Loading...
HomeMy WebLinkAboutPermit Wastewater Allocation Supplemental Info 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com June 18, 2013 Doug Hewitt Summit Engineering, Inc. 1233 Shelburne Rd, Suite 2 South Burlington, Vermont 05403 Re: 205 Dorset Street/ University Mall Wastewater Allocation Dear Doug, This letter is to confirm that the property on which the above listed facility is located is presently connected to the city’s water and wastewater system. Based on the information you have provided us, the current approved maximum wastewater and water flow is 590 gallons per day (gpd). The proposed wastewater flow will be 160 gallons per day, less than the approved wastewater flow. The proposed water flow will be 180 gallon per day. The City has the capacity to continue to serve the proposed replacement building at this site. Please note that any proposed increases in flows, as determined by State regulations, will require a permit for allocation from the City. Please contact me should you have any questions. Sincerely, Paul Conner, AICP Director of Planning & Zoning cc: Justin Rabidoux, Director of Public Works