HomeMy WebLinkAbout0000 Cider Mill Drive - Infrastructure - 6/5/2005CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING & ZONING
575 DORSET STREET
SOUTH BURLINGTON, VERMONT 05403
(802) 846-4106
FAX (802) 846-4101
February 9, 2006
Paul O'Leary, Jr.
O'Leary — Burke Civil Associates, PLC
1 Corporate Drive, Suite 1
Fssey Junction; VT 05452
Re: Cider Mill Phase I — Reduction of Letter of Credit #1031139
Dear Mr. O'Leary:
Per your request of January 18, 2006, please be advised that the City of South
Burlington authorizes the reduction of the above referenced Letter of Credit from
$1,270,355 to $801,352. Please submit a new Letter of Credit for the reduced
amount.
Sincer y
i
R d J. Belair
Administrative Officer
O'Leary -Burke Civil Associates, PLC
CIVIL ENGINEERING I REGULATORY AND PERMIT PREPARATION I LAND SURVEYING I CONSTRUCTION SERVICES I LAND USE PLANNING
December 14, 2006
Ray Belair
City of South Burlington
575 Dorset Street
So. Burlington, VT 05403
Re; Cider Mill Phase 1
Reduction in Letter of Credit
Dear Ray,
Please find attached the original construction cost estimate ($2,020,944) dated
June 22, 2005 and a revised estimate dated December 28, 2005 for the first phase of
the Cider Mill project. Phase 1 included:
Cider Mill Drive from Sta. 0+00 to 15+00;
Crispin Drive from 5to 0+00 to 16+32;
Braeburn Drive from 5ta 0+00 to 1+00;
5tormwater ponds 4, 5, and 6;
The pump station and forcemain to Dorset Street and;
The recreation path along the South side of Crispin Drive.
A request was made for a reduction in the Letter of Credit per the December
28, 2005 estimate and was granted in an authorization letter dated February 9, 2006
which is attached for your conveinience. A third estimate, dated December 11, 2006,
shows the amount of work completed to date ($1,980,600) representing 98% of the
estimated construction cost. Per a phone conversation with you on December 14, 2006,
it is my understanding that the letter of credit be maintained at 10% of the overall
construction cost for a period of 2 years after the completion of construction. Because
the remaining cost is under 10% ($40,344) we would like to request a reduction in the
letter of credit for Phase 1 from $801,352 to $202,094. Please let us know at your
earliest convienence if you need additional information to process this request.
Sincerely,
Daniel V. Rexford
�t- 2v- oL 8► . 7`>1z crse, sfrcc�8 frw{�!<<sJ/h-S S�r�t-�
Enc.
cc: Al Bartlett A. �� /'� a►rXc trS Y C. "-) c4'� i-7 �v .GG G nM �e�c� n -S"A ri
1 CORPORATE DRIVE SUITE #1 ESSEX JUNCTION VERMONT 05452
TEL 802 878 9990 I FAX 802 878 9989 I obca@olearyburke.com
9 M om•��
WN 16 16A 1
4 W11 0 1 DK @•
440 SHUNPIKE RD. - WfLUSTON, VT 05495
(802%; 864-0037
THE CMER MILL
Phase I
June 22, 2005
Control
I
LS
105,000.00
105,000.00
-Erosion
Clearing & Grubbing
5
A
3,700.00
18,500.00
St_ri &Stockpile Topsoil
12,400
CY
2.75
34,100.00
Roadway Cuts and Fills
28,000
CY
3.10
86,800.00
10' Paved Recreational Path
3,350
LF
35.00
117,250.00
Wooden Boardwalk
200
LF
225.00
45,000.00
8" PVC Sewer Main
3,505
LF
22.75
79,738.75
48" DIA. Manhole
15
EA
2,075.00
31,125.00
6"Sewer Service
11
EA
550.00
6,050.00
4" Sewer Service
46
EA
525.00
24,150.00
Sewage Pump Station
I
LS
79,895.00
79,895.00
Electrical & Startup
1
LS
4500'00
4,500.00
Valve Pit
I
LS
7:865Go
7,865-00
5400 Gallon Storage Tank
2
EA
12,870.00
25,740.00
6' Force Main
1,348
LF
19.25
25,949.00
Connection Manhole
1
EA
5,100.00
5,100. GO
12" x 12" Wet Tap & Valve
I
EA
4,900.00
4,900.00
Road X-ING Sleeve
2
EA
7,000.00
14,000-00
12" Ductile Iron Water Main
1,600
LF
35.50
56,800.00
12" Gate Valve & Box
6
EA
1,330.00
7,980.00
12" x 8" Wet Tap
1
EA
3,750.00
3,750.00
8" Ductile Iron Water Main
5,180
LF
25.75
133,385.00
8" Gate Valve & Box
18
EA
650.00
11,700.00
Hydrant wNalve
11
EA
2,350.00
25,850.00
3/4" Water Service
68
EA
525.00
35,700.00
Catch Basins
33
EA
1,785.00
58,905-00
12" PVC Storm Drain
1,205
LF
22.00
26,510.00
15" PVC Storm Drain
895
LF
26.00
23,270.00
18" PVC Storm Drain
585
LF
34.25
20,036.25
24" PVC Storm Drain
506
LF
40.50
20,493.00
3' x 2' Box Culvert
I
LS
22,500.00
22,500.00
Wingwalls, Rip -Rap, etc.
