HomeMy WebLinkAboutSD-22-10 - Supplemental - 0500 Old Farm Road (20)Appendix E Submission Requirments
Preliminary Plat
Item Description Description of Location
Completed application form.
Please see Exhibit 001 provided. Executed Final
Plat Application Form.
One full size copy one 11x17 copy and one digital copy of plans
We have provided a digital copy as per recent
electronic submission protocals. If paper copies
are required again please let us know.
List of the owners of record of abutting properties.
We have provided a project abutter list at
Exhibit 002
Name and address of the owner of record See Application Form Exhibit 001
Name and address of the applicant See Application Form Exhibit 002
Name and address of engineer
Krebs and Lansing Consulting Engineers 164
Main Street, Colchester, VT 05446
Name and address of architect
BSB Design 300 West Summit Avenue, Suite
210 Charlotte, North Carolina 28203.
Name and address of landscape architect.
Wagner Hodgson Landscape Architects, 430
Warren Street, Hudson, NY 12534
Plan preparation dates
See Plan Sheets. Also See Exhibit File Names
and Exhibit Table of Contents.
Plan revision dates
See Plan Sheets. Also See Exhibit File Names
and Exhibit Table of Contents.
True North Arrow and scale. Preferred scale not more than on hundred feet to the inch. Scale and North Arrow on All Plans Provided.
Narrative Description of project. Narrative provided.
Narrative Demonstration of compliance with applicable review standards
Narrative provided goes line by line through the
Preliminary Plat decision. It provides a screen
shot of the Preliminary Plat decsision or
request and the responds to the item or
request. We believe this criterion is satisfied.
Narrative list of submission elements.
An Exhibit Table of Contents is attached with a
list of all submission elements as well as the
date of the most -current versions
Narrative list of changes made from previous submittals.
Please see narrative section: Updates since
Prelimianry Plat
List of waivers requested. Details on why the request and authority to grant.
Waivers requested are listed in the Project
narrative, and discussed in the Preliminary Plat
Permit.
Etimated project construction schedule
The consturction of the housing proposed and
associated infrastructure is anticipated to take
7 years. The commecial and industrial areas
have no structures proposed at this time and so
no schedule is available. In general, the
timeline will progress through the phasing plan
sequentially, and we would expect
infrastructure proposed in connection with the
for-sale component to be complete within five
years.
Project Phasing Plan
A project phasing plan is provided at Exhibit
123. It includes updates required in the
Preliminary Plat decision.
Estimated Date of Completion Provided at Exhibit 001. Estimated date is 2032
Estimated cost of all site improvements
Please see Exhibit 008, which includes an
estimated cost by Phase, per the Phasing Plan
provided.
Any other data the administrative officer or development review board shall require. Please advise
Location map showing relation of subject property to surrounding areas. Located on Project Plans
Boundaries and area of existing subject property.
Please see Sheet X-1 to X-3, existing conditions
plans. Exhibit 113-115.
Proposed property lines Please see Exhibit 116-122
Boundary lines of all zoning districts, transects and overlay districts.
Sheet C1.1 shows the overall project site plan
and clearly labels the different zoning districts.
Please see Exhibit 125.
City official map designations See Project civil plans.
Lots proposed are numbered. All lots are numbered.
Location of existing restrictions on land, easments and covenants.
Please see Sheet X-1 to X-3, existing conditions
plans.
Location of planned restrictions on land such as easements and covenants Please see Exhibit 116-122
Permanent Reference Monuments Please see Exhibit 116-122
Copies of proposed deeds, deed restrictions, covenants, agreements and other documents showing
the manner in which open space including park and recreational area are to be dedicated, reserved
and maintained.
Please see Exhibit TOC for a complete list of all
legal exhibits submitted. Specifically Exhibits
053-064.
Certificate from City Attorney that these items are satisfactory.
These items have been provided directly to the
City Attorney for review.
Subdivisions served by a private street, copy of items related to roadway maintenance.
See Association Declarations and Bylaws
Provided.
Complete survey of subddivision Please see Exhibit 116-122
Lot area in square feet and acres.
Please see Exhibit 050 a list of all lots in square
feet an acres as required.
Lot coverage calculations including building and overall.Please see Exhibit 005
Front yard coverage.Not applicable.
Location and layout of any off-street parking or loading areas. Not applicable.
Location and layout of any traffic circulation areas. Not applicable.
Location and layout of any pedestrian walkways.
Please see project civil and landscape plans, for
comprehensive figure please see Exhibit 009
figure A, the WCG Pedestrian Report.
Location and layout of fire lanes. On Plans as Applicable
Lighting plan and cut sheets for all proposed outdoor lighting.
No outdoor lighting is proposed except for
sconces on single family,duplex homes and
triplex homes. Given that so many homes are
available on so many lots, it is impossible to
determine with certainty what fixtures will be
exactly where. Each lot can recevie multiple
plans, with fixtures in different locations. The
Applicant will certify and accept a condition of
the permit that all outdoor lighting will comply
with Appendix D. With no street lights or
parking lot lights proposed, it is inconceivable
that the 100 acres site will be over the
allowable lighting maximum due to a few front
porch lights limited to the R1 area.
Preliminary grading and drainage plans. See Project civil plans.
Preliminary landscaping and buffering plan. See Project landscape plans provided
The extent and amount of cut and fill for all disturbed areas, including before-and-after profiles and
cross sections of typical development areas, parking lots and roads, and including an erosion and
sedimentation control plan, and proposed locations of sediment sink/setting pond and interceptor
swales.
The Applicant has spent a significant amount of
time analyzing the cuts an fills associated with
construction of the Project. Our current
estimate is 93,000 cubic yards of cut
(exclcuding the borrow pit) and 61,000 cubic
yards of fill. The borrow pit is anticipated to be
approximately 70,000 yards of cut, generating
nearly 100,000 cubic yards of stone due to
expansion from fragmentation. Full EPSC
sheets are provided for the Project, attached.
