEE PUBLIC ROWCONCRETE SIDEWALK DETAIL AND CONC.SIDEWALK JOINTS, FINISH & NOTESCB146" SDR35 PVC24" PE18" PECB16APPROXIMATE LIMITS OFPAVEMENT REPLACEMENTFOR MOUNTABLE CURBNEW MOUNTABLEGRANITE CURBMOUNTABLEGRANITE CURBAPPROXIMATE LIMITS OF PAVEMENTREPLACEMENT FOR CURB REPLACEMENTEXISTING CONCRETESIDEWALK TO BE REMOVEDNEW CONCRETE CURB6" CL52 D I WATER8"X8" TEE WITH REDUCER& 6" G.V. TO BLDG & HYD22° BEND8" SDR35 PVC SEWERINV = 301.3. CUT BACK EXIST.STUB AND TRANSITION TOSCH40 PVC THRU FOUNDATION6" PVC SEWER STUB. INV ELEVUNKNOWN. TRANSITION TOSCH40 PVC THRU FOUNDATION.6" PVC SEWER STUB. APPROX.INV ELEV = 303.9. TRANSITION TOSCH40 PVC THRU FOUNDATION.MIN. S = 0.016" DI WATER SERVICE AND 2"COPPER DOMESTIC SERVICE(SEE DETAIL ON SHEET 10)6" SEWER SERVICEINV = 305.36" SCH40 PVC THRU WALLS = 0.018" SCH40 PVC ROOF DRAIN THRUFOUNDATION WALL, ELEV = 310.158" SCH40 PVC ROOF DRAIN THRUFOUNDATION WALL, ELEV = 310.478" SDR35 PVC8" SDR35 PVCS = 0.005315" PES = 0.0115" PES = 0.00515" PES=0.005 12" PES=0.0165" SCH40 PVC (ELEC)SEE MECHANICAL PLANS FORBUILDING SERVICE REQUIREMENTSS=0.005112" PE1 5 " P E S = 0 . 0 0 58" SDR35 PVC8" SDR35 PVC12" SDR35 PVC S = 0.00512" X 8" WYE8" SCH40 PVC ROOF DRAIN THRUFOUNDATION WALL, ELEV = 311.38" SCH40 PVC ROOF DRAIN THRUFOUNDATION WALL, ELEV = 310.68" SDR35 PVC12" CL52 DI12" CL52 DIEXIST. 8" CL52 DI WATER STUB - REMOVESTUB AND INSTALL END CAP WITH FOSTERADAPTER TO EXISTING GATE VALVE ANDPRECAST CONCRETE THRUST BLOCK6" DI WATER SERVICE AND 2"COPPER DOMESTIC SERVICE(SEE DETAIL ON SHEET 10)8" PVC SEWER NEW HYDRANTTO BE LOCATED IN CENTER OFISLAND, AWAY FROM TREESTYP. TYPE I STONE SWALE5" SCH40 PVC (ELEC)(2) 4" SCH40 PVC(TELECOM/CTV)SEE MECHANICAL PLANS FORBUILDING SERVICE CONDUITREQUIREMENTSELECVAULTELECVAULTTRASH & RECYCLINGENCLOSUREBOULDER OR STONEBLOCK RETAINING WALLCB15NEW GAS METERNEW GAS METER(2) 3" SCH40 PVC FM (STORM)2" SCH40 PVC FM(STORM)HOSE BIB FOR SHARED GARDENSTYPICAL 8" THICKCONCRETE SIDEWALKPAVED PATHTYP. EXIST. CURBTO BE REMOVEDEX. 18" PEMOUNTABLECONCRETE CURBMOUNTABLECONCRETE CURBTYP. CONNECT ROOFDRAIN TO YARD INLETEXISTING CONCRETE CURB EXISTING CONCRETE CURB NEW MOUNTABLECONCRETE CURBSEE SHEET 6 FORLIGHTING DETAILSEXISTING CHAIN LINK FENCE6" SDR35 PVCSEWER SERVICERETAIN EXISTING STREET LIGHTNEW CONCRETE SIDEWALK RAMPSEE SHEET 11 FOR LIMITS OF PAVEMENTMILLING AND REPLACEMENT TOELIMINATE EXIST. PAVEMENT MARKINGSNEW 6" THICK CONCRETE SIDEWALK TOREPLACE EXISTING PAVED SIDEWALK. SEEPUBLIC ROW CONCRETE SIDEWALK DETAIL &CONC. SIDEWALK JOINTS, FINISH AND NOTESNEW 6" THICK CONCRETE SIDEWALK TOREPLACE EXISTING PAVED SIDEWALK. SEEPUBLIC ROW CONCRETE SIDEWALK DETAIL &CONC. SIDEWALK JOINTS, FINISH AND NOTESEXIST. CBTO REMAINFDCFDCFDCRELOCATE EXISTINGSTREET LIGHTRELOCATE EXIST. TREEAWAY FROM HYDRANT(SEE ALSO SH.10)25' R.25' R.NEW 8" THICKCONCRETE SIDEWALKACROSS DRIVEWAYNEW MOUNTABLECONCRETE CURBEXISTING CONCRETE SIDEWALK EXISTING CONCRETE SIDEWALK EXISTING PAVED PATHEXISTING PAVED PATH NEW CONCRETE SIDEWALKSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILSNEW CONCRETE SIDEWALKSEE PLANS BY TJ BOYLE FORADDITIONAL DESIGN DETAILSET316 315G 316 W G GGEEET315G 41-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT LEGENDPROJECT BOUNDARY 310EXISTING TREELINEABUTTING PROPERTY LINESIDELINE OF EASEMENTEXISTING CONTOURSOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN#310MARKET ST#200 GARDEN STREETCENTRAL SCHOOLPROPOSED TREELINEEXISTING 4' CHAIN LINK FENCEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLE(IN FEET)GRAPHIC SCALE2002040801" = 20 ft.