I
LS
12,500.00
12,500.00
4" Underdrain
10,140
LF
10.25
103,935-GO
4" PVC Drainage
450
LF
9.50
4,275.00
Drainage Ditch
680
LF
14.00
9,520.00
4" Underdrain Service
51
EA
315.00
16,06500
Pond #3
1
LS
27,000-00
27,000.00
Pond #4
1
LS
26,000.00
26,000.00
Pond #5
1
LS
34,000-00
34,000-00
Pond #6
1
LS
24,000.00
24,000.00
600x Stabilization Fabric
21,100
SY
0.75
15,825.00
24" Gravel Base
15,850
Cy
14.10
223,485.00
Concrete Curb
8,470
LF
11.75
99,522.50
2" Type 11 Asphalt Base
17,075
SY
6.00
102,450.00
1" Type III Asphalt To
17,075
SY
3.00
51,225.00
5'Wide Concrete Sidewalk
3,420
LF
16.50
56,430.00
Driveway Aprons
27
EA
280.00
7,560.00
Topsoil & Seed within ROM
I
LS
28,860.00
28,860.00
,Miscellaneous Items
1
LS
15,750.00
15,750.00
•
■1616,
440 SHUNPiKE RD. • WILLiSTON. VT 05495
(802)864-0037
THE CIDER MILL December 28, 2005
Roadway Construction Summary of Completed Work
3•
'110 Jill?
jv
Erosion Control
105,000.00
85%
89,250.00
Ctearin & -Grubbing
18 500.00
90%
16,650.00
Strip & Stockpile Topsoil
34:100.00
90%
30,690.00
Roadway Cuts and Fills
86,800.00
100%
86,800.00
10' Paved Recreational Path
117,250.00
0%
0.00
Wooden Boardwalk
45,000.00
0%
0.00
8" PVC Sewer Main
79,738. 55
1000/0
79,738.75
48" DIA. Manhole
31,125.00
95%
29,568,75
6"Sewer Service
6,050.00
100%
6,050.00
4" Sewer Service
24,150.00
100%
24,150.00
Sewage Pump Station
79,895.00
0%
0.00
Electrical & Startup4,500.00
0%
0.00
Valve Pit
7,865.00
0%
0.00
5400 Gallon Storage Tank
25,740.00
0%
0.00
6" Force Main
25,949.00
0%
0.00
Connection Manhole
5,100.00
65%
3,315.00
12" x IT Wet Tap & Vatve
4,900.00
100%
4,900.00
Road X-ING Sleeve
14,000.00
50%
7,000.00
12" Ductile Iron Water Main
56,800.00
100%
_ 56,800.00
12" Gate Valve & Box
7,980.00
100%
7,980.00
12" x 8" Wet Tap
3,750.00
0%
0.00
8" Ductile Iron Water Main
133,385.00
74%
98,705.00
8" Gate Valve & Box
11,700.00
91% _
10,647.00
Hydrant wNalve
25,850.00
100% -
25,850.00
3/4" Water Service
35,700.00 -
100%
35,700.00
Catch Basins
58,905.00 "
95%
55,959.75
12" PVC Storm Drain
26,510.00
100%
26,510.00
15" PVC Storm Drain
23,270.00
100%
23,270.00
18" PVC Storm Drain
20,036.25
100%
20,036.25
24" PVC Storm Drain
20,493.00
100%
20,493.00
3' x 2' Box Culvert
22,500.00
_ 100%
22,500.00
_
Win walls, Rip -Rap, etc.
12,500.00
100%
12,500.00
4" Underdrain
103,935.00
100%
103,935.00
4" PVC Drainage
4,275.00
100%
4,275.00
Drainage Ditch
9,520.00
80%
7,616.00
4" Underdrain Service
16,065.00
100%
16,065.00
Pond #3
27 000.00
100%
27 000.00
Pond #4
26,000.00
100%
26,000.00
Pond #5
34,000.00
100%
34 000.00
Pond #6
24,000.00
0%
0.00
600x Stabilization Fabric
15,825.00
100%
15,825.00
24" Gravel Base
223,485.00
80%
178,788.00
Concrete Curb
99,522.50
0%
0.00
2"Type II As halt Base
102,450.00
0%
0.00
1" Type III As halt T
51,225.00
0%
0.00
5' Wide Concrete Sidewalk
56,430.00
0%
0.00
DrivewayAprons
7,560.00
00/0
0.00
Topsoil & Seed within R.O.W
28,860.00
0°%o
0•00
Miscellaneous Items
15,750.00
1 70%
11,025.00
.a._
...,..., s.i ..L:F
a..:. ;...,.."�.
