Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation Supplemental Info (3)DONALD L. HAMLIN CONSULTING ENGINEERS, INC. Please reply to: ENGINEERS AND LAND SURVEYORS P.O. Box 9 136 Pearl Street Tel. (802) 878-3956 Essex Junction Essex Junction, Vermont Fax (802) 878-2679 Vermont 05453 www.dlhce.com WATER SUPPLY & DISTRIBUTION MUNICIPAL ASSISTANCE AGRICULTURAL ENGINEERING STORMWATER MANAGEMENT SITE DEVELOPMENT & SUBDIVISION PERMITTING ASSISTANCE CONTRACTOR SERVICES RECREATION FACILITIES & SKI AREAS RESIDENT ENGINEERING STREETS & HIGHWAYS WASTEWATER COLLECTION & TREATMENT LAND SURVEYING Engineering – “The link between what we have and what we need” October 26, 2021 Mr. Justin Rabidoux, P.E., Public Works Director City of South Burlington Public Works Department 104 Landfill Road South Burlington, VT 05403 Re: 469 Lime Kiln Road Request for Additional Wastewater Allocation Dear Mr. Rabidoux: Please find attached a completed Application for Wastewater Allocation for the property located at 469 Lime Kiln Road in South Burlington. This existing property and its two buildings are currently served by municipal sewer with an existing allocation of 81 gallons per day accordingly to existing State permit #WW-4-1559. The applicant is seeking approval for additional allocation related to the food truck operation on the property. The food truck is used for food preparation, cooking, and dish washing. In addition, the existing building on the property will be used for packaging food for takeout and delivery. Also attached is a breakdown of the existing and proposed wastewater demand for the property. An additional 90 gallons per day of wastewater allocation is being requested to serve the property. Please confirm applicable allocation fees and we will coordinate with the applicant on the submission of payment. Please do not hesitate to contact me with any questions or if you need additional information. Respectfully, Jeffrey P. Kershner, P.E. President Enc. Cc: Paul Koenig *Flow Calculations (You may substitute an engineer’s calculation or letter for the information requested below) For residential projects, list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: ___________________________________________________ ________________________________________________________ For commercial and industrial projects, list existing and proposed tenants, uses and flows: Tenant/ Type of use Number of Flows per Other Total Business seats, SF, etc X unit Adjustments Flow TOTAL *Total development wastewater flow requested: ________gallons per day Flow characteristics (for commercial and industrial projects) Volume: ____________________________________________________________ __________________________________________________ Flow rate: ____________________________________________________________ __________________________________________________ Strength: ____________________________________________________________ __________________________________________________ See Attached. 90 90 gallons per day gallons per day domestic Please do not write below this line Application & Recording Fee received: _____________ ________ Name Date Receiving Plant: ______Airport Pkwy _____Bartlett Bay City Center District: ____Yes _____No Approved by Water Pollution Control Department (Commercial and Industrial Projects) ______________________ _____________ Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) _______________________ _____________ Director of Planning and Zoning Date Final allocation issued: (payment of fee is required, either in full or pro-rated for projects with multiple zoning permits involved) _______________________ _____________ Director of Planning and Zoning Date Final allocation expires _________________with permit #____-____-____ (Date) Zoning permit issued___________________with permit#____-____-____ (Date) Associated WW connection permit (if applicable) #____-____-____ For extensions of Final Allocation Only EXTENSION GRANTED ____________to______________ (Date) (Date of Expiration) 50% EXTENSION FEE PAID _________ $___________ (Date) (Amount) 469 Lime Kiln Road Estimated Design Flows Existing Koenig Cedar office building office 3 emp x 15 gpd/emp =45 gpd Existing building (catering)takeout/delivery 2 emp x 13 gpd/emp =26 gpd takeout/delivery 1 unit x 100 gpd/each =100 gpd Total =171 gpd Total flow all uses =171 gpd previously approved/allocated =81 gpd Total New Allocation Request =90 gpd