#324GARDEN ST#180 MARKET STCITY HALL & LIBRARY PROPOSED CONTOUR313PROPOSED SPOT GRADE+315.50EXISTING SPOT GRADE+315.46PROPOSED STONE FILLUTILITY &LAYOUT PLANSTORMWATER STRUCTURE DATAEX CB14EXISTING CATCHBASINRIM = 313.956" UD IN = 309.266" UD OUT = 310.4724" IN = 309.30 (STUB TO BE REMOVED)24" OUT = 309.26NEW CB1RIM = 313.7518" PE IN = 309.722" FM IN = 309.75 (INSULATE)24" PE OUT = 309.70NEW CB2RIM = 314.1012" PVC IN = 309.9012" PE IN = 309.9018" PE OUT = 309.87NEW CB3RIM = 313.00(2) 8" PVC IN = 310.5512" PVC OUT = 310.53NEW CB4RIM = 313.208" PVC OUT = 310.75NEW CB5RIM = 313.508" PVC IN = 310.65(2) 2" FM IN = 310.70 (INSULATE)12" PE OUT = 310.65NEW CB6RIM = 313.508" PVC OUT = 310.75NEW CB7RIM = 314.012" PE OUT = 310.45NEW CB8RAIN GARDEN INLET STRUCTUREINLET OPENING = 314.50OUTLET OPENING = 313.25NEW CB9RAIN GARDEN INLET STRUCTUREINLET OPENING = 314.50OUTLET OPENING = 313.25NEW CB10RIM = 313.25(2) 8" PVC IN = 309.8515" PE OUT = 309.80NEW CB11RIM = 313.6015" PE IN = 309.4515" PE OUT = 309.45NEW CB12RIM = 314.1012" PE IN = 310.5015" PE IN = 309.0515" PE OUT = 309.05NEW CB13RIM = 313.6015" PE IN = 308.5018" PE OUT = 308.50(EXTEND EXIST. STUB)NEW CB14YARD INLETRIM = 313.656" PVC IN = 310.958" PVC OUT = 310.90NEW CB15YARD INLETRIM = 313.506" PVC IN = 310.808" PVC OUT = 310.75NEW CB16YARD INLETRIM = 313.0012" PE OUT = 311.00PS1PUMP STATIONRIM = 302.60(2) 6" UD IN = 398.606" PVC IN = 299.10(2) 2" FM OUT (SEE PS DETAIL)APPROX. LOCATION OF EXISTING5" CONDUIT FOR ELECTRICSEE INSET 'A'INSET 'A'1" =20'5" SCH40 PVC (ELEC)(2) 4" SCH40 PVC(TELECOM/CTV)APPROX. LOCATION OF 5" (ELEC)AND (2) 4" (TELECOM/CTV) CONDUITSGARDEN STREETNEW CONCRETE SIDEWALK EXIST. PAVED PATH EXIST. CONCRETE SIDEWALK #324ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED INACCORDANCE WITH THE CHAMPLAIN WATER DISTRICT SPECIFICATIONSAND DETAILS FOR THE INSTALLATION OF WATER LINES ANDAPPURTENANCES, CURRENT EDITION. THE SBWD SHALL BE NOTIFIEDFOR A PRE-CONSTRUCTION MEETING AT LEAST 7 DAYS PRIOR TO ANYEXCAVATION RELATED TO THE EXISTING OR NEW WATER SYSTEM.NOTES:1.THE LOCATION AND ELEVATION OF EXISTING UTILITIES AND SERVICE STUBSARE BASED ON RECORD DRAWING DATA PROVIDED BY OTHERS.2.PRIOR TO THE FABRICATION OF STRUCTURES, THE SITE CONTRACTORSHALL PERFORM EXPLORATORY EXCAVATION TO CONFIRM THEHORIZONTAL AND VERTICAL LOCATION OF EXISTING UTILITIES.3.THE CONTRACTOR SHALL COORDINATE THE HORIZONTAL LOCATION OFTHE WATER, SEWER, FOOTING DRAIN, AND ROOF DRAIN SERVICECONNECTIONS TO THE BUILDING WITH THE OWNER AND MECHANICALPLANS.4.THE FOUNDATION DRAIN COLLECTION SYSTEM AND STORMWATER PUMPSTATION (IF THE FOOTING DRAINS ARE CONNECTED TO THE PUMP STATION)ARE TO BE DESIGNED BY OTHERS. SEE PLANS BY OTHERS FORFOUNDATION DRAIN PIPING SPECIFICATIONS AND LOCATION.5.PRIOR TO CONSTRUCTION, THE ELEVATIONS OF THE SEWER, FOOTINGDRAIN, AND ROOF DRAIN SERVICES FROM THE MECHANICAL PLANS SHALLBE COMPARED TO THE ELEVATION OF THE COLLECTION MAINS ANDSERVICES SHOWN ON THESE PLANS. REPORT ANY DISCREPANCIES TO THEENGINEER.6.UTILITY LAYOUTS SHOWN ON THIS PLAN ARE FOR REVIEW PURPOSES ONLY.REFER TO DESIGN DRAWINGS BY EACH RESPECTIVE UTILITY FORCONSTRUCTION.7.ALL PIPE SLOPES ARE IN FEET / FEET.NEW NATURAL GAS SERVICETO BE COORDINATED WITH VGSAPPROX. LOCATION OFEXISTING GAS SLEEVENEW GAS METERWATER SERVICE NOTE: SEE ALSO WATER SERVICE INSETS ON SHEET 1011-16-22UPDATE B3 FOOTPRINT AND WALKSABRWETPROPOSED WATER LINE & HYDRANTPROPOSED SEWER LINE & CLEANOUTPROPOSED STORM FORCEMAINPROPOSED STORM PIPE & CATCHBASINPROPOSED GAS LINEPROPOSED