2006 12/12 08:43 FAX 802 893 0102 JC ANTONE & CO Z 001
rr . HOHE.R r
AND COMPANY
Mr. Alan Bartlett
Dorset Street Associates
25 Pinecrest Drive
Essex Jct,, VT 05452
Dear AT,
Enclosed is a summary of the roadway construction work
Cider Mill project on Dorset Street in South Burlington.
construction estimate for Phase I of the Cider Mill, which
The roadway and related items are now 98% complete. E
Asphalt top on Crispin Drive, Royal Drive and Braeburn
time.
December 11, 2006
has been completed at the
summary is based on the
done on June 22, 2005.
ty Aprons and I "Type III
are not completed at this
s
Willis
2008 12/12 08:43 FAX 802 893 0162 JC ANTONE & COj002
THE CIDER MILL
Roadway Const ructior! Summary of Completed WOrir
December 11, 2006
Erosion Control
9 Q5,o00 OD
105,000.OQ.—_
Clearing & Grubbin
18 500.00
—_100%
100%
—
1$ 500-00
Step &Stockpile Topsoil
.... ___
Roadway Cuts and Fills
34 100.00
-._.._._L�_�.-
100E
_
34,100.00
86,800-00
100%
86,800.00
10' paved Recreational Path
117,250.00
100E
_
1 117.250.00
Wooden Boardwalk
45,000.00
100%
45,000.00
8" PVC Sewer Main
79.738.75
100E
_
79,738,75
- 37 125,00
48" DIA. Manhole
31,125..00--
6,050.00
- --
- _ 100%
100E
6"Sewer Service _
4" Sewer Service -_
�-
6,050,00
24 150.00
100%
24 150.00
Sewage PumP 5taflon„. '.-•-
Electrical & Startup
.----.--78,895.00 _--
.__ _ 500-00
7,865,00„
25 7AO.pr)
—_—_—._ 100%....
100%
4 500.00
Valve Pit
- w JOQT°
100%
-•---�
-� _
7,865.00 -
25 74D_00
5400 Gallon Storage Tank, _
6" Force Main _ _ T
25,94900
100%
25 949.00
Connection Manhole
5 100-00
100%
5 100.00
12" x 17" Wet Tap & Valve
4,90000
100%
4 900.00
Road X_ING Sleeve _ . _
12" Ductile Iran Water Main
14 000.00
100E
14,000,00
56 800.00
100E
56,800.00
12" Gate Valve & Box
12" x 8" Wet Tap
7 980.00
100%
_
7.980.00
3 750.00
100°%
3,750,00
8" Ductile Iron Water Main
133,385.00
100%
133,385-00
8" Gate Valve & Box
11 700-00
100%
11 700.00
Hydrant wNalve
25 850.00
100%
25 850.00
ZM" Water Service
35 700.00
100%
35 700.00
Catch Basins
58 905-00
100%
58 905.00
12" PVC Storm Drain_
26,510.00
23,270=00�
100°h
1
23 270-OC
16" PVC Storm Drain
18" PVC Storm Drain
20,036.25
1OD%
20,036.25
20 493.OQ
24" PVC Storm Drain
20 493.00
22.500.00
100%
100%
3' x 2' Box Culvert
22,500,00
Win walls Rip-Rep,etc.
12.500.00 _._
103,935.00
._,... _,-.------.1000/° .
100%0
12,500.00
4" Underrlrain
103,935.00
4" PVC Draina a
4,275.00
— • 9.520,00
_ 100E
y 00%
- —
_ �4,275,00
9,520.00
Drainage Ditch --
4" Underdrain Service
16,065-00
27 000-00
100%
100%
16 065.00
Pond #3
27 000.00
Pond #4
Pond #5
26 000-00
100%
26,000.00
34 000.00
100%
34 000.00
Pond #6
24 000.00
100%
24 000,00
600x Stabilization Fabric
15,825-00
100°%
15,825.00
24" Gravel Base
223,48500
100°%
223 485.00
Concrete Curb
99,522.50
100°k
99.522.50
2" Type 11 Asphalt Base
102 450.00
100%
102 450.00
1" Type III halt Top
51,225.00
36%
18,441.00
5' Wide Concrete Sidewalk
56.430.00
100E
_
56,430,00
Driveway Aprons
7,580.00
0%
0.00
Topsoil & Seed wi hln R-O.W
28,860M
100%
_
28,860.00
Miscellaneous items
15,750.00
100%
15,150.00 � _
December 28, 2006
R�r R!-1,ai r
1
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
Re: Irrevocable Standby Letter of Credit #1031139
Expiration Date: June 7, 2008
Dorset Street Associates, LLC
25 Pinecrest Drive
Essex Junction, VT 05452
Dear Beneficiary:
The above -mentioned Letter of Credit is amended as follows:
Decrease value of credit by: $599,258.00 (New value of
$202,094.00)
All other terms and conditions remain the same.
