Site plan application #SP-23-004 of Burlington International Airport to amend a previously approved
plan for an airport complex. The amendment consists of rehabilitating and constructing an expansion of
the existing taxiway “A”, 1200 Airport Drive.
Based on the plans and materials contained in the document file for this application, the Administrative
Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The City of Burlington/Burlington International Airport, hereinafter referred to as the applicant,
is seeking site plan approval to amend a previously approved plan for an airport complex. The
amendment consists of rehabilitating and constructing an expansion of the existing taxiway “A”,
1200 Airport Drive.
2. The owner of record of the subject property is the City of Burlington/Burlington International
Airport.
3. The subject property is located in the Airport and Airport Industrial Zoning Districts.
4. The application was received on January 24, 2023.
5. The applicant previously received unanimous approval for this project from the Development
Review Board on April 21, 2022, via Site Plan application #SP-22-012. That approved decision
included a condition requiring the applicant to obtain a Zoning Permit within 180 days of the
date of approval, or the approval would be rendered null & void. The applicant did not obtain a
Zoning Permit within the specified timeframe and therefore must seek approval for this project
through the Site Plan process once again. Article 14.04.B(1)(b) of the Land Development
Regulations gives the Administrative Officer the authority to issue re-approval of plans if a
permit issued by the Development Review Board has expired within the preceding six months
and no changes or alterations of any kind are proposed. As such, the Administrative Officer has
the authority to review and approve this application, the contents of which were previously
reviewed and approved by the Development Review Board.
6. The plans submitted consist of the following:
Sheet No: Plan Description: Prepared By: Last Revised Date:
1 Overall Site Plan McFarland Johnson 02/18/2022
Cover Sheet McFarland Johnson 02/18/2022
GP-01 General Plan & Airfield Survey
Control
McFarland Johnson 02/18/2022
CS-01 Overall Construction Safety &
Phasing Plan
McFarland Johnson 02/18/2022
DE-01 &
DE-02
Existing Conditions &
Demolition Plan
McFarland Johnson 02/18/2022
#SP-23-004
2
GE-01 &
GE-02
Geometry Plan McFarland Johnson 02/18/2022
GR-01 &
GR-02
Grading, Drainage & Erosion
Control Plan
McFarland Johnson 02/18/2022
EC-01, EC-
02 & EC-
03
Drainage & Erosion Control
Notes & Details
McFarland Johnson 02/18/2022
EP-01 &
EP-02
Electrical Plan McFarland Johnson 02/18/2022
EP-03 &
EP-04
Electrical Details McFarland Johnson 02/18/2022
1 Overall Sketch Plan McFarland Johnson 02/18/2022
7. Applicable review standards include the Airport District Standards, 13.05 Stormwater
Management Standards, Section 14.06 General Review Standards, Section 14.07 Specific Review
Standards, and Appendix A Performance Standards.
A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Airport Zoning District Required Existing Proposed
Min. Lot Size 3 ac 942 ac No change
Max. Building Coverage 30 % Unknown No change
Max. Overall Coverage 50 % 34.5% 35.2%
Min. Front Setback 50 ft. Unknown No change
Min. Side Setback 35 ft. Unknown No change
Min. Rear Setback 50 ft. N/A N/A
Max. Front Setback Coverage 30% Unknown No change
Max. Height (flat roof) 35 ft. Unknown No change
√ Zoning Compliance
AIRPORT DISTRICT STANDARDS
6.02D Airport District Additional Standards.
(1) All applications for development within the AIR District involving new or expanded buildings or
structures shall comply with the requirements of Section 13.03, Airport Approach Cones.
No new buildings or structures are proposed.
B) SITE PLAN REVIEW STANDARDS
14.06 General Review Standards
#SP-23-004
3
A. Relationship of Proposed Structures to the Site.
(1) The site shall be planned to accomplish a desirable transition from structure to site, from
structure to structure, and to provide for adequate planting, safe pedestrian movement,
and adequate parking areas.
The applicant is proposing to expand Taxiway A. The Administrative Officer finds the
proposed expansion will not affect compliance with this criterion.
(2) Parking:
(a) Parking shall be located to the rear or sides of buildings. Any side of a building facing a
public street shall be considered a front side of a building for the purposes of this subsection.
The project does not affect parking. The Administrative Officer finds this criterion not
applicable.
(3) Without restricting the permissible limits of the applicable zoning district, the height and
scale of each building shall be compatible with its site and existing or anticipated adjoining
buildings.
No new buildings are proposed. The Administrative Officer finds this criterion not applicable.
14.07 Specific Review Standards
In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply:
A. Environmental Protection Standards. All proposed development shall be subject to the
applicable requirements of Article 12, Environmental Protection Standards.
No impacts to natural resource areas are proposed. The Administrative Officer finds this criterion not
applicable.
B. Site Design Features. All proposed development shall comply with standards for the placement
of buildings, parking and loading areas, landscaping and screening, open space, stormwater, lighting,
and other applicable standards related to site design pursuant to these Land Development Regulations.
The proposed lighting changes are to FAA-owned navigational aids. Stormwater management standards
are discussed above. The Administrative Officer finds this criterion met.
C. Access and Circulation. All proposed development shall comply with site access and circulation
standards of Section 15.A.14.
No changes to site access or circulation are proposed; the proposed project involves minor widening of
an existing airport taxiway. The Administrative Officer finds this criterion met.
D. Transportation Demand Management (TDM) [reserved]
E. Building Form. Development within the City Center Form Based Code District, the Urban Design
Overlay District, and other districts with supplemental building form standards shall adhere to the
standards contained therein.
No buildings are proposed. The Administrative Officer finds this criterion not applicable.
F. Streetscape Improvements. A proposed new construction or extension/expansion of an existing
structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section 8.11(D) within the
City Center Form Based Code, or Section 3.11(D) in all other zoning districts, shall be required to upgrade
adjacent sidewalks, greenbelts, and related street furniture (trees, benches, etc.) to the standards
#SP-23-004
4
contained within the applicable Street Type and Building Envelope Standard. Nothing in this subsection
shall be construed to limit requirements for additional upgrades as necessary to meet the requirements
of these Regulations.
No construction or expansion of structures is proposed. The Administrative Officer finds this criterion not
applicable.
G. Access to Abutting Properties. The reservation of land may be required on any lot for provision
of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an
arterial or collector street, to provide additional access for emergency or other purposes, or to improve
general access and circulation in the area.
The Administrative Officer finds that no additional land is needed to support access to abutting
properties.
H. Utility Services. Electric, telephone and other wire-served utility lines and service connections
shall be underground insofar as feasible and subject to state public utilities regulations. Any utility
installations remaining above ground shall be located so as to have a harmonious relation to
neighboring properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and
Services, shall also be met.
Wire-served utility services are not proposed to be affected. The Administrative Officer finds this criterion
not applicable.
I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including
compliance with any recycling, composting, or other requirements, shall be accessible, secure and
properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s).
Small receptacles intended for use by households or the public (ie, non-dumpster, non-large drum) shall
not be required to be fenced or screened.
No changes affecting compliance with this criterion are proposed.
C) OTHER
13.05 Stormwater Management Standards
The Stormwater Superintendent reviewed the application on April 12, 2022 and indicated they have no
comments on the project. The Administrative Officer finds these criteria met.
16.03 Standards for Erosion Control during Construction
The applicant has submitted an erosion and sediment control plan (sheets GR-01 and GR-02) in support
of the project, as well as erosion prevention and sediment control details (sheets EC-01, EC-02, and EC-
03). The Administrative Officer finds the applicant must comply with the standards of 16.03 for erosion
control during construction.
14.05(C)(3) Combined Review
Pursuant to Section 14.05(C)(3), The Administrative Officer finds the criteria for combined review to be
met.
#SP-23-004
5
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site plan application
#SP-23-004 of Burlington International Airport, subject to the following conditions:
1. All previous approvals and stipulations shall remain in full effect except as amended herein.
2. This project shall be completed as shown on the plan submitted by the applicant and on file in the
South Burlington Department of Planning and Zoning.
3. The Administrative Officer concurrently issues Zoning Permit #ZP-23-047.
4. The applicant must regularly maintain all stormwater treatment and conveyance infrastructure.
5. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior to use of
the new uses.
6. Any change to the site plan shall require approval by the South Burlington Development Review
Administrative Officer or the Administrative Officer as allowed by the Land Development Regulations.
Signed this 7th day of February, 2023, by
___________________________________
Marty Gillies, Acting Administrative Officer
Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this
decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental
Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South
Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See
V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-828-1660 or
http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on filing
requirements, deadlines, fees and mailing address.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.