ELECTRIC & TELECOMSFMGEXISTING WATER LINE & HYDRANTEXISTING SEWER LINEEXISTING STORM PIPE & CATCHBASINEXISTING ELECTRIC & TELECOMETPROPOSED POLE MOUNTED LIGHTWS12-09-22REV SCHOOL ST, RELOCATE ST LIGHT, ADD FDCABR01-09-23REV B1 & B2 WATER SERVICES PER SBWD, LANDSCAPE COORDABRNEW CONCRETESIDEWALK EEE TETEETTT E T S S WESSSWWEETEEGGWWWTWWWSGTTWWWWWWWS SSSS312TUEUETW 314313313 307 3 0 6 315312G310310309 312312 3133143123103123123133133 1 4314 315313313312312310314315311311310308309UEUESSSSSSSWWWWWWWWWGGGGGGGGGGGS SS S SSEEETWWWGTTTTT E E EE ET TT EETTTTTTTTTTTTSS312 313313314314313313313314315 314SGG315GGGGGGGGGWS S WSWL G RDWWRDG FM 3 0 7 3 0 8 3 1 0 3 1 2 310312 31 2 UESUUUUUU BLDG B3BLDG B1BLDG B2MARKET STREETGARDEN S TR E E T BIORETENTIONAREAEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALKEXISTING CONCRETE SIDEWALK EXI S T I NG P A V ED P A TH E X I S T ING CON CR E TE S ID EWA L K EX I S T I NG P A V E D P A T H E X I S T ING CON CRE TE S IDEW A L K EXISTING CONCRETE SIDEWALKEXISTING PAVED PATHEXISTING PAVED PATHLODLODLODTPZTPZ TPZ TPZ TPZTP Z TP Z T P Z T P Z EXISTING CONCRETE SIDEWALK EXI S T I NG P A V ED S TREE T E X I S T ING P A VED S TR E E T EXISTING PAVED STREETEXISTING PAVED STREETEXISTING PAVED STREET 3143153 1 5316 3163153153163 1 5 3 1 3315314315314312310308306304303315314 3143153 1 4 315314316314315313314313314314314FM FM 314314315313315315314314FM 3 1 6 EDGE EXISTING GRAVELTYPICAL EXISTING 3" PVCSLEEVE UNDER MARKETSTREET (TOTAL OF 3)EXISTING MATURE TREESEXISTING MATURE TREESEXISTING GRASSEXISTING GRASSFLOW PATH CONTINUES TOTEMPORARY STONE LINED SUMPWITH OUTLET TO STORM PONDDEWATERING PIT(LOCATION TO VARY)DWSTSTFILTER BAG OR STONE PADDEWATERING DISCHARGE LOCATIONDWSTTYPICAL 2" PE TUBING THROUGHEXISTING 3" PVC SLEEVETYPICAL SILT SACK TO BE INSTALLEDON MARKET ST & GARDEN ST - SEE CBINLET PROTECTION DETAIL ON SHEET 851-888-DIG-SAFE PRIOR TO ANY EXCAVATION.THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT GRAPHIC SCALE3003060120(IN FEET)1" = 30 ft.LEGENDPROJECT BOUNDARY 310EXISTING TREELINESIDELINE OF EASEMENTEXISTING CONTOURSOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWNEXISTING 4' CHAIN LINK FENCEEXISTING POLE MOUNTED LIGHTEXISTING HYDRANTEXISTING STORM MH & CBEXISTING SEWER MANHOLEEROSION PREVENTION &SEDIMENT CONTROL PLANSILT FENCE OR EROSION LOG (12" DIA)STABILIZED CONSTRUCTION EXITEROSION MATTINGLIMITS OF DISTURBANCEEROSION PREVENTION & SEDIMENT CONTROL PERMIT REQUIREMENTSPRIOR TO CONSTRUCTION, THE SITE CONTRACTOR SHALL OBTAIN CO-PERMITEE COVERAGE UNDER GENERAL PERMIT3-9020 WHICH REGULATES STORMWATER RUNOFF FROM CONSTRUCTION SITES.THIS PROJECT QUALIFIES AS HAVING A LOW RISK FOR IMPACTS TO WATER QUALITY, BASED UPON THE FOLLOWING:- A MAXIMUM OF 14 CONSECUTIVE DAYS BEFORE DISTURBED EARTH IS TEMPORARILY OR PERMANENTLY STABILIZED.- A MAXIMUM OF 2 ACRES OF DISTURBANCE AT ANY TIMETHESE CRITERIA FORM THE BASIS FOR THE LOW RISK DETERMINATION. ANY CHANGES TO THESE CRITERIA REQUIRETHAT THE RISK ANALYSIS BE RE-EVALUATED TO DETERMINE IF THE POTENTIAL RISK TO WATER QUALITY, AND THERELATED PERMITTING REQUIREMENTS, HAVE CHANGED.THE CONTRACTOR SHALL REFER TO THE LOW RISK SITE HANDBOOK FOR EROSION PREVENTION AND SEDIMENTCONTROL MEASURES TO BE IMPLEMENTED ON THE SITE. AT A MINIMUM, THESE SHALL INCLUDE:- MARKING THE LIMITS OF DISTURBANCE TO PRESERVE EXISTING VEGETATION OUTSIDE THE LIMITS OFCONSTRUCTION- LIMITING THE DISTURBED AREA TO THAT WHICH IS ACTIVELY BEING WORKED- MULCHING DISTURBED AREAS WITHIN 14 DAYS OF INITIAL DISTURBANCE AND