_rul of rs'
Brian D. Messier
Banking Officer
Two Burlington Square P.O. Box 820 Burlington, Vermont 05402 802-658-4000 www.chittenden.com
CITY OF SOUTH BURLINGTON
DEPAKI'MhENT OF PLANNING & ZONING
575 DORSET STREET
SOUTH BURLINC'1'ON, VERMONT 05403
(802) 846-4106
FAX (802) 846-4101
December 21, 2006
Daniel V. Rexford
O'Leary -Burke Civil Associates
1 Corporate Drive, Suite 1
Essex Junction, VT 05452
Re: Cider Mill Phase I - Reduction on Letter of Credit
Dear Mr. Rexford:
This is in response to your letter of December 14, 2006 requesting a
reduction in the Letter of Credit for the above referenced project from
$801,352 to $202,094.
Please be advised that the City Engineer has reviewed your request and it is
hereby approved.
e
�C
43�r 1
Administrative Officer
?4 /
February 16, 2006
Ray Belair
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
Re: Irrevocable Standby Letter of Credit #1031139
Expiration Date: June 7, 2008
Dorset Street Associates, LLC
25 Pinecrest Drive
Essex Junction, VT 05452
Dear Beneficiary:
The above -mentioned Letter of Credit is amended as follows:
Decrease value of credit by: $469,003.00 (New value will be
$801,352.00)
All other terms and conditions remain the same.
Very truly yours,
Debra E. Cross
Vice President
Two Burlington Square P.O. Box 820 Burlington, Vermont 05402 802-658-4000 www.chittenden.com
SUBDIVISION
LETTER OF CREDIT AGREEMENT
THIS AGREEMENT, executed in triplicate between
Aorse-� S�r�-t ASS c des .C, , of SCL44 ,i,.' 4t., . I/T
hereinafter referred to as "(DEVELOPER", CA; f-j e4 /1 ha,;
OF hereinafter referred to as "BANK", and
C i , hereinafter referred to as
" M U I P L ITY".
WITNESSETH:
WHEREAS, Developer has received final subdivision approval frori the
MUNICIPALITY'S C,evelop71a
ent Review Board for the development of a
subdivision consisti-Ig of lots with related improvements, in a
development to cl " be known as L
ez i #C 81-I bf,16 b n 46./IT
, as depicted on and in accordance with the specifications as set fwh on
sheet of --d- or. the final plat plan entitled,
" Dycra It 6,1L1rla,Sl0 Pl " dated
P 10-710 preparea Dy
�t ( as recorded in Book
pages _7-1,1 of the Land Recor of the City of South Burlington;
WHEREAS, DEVELOPER is required by said approval, at its own
expense, to complete the construction of the development site in accordance
with the plan approved by the Development Review Board;
WHEREAS, the parties to the Agreement wish to establish a mechanism
to secure the obligations of the DEVELOPER for the work as set forth above; and
WHEREAS, the BANK executes this Agreement solely in the capacity of
issuer of a Letter of Credit hereinafter specified;
NOW, THEREFORE, the parties hereby covenant and agree as follows:
1. DEVELOPER will, at its own expense, complete the following
construction as depicted and in accordance with the specifications set forth in
said final plat and related documents:
titer MI'[I' nfi�,le. S+A l qoc r-n Sir �51r'JC7 : � r1}nl ,i �/f u�
is 5 fia ���3 Z; ��g��r/► D� �>e� �
#41 H-) #6l, Pv,-y S144
Moo 4r, NO,
oiUL
polls
2. The Developer shall complete the improvements set forth in Paragraph
1 no later than C
3. DEVELOPER shall replace or repair any defective o, improper work or
materials which may be recognized within one year after completion of the
improvements set forth in Paragraph 1. For the purpose of this Agreement
"completion" shall be deemed to have occurred when the MUNICIPALITY has
inspected and approved the construction of all the improvements required by this
Agreement and issued written notice to the DEVELOPER that the construction is
complete.
4. For the guarantee of DEVELOPER's performance of all requirements
hereunder set forth, DEVELOPER has caused the BANK to issue its Irrevocable
Letter of Credit in favor of the MUNICIPALITY, the original of which is attached to
the MUN!CIPALITY's copy of this Agreement, and a copy of which is attached to
the DEVELOPER's copy of this Agreement. During the term o this Agreement,
DEVELO?ER shall cause the attached Letter of ::credit to be re.-iewee at least
thirty (30; days before the maturity date thereof. Failure of the DEVELOPER to
deliver evidence of such renewal to MUNICIPALITY thirty (30) days prior to the
date of e;. piration of said Letter of Credit shall constitute a defy •ilt of the terms of
this Agreement.
