Loading...
HomeMy WebLinkAboutSP-22-032 - Supplemental - 0119 Tilley Drive (47)Version: 11/30/2020 Project Name: Discharge Point: Treatment Wetland # Practice Drainage Area For Permit Coverage Not for Permit Coverage Total to Practice 1 Total Area (acres)2.730 0.000 2.730 2 1.910 0.000 1.910 3 0.000 0.111 0.111 WQV for credit WQV not for credit Total WQV 4 WQV to practice 0.1546 0.0000 0.1546 97 5 2 6 2 Response Attachment location 7 Plans - C-1.3 & C-4.6 8 Plans - C-1.3 & C-4.6 9 Plans - C-1.3 & C-4.7 10 Plans - C-4.6 11*Plans - C-1.3 12*Plans - C-4.6 13*Plans - C-4.6 Response Attachment location 14 Plans - C-1.3 Has a low for orifice been provided to meet the the WQV and CPV extended Has a liner designed in accordance with Section 4.3.5.2 been provided if the infiltration rate exceed 0.05 inches per hour and the wetland is located above New Impervious (acres) UVM MC Outpatient Surgery SN001 Gravel Wetland #2Treatment Wetlands (4.3.5) Redeveloped Impervious Pre-Treatment (4.3.6.3) Has pretreatment been provided for non-rooftop runoff? Discharges to Cold or Warm Water Fishery? Modified CN for WQ (1.0") storm Note: Designers may use the Practice Drainage Area Runoff Calculator (second tab) for calculation of practice- specific runoff volumes for other treatment standards. Conveyance (4.3.5.2) Are inlets stabilized to ensure that non-erosive conditions exist for at least the 1-year, 24 hour storm? * Questions preceded by an asterix (*) may change based on previously entered values Have inlet pipes been set at the permanent pool or the base of the gravel bed? ↑Enter this value on the Standards Compliance Workbook Is outlet elevation designed such that a sub-surface water level is maintained in the gravel wetland? If the gravel wetland is designed with an organic soil layer at the surface, have vertical perforated riser pipes been provided to deliver stormwater stormwater from the surface down to the gravel bed? Have the outfalls and the conveyance to the discharge point been designed and protected to avoid erosion? Practice Type Yes No Yes No No No Yes Yes NoYes Cold Warm NoYes NoYes NoYes Shallow surface wetland Gravel wetland Page 1 of 2 15 Response Attachment location 16 ft3 1061 Attachment Modeling 17 ft3 3,397 Attachment Modeling 18 ft3 4458 19* 20* 21 66.2%Yes 22 Modeling 23 24 ac-ft 0.319 Enter this on the eNOI Response Attachment location 25 N/A 26 N/A 27 Plans - C-4.6 28 N/A 29 Plans - C-4.6 30 Does the planting plan specify that no woody vegetation >2 inches in diameter shall be planted or allowed to grow on the dam, within 15 feet of the dam or the toe of the embankment, or within 25 of a principal spillway outlet? What type of pretreatment is being used? Has an aquatic been been provided that extends at least 5 feet inward from the normal water edge and is no more than 18 inches deep? Has a setback been provided that extends 25 feet from the maximum design water surface elevation of the practice? What is the Storage Volume of the practice. Include the permanent pool and any volume used for providing extended detention. Are all deep pool areas of ≥ 4 feet depth with side slopes steeper than 4:1 (H:V) surrounded by a safety bench with ≤6% slope extending 10 feet outward from the normal water edge to the toe of the side slope? Landscaping (4.3.6.5) Treatment (4.3.6.4) Has a minimum flow path at normal water level of 3:1 been provided? Attachment location: Indicate the specific location (i.e. appendix, page, plan sheet) where the requisite support documentation has been provided within the application. What is the volume stored in the forebay or other volumetric pre- treatment if used? (minimum 10% WQV) What is the volume stored in the permanent pool? What is the total WQV stored at the normal water level (pre- treatment + permanent pool)? Does the pre-treatment volume plus the permanent pool equal at least 50% of the WQV? Has a planting plan been prepared showing how aquatic and terrestrial areas will be stabilized, including plant species, plant locations, sources of plant material and any required soil amendments? Are any donor organic soils used in the practice obtained from a source other than natural wetlands? Is the remaining WQV provided for by extended detention over 24 hours? Swale Filter Strip Forebay (10% WQv) Deep Sump Catch Basins Proprietary NoYes NoYes NoYes Yes No NoYes NoYes NoYes NoYes NoYes NoYes Page 2 of 2