WHENEVER SITE WORK ACTIVITY WILLBE SUSPENDED- INSTALLATION OF STABILIZED CONSTRUCTION EXITS- INLET PROTECTION AT ALL EXISTING AND NEW CATCHBASINS- INSTALLATION OF SILT FENCE ALONG THE DOWNSLOPE PERIMETER OF THE DISTURBED AREA AND AROUND SOILSTOCKPILES- PLACEMENT OF EROSION MATTING IN CHANNELS, ON ALL SLOPES 3H:1V OR STEEPER, AND MULCHING ALL OTHERDISTURBED AREAS- SWEEPING PAVED AREAS TO REMOVE SEDIMENT- APPLICATION OF WATER OR DUST SUPPRESSING AGENT(S)LODNOTE:THE LIMITS OF DISTURBANCE SHALL BE MARKED WITH 4"ORANGE POLYESTER BARRIER TAPE, CONSTRUCTION FENCE,OR SNOW FENCE, EXCEPT IN AREAS WITHIN 50 FEET OF APRESERVED WETLAND OR STREAM WHERE CONSTRUCTIONFENCE SHALL BE USED TO MARK THE LIMITS OF DISTURBANCE.TEMPORARY STABILIZEDWORK / STORAGE AREAEPSC LEGENDTREE PROTECTION ZONETPZBIORETENTION AREA EPSC SEQUENCING1.THE BIORETENTION AREA MAY BE USED AS A SEDIMENT BASIN DURINGCONSTRUCTION. IF USED AS A SEDIMENT BASIN, THE BOTTOM OF THEBIORETENTION AREA SHALL NOT BE DISTURBED. SEDIMENT BASINSTORAGE VOLUME SHALL BE CREATED BY THE PLACEMENT OF FILL TO THEFINISH GRADES SHOWN AROUND THE PERIMETER OF THE BIORETENTIONAREA.2.REGARDLESS OF WHETHER THE BIORETENTION AREA IS USED AS ASEDIMENT BASIN, TO PREVENT COMPACTION OF THE UNDERLYING SOIL,THIS AREA SHALL NOT BE USED FOR THE STORAGE OF MATERIALS OREQUIPMENT, AND SHALL BE NOT BE USED FOR VEHICLE PARKING.3.PRIOR TO CONSTRUCTION OF THE TYPICAL BIORETENTION SECTION SHOWNON VHB SHEET D2, ALL ACCUMULATED SEDIMENT, ORGANIC DEBRIS(VEGETATION, STUMPS, AND ROOTS LARGER THAN 1" DIAMETER), ANDTOPSOIL SHALL BE REMOVED.4.RUNOFF SHALL NOT BE DIRECTED INTO THE BIORETENTION FACILITY UNTIL:A. ALL UPGRADIENT CONTRIBUTING AREAS HAVE BEEN PERMANENTLY STABILIZED.B. THE BIORETENTION FACILITY IS COMPLETE AND ALL AREAS SUBJECT TO RUNOFF HAVE BEEN PERMANENTLY STABILIZED.5.IN THE EVENT THAT SEDIMENT IS INTRODUCED INTO THE BIORETENTIONAREA, THE SEDIMENT AND ALL CONTAMINATED MATERIAL (SUCH AS MULCHOR SOIL MIX) SHALL BE REMOVED AND REPLACED BY THE CONTRACTOR ATNO EXPENSE TO THE OWNER.DURING SITEWORK AND BUILDING CONSTRUCTION, AT LEAST ONE OF THEFOLLOWING MEASURES SHALL BE IMPLEMENTED:-THE AREA BETWEEN THE FOUNDATION AND EXISTING SIDEWALK OR CURBSHALL BE STABILIZED WITH STONE OR GRAVEL-THE TEMPORARY GRADE ADJACENT TO THE FOUNDATION SHALL BE ATLEAST 1 FOOT LOWER THAN THE GRADE OF THE ADJACENT EXISTINGSIDEWALK OR CURB.-SILT FENCE OR EROSION LOG SHALL BE INSTALLED ALONG THE ADJACENTEXISTING SIDEWALK OR CURB.DURING SITEWORK AND BUILDING CONSTRUCTION, AT LEASTONE OF THE FOLLOWING MEASURES SHALL BE IMPLEMENTED:-THE AREA BETWEEN THE FOUNDATION AND EXISTINGSIDEWALK OR CURB SHALL BE STABILIZED WITH STONE ORGRAVEL-THE TEMPORARY GRADE ADJACENT TO THE FOUNDATIONSHALL BE AT LEAST 1 FOOT LOWER THAN THE GRADE OFTHE ADJACENT EXISTING SIDEWALK OR CURB.-SILT FENCE OR EROSION LOG SHALL BE INSTALLED ALONGTHE ADJACENT EXISTING SIDEWALK OR CURB.DURING SITEWORK AND BUILDING CONSTRUCTION, AT LEASTONE OF THE FOLLOWING MEASURES SHALL BE IMPLEMENTED:-THE AREA BETWEEN THE FOUNDATION AND EXISTINGSIDEWALK OR CURB SHALL BE STABILIZED WITH STONE ORGRAVEL-THE TEMPORARY GRADE ADJACENT TO THE FOUNDATIONSHALL BE AT LEAST 1 FOOT LOWER THAN THE GRADE OFTHE ADJACENT EXISTING SIDEWALK OR CURB.