HomeMy WebLinkAboutSD-19-01 - Supplemental - 0284 Meadowland Drive (18)FOR INTERNAL USE ONLY
W WA Permit #
CITY OF SOUTH BURLINGTON
APPLICATION for WASTEWATER ALLOCATION
*Items marked with an asterisk must be filled in by ALL applicants
*APPLICANT INFORMATION
Applicant: SBRC Properties LLC
Contact Person: Tim McKenzie
Mailing Address: PO Box 2204, South Burlington, VT 05407
Telephone & Fax for Contact Person: Phone: 863-9039
Property Owner Name (if not applicant): Same as above
Property Owner Mailing Address: Same as above
*Physical Location of Project: 410 Meadowland Drive
InS1 atu t Signatur roperty er
(Botha 1 ant aAnd property owner MUST sign the pplication!)
*Project Information
If the project is a single-family home, please check one: New E:JF.xisting
If not a single-family home, project name: Booska Movers Subdivision
*Application or Permit Numbers: (from Planning & Zoning office)
Engineer's Information for flows over i,000 gpd
Name of Engineer:
Firm
Mailing Address:
Phone & Fax:
PE License #:
Please do not write below this line
Application & Recording Fee received: _
Name Date
Receiving Plant: L
Airport Pkwy OBartlett Bay
City Center District: Dyes ONo
Approved by Water Pollution Control Department (Commercial and Industrial
Projects)
Director of Water Pollution Control
Date
Preliminary allocation issued: (payment of fee is not required)
Director o ning and Zoning Date
Final allocation issued: (payment offee is required, either in full or pro -rated for
projects with multiple zoning permits involved)
Director of Planning and Zoning
Final allocation expires
(Date)
Date
with permit #.
Zoning permit issued with permit# - -
(Date)
Associated W W connection permit (if applicable)
For extensions of FinalAllocation Only
EXTENSION GRANTED to
(Date) (Date of Expiration)
50% EXTENSION FEE PAID
(Date) (Amount)
Proposed Water and Sewer Design Flows for Commercial Buildings
Booska Movers Proposed Lot 1-G
284 Meadowland Drive, South Burlington, VT 05403
Prepared by: Civil Engineering Associates
10 Mansfield View Lane - South Burlington, VT 05403
January 21, 2019
Proposed Sewer flows:
Booska Movers Commercial Building:
10 Office Employees x 15 gpd/employee=
25 Field Employees x 5 gpd/employee=
Proposed Water flows:
Booska Movers Commercial Building:
10 Office Employees x 15 gpd/employee=
25 Field Employees x 5 gpd/employee=
150 gpd
125 gpd
Sub Total Proposed Sewer Flow = 275 gpd
(20% Municipal Credit) = 55 gpd
Total Proposed Sewer Flow = 220 grid
Sewer Allocation Needed = 220 gpd
150 gpd
125 gpd
Sub Total Proposed Water Flow = 275 grid
(10%Low Flow Credit) = 27.5 gpd
Total Proposed Sewer Flow = 248 grid
Water Allocation Needed = 248 grid
P WutoCADD Pmjects\2018\I8213\3-Peemitting\3-State Applications\WaaematedDesiM Flows Table for Booska Movera ab
*'Flow Calculations
(You may substitute an engineer's calculation or letter for the information requested
below)
Far residential nroiects. list number of bedrooms and units requested:
Number of
Bedrooms
Number of Units
X
Gallons per day
I per unit =
Total Flows
1
140
2 or more
210
TOTAL
Notes:
For commercial and industrial projects, list existing and proposed tenants, uses and
flows. -
Tenant/ Type of use Number of Flows per Other Total
Business seats SF, etc X unit Adjustments Flow
10 Office Employees x 15 gpd/employee = 150 gpd
25 Field Employees x 5 gpd/employee = 125 gpd
Sub Total Proposed Sewer Flow = 275 gpd
(20% Municipal Credit) = 55 gpd
TOTAL Proposed Sewer Flow = 220 q pd
*Total development wastewater flow requested: 220 gallons per
day
Flow characteristics (for commercial and industrial projects)
Volume:
Typical office space use - bathroom waste
Flow rate:
During typical work day
Strength:
Normal (Typical bathroom use)