City of Burlington/Burlington International Airport, hereinafter referred to as “applicant”, is seeking
approval to amend a previously approved plan for an airport complex. The amendment consists of
modifying the approved plans for a terminal expansion by reconfiguring the dumpster enclosure,
relocating a sidewalk, removing a door, and modifying the approved landscaping, 1200 Airport Drive.
Based on the plans and materials contained in the document file for this application, the Administrative
Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. City of Burlington/Burlington International Airport, hereinafter referred to as “applicant”, is seeking
approval to amend a previously approved plan for an airport complex. The amendment consists of
modifying the approved plans for a terminal expansion by reconfiguring the dumpster enclosure,
relocating a sidewalk, removing a door, and modifying the approved landscaping, 1200 Airport
Drive.
2. The project is also referred to by the airport as the “Terminal Integration Project” or “TIP.”
3. The owners of record of the subject property is City of Burlington/Burlington International Airport.
4. The project is located in the Airport District.
5. The application was received on February 1, 2022.
6. The plans submitted consists of the following
Plan
Number
Title Prepared By Date Last
Revised
1 Exhibit A The Jones Payne Group, Inc. 10/02/2020
G00-00 Cover Sheet Scott + Partners 04/02/2021
L100 Landscape Plan Wagner Hodgson 12/08/2021
L101 Landscape Plan & Elevation Wagner Hodgson 12/08/2021
C3.101 Proposed Grading and Drainage Plan Hoyle Tanner & Associates 11/29/2021
SP1.1 Overall Site Plan Hoyle Tanner & Associates 04/02/2021
Additional plans not relevant to this amendment were included in the application and are not
considered to be record drawings for this application.
7. The applicant received Development Review Board approval SP-21-018, and related zoning permit
approval ZP-21-090, to construct the related terminal integration project.
correction: SP-22-002
correction: SP-22-002
#SP-20-013
2
DIMENSIONAL REQUIREMENTS
8. There are no changes to coverages proposed with this application.
SITE PLAN REVIEW STANDARDS
Only the standards below are affected by this application. All other standards will continue to be met.
Relationship of Proposed Structures to the Site
9. Pursuant to Section 14.06(B)(1) The site shall be planned to accomplish a desirable transition from
structure to site, from structure to structure, and to provide for adequate planting, pedestrian
movement, and adequate parking areas.
The Administrative Officer finds the modified door and sidewalk does not detract from previously
approved compliance with this criterion.
Disposal of Wastes
10. Pursuant to Section 14.07C, all solid waste handling facilities must be accessible, secure, and
properly screened with opaque fencing to ensure that trash and debris do not escape the
enclosure(s). The dumpster enclosure is fully enclosed by a chain link fence with green vinyl slats
and a swing gate, and will be further screened by seven (7) arborvitae. This criterion is met.
Landscaping and Screening Requirements
Pursuant to Section 13.06(A) of the proposed Land Development Regulations, landscaping and screening is
required for all uses subject to site plan and planned unit development review. The minimum landscape
requirement for this project is determined by Table 13-9 of the South Burlington Land Development
Regulations.
Miscellaneous approval #MS-21-01 establishes an overall landscaping plan for the airport which the
airport agreed to draw upon when required minimum landscaping cannot be provided on site. The total
cost of the building addition approved in #SP-21-018 is estimated at $13,286,271 by the applicant, requiring
$140,362.71 in landscaping. The applicant’s proposed modification reduces the previously approved
landscaping by $275, for a total of $106,610 in trees, shrubs, grasses and hardscape, as follows.
Trees and Shrubs $33,945
Grasses $14,095
Hardscape $58,570
The administrative officer finds the applicant must install an additional $275 in the areas approved in
#MS-21-01 concurrently with this application. Concurrent installation shall mean that a zoning permit
and certificate of occupancy for the off-site landscaping must be obtained prior to issuance of a
certificate of occupancy for this amended terminal expansion project.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site plan application
#SP-22-002 of City of Burlington/Burlington International Airport, subject to the following conditions:
correction: SP-22-002
#SP-20-013
3
1. All previous approvals and stipulations which are not changed by this decision, will remain in full
effect.
2. This project must be completed as shown on the plans submitted by the applicant, and on file in
the South Burlington Department of Planning and Zoning.
3. The applicant must obtain a zoning permit within six (6) months pursuant to Section 17.04 of the
Land Development Regulations or this approval is null and void.
a. The applicant must obtain approval for an additional $275 in off-site landscaping prior to
issuance of a zoning permit for this amended terminal expansion project. Such
landscaping must be installed concurrently with this application. Concurrent installation
shall mean that a zoning permit and certificate of occupancy for the off-site landscaping
must be obtained prior to issuance of a certificate of occupancy for this terminal
expansion project.
4. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior to use
or occupancy of the building.
5. Any change to the site plan shall require approval by the South Burlington Development Review
Board or the Administrative Officer as allowed by the Land Development Regulations.
Signed this _24_ day of ___May_______ 2022, by
Marla Keene, Acting Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a
Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be
accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits
for this project. Call 802.477.2241 to speak with the regional Permit Specialist.
correction: SP-22-002