-SILT FENCE OR EROSION LOG SHALL BE INSTALLED ALONGTHE ADJACENT EXISTING SIDEWALK OR CURB.TREE PROTECTION ZONE DETAILNTSEXISTING TREE TO BEPROTECTED - SEE PLANSFOR LOCATIONS.8'-0" MAXIMUM36" MIN STEEL OR WOOD POSTHDPE MESH FENCE. SECUREMESH TO POSTS WITH NYLONZIP CABLE TIES-3 PER POST.EXISTING GRADE1.PRIOR TO START OF CONSTRUCTION, INSTALL TEMPORARY PROTECTION ZONE (TPZ) FENCEIN LOCATIONS SHOWN ON PLANS.2. TPZ FENCE SHALL PROTECT EXISTING TREES THROUGHOUT CONSTRUCTION AGAINSTCUTTING, BREAKING OR SKINNING OF ROOTS; SKINNING AND BRUISING OF BARK;SMOTHERING OF TREES BY STOCKPILING CONSTRUCTION MATERIALS OR EXCAVATEDMATERIALS; EXCESS FOOT OR VEHICULAR TRAFFIC; AND PARKING OF VEHICLES.3.WHERE TEMPORARY CLEARANCE IS NEEDED DURING CONSTRUCTION THAT MAY CONFLICTWITH EXISTING TREES, BRANCHES SHALL BE TIED BACK TO HOLD THEM OUT OF THECLEARANCE ZONE.4. ROOTS ENCOUNTERED DURING EXCAVATION IN THE VICINITY OF TREE PROTECTION ZONESSHALL BE CLEANLY CUT AND PROTECTED DURING CONSTRUCTION OPERATIONS.TEMPORARILY COVER EXPOSED ROOTS WITH A DOUBLE LAYER OF DAMPENED BURLAP TOPREVENT ROOTS FROM DRYING OUT UNTIL THEY CAN BE COVERED WITH SOIL. COVERROOTS WITH SOIL AS SOON AS POSSIBLE REMOVING BURLAP FIRST.5. IF ANY TREES DESIGNATED TO BE SAVED ARE DAMAGED AND REPLACEMENT IS REQUIRED,TREES OR SHRUBS OF THE SAME SPECIES AND VARIETY SHALL BE FURNISHED ANDPLANTED BY THE CONTRACTOR. THE TOTAL INCH DIAMETER OF THE REPLACEMENT TREESOR SHRUBS SHALL EQUAL THE DIAMETER OF THE TREE OR SHRUB TO BE REPLACED.6. REMOVE TEMPORARY PROTECTION DEVICES AND FACILITIES INSTALLED DURING COURSEOF WORK AFTER COMPLETION OF ALL WORK AND RESTORE PLANT PROTECTION AREAS TOTHEIR ORIGINAL CONDITION.11-16-22UPDATE B3 FOOTPRINT AND WALKSABREXISTING STORM PIPE & CBPROPOSED STORM PIPE & CB12-09-22REVISE CURBING ALONG CITY HALL/SCHOOL DRIVEABR01-09-23REVISE BIORETENTION/SED BASIN NOTES, LANDSCAPE COORDABRBLOCK B FOUNDATION EXCAVATION DEWATERING SPECIFICATIONSDEWATERING FROM THE FOUNDATION EXCAVATIONS MAY OCCUR AT ONE OR MULTIPLE LOCATIONS, BASED UPONTHE DEWATERING METHODS, SOIL, AND GROUNDWATER CONDITIONS. DEWATERING DISCHARGE WILL BECONVEYED ACROSS MARKET STREET THROUGH 2" CONTINUOUS CTS POLYETHYLENE (PE) TUBING WITHIN ONEOR MORE OF THE EXISTING 3" UTILITY SLEEVES.DEWATERING SHALL BE FROM A STABILIZED SUMP OR DEWATERING PIT. THE DEWATERING PIT SHALL BEADEQUATELY SIZED TO MINIMIZE SOIL MIGRATION AND SEDIMENT TRANSPORT.THE DISCHARGE LOCATION(S) SHALL BE OUTSIDE THE MARKET STREET RIGHT OF WAY, IN A LOCATION OFEXISTING VEGETATION OR STABILIZED SURFACE (CLEAN STONE FILL), HAVING A SLOPE OF LESS THAN 5%. IFTHERE ARE MULTIPLE DISCHARGE LOCATIONS, THEY SHALL BE SEPARATED BY AT LEAST 50 FEET.IF THE DISCHARGE IS VISIBLY TURBID, A FILTER BAG SHALL BE INSTALLED. IF THE DISCHARGE IS NOT VISIBLYTURBID, A LEVEL 10' X 10' X 8" THICK CLEAN 2" STONE PAD SHALL BE INSTALLED TO PREVENT EROSION AT THEOUTLET.FROM THE DISCHARGE LOCATION NEAR MARKET STREET, THERE SHALL BE OVERLAND FLOW ACROSS THEEXISTING VEGETATED TERRAIN TO THE EXISTING STONE LINED SUMP AND OUTLET TO THE STORM POND. IF THEFLOW BECOMES CHANNELIZED, THE DISCHARGE LOCATION SHALL BE CHANGED TO MODIFY THE FLOW PATH, ORTHE FLOW PATH SHALL BE STABILIZED WITH CLEAN STONE FILL, EROSION MATTING, OR WOOD CHIPS.WINTER EPSC PLAN REQUIREMENTSIF CONSTRUCTION ACTIVITIES INVOLVING EARTH DISTURBANCE CONTINUE PAST OCTOBER 15, ORBEGIN BEFORE APRIL 15, THEN THE FOLLOWING PROVISIONS SHALL BE IMPLEMENTED:1.STABILIZED ACCESS POINTS SHALL BE ENLARGED TO PROVIDE FOR SNOW STOCKPILING WHILESTILL MAINTAINING EFFECTIVE SEDIMENT CONTROL. PACKED SNOW AND ICE MAY NEED TO BEREMOVED AND ADDITIONAL STONE PLACED TO MAINTAIN THE LOOSE STONE SURFACE ATSTABILIZED CONSTRUCTION EXITS.2.BASED UPON THE WINTER ACTIVITIES PROPOSED, THE ON-SITE PLAN COORDINATOR SHALLDEVELOP A SNOW MANAGEMENT PLAN THAT SHALL INCLUDE AT A MINIMUM:A.ADEQUATE