Loading...
HomeMy WebLinkAboutSP-22-057 - Supplemental - 0002 Baldwin Avenue (4)TRANSMITTAL Vermont | Massachusetts www.doreandwhittier.com October 14, 2022 To:Marty Gillies City of South Burlington Planning & Zoning Dept. 180 Market Street South Burlington VT 05403 From:Rani Philip Project Name:SBSD Elementary School Building Assessments - ZEMs Project Number:21-0823 Copies Description / Comments 1 Memorandum dated 10/14/22 1 Application for Site Plan Review 1 Orchard School, 2022 Elementary School ZEMs – Zoning Plan Set dated 10/14/22 1 Orchard Elementary School, South Burlington ES Modulars – Progress set dated 10/14/22 1 List of Abutters Additional Remarks: HI Marty, Please see the enclosed Site Plan Application package for the South Burlington School District. Please let me know if you have any questions. Sent By: ☐ Messenger ☐ Overnight / Express ☐ Hand Delivered ☐ First Class Mail ☒ Other Sincerely, Rani Philip, Associate AIA, CDT, LEED AP Copy: SBSD, D&W, EV, File MEMORANDUM Vermont | Massachusetts www.doreandwhittier.com October 14, 2022 To: Marty Gillies, SB Planning and Zoning From: Rani Philip, Dore & Whittier Architects, Inc. Subject: South Burlington School District – Orchard School Site Plan Application Project Name: SBSD Elementary School Building Assessments - ZEMs Project Number: 21-0823 Dear Marty, Attached please find the Site Plan Application for the Orchard School Modular Project. Project Information: Owner of Record: South Burlington School District 577 Dorset Street, South Burlington VT 05403 Applicant: South Burlington School District 577 Dorset Street, South Burlington VT 05403 Property Abutters: See attached List of Abutters Design Team: Dore & Whittier Architects, Inc. 212 Battery Street, Burlington VT 05401 Engineering Ventures, PC 208 Flynn Ave, Ste 2A, Burlington VT 05401 Plans Enclosed: Orchard School, 2022 Elementary School ZEMs – Zoning Plan Set dated 10/14/22 Orchard Elementary School, South Burlington ES Modulars – Progress set dated 10/14/22 Project Description: The South Burlington Elementary Schools Modular Addition (the Project) includes the placement of four classrooms built from pre-fabricated building modules (i.e. “modular construction”) south of the existing Orchard School building located at 2 Baldwin Avenue. Also included is the construction of a connecting walkway to access the modular classrooms from the existing school, and associated site work. To the best of our knowledge, this submission complies with applicable review standards. p:\sbsd elementary school bldg assessments 21-0823\arch\admin\k - zem concept\permitting\orchard drb application\cover letter.docx Page 2 of 2 Enclosed in this submission are the following: • List of Abutters • Drawing set: Orchard School, 2022 Elementary School ZEMs – Zoning Plan Set dated 10/14/22 • Drawings Set: Orchard Elementary School, South Burlington ES Modulars – Progress set dated 10/14/22 Project Schedule: • Upon permitting approval and budget approval, this project will commence in Spring of 2023 with an estimated 3-month construction duration. • Phasing is to be determined. Site improvement cost is estimated at $120,000. We kindly request waivers for the following items: • Point-by-point lighting plan and cut sheets for all proposed outdoor lighting within the site: Cut sheets for building-mounted lights included. WAIVER REQUESTED for point-by-point lighting plan. • Detailed specifications and locations of planting, landscaping, screening, and/or buffering materials: WAIVER REQUESTED The new classrooms are intended to be temporary, to address an immediate need of the school district. Since the plan is to address the classroom needs in another way over the next 2-6 years, it does not make sense to install permanent landscape plantings or screenings. We are requesting a waiver from this requirement. If necessary, the waiver could be time-limited to 6 years. • A list of existing vegetation: We have identified tree line and independent trees, but do not yet have a full list of trees 6” or larger. We will collect this information and provide it prior to the hearing. • A written plan to preserve and protect significant existing vegetation during and after construction: We will collect this information and provide it prior to the hearing. • Detailed landscaping plan, specification of materials, costs, and phasing plan. Including vegetation to remain, types of new plant materials by height and/or diameter at time of planting,,,,: WAIVER REQUESTED Given the temporary nature of this project, no permanent landscaping is proposed. • Solar ready roof analysis report: WAIVER REQUESTED Given the temporary nature of this project, a solar ready roof analysis has not been conducted. Sincerely, Rani Philip, Associate AIA, CDT, LEED AP