HomeMy WebLinkAboutAgenda 05_SP-22-020_39 Bowdoin Street_neagleychase TO: South Burlington Development Review Board FROM: Marty Gillies, Development Review Planner I SUBJECT: #SP-22-020 39 Bowdoin Street DATE: November 15, 2022 Development Review Board meeting PROJECT DESCRPTION Site plan application #SP-22-020 of Neagley & Chase Construction to construct a 12,840 sf contractor or building trade facility with supporting parking and infrastructure improvements, 39 Bowdoin St. CONTEXT The Board held a hearing on this application on June 21 and October 4, 2022. The Board reviewed the application with the applicant, provided feedback, and continued the hearing on both of those dates for the purpose of allowing the applicant to make necessary modifications to the project for the project to be compliant with the City’s Land Development Regulations. The applicant provided revised materials on November 8. Review of these revised materials is incorporated herein; criterion which Staff considers to have been addressed have been removed from this report. COMMENTS A) SITE PLAN REVIEW STANDARDS 14.06 General Review Standards C. Site Amenity Requirement (1) The required area shall be: (a) For Non-Residential development, a minimum of 6% of non-residential building gross floor area. (b) For Residential development, determined by number of units as: (i) For fewer than 10 units, 100 square feet per unit; (ii) For 10 to 19 units, 85 square feet per unit; or (iii) For 20 or more units, 60 square feet per unit. #SP-22-020 2 The proposed 11,317 sf building requires a minimum of 680 sf of Site Amenity. The applicant has revised the plans to propose a 1,338 sf parklet located near the southwest corner of the building, directly adjacent to the proposed primary entrance and the existing public sidewalk. The minimum size of this amenity is 600 sf, it must be directly adjacent to the public right of way and sidewalk or operable building entry, and must have seating as the main focus of the space. Additionally, the landscaping requirement for parklets states that “Landscaping shall also be a primary component of the space. Because the space is inherently small, it shall be carefully landscaped in a higher proportion than larger spaces. Landscaping should not interfere with seating, but instead complement it.”. The proposed Site Amenity features four paperbark maples and four metal picnic tables. 1. Staff recommends the Board review the applicant’s plans and determine whether this criterion has been met. 14.07 Specific Review Standards In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply: A. Environmental Protection Standards. All proposed development shall be subject to the applicable requirements of Article 12, Environmental Protection Standards. The property contains a wetland, wetland buffer, and river corridor. The river corridor is contained entirely within the wetland and wetland buffer. The applicant is proposing minor grading outside of the wetland buffer and is proposing to appropriately fence the fill used for this project in order to avoid impacts to the wetland buffer. The applicant has revised the plans to connect the proposed project to the existing City sewer line outside of the Class II wetland buffer. As such, Staff considers this criterion met. C. Access and Circulation. All proposed development shall comply with site access and circulation standards of Section 15.A.14. Much of 15.A.14 pertains to the construction of streets, which are not applicable to this application. The applicable sections of 15.A.14 follow. 15.A.14 (D) Functional Capacity and Transit Oriented Development. The nearest signalized intersection or those intersections specified by the DRB shall have an overall level of service “D” or better, at the peak street hour, including the anticipated impact of the fully developed proposed PUD or subdivision. In addition, the level of service of each through movement on the major roadway shall have a level of service of “D” or better at full buildout. The applicant has estimated traffic based on 5,490 sf of Warehousing use (ITE LUC #150) and 7,710 sf of Specialty Trade Contractor use (ITE LUC #180) and estimates that the project weekday PM peak hour trip generation will be 16 VTEs per hour. Staff considers this criterion met. 15.A.14(E) Access and Circulation. The applicant must demonstrate that the street network is arranged to meet applicable access management, traffic, and pedestrian circulation standards under these Regulations, including criteria for site plans under Article 14, Transect Zone Subdivisions under Article 9, or a type of Planned Unit Development under Article 15.C; and, for state highways, VTrans Access Management Program Guidelines in #SP-22-020 3 effect at the time of application. Unless otherwise specified under these regulations, the street network, including the location and arrangement of streets, must be designed to: (8) Align access point with existing intersections or curb cuts and consolidate existing access points or curb cuts within the subdivision, to the extent physically and functionally feasible. Staff considers the pedestrian access to be adequate and supports the proposed driveway widths. At previous hearings, the Board asked the applicant whether the curb cut on Bowdoin St could be re-configured to align with the existing curb cut on the opposite side of the street. One potential advantage is that this would result in trucks making their maneuvers on the site rather than in the public way. The applicant has reviewed a variety of options and concludes that the request from the Board to re-align the proposed curb cut in the manner suggested is not functionally feasible. 