SIZE FOR SNOW STORAGE AREASB.SNOW STORAGE AREAS LOCATED DOWN GRADIENT OF AREAS OF PLANNED DISTURBANCEC.CONTROL OF SNOWMELT RUNOFFD.PROHIBITING STORAGE OF SNOW IN STORMWATER TREATMENT STRUCTURESE.A MINIMUM 25 FOOT BUFFER BETWEEN PERIMETER CONTROLS (SUCH AS SILT FENCE) TOALLOW FOR SNOW CLEARING AND MAINTENANCE3.IN AREAS OF DISTURBANCE WITHIN 100 FT OF A RECEIVING WATER, THE FOLLOWING MUST BEINSTALLED ACROSS THE SLOPE, DOWN GRADIENT OF THE EARTH DISTURBANCE:A.FILTER SOCKS OR STRAW WATTLES SHALL BE PLACED IN FRONT OF SILT FENCE OR EROSIONCONTROL BERMSB.SILT FENCE SHALL BE USED IN CONJUNCTION WITH EROSION CONTROL BERMSC.A SINGLE ROW OF REINFORCED SILT FENCE4.THE ONSITE PLAN COORDINATOR INSPECTIONS SHALL INCLUDE MAINTENANCE OF DRAINAGESTRUCTURES TO INSURE THAT THEY ARE OPEN AND FREE OF SNOW AND ICE DAMS.5.SILT FENCE AND OTHER PRACTICES REQUIRING EARTH DISTURBANCE SHALL BE INSTALLED AHEADOF GROUND FREEZING. IF PRACTICES MUST BE INSTALLED OR MAINTAINED AFTER GROUNDFREEZING, NO FROZEN MATERIAL SHALL BE USED IN THE CONSTRUCTION OF BERMS OR DIKES, ORINSTALLATION OF SILT FENCE.6.WHERE MULCH IS USED FOR TEMPORARY STABILIZATION, IT SHALL BE APPLIED AT A MINIMUM OF 2INCHES WITH AN 80-90% COVER.7.TO ENSURE COVER OF DISTURBED SOIL IN ADVANCE OF A MELT EVENT, AREAS OF DISTURBEDSOIL MUST BE STABILIZED PRIOR TO ANY RUNOFF PRODUCING EVENTS, WITH THE FOLLOWINGEXCEPTION:A.STABILIZATION IS NOT REQUIRED IF THE WORK IS OCCURING IN A SELF-CONTAINEDEXCAVATION (E.G. NO OUTLET) WITH A DEPTH OF 2 FEET OR GREATER (E.G. HOUSEFOUNDATION EXCAVATION, UTILITY TRENCHES, PROVIDED ANY DEWATERING, IF NECESSARYIS CONDUCTED AS REQUIRED.8.PRIOR TO STABILIZATION, SNOW OR ICE MUST BE REMOVED TO THE EXTENT PRACTICABLE.9.WHERE EXTERIOR CONSTRUCTION ON BUILDINGS WILL CONTINUE, OR WHERE VEHICLE OREQUIPMENT TRAFFIC ASSOCIATED IS EXPECTED, A STABILIZED WORK AREA AROUND THEPERIMETER OF THE STRUCTURE SHALL BE STABILIZED WITH CRUSHED STONE OR GRAVEL.01-23-23ADD DEWATERING NOTES, SPECIFICATIONS AND WINTER EPSCABRDEWATERING DISCHARGE STONE PAD CB INLET PROTECTION (SEE SHEET 8FOR ADDITIONAL SPECIFICATIONS)DRAFT 01-24-23 BLDG B3BLDG B1BLDG B2MARKET STREETGARDEN STREET CITY HALL / SCHOOL DRIVEWAYFUTURE PUBLIC STREET BIORETENTIONAREASOUTH BURLINGTON CITY CENTERCATAMOUNT RUNMARKET ST. & GARDEN ST. SOUTH BURLINGTONDateSheet numberScaleCheckedDrawnSurvey DateRevisionByThese plans shall only be used for the purpose shown below:Sketch/ConceptFinal Local ReviewConstructionRecord Drawing11-07-22KBABRB&GTHE SNYDER GROUP, INC.4076 SHELBURNE ROAD, SUITE 6SHELBURNE, VERMONT 05482802-985-5722WWW.SNYDERHOMESVT.COMAS SHOWN6LIGHTING PLANGRAPHIC SCALE30030601201" = 30 ft.LIGHTING SPECIFICATIONSLEGENDDESCRIPTIONMOUNT HEIGHTDISTRIBUTION TYPECOLOR TEMPRAB BLED18N 18W42" BOLLARD180 DEGREE4000KRAB ALED4T125N24 FEET POLETYPE IV4000KRAB ALED5S150N24 FEET POLETYPE V4000KRAB WPLED13N9' WALLTYPE III4000KLITHONIA 4BEMW11' CANOPYRECESSED CUTOFF4000KNOTES:COLOR - FIXTURES AND POLES SHALL BE BRONZE - TO BE CONFIRMED WITH OWNERPOWER SUPPLY - COORDINATE WITH OWNER ON POWER SUPPLY LOCATION IN BUILDING(S)LIGHTING CONTROLS - LIGHTING CONTROL DESIGN SHALL BE BY THE OWNER'S ELECTRICIANCONDUIT SIZE & LAYOUT - CONDUIT SIZE AND LAYOUT DESIGN SHALL BE BY THE OWNER'S ELECTRICIAN45WWW444455554LOT BWW11-16-22UPDATE B3 FOOTPRINT, WALKS, & LIGHTINGABRWBBBBBBBBBBBBB12-09-22REVISE WALL MOUNT FIXTUREABRPOLE MOUNTED LIGHT DETAIL 01-23-23ADD POLE MOUNTED LIGHT DETAILABR SOUTH BURLINGTON CITY CENTER CATAMOUNT RUN MARKET ST. & GARDEN ST. SOUTH BURLINGTON Date Sheet number Scale Checked Drawn Survey Date Revision By These plans shall only be used for the purpose shown below: Sketch/Concept Final Local Review Construction Record Drawing 11-07-22 KB ABR B&G THE SNYDER GROUP, INC. 4076 SHELBURNE ROAD, SUITE 6 SHELBURNE, VERMONT 05482 802-985-5722 WWW.SNYDERHOMESVT.COM AS SHOWN 7 DETAILS AND SPECIFICATIONS SITEWORK GENERAL CONSTRUCTION SPECIFICATIONS 1. ALL WORK AND MATERIALS SHALL BE APPROVED BY AND IN ACCORDANCE WITH THE LATEST VERMONT AGENCY OF TRANSPORTATION STANDARD SPECIFICATIONS FOR CONSTRUCTION, THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, THE CITY OF SOUTH BURLINGTON PUBLIC WORKS SPECIFICATIONS AND THESE PLANS. 2. THE CONTRACTOR SHALL CONTACT ALL UTILITIES BEFORE EXCAVATION TO VERIFY THE LOCATION OF ANY UNDERGROUND LINES. THE CONTRACTOR SHALL NOTIFY "DIGSAFE" AT 811 PRIOR TO ANY EXCAVATION. THE CONTRACTOR SHALL PERFORM EXPLORATORY EXCAVATIONS AS NEEDED TO DETERMINE THE ACTUAL LOCATION OF THE EXISTING SERVICE STUBS AND PRIVATE UTILITIES WITHIN THE LIMITS OF THE PROPOSED WORK. 3. UTILITIES INFORMATION SHOWN HEREON WERE OBTAINED FROM LIMITED FIELD SURVEYS AND AVAILABLE PRIOR SITE PLANS AND MAY OR MAY NOT BE EITHER ACCURATE OR COMPLETE. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL EXISTING UTILITIES AND SHALL BE RESPONSIBLE FOR ANY DAMAGE TO ANY UTILITY, PUBLIC OR PRIVATE, SHOWN OR NOT SHOWN HEREON. THE CONTRACTOR SHALL CONNECT OR RECONNECT ALL UTILITIES TO THE NEAREST SOURCE THROUGH COORDINATION WITH UTILITY OWNER. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND REMOVAL OF ALL EXISTING VEGETATION, PAVEMENT AND STRUCTURES NECESSARY TO CONSTRUCT THIS PROJECT UNLESS OTHERWISE NOTED ON THESE PLANS. THE CONTRACTOR SHALL REMOVE ALL EXCESS MATERIAL, DEBRIS AND TRASH FROM THE SITE UPON COMPLETION OF CONSTRUCTION, UNLESS OTHERWISE DIRECTED BY THE OWNER. 5. THE CONTRACTOR SHALL BE RESPONSIBLE AT HIS OWN EXPENSE FOR ENSURING THAT THE DUST CREATED AS A RESULT OF CONSTRUCTION DOES NOT CREATE A NUISANCE OR A SAFETY HAZARD. WHERE AND WHEN DEEMED NECESSARY BY THE OWNER, THE CONTRACTOR SHALL BE REQUIRED TO WET SECTIONS OF THE CONSTRUCTION AREA WITH WATER, APPLY CALCIUM CHLORIDE OR SWEEP ASPHALT ROADS WITH A POWER BROOM AS DUST CONTROL. 6. THE CONTRACTOR SHALL ERECT TEMPORARY CONSTRUCTION SIGNS IN ACCORDANCE WITH STATE E-STANDARDS AND CITY REQUIREMENTS. ADDITIONAL TEMPORARY CONSTRUCTION SIGNS SHALL BE IN PLACE WHILE ANY WORK IS UNDERWAY WITHIN THE PUBLIC RIGHT OF WAY. THE CONTRACTOR SHALL PROVIDE FLAGGERS FOR TRAFFIC CONTROL AT ALL TIMES THAT WORK IS UNDERWAY ON THE SHOULDER OR WITHIN THE PAVED PORTION OF THE PUBLIC RIGHT OF WAY. 7. ANY SURFACES, LINES, OR STRUCTURES WHICH HAVE BEEN DAMAGED BY THE CONTRACTOR'S OPERATIONS SHALL BE RESTORED TO THE CONDITION AT LEAST EQUAL TO THAT IN WHICH THEY WERE FOUND IMMEDIATELY PRIOR TO THE BEGINNING OF OPERATIONS. 8. THE HORIZONTAL AND VERTICAL SEPARATION FOR SEWER, STORM, AND WATER LINES SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE VERMONT ENVIRONMENTAL REGULATIONS AND THE VERMONT WATER SUPPLY RULES. 9. HEALTHY EXISTING TREES, AS SHOWN ON THE PLANS, ON AND ADJACENT TO THE SITE SHALL BE PROTECTED BY THE CONTRACTOR. 10. ALL FILL SHALL BE PLACED IN 6 INCH LIFTS AND THOROUGHLY COMPACTED TO 95% OF MAXIMUM DENSITY AT OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D698 STANDARD PROCTOR, UNLESS OTHERWISE SPECIFIED. 