Loading...
HomeMy WebLinkAboutSD-19-01 - Supplemental - 0284 Meadowland Drive (18)FOR INTERNAL USE ONLY W WA Permit # CITY OF SOUTH BURLINGTON APPLICATION for WASTEWATER ALLOCATION *Items marked with an asterisk must be filled in by ALL applicants *APPLICANT INFORMATION Applicant: SBRC Properties LLC Contact Person: Tim McKenzie Mailing Address: PO Box 2204, South Burlington, VT 05407 Telephone & Fax for Contact Person: Phone: 863-9039 Property Owner Name (if not applicant): Same as above Property Owner Mailing Address: Same as above *Physical Location of Project: 410 Meadowland Drive InS1 atu t Signatur roperty er (Botha 1 ant aAnd property owner MUST sign the pplication!) *Project Information If the project is a single-family home, please check one: New E:JF.xisting If not a single-family home, project name: Booska Movers Subdivision *Application or Permit Numbers: (from Planning & Zoning office) Engineer's Information for flows over i,000 gpd Name of Engineer: Firm Mailing Address: Phone & Fax: PE License #: Please do not write below this line Application & Recording Fee received: _ Name Date Receiving Plant: L Airport Pkwy OBartlett Bay City Center District: Dyes ONo Approved by Water Pollution Control Department (Commercial and Industrial Projects) Director of Water Pollution Control Date Preliminary allocation issued: (payment of fee is not required) Director o ning and Zoning Date Final allocation issued: (payment offee is required, either in full or pro -rated for projects with multiple zoning permits involved) Director of Planning and Zoning Final allocation expires (Date) Date with permit #. Zoning permit issued with permit# - - (Date) Associated W W connection permit (if applicable) For extensions of FinalAllocation Only EXTENSION GRANTED to (Date) (Date of Expiration) 50% EXTENSION FEE PAID (Date) (Amount) Proposed Water and Sewer Design Flows for Commercial Buildings Booska Movers Proposed Lot 1-G 284 Meadowland Drive, South Burlington, VT 05403 Prepared by: Civil Engineering Associates 10 Mansfield View Lane - South Burlington, VT 05403 January 21, 2019 Proposed Sewer flows: Booska Movers Commercial Building: 10 Office Employees x 15 gpd/employee= 25 Field Employees x 5 gpd/employee= Proposed Water flows: Booska Movers Commercial Building: 10 Office Employees x 15 gpd/employee= 25 Field Employees x 5 gpd/employee= 150 gpd 125 gpd Sub Total Proposed Sewer Flow = 275 gpd (20% Municipal Credit) = 55 gpd Total Proposed Sewer Flow = 220 grid Sewer Allocation Needed = 220 gpd 150 gpd 125 gpd Sub Total Proposed Water Flow = 275 grid (10%Low Flow Credit) = 27.5 gpd Total Proposed Sewer Flow = 248 grid Water Allocation Needed = 248 grid P WutoCADD Pmjects\2018\I8213\3-Peemitting\3-State Applications\WaaematedDesiM Flows Table for Booska Movera ab *'Flow Calculations (You may substitute an engineer's calculation or letter for the information requested below) Far residential nroiects. list number of bedrooms and units requested: Number of Bedrooms Number of Units X Gallons per day I per unit = Total Flows 1 140 2 or more 210 TOTAL Notes: For commercial and industrial projects, list existing and proposed tenants, uses and flows. - Tenant/ Type of use Number of Flows per Other Total Business seats SF, etc X unit Adjustments Flow 10 Office Employees x 15 gpd/employee = 150 gpd 25 Field Employees x 5 gpd/employee = 125 gpd Sub Total Proposed Sewer Flow = 275 gpd (20% Municipal Credit) = 55 gpd TOTAL Proposed Sewer Flow = 220 q pd *Total development wastewater flow requested: 220 gallons per day Flow characteristics (for commercial and industrial projects) Volume: Typical office space use - bathroom waste Flow rate: During typical work day Strength: Normal (Typical bathroom use)