5. Said Irrevocable Letter of Credit provides that the drafts drawn under
said credit, must be accompanied by a written statement signed by a duly
authorized agent of the MUNICIPALITY, that in the judgement of the
MUNICIPALITY, the DEVELOPER is in default under the term:. of this
Agreement, and that the funds to be drawn by the draft are in payment for, or in
anticipation of payment for materials, labor and services required for completion
of the improvements identified in Paragraph 1. Payment of each draft will be
made at sight when presented to the BANK by the MUNICIPALITY, the payment
limited only by the aggregate amounts presented in relationship to the maximum
amount of the Letter of Credit. If DEVELOPER shall be in default of the
Agreement for seven (7) days because of its failure to provide evidence of
renewal of the Letter of Credit, required in paragraph 4 above, the
MUNICIPALITY shall notify DEVELOPER by certified mail of said default.
DEVELOPER shall then within three (3) business days provide MUNICIPALITY
with evidence of said renewal of Letter of Credit or MUNICIPALITY may notify
BANK of such default and request payment under said Letter of Credit.
6. The DEVELOPER and MUNICIPALITY hereby agree that the sum of
($4�20235�, — ) shall be sufficient to
secure DEVELOPER's obligations under this Agreement but shall not relieve
DEVELOPER from the obligation to pay any additional costs, if actual costs
exceed the above -stated cost.
7. The MUNICIPALITY will promptly submit to the DEVELOPER a copy of
any draft it submits to the BANK. The consent of the DEVELOPER to payment
of said draft by BANK to the MUNICIPALITY under said Letter of Credit shall not
be required.
8. The MUNICIPALITY shall not file with the BANK a Statement of Default
until ten (10) days after notice has been sent to the DEVELOPER, by certified
mail, setting forth its intention to do so.
9. All funds drawn on the BANK by the MUNICIPALITY pursuant to the
Letter of Credit shall be used so ely by the MUNICIPALITY for the purpose of
completing construction of the in iprovements identified in Paragraph 1. Any work
contracted for by the MUNICIPALITY pursuant hereto shall be let on a
contractual basis, or on a time and material basis, or shall be performed by the
MUNICIPALITY's own work force and equipment, or shall be accomplished in
such other manner as in the judgement of the MUNICIPALITY shall accomplish
the work more expeditiously and econcmically.
10. If payments are drawn on the BANK by the MUNICIPALITY pursuant
to said Letter of Credit, and it shall later develop that a portion of the monies
drawn are in excess of the MUN'CIPALITY's needs, any such excess amount
shall be refunded by the MUNICIPALITY to the BANK, to be credited by said
BANK to the DEVELOPER.
11. This Agreement and said Letter of Credit shall terminate and shall be
of no force and effect upon completion of one year warranty period as described
in the above Paragraph 3. If the MUNICIPALITY has not delivered any written
notice to the DEVELOPER of any defective or improper work or materials in the
construction of the improvements within the twelve (12) month period, or if notice
has been given and the defective work or materials have been corrected by the
DEVELOPER, the MUNICIPALITY shall forthwith notify the BANK in writing that
the Letter of Credit may be cancelled, and shall return the original Letter of Credit
to the BANK, and both the DEVELOPER and the BANK shall be released from
all obligations hereunder and under said Letter of Credit.
12. Upon request of DEVELOPER, but only at the sole discretion of the
MUNICIPALITY, the MUNICIPALITY may agree to reduce the amount of said
Letter of Credit required hereunder if the MUNICIPALITY believes that the full
amount of said Letter of Credit is no longer necessary to protect its interest, and
shall notify the BANK in writing of such reduction in the amount of the Letter of
Credit.
13. The BANK may not modify the Letter of Credit without first receiving
written consent of the MUNICIPALITY.
14. DEVELOPER hereby agrees to indemnify and hold BANK harmless
from all claims, causes of action or liability of any kind arising out of this
Agreement or the issuance by BANK of this Letter of Credit, including attorney's
fees, as long as BANK follows the terms and conditions outlined in said Letter of
Credit.
15. This agreement shall be binding on all parties hereto and their
respective heirs, executers, administrators, successors, and assigns.
Dated at ESSe--,/, , Vermont, this day of
. u me
IN THE PRESENCE OF:
Wl t � �BY
�QCYi(�
Uuly Authorized Agent
(DEVELOPER)
Dated at k, f- c ►ti Vermont, this day of
20
IN 01E PRESENCE OF:
By:
Dated at,(".