11. AT COMPLETION OF GRADING, SLOPES, DITCHES, AND ALL DISTURBED AREAS SHALL BE SMOOTH AND FREE OF POCKETS WITH SUFFICIENT SLOPE TO ENSURE DRAINAGE. SIDEWALK RAMP DETAILS C B A C B 8.3 % MAXIMUM CURB TRANSITION SECTION C-C 5' MIN. WIDTH SECTION B-B SECTION A-A CONCRETE CURB 8.3 % MAX. RAMP AUXILIARY ROUNDING ( TYPICAL ) 8.3 % MAX. AUXILIARY RAMP CURB SIDEWALK RAMP 1/4" REVEAL EDGE OF PAVEMENTCONCRETE CURB 24" CAST IRON DETECTABLE WARNING SURFACE LEVEL LANDING SIDEWALK RAMP WITH CAST IRON DETECTABLE WARNING SURFACE SIDEWALK RAMP SIDEWALK RAMP SINGLE RAMP ON TANGENT: SIDEWALK ADJACENT TO CURB. CONCRETE SIDEWALK DETAIL ACCESSIBLE VAN PARKING RESERVED ACCESSIBLE PARKING SPACE DETAIL NOTE: ALL DETECTABLE WARNING SURFACES SHALL BE CAST IRON AND SET IN PORTLAND CEMENT CONCRETE. SEE PLANS 1 1 GRADE OF PAVEMENT SLOPE TO MATCH FINISH SEE SITE PLAN FOR GRADING CONCRETE CURB 18" 1 1/2" THICK VTRANS TYPE III WEARING COURSE 2" THICK VTRANS TYPE II BASE COURSE MIRAFI 500X GEOTEXTILE FABRIC OR EQUAL DENSE GRADED CRUSHED STONE (VTRANS SPEC 704.06) SELECT NATIVE SAND DRIVE & PARKING AREA CROSS SECTION NTS WHERE FILL IS REQUIRED, SELECT NATIVE SAND OR APPROVED SAND FILL SHALL BE USED TO REACH THE SUBGRADE ELEVATION. IF ALTERNATE MATERIAL IS USED, THE ENGINEER SHALL BE CONSULTED REGARDING THE NEED FOR UNDERDRAIN TYPICAL SANITARY SEWER & STORM TRENCH INV. ELEV. POINT ON PLANS AS NOTED SHORT LENGTH OF PIPE NTS 18" X 18" X 8" - 3500 P.S.I. SQUARE 24" 45° BEND FLOW CONCRETE PAD 6" THICK GRAVEL BASE UNDER CONCRETE PAD CLEANOUT DETAIL COVER SHALL BE MARKED SEWER OR STORM THREADED PVC CAP INSIDE CAST IRON CLEANOUT FRAME & COVER 24"X24" SQUARE STRUCTURE TYPICAL CATCHBASIN ROUND STRUCTURE NTS MIN. 30" BIKE RACK DETAIL BIKE RACK LOOP SEE LANDSCAPING PLANS FOR BIKE RACK SPECIFICATIONS 22" MIN. SIDE VIEW NOTES: 1.SHOP DRAWINGS SHALL BE SUBMITTED AND APPROVED BY ENGINEER PRIOR TO ORDERING. 2.THE BIKE RACK SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 3.SEE LANDSCAPING PLANS FOR BIKE RACK SPECIFICATIONS. STAINLESS STEEL WEDGE ANCHOR, MIN. 2 PER SIDE SEE CONCRETE SIDEWALK DETAIL STAINLESS STEEL WEDGE ANCHOR, MIN. 2 PER SIDE ROADWAY SURFACE CONCRETE CURB DETAIL FENCE & RETAINING WALL RAILING NOMINAL 8 FEET ON CENTER THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR THE PROPOSED ATTACHMENT OF THE RAILING POSTS TO TOP OF RETAINING WALL. INSTALL PER MANUFACTURERS RECOMMENDATIONS WHERE NOT LOCATED ALONG TOP OF RETAINING WALL RAILING SHALL BE MONTAGE MAJESTIC WELDED STEEL PANEL FENCE SECTIONS: -TWO RAIL OPTION WITH FLUSH BOTTOM -COLOR SHALL BE BLACK -NO FINIALS OR DOUBLE RING ADORNMENT FINISH GRADE 48" NOMINAL HEIGHT PARTIAL GARDEN STREET TYPICAL SECTION NTS SEE ALSO GARDEN STREET DESIGN PLANS ADDITIONAL CROSS SECTION DETAILS CONCRETE CURB 4 1 12" SUBBASE OF DENSE GRADED CRUSH GRAVEL, FINE GRADED 4" TOPSOIL & SEED 5" THICK CONCRETE SIDEWALK 6'2.5'6" 6" TOPSOIL & SEED OR CONCRETE WALK (SEE LAYOUT PLAN FOR WALK LOCATIONS) S = 2% 1 1 3/8" CRUSHED STONE BEDDING 24" X 24" 48" SUMP LEDGE PAYMENT LIMIT 12" 6" PRECAST REINFORCED CONCRETE CATCHBASIN DESIGNED TO MEET AASHTO H-20 LOADING REQUIREMENTS RAIN GARDEN INLET STRUCTURE OUTLET = 313.25 INLET = 314.50 6" 6" SOLID PRECAST REINFORCED CONCRETE COVER STONE FILL (SEE PLAN) FINISH GRADE CAST IN PLACE CONCRETE CURB ON EACH SIDE OF STRUCTURE 11-16-22 ADD RAIN GARDEN INLET STRUCTURE, REVISE FENCE DETAIL ABR 4" MAXIMUM 12-09-22 ADD NOTES RE: PUBLIC ROW SIDEWALK, ADD GRANITE CURB ABR FOR ALL SIDEWALK TO BE CONSTRUCTED WITHIN THE CITY STREET RIGHT OF WAY (MARKET ST, GARDEN ST & CITY HALL/SCHOOL DRIVEWAY) SEE PUBLIC ROW CONCRETE SIDEWALK DETAIL AND CONC. SIDEWALK JOINTS, FINISH AND NOTES ON SHEET 12