2. Staff recommends the Board review the applicant’s plans and determine whether this criterion has been met. B) SUPPLEMENTAL REGULATIONS 13.02 Off Street Parking and Loading F. Access management Requirements. It is the intent of the City to minimize traffic and pedestrian conflicts caused by vehicular driveways on public roadways by reducing the number of required driveways and by minimizing the number of vehicles utilizing such driveways off public roadways. All applicants must make an effort to reduce these impacts. All commercial lots (retail, restaurant, office, service uses, excluding residential, agricultural and industrial uses) located adjacent to other commercial lots must provide a driveway connection to any adjacent commercial lot. If the adjacent property owner does not want to provide for that connection, the applicant must provide an easement to do so in the future when circumstances may change. This driveway connection or easement should be located where vehicular and pedestrian circulation is most feasible. As discussed above, Staff considers cross-lot connections to not be viable. However, in the case of a site plan, the Board only has the authority to waive dimensional requirements. The applicant has provided a draft deed for a 25-foot-wide access easement between the subject property and the property to the north. As such, Staff considers this criterion met. 13.03 Bicycle Parking and Storage. The applicant has provided two bicycle racks, providing short-term parking spaces for four bicycles, and a bicycle storage space & locker. Required Bike Parking Required Short Term (1 per 5k sf office, 1 per 20k sf contractor facility, minimum 4) 4 #SP-22-020 4 Long Term (50% of short term retail and office, 1 per unit) 2 Clothes Lockers 1 The applicant has revised the plans to provide the required short-term and long-term bicycle parking spaces and meet the design standards for these spaces. As such, Staff considers this criterion met. 13.04 Landscaping, Screening & Street Trees B. Except for parking spaces accessory to a one-family or two-family dwelling, all off-street parking areas subject to review by the Development Review Board, shall be curbed and landscaped with appropriate trees, shrubs, and other plants including ground covers, as approved by the Development Review Board. Sections of recessed curb are permitted if their purpose is to allow stormwater runoff from the adjacent parking area to reach stormwater collection, treatment and management infrastructure. The Development Review Board shall consider the adequacy of the proposed landscaping to assure the establishment of a safe, convenient, and attractive parking area and the privacy and comfort of abutting properties. (4) Landscaping Requirements (b) At least one (1) major deciduous shade tree shall be provided within or near the perimeter of each parking area, for every five (5) parking spaces. The trees shall be placed evenly throughout the parking lot to provide shade and reduce glare. Trees shall be placed a minimum of thirty (30) feet apart. 23 parking spaces are provided, requiring 5 shade trees. The applicant has revised the plan to provide 6 shade trees distributed between both sides of the parking area. Staff considers this criterion met. (c) Where more than ten (10) trees are installed, a mix of species is encouraged; the species should be grouped or located in a manner that reinforces the design and layout of the parking lot and the site. The applicant has revised the plan to propose sixteen trees representing six different species. As such, staff considers this criterion met. (7) Snow storage areas must be specified and located in an area that minimizes the potential for erosion and contaminated runoff into any adjacent or nearby surface waters. Snow storage areas have been revised, and Staff considers this criterion met. G(3) Landscaping Budget Requirements. The Development Review Board shall require minimum planting costs for all site plans, as shown in Table 13-4 below. In evaluating landscaping requirements, some credit may be granted for existing trees or for site improvements other than tree planting as long as the objectives of this section are not reduced. The costs below are cumulative; for example, a landscaping budget shall be required to show a planned expenditure of three percent of the first $250,000 in construction or improvement cost plus two percent of the next $250,000 in construction or improvement cost, plus one percent of the remaining cost over $500,000. The landscaping budget shall be prepared by a landscape architect or professional landscape designer. #SP-22-020 5 The applicant has not provided a total estimated project cost calculation. The minimum landscaping budget is calculated as a percentage of the total estimated project cost. As such, it is impossible to calculate whether the applicant has met the minimum landscaping budget requirement. 3. Staff recommends the Board require the applicant to provide a project cost estimate before the conclusion of the hearing. RECOMMENDATION Staff recommends that the Board work with the applicant to address the issues identified herein. Respectfully submitted, Marla Keene, Development Review Planner CIVIL ENGINEERING ASSOCIATES, INC. 10 Mansfield View Lane Phone: 802-864-2323 South Burlington, VT 05403 Fax: 802-864-2271 E-Mail: dmarshall@cea-vt.com November 7, 2022 Mr. Marty Gillies Development Review Planner City of South Burlington Planning & Zoning 575 Dorset Street South Burlington, Vermont 05403 Re: Northeast Territories, Inc. 39 Bowdoin Street SP-22-020 Lot 7 at Meadowland Business Park Site Plan Application for Proposed Office Space and Contractor’s Yard Supplemental Information Dear Mr. Gillies: Thank you for your assistance in the management of this application. To assist in the management of the supplemental information offered with this correspondence, we have inserted the “red” staff recommendations as a starting point in support of the applicant’s responses 1. It appears the applicant’s proposed height is calculated based on the floor to ceiling height of the building, not the height as calculated from the average preconstruction grade of the site. Furthermore, there is a discrepancy between the stated height in the application (33 feet) and the height demonstrated in the elevations (roughly 25 feet). Staff recommends the Board require the applicant to provide a height measured from average pre-construