Loading...
HomeMy WebLinkAboutSP-23-004 - Supplemental - 1200 Airport Drive (4)Vermont Operational Stormwater Permit - Standards Compliance Workbook The name above will appear on all the discharge point tabs Site Summary Total SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 New 0.73 0.43 0.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Redeveloped 0.11 0.06 0.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Existing 2.06 1.56 0.00 0.50 0.00 0.00 0.00 0.00 0.00 0.00 Previously Authorized 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total 2.90 2.05 0.35 0.50 0.00 0.00 0.00 0.00 0.00 0.00 Site Area 6.39 2.77 3.12 0.50 0.00 0.00 0.00 0.00 0.00 0.00 44.46776 44.46776 44.46776 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 -73.15304 -73.15304 -73.15304 0.00000 0.00000 0.00000 0.00000 0.00000 0.00000 Receiving Water Centennial Brook Potash Brook Potash Brook 0 0 Recharge Total SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 Required 0.1395 0.0995 0.0150 0.0250 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Provided 0.5440 0.3280 0.2160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Standard met?Yes Yes Yes No n/a n/a n/a n/a n/a n/a Notes: Water Quality Total SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 Required 0.2523 0.1688 0.0439 0.0396 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Provided 0.5440 0.3280 0.2160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Standard met?Yes Yes Yes No n/a n/a n/a n/a n/a n/a Notes: Channel ProtectionImperviousProject Name Do not fill this tab out, apart from the project name and notes. It will auto-populated based on the values on the discharge point tabs. Discharge points (SN) will only show on the summary if an area has been entered on that tab. Areas listed below are those seeking permit coverage. SN3 is area is being diverted to Permit: 3028-INDS.9 where is will be treated and detained. Burlington International Airport Latitude Longitude A minimum WQ V of 0.2" (P*R V ) is required for sites with low impervious (<16.67%). This calculation has not been incorporated into this workbook. Designers should check that the minimum WQ V has been met for their site. SN3 is area is being diverted to Permit: 3028-INDS.9 where is will be treated and detained. Last Updated 8/28/2018 Summary: Page 1 of 3 Vermont Operational Stormwater Permit - Standards Compliance Workbook Total SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 Standard Applies?Yes Yes Yes Yes Yes 0 0 0 0 Waiver n/a n/a n/a n/a n/a Method Hydrologic Condition Method Hydrologic Condition Method Extended Detention Hydrologic Condition Method Hydrologic Condition Method n/a n/a n/a n/a HCV 0.3658 0.2611 -0.0098 0.1145 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 TV Provided 0.5440 0.3280 0.2160 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Notes: Overbank Flood Protection SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 Standard Applies?Yes Yes Yes Yes Yes 0 0 0 0 Pre-Dev Q (cfs)11.14 0 0 0 0 Routed, Post-Dev Q (cfs)8.03 0 0 0 0 Waiver n/a n/a n/a n/a n/a Notes: Extreme Flood Protection SN1 SN2 SN3 SN4 SN5 SN6 SN7 SN8 SN9 Standard Applies?Yes Yes Yes Yes Yes Pre-Dev Q (cfs)22.78 0 0 0 0 Routed, Post-Dev Q (cfs)15.79 0 0 0 0 Waiver n/a n/a n/a n/a n/a Notes: General Notes SN3 is area is being diverted to Permit: 3028-INDS.9 where is will be treated and detained. SN2 is a simple disconnection where an existing infiltration basin reside. A approximate Tv was calculated based from existing suvey but pavement has been reduced. Last Updated 8/28/2018 Summary: Page 2 of 3 Vermont Operational Stormwater Permit - Standards Compliance Workbook The high point in between SN1 ands SN2 has been modified and the pre-developed areas are slightly different to post- developed area creating an area on the workbook. The total area for the pre-developed and post-developed remains the same of 6.39 acres. SN3 is a small area of disturbance within project limts but the water runoff is diverted to Permit 3028-INDS.9 in the proposed condition. Last Updated 8/28/2018 Summary: Page 3 of 3 Vermont Operational Stormwater Permit - Standards Compliance Workbook General Discharge Point Information Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) Precipitation Data NOAA Atlas 14 Storm WQ Storm 1 yr, 24 hr 10 yr, 24 hr 100 yr, 24 hr Precipitation (inches) 1.00 1.90 3.26 4.87 Drainage Area Information Landuse A B C D Total Grass 1.240 0.000 0.000 0.000 1.240 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 Existing Impervious 1.740 0.000 0.000 0.000 1.740 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area 2.980 % Landuse A B C D Total Grass 0.720 0.000 0.000 0.000 0.720 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 New Impervious 0.430 0.000 0.000 0.000 0.430 15.5% Existing for Permit Coverage (Treated to New Standards) 1.560 0.000 0.000 0.000 1.560 56.3% Existing Impervious Not for Permit Coverage 0.000 0.0% Redeveloped Impervious 0.060 2.2% 0.000 Total Site Area 2.770 Total Impervious for Permit Coverage 2.050 Net Reduced Impervious 0.000 0.0% Reduced Existing Impervious (for redevelopment)0.120 66.7% Average Catchment Slope, Y (%) Hydraulic Length, l (ft) Pre Development 0.5 561.00 Post Development 0.5 561.00 Impervious previously authorized under 2002 VSMM Post Development Land Use (acres) WARNING: Pre development and post development areas don't match, so evaluation of the Hydrologic Condition Method is not appropriate within this drainage area. Designer may consider HCM across drainage Information for Calculating TC by the Watershed Lag Method Burlington International Airport SN1 Pre Development Land Use (acres) Centennial Brook 44.46776 -73.15304 * Preciptation values shall be obtained from Last Updated 8/28/2018 SN1: Page 1 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Runoff Calculations 1 yr, 24-hr 10 yr, 24-hr 100 yr, 24-hr 0.2429 0.4391 0.6899 0.2862 0.5172 0.8020 Tier 1/Runoff Reduction Practices Practice TV (ac-ft) TV (ac-ft) Infiltration Chambers 0.328 Runoff Reduction Calculations Standard Re WQ CP QP10 QP100 TV Required (ac-ft)0.0995 0.1688 0.2611 0.4717 0.7142 TV Provided (ac-ft)0.3280 0.3280 0.3280 0.3280 0.3280 TV Remaining (ac-ft)0.0000 0.0000 0.0000 0.1437 0.3862 Standard met with HCM?Yes Yes Yes No No Post-Development CN n/a 97 93 90 87 CNadj n/a n/a n/a 69 71 Pre-Development CN n/a n/a 90 84 80 Groundwater Recharge Standard (Re)1 Standard Applicable? ReV 0.0995 Standard met with Tier 1 Practices? Yes Recharge Notes: List all Tier 1 practices below with the associated treatment volume (TV ). The T V will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) Practice Yes No Last Updated 8/28/2018 SN1: Page 2 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Water Quality Treatment Standard (WQ)1 1 (ac-ft)Apply Reduction? WQV - New & Existing 0.1608 0.0% WQV - Redevelopment 0.0080 66.7%Max 25% applied Total WQV 0.1688 WQV met with Tier 1 practices 0.1688 1 WQV to be met with Tier 2 and/or Tier 3 practices 0.0000 WQV Provided (ac-ft)Tier Total WQV Provided (ac-ft)0.0000 ac-ft Is the WQV Standard met?Yes Water Quality Notes: Channel Protection Standard (CP)1 1 Standard Applicable? Standard Met with HCM?Yes Provide Extended Detention for:n/a ac-ft Warm or Cold Water Fishery?→Provide: FALSE Extended Detention STP: CNAdj n/a 15.8 (Watershed Lag Method) Channel Protection Notes: Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. OR The Alternative Extended Detention Method (§2.2.5.4) is being used. 12 hours of extended detention The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. Is all impervious treated by disconnection? % Net Reduction % Removed Existing Impervious (Redevelopment) See the Vermont Water Quality Standards for warm and cold water designations Post Development TC (min) Tier 2 & 3 Water Quality Practice Yes No Cold Warm No Yes (WQv met) No Yes No Yes Last Updated 8/28/2018 SN1: Page 3 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Overbank Flood Protection (QP10)1 Standard Applicable? Standard Met with HCM?No STP used: Pre-development peak discharge rate (cfs)11.14 Pre-routed, post-development peak discharge rate (cfs)13.79 Routed, post-development peak discharge rate (cfs)8.03 Pre-Development CN (Flow- weighted composite)84 24.4 CNAdj 69 38.7 Overbank Flood Notes: Extreme Flood Protection (QP100)1 Standard Applicable? Standard Met with HCM?No STP used: Pre-development peak discharge rate (cfs)22.78 Pre-routed, post-development peak discharge rate (cfs)26.71 Routed, post-development peak discharge rate (cfs)15.79 Pre-Development CN (Flow- weighted composite)80 28.3 CNAdj 71 36.3 Extreme Flood Notes: (Watershed Lag Method) The QP10 standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 10 yr, 24 hour storm event. The extreme standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 100 yr, 24 hour storm event. Post-developed runoff does not exceed pre-developed flows for the 10-year storm Modeling Info: When demonstrating Q P10 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. Post-developed runoff does not exceed pre-developed flows for the 100-year storm Post Development TC (min) Post Development TC (min) Pre Development TC (min)(Watershed Lag Method) Pre Development TC (min) Modeling Info: When demonstrating Q P100 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP100 is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through runoff reduction practices. The T C is calculated by the watershed lag method using CN Adj as CN'. Yes No Yes No Last Updated 8/28/2018 SN1: Page 4 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook General Discharge Point Information Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) Precipitation Data NOAA Atlas 14 Storm WQ Storm 1 yr, 24 hr 10 yr, 24 hr 100 yr, 24 hr Precipitation (inches) 1.00 1.90 3.26 4.87 Drainage Area Information Landuse A B C D Total Grass 1.210 0.000 0.000 0.000 1.210 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 Existing Impervious 2.190 0.000 0.000 0.000 2.190 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area 3.400 % Landuse A B C D Total Grass 1.000 0.000 0.000 0.000 1.000 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 New Impervious 0.300 0.000 0.000 0.000 0.300 9.6% Existing for Permit Coverage (Treated to New Standards) 0.000 0.000 0.000 0.000 0.000 0.0% Existing Impervious Not for Permit Coverage 1.770 56.7% Redeveloped Impervious 0.050 1.6% 0.000 Total Site Area 3.120 Total Impervious for Permit Coverage 0.350 Net Reduced Impervious 0.070 3.2% Reduced Existing Impervious (for redevelopment)0.370 88.1% Average Catchment Slope, Y (%) Hydraulic Length, l (ft) Pre Development 0 0.00 Post Development 0 0.00 Information for Calculating TC by the Watershed Lag Method WARNING: Pre development and post development areas don't match, so evaluation of the Hydrologic Condition Method is not appropriate within this drainage area. Designer may consider HCM across drainage Burlington International Airport SN2 Potash Brook 44.46776 -73.15304 * Preciptation values shall be obtained from Pre Development Land Use (acres) Post Development Land Use (acres) Impervious previously authorized under 2002 VSMM Last Updated 8/28/2018 SN2: Page 1 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Runoff Calculations 1 yr, 24-hr 10 yr, 24-hr 100 yr, 24-hr 0.3057 0.5526 0.8632 0.2960 0.5349 0.8331 Tier 1/Runoff Reduction Practices Practice TV (ac-ft) TV (ac-ft) Simple Disconnection 0.216 Runoff Reduction Calculations Standard Re WQ CP QP10 QP100 TV Required (ac-ft)0.0150 0.0439 -0.0098 -0.0177 -0.0301 TV Provided (ac-ft)0.2160 0.2160 0.2160 0.2160 0.2160 TV Remaining (ac-ft)0.0000 0.0000 0.0000 0.0000 0.0000 Standard met with HCM?Yes Yes Yes Yes Yes Post-Development CN n/a 85 92 88 85 CNadj n/a n/a n/a n/a n/a Pre-Development CN n/a n/a 91 87 83 Groundwater Recharge Standard (Re)1 Standard Applicable? ReV 0.0150 Standard met with Tier 1 Practices? Yes Recharge Notes: Pavement to existing infiltration system has been reduced. Tv has been estimated from existing survey information. Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) List all Tier 1 practices below with the associated treatment volume (TV ). The T V will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Yes No Last Updated 8/28/2018 SN2: Page 2 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Water Quality Treatment Standard (WQ)1 1 (ac-ft)Apply Reduction? WQV - New & Existing 0.0355 3.2% WQV - Redevelopment 0.0084 88.1%Max 25% applied Total WQV 0.0439 WQV met with Tier 1 practices 0.0439 1 WQV to be met with Tier 2 and/or Tier 3 practices 0.0000 WQV Provided (ac-ft)Tier Total WQV Provided (ac-ft)0.0000 ac-ft Is the WQV Standard met?Yes Water Quality Notes: Channel Protection Standard (CP)1 1 Standard Applicable? Standard Met with HCM?Yes Provide Extended Detention for:n/a ac-ft Warm or Cold Water Fishery?→Provide: FALSE Extended Detention STP: CNAdj n/a 0.0 (Watershed Lag Method) Channel Protection Notes: Pavement to existing infiltration system has been reduced. Tv has been estimated from existing survey information. The channel protection standard has been fully met with hydrologic condition method. Additional treatment of the 1 year storm is not required. 12 hours of extended detention See the Vermont Water Quality Standards for warm and cold water designations OR The Alternative Extended Detention Method (§2.2.5.4) is being used. Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. Post Development TC (min) Pavement to existing infiltration system has been reduced. Tv has been estimated from existing survey information. % Net Reduction % Removed Existing Impervious (Redevelopment) Is all impervious treated by disconnection? Tier 2 & 3 Water Quality Practice Yes No Cold Warm No Yes (WQv met) No Yes No Yes Last Updated 8/28/2018 SN2: Page 3 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Overbank Flood Protection (QP10)1 Standard Applicable? Standard Met with HCM?Yes STP used: Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre-Development CN (Flow- weighted composite)87 0.0 CNAdj n/a 0.0 Overbank Flood Notes: Extreme Flood Protection (QP100)1 Standard Applicable? Standard Met with HCM?Yes STP used: Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre-Development CN (Flow- weighted composite)83 0.0 CNAdj n/a 0.0 Extreme Flood Notes: Pre Development TC (min)(Watershed Lag Method)Post Development TC (min) Pavement to existing infiltration system has been reduced. Tv has been estimated from existing survey information. Pavement to existing infiltration system has been reduced. Tv has been estimated from existing survey information. The extreme flood standard has been fully met. No additional STPs are required. Modeling Info: When demonstrating Q P100 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP100 is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through runoff reduction practices. The T C is calculated by the watershed lag method using CN Adj as CN'. The QP10 standard has been fully met. No additional STPs are required. Modeling Info: When demonstrating Q P10 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. Pre Development TC (min)(Watershed Lag Method)Post Development TC (min) Yes No Yes No Last Updated 8/28/2018 SN2: Page 4 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook General Discharge Point Information Project name Discharge point serial number (e.g. S/N 001) Name of receiving water Latitude (decimal degrees to five decimal places) Longitude (decimal degrees to five decimal places) Precipitation Data NOAA Atlas 14 Storm WQ Storm 1 yr, 24 hr 10 yr, 24 hr 100 yr, 24 hr Precipitation (inches) 1.00 1.90 3.26 4.87 Drainage Area Information Landuse A B C D Total Grass 0.000 0.000 0.000 0.000 0.000 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 Existing Impervious 0.180 0.000 0.000 0.000 0.180 Impervious previously authorized under 2002 VSMM (not included in calculations) Total Pre Site Area 0.180 % Landuse A B C D Total Grass 0.000 0.000 0.000 0.000 0.000 Meadow 0.000 0.000 0.000 0.000 0.000 Woods 0.000 0.000 0.000 0.000 0.000 New Impervious 0.000 0.000 0.000 0.000 0.000 0.0% Existing for Permit Coverage (Treated to New Standards) 0.500 0.000 0.000 0.000 0.500 100.0% Existing Impervious Not for Permit Coverage 0.000 0.0% Redeveloped Impervious 0.000 0.0% 0.000 Total Site Area 0.500 Total Impervious for Permit Coverage 0.500 Net Reduced Impervious 0.000 0.0% Reduced Existing Impervious (for redevelopment)0.000 0.0% Average Catchment Slope, Y (%) Hydraulic Length, l (ft) Pre Development 0 0.00 Post Development 0 0.00 Information for Calculating TC by the Watershed Lag Method WARNING: Pre development and post development areas don't match, so evaluation of the Hydrologic Condition Method is not appropriate within this drainage area. Designer may consider HCM across drainage Burlington International Airport SN3 Potash Brook 44.46776 -73.15304 * Preciptation values shall be obtained from Pre Development Land Use (acres) Post Development Land Use (acres) Impervious previously authorized under 2002 VSMM Last Updated 8/28/2018 SN3: Page 1 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Runoff Calculations 1 yr, 24-hr 10 yr, 24-hr 100 yr, 24-hr 0.0251 0.0454 0.0695 0.0698 0.1261 0.1931 Tier 1/Runoff Reduction Practices Practice TV (ac-ft) TV (ac-ft) Infiltration Chambers Runoff Reduction Calculations Standard Re WQ CP QP10 QP100 TV Required (ac-ft)0.0250 0.0396 0.1145 0.2069 0.3165 TV Provided (ac-ft)0.0000 0.0000 0.0000 0.0000 0.0000 TV Remaining (ac-ft)0.0250 0.0396 0.1145 0.2069 0.3165 Standard met with HCM?No No No No No Post-Development CN n/a 100 98 98 98 CNadj n/a 100 98 98 98 Pre-Development CN n/a n/a 98 98 98 Groundwater Recharge Standard (Re)1 Standard Applicable? ReV 0.0250 Standard met with Tier 1 Practices? No Recharge Notes: NOTE: Treatment provided is insufficient to meet the recharge standard within this drainage area. Add more infiltrating practices unless recharge is being met site-wide. (check summary tab) Flows are discharged to Permit: 3028-INDS.9 Predevelopment runoff volume (ac-ft) Pre-routed, post development runoff volume (ac-ft) List all Tier 1 practices below with the associated treatment volume (TV ). The T V will be applied to all treatment standards, except for Green Roofs, which do not receive recharge or water quality credit. Please include the appropriate STP worksheet(s) with the application. Practice Yes No Last Updated 8/28/2018 SN3: Page 2 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Water Quality Treatment Standard (WQ)1 1 (ac-ft)Apply Reduction? WQV - New & Existing 0.0396 0.0% WQV - Redevelopment 0.0000 0.0% Total WQV 0.0396 WQV met with Tier 1 practices 0.0000 1 WQV to be met with Tier 2 and/or Tier 3 practices 0.0396 WQV Provided (ac-ft)Tier Total WQV Provided (ac-ft)0.0000 ac-ft Is the WQV Standard met?No Water Quality Notes: Channel Protection Standard (CP)1 1 Standard Applicable? Standard Met with HCM?No Provide Extended Detention for:0.070 ac-ft Warm or Cold Water Fishery?→Provide: FALSE Extended Detention STP: CNAdj 98 0.0 (Watershed Lag Method) Channel Protection Notes: Flows are discharged to Permit: 3028-INDS.9 The channel protection standard has not been fully met. Either increase Tv credit to fully meet HCM or provide extended detention. 12 hours of extended detention See the Vermont Water Quality Standards for warm and cold water designations OR The Alternative Extended Detention Method (§2.2.5.4) is being used. Modeling Info: When demonstrating CP compliance with extended detention in a hydrologic model, use the CN and TC below if the practice being modelled is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. Post Development TC (min) Flows are discharged to Permit: 3028-INDS.9 NOTE: Add more water quality practices unless site balancing is being used. (Check summary tab) % Net Reduction % Removed Existing Impervious (Redevelopment) Is all impervious treated by disconnection? Tier 2 & 3 Water Quality Practice Yes No Cold Warm No Yes (WQv met) No Yes No Yes Last Updated 8/28/2018 SN3: Page 3 of 4 Vermont Operational Stormwater Permit - Standards Compliance Workbook Overbank Flood Protection (QP10)1 Standard Applicable? Standard Met with HCM?No STP used: Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre-Development CN (Flow- weighted composite)98 0.0 CNAdj 98 0.0 Overbank Flood Notes: Extreme Flood Protection (QP100)1 Standard Applicable? Standard Met with HCM?No STP used: Pre-development peak discharge rate (cfs) Pre-routed, post-development peak discharge rate (cfs) Routed, post-development peak discharge rate (cfs) Pre-Development CN (Flow- weighted composite)98 0.0 CNAdj 98 0.0 Extreme Flood Notes: Pre Development TC (min)(Watershed Lag Method)Post Development TC (min) Flows are discharged to Permit: 3028-INDS.9 Flows are discharged to Permit: 3028-INDS.9 The extreme standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 100 yr, 24 hour storm event. Modeling Info: When demonstrating Q P100 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP100 is not a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through runoff reduction practices. The T C is calculated by the watershed lag method using CN Adj as CN'. The QP10 standard has not been fully met. Provide additional STPs to ensure post development peak runoff does not exceed pre development peak runoff for the 10 yr, 24 hour storm event. Modeling Info: When demonstrating Q P10 compliance in a hydrologic model, use the following CN and T C below, if the practice used to meet QP10 is not itself a Tier 1 practice. The CN Adj takes into account the reduction in runoff volume achieved through Tier 1 practices. The T C is calculated by the watershed lag method using CNAdj as CN'. Pre Development TC (min)(Watershed Lag Method)Post Development TC (min) Yes No Yes No Last Updated 8/28/2018 SN3: Page 4 of 4