�!o✓
Vermont, this day of
u y uthorize Agent
(CITY OF SOUTH BURLINGTON)
,M
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING & 'ZONING
575 DORSET STREET
SOUTH BURUNGTON, VERMONl' 05403
(802) 846-4106
FAX (802) 846-4101
February 15, 2006
Michael Gingras
Chittenden Bank
PO Box 820
Burlington, VT 05402-0820
Re: Cider Mill Phase I — Reduction of Letter of Credit #1031139
Dear Mr. Gingras:
Per Paul O'Leary's request of January 18, 2006, please be advised that the City
of South Burlington authorizes the reduction of the above referenced Letter of
Credit from $1,270,355 to $801,352. Please submit a new Letter of Credit for the
reduced amount.
Sin
RayMond J. Belair
Administrative Officer
A
O'Leary -Burke Civil Associates, PLC
CIVIL ENGINEERING I REGULATORY AND PERMIT PREPARATION I LAND SURVEYING I CONSTRUCTION SERVICES I LAND USE PLANNING
January 18, 2006
Ray Belair
City of South Burlington
575 Dorset Street
So. Burlington, VT 05403
Re: Cider Mill Phase 1
Reduction in Letter of Credit
Dear Ray,
Please find attached the original construction cost estimate
($2,020,944) dated June 22, 2005 for the first phase of the Cider Mill
project. Phase 1 included:
Cider Mill Drive from Sta. 0+00 to 15+00;
Crispin Drive from Sta 0+00 to 16+32,
Braeburn Drive from Sta 0+00 to 1+00;
Stormwater ponds 4, 5, and 6;
The pump station and forcemain to Dorset Street and;
The recreation path along the South side of Crispin Drive.
A second estimate, dated December 28, 2005, shows the amount of
work completed to date ($1,219,592). The purpose of this letter is to
request a reduction in the letter of credit for Phase 1 from $2,020,955
to $801,352. Please let us know at your earliest convienence if you need
additional information to process this request.
Enc.
Sincerely,
r'
Paul O'Leary Jr., P.E.
1 CORPORATE DRIVE SUITE #1 ESSEX JUNCTION VERMONT 05452
TEL 802 878 9990 I FAX 802 878 9989 I obca@olearyburke.com
W ®&&§
440 SHUNPIKE RD. • WILLISTON, VT 05495
(802) 864-0037
Mr. Alan Bartlett
Bartlett -Weaver Associates
25 Pinecrest Drive
Essex Jct., VT 05452
Dear Al,
June 22, 2005
Enclosed is an updated estimate for the first phase of the "Cider Mill" project on Dorset
Street in South Burlington. This phase consists of the first 1500 feet of Cider Mill Drive,
all of Crispin Drive, all of Royal Drive, and 650 feet of Braeburn Street. The total length
of roadway is about 5050 feet.
The sewer system includes a pump station with storage tanks and a force main. The
water system includes two taps off existing 12-inch water main on Dorset Street and is
mainly 8-inch ductile iron pipe except the pipe on Cider Mill Drive, which is 12-inch
ductile iron. The storm drainage systems empty into four separate detention ponds.
About 3300 feet of paved recreation path will be constructed in this phase of
construction.
No attempt has been made to allow for costs that would be incurred if ledge excavation
were necessary. The cost of utilities (power, telephone, cable, and natural gas) should be
added to this estimate along with landscaping, engineering costs, permit fees, etc.
If I can be of further help, please call.
Sincerely,
. Ua,9--O_,
Robert Willis
440 SHUNPIKE RD. • WILLISTON, Tr 05495
(802) 864-0037
THE CIDER MILL
Phase I
June 22, 2005
Erosion Control
1
LS
105,000.00
105,000.00
Clearing & Grubbing
5
A
31700.00
18,5W.00
Strip & St 'le Topsoil
12,400
CY
2.75
34,100.00
Roadway Cuts and Fills
_
28,000
CY
3.10
86,800.00
19 Paved Recreational Path
3,350
LF
35.00
117,250.00
Wooden Boardwalk
200
LF
225.00
45,000.00
8" WC Sewer Main
_
3,505
LF
22.75
79 738.75
48" DIA. Manhole
15
EA
2,075.00
31,125.00
6"Sewer Service
11
EA
550.00
6,050.00
4" Sewer Service
46
EA
525.00
_ 24,150.00
Sewage Pump Station
1
LS
79 895.00
79,895.00
Electrical & Startup
1
LS
4,500.00
4,500.00
Valve Pit
1
LS
7,865.00
7,865.00
MW Gallon Storage Tank
_
2
EA
12,870.00
25,740.00
6" Force Main
1 348
LF
19.25
25,949.00
Connection Manhole
1
EA
5100.00
5,100.00
12" x 12" Wet Tap & Valve
1
EA
4,900.00
4,900.00
Road X-ING Sleeve
2
EA
7,000.00
14 000.00
12" Ductile Iron Water Main
1,600
LF
35.50
56,800.00
12" Gate Valve & Box
6
EA
1330.00
7,980.00
12" x 8" Wet Tap
1
EA
3,750.00
3,750.00
8" Ductile Iron Water Main
5,180
LF
25.75
133,385.00
8" Gate Valve & Box
18
EA
650.00
11,700.00
Hydrant wNalve
11
EA
2,350.00
25,850.00
3/4" Water Service
68
EA
525.00
35,700.00
Catch Basins
33
EA
1,785.00
58,905.00
12" PVC Storm Drain
1,205
LF
22.00
26,510.00
15" PVC Storm Drain
895
LF
26.00
23,270.00
18" PVC Storm Drain
585
LF
34.25
20,036.25
24" PVC Storm Drain
506
LF
40.50
20,493.00
Tx 2' Box Culvert
1
LS
22,5W.00
22,500.00
Win-grwalls, Rip-Rap,etc.
1
LS
12,500.00
12,500.00
4" Underdrain
10,140
LF
10.25
103,935.00
4" PVC Drainage
450
LF
9.50
4,275.00
Drainage Ditch
680
LF
14.00
9,520.00
4" Underdrain Service
51
EA
315.00
16 065.00
Pond #3
1
LS
27,000.00
27 000.00
Pond #4
1
LS
26,000.00
26,000.00
Pond #5
1
LS
34,000.00
34,000.00
Pond #6
1
LS
24 000.00
24,000.00
600x Stabilization Fabric
21,100
SY
0.75
15,825.00
24" Gravel Base
15,850
CY
14.10
223,485.00
Concrete Curb
8,470
LF
11.75
99 522.50
2" Type II Asphalt Base
17,075
SY
6.00
102,450.00
1" Type III Asphalt Top
17,075
SY
3.00
51 225.00
5' Wide Concrete Sidewalk
3,420
LF
16.50
56,430.00
Driveway Aprons
27
EA
280.00
7,560.00
Topsoil & Seed within R.O.W
_
1
LS
28,860.00
28,860.00
Misceilaneous Items
1
LS
15,750.00
15,750.00
m n
MWEN"4'e%nC :!fib h. +i".lr �"rM ,'n4 w.l. ysa.'1y .-✓'u w+;.. '. Yif rr.
ENff
•:
OMMINMa
1
440 SHUNPIKE RD. • WILLISTON V7 05495
(802) 864-0037
Mr. Alan Bartlett
Dorset Street Associates
25 Pinecrest Drive
Essex Jct., VT 05452
Dear Al,
December 28, 2005
Enclosed is a summary of the roadway construction work that has been completed at the
Cider Mill project on Dorset Street in South Burlington. This summary is based on the
construction estimate for Phase I of the Cider Mill, which was done on June 22, 2005.
The roadway and related items are now 60.3% complete. Curbs, sidewalks, gravel, and
asphalt will be completed in 2006. The sewage pump station, force main, pond #6, and a
portion of 8" water main will also be constructed next year.
Sincerely,
7�g's OL-
Robert Willis
•
■i.161S
440 SHUNPIKE RD. • WILLISTON, VT 05495
(802) 864-0037
THE CIDER MILL
Roadway Construction Summary of Completed Work
December 28, 2005
TOTAL
% COMPLETED
AMOUNT COMPLETED
Erosion Control
105,000,00
- _ 85%
90%
90%
89,250.00
16,650.00
30,690.00
86,800.00
0.00
0.00
79,738.75
29,568.75
6,050.00
-_
Clearing & Grubbing
18 500.00
34,100.00
Strip & Stockpile Topsoil
Roadway Cuts and Fills
10' Paved Recreational Path
86,800.00
100%
117,250.00
0%
_
Wooden Boardwalk
45,000.00
0%
100%
8" PVC Sewer Main
79,738.75
48" DIA. Manhole
31,125.00
95%
6"Sewer Service
6,050.00
1000/0
4" Sewer Service
24,150.00
100%
_
24,150.00
Sewage Pump Station
79,895.00
0°/
0.00
0.00
Electrical & Startup
4,500.00
0%
Valve Pit
7,865.00
0%
0.00
5400 Gallon Storage Tank
25,740.00
0%
0.00
6" Force Main
25 949.00
0%
0.00
Connection Manhole
5,100.00
65%
3,315.00
12" x 12" Wet Tap & Valve
4,900.00
100%
4,900.00
Road X-ING Sleeve
14,000.00
50%
7,000.00
12" Ductile Iron Water Main
5615W.00
100%
56 800.00
12" Gate Valve & Box
7,980.00
100%
7,980.00
12" x 8" Wet Tap
3,750.00
0%
0.00
8" Ductile Iron Water Main
133,385.00
74%
98,705.00
8" Gate Valve & Box
11 700.00
91%
10,647.00
Hydra wNalve
25 850.00
100%
25,850.00
3/4" Water Service
35,700.00
100°/0
35 700.00
Catch Basins
58,905.00
95%
55,959.75
12" PVC Storm Drain
26,510.00
100%
26,510.00
15" PVC Storm Drain
23,270.00
100%
23 270.00
18" PVC Storm Drain
20,036.25
100%
20,036.25
24" PVC Storm Drain
20,493.00
100%
20,493.00
3' x 2' Box Culvert
22,500.00
1000/0
22,500.00
Win ails, Rip -Rap, etc.
12,500.00
1000/0
12 500.00
4" Underdrain
103,935.00
100%
103 935.00
4" PVC Drainage
4,275.00
100%
4,275.00
Drainage Ditch
9,520.00
80%
7,616.00
4" Underdrain Servioe
16 065.00
100%
- 16 065.00
Pond #3
27 000.00
100%
27 000.00
Pond #4
26 000.00
100%
26 000.00
Pond #5
34,000.00
100%
34 000.00
Pond 06
24 000.00
0%
0.00
600x Stabifization Fabric
15,825.00
100%
15,825.00
24" Gravel Base
Concrete Curb
2" Type 11 Asphalt Base
1" Type III Asphalt Top
223,485.00
80%
178,788.00
0.00
0.00
0.00
0.00
0.00
0.00
11,025.00
99,522.50
0%
102,450.00
00/0
51,225.00
56,430.00
7,560.00
0%
00/0
0% -
5' Wide Concrete Sidewalk
Driveway Aprons --
Topsoil & Seed within R.O.W
28 860.00
15,750.00
0%
70%
Miscellaneous Items
TOTALS1
$2,020,944.50
i30.3%
1,219,582.50
FEB-09-200S 08:37 From:+OLEARYBURKE 8028789989 To:8028464101 P.1/1
O'Leary -Burke Civil Associates, P
( Ivil + ri(dN1 1 OM., : KGULAT4RY ANU F Hi,%1ii r PPFIDAR117, (
January 25, 2006
Bill Szymanski, City Engineer
City of South Burlington
575 Dorset Street
So. Burlington, VT 05403
Re: Cider Mill Phase, 1
Reduction in Letter of Credit
Dear Bill,
O'Leary -Burke certifies that the work indicated on the Robert
Willis and Company estimate dated December 28, 2005 at the Cider Mill
project in South Burlington has been completed according to the
approved plans and specifications and complies with City of South
Burlington standards. All of the appropiate water and sewer tests on the
completed infrastructure has been completed.
Sincerely,
�- Rau.L.Q lLcgr ,_,P..E. r-^—
p,>/ JO s Z- y_oG
I U )PPO BRA FF DRIVE SJP L If i F_S EX YJNC I ION VERMONT 0-14�)
TEL $tip_A/8 9`)90 ; FAX r3(7_ 8/S 338:+ uL�Ci1(a1,>,Fary���Irh.e.Ct�rn
June 8, 2005
Ray Belair
City of South Burlington
575 Dorset Street
South Burlington, VT 05403
Re: Irrevocable Standby Letter of Credit #1031139
Dorset Street Associates, LLC
25 Pinecrest Drive
Essex Junction, VT 05452
Dear Beneficiary:
We hereby establish our Irrevocable Standby Letter of
Credit #1031139 in favor of City of South Burlington for the
account of Dorset Street Associates, LLC up to an aggregate
amount of $1,270,355.00 available by your draft or drafts on us
at sight accompanied by:
1.) the original Letter of Credit and all amendments, if
any,
2.) a written statement signed by an authorized officer of
City of South Burlington that these funds are due you under
the terms of your agreement with, Dorset Street Associates,
LLC accompanied by
3.) a current secretary certificate or resolution from City
of South Burlington that the officer is authorized to sign
on behalf of City of South Burlington.
If your demand represents a partial drawing hereunder, we will
endorse the original credit and return same to you for possible
future claims. If, however, your demand represents a full
drawing, or if such drawing is presented on the day of the
relevant expiration date hereof, we will hold the original for
our files and remove same from circulation.
Two Burlington Square P.O. Box 820 Burlington, Vermont 05402 802-658-4000 www.chittenden.com
All drafts must be marked under Letter of Credit #1031139.
We engage with you that all drafts drawn under and in compliance
with the terms and conditions of this credit will be duly honored
on delivery of documents as specified if presented at this office
on or before June 7, 2008.
Except so far as otherwise expressly stated, this credit is
subject to the "International Standby Practices ISP 98 (1998
Revision), International Chamber of Commerce Publication #590"
Very truly yours,
Debra E. Cross
Vice President
Two Burlington Square P.O. Box 820 Burlington, Vermont 05402 802-658-4000 www.chittenden.com