Location of any outdoor equipment storage NA
Location of any outdoor materials storage NA
Location of any solid waste related facilities dupmpsters, recycle bins.
All homes will use garbage totes, that will be
placed in the garage per the HOA documents.
Estimate of all earthwork including quantity of material to be imported or removed from the site.
The Applicant is proposing a net neutral site.
The on site borrow pit and the on site fill area
limiting material export and import. While
select stone products may need import if they
cannot be produced on site, no large fills will
require import and no large cuts will require
export.
Location of existing structures on the site.
Please see Sheet X-1 to X-3, existing conditions
plans.
Plan showing all site conditons to remain. See project civil plans.
Plan showing existing water courses and buffers.See Sheet X-1 to X-3
Plan showing wetlands and bufferes.
Wetlands and buffers are shown on all civil
plans where present as required by the
Preliminary Plat.
Base flood elevations if located in special flood hazard area. NA
Plan showing current wooded areas.
Please see Sheet X-1 to X-3, existing conditions
plans. Exhibit 113-115.
Plan showing existing ledge outcrops.
Please see Sheet X-1 to X-3, existing conditions
plans. Exhibit 113-115.
Plan showing other natural features, if any.
Please see Sheet X-1 to X-3, existing conditions
plans. Exhibit 113-115.
Plan showing existing and proposed open space. See Sheet C-21 Open Space Plan Exhibit 155
By proper designation on such plat, all public space for which offers of cession are made by the
applicant and those spaces title to which is reserved by him.See Plat Plans Exhibit 116-122
The location of open space to be dedicated to the City.
See Application Narrative. See offers of
Dedication attached.
The location of open space to be retained by the Applicant. See Application Narrative.
Existing and proposed contours at maximum interval of 2'.All Plans have contours as required
A written plan to protect vegetation during and after construction.
Please see Exhibit 051 for a written plan,
protective measures and locations are shown
on EPSC plans.
Detailed landscaping plan, specification of materials, costs, and phasing plan, including vegetation to
remain, types of new plant materials, identified by common name and botanical name, sizes of all
new plant materials by height and/or diameter at time of planting and at maturity, quantities of each
of the planting materials, and treatment of the ground surface (paving, seeding, or groundcover) for
all plantings, screening, buffering, and stormwater infiltration
Please see enclosed detailed landscaping plans.
Please note that landscaping phases are the
same as construction phases. No separate
landscape phasing plan is provided.
Landscaping within phases constructed will be
installed.
Detailed erosion control plan demonstrating compliance with these regulations Please see project EPSC plans.
Existing and proposed structures.
Existing structures are shown on the Existing
Conditions Plan X-1 to X-3. Proposed structures
are shown on plans.
Elevation, Floor Plan and section of proposed buildings.
Please see Exhibit 019 to Exhibit 041 plans
proposed for the project.
Elevations to demonstrate compliance with Building Envelope Standards. NA
Elevations of buildings proposed as part of a planned unit development.
Please see Exhibit 019 to Exhibit 041 plans
proposed for the project.
Location of proposed roads.
Please see Civil Plans, Pavement Marking Plans,
provided.
Width of proposed roads.
Roadway sections are provided. Please see
Sheets D-1. to D-1.3
Location of sidewalks and recreation paths.
Shown on Civil Plans, Landscape Plans, and also
shown at Figure A of Exhibit 09.
Plans showing location of existing and proposed street pavements.
Please see project civil plans and existing
conditions plans.
Plans showing proposed elevations along center lines of all streets, curbs, gutters, sidewalks. Please see project civil plans.
Plans showing location of existing and proposed street pavements.
Please see project civil plans, traffic signal
plans, and pavement marking plans.
Plans showing elevation of manholes and catch basins and culverts.
Please see project civil plans, traffic signal
plans, and pavement marking plans.
Plans showing the location size and invert elevations of planned sewer and storm drains.
Please see project civil plans, traffic signal
plans, and pavement marking plans.
Plans showing fire hydratds, water, gas, electricity and other utilities.
Please see project civil plans, traffic signal
plans, and pavement marking plans.
Location of existing septic systems. Please see existing conditions plans, X-1 to X-3
Location of existing wells. Please see existing conditions plans, X-1 to X-3
Existing and proposed water usage.
Please see preliminary water allocation
attached as Exhibit 012
Existing and proposed wastewater usage.
Please see preliminary wastewater allocation
attached as Exhibit 013
Location and design of utilities. Please see project civil plans and details.
The location and details of all the improvements and utilities, including the location of all utility poles,
utility cabinets, sewage disposal systems, water supply systems, and all details and locations of the
stormwater management system.Please see project civil plans and details.
Construction drawings of all improvements.
Please see project civil plans and details.
Landscape plan and Landscape Details. Traffic
Light Plans and Details and Pavement Marking
Plans.
The length of all straight lines, the deflection angles, radii, length of curves and central angles of all
curves tangent distance and tangent bearings for each street
Information is provided in civil drawings for
project.
All means of vehicular access and egress to and from the site. Please see project civil plans and details.
Plans showing pedestrian circulation. Please see Attachement A of Exhibit 009.
Analysis of traffic impacts.
Project TIA is attached as Exhibit 010.
Appendices to the TIA are attached as Exhibit
011
Proposed stormwater management system including location and suporting design data. See Exhibit 049
Copies of all computations as a basis for the design capacity. See Exhibit 049
Detailed plans, designs and finished grades of retaining walls, steps, ramps, paving, site
improvements, fences, bridges, culverts, and drainage structures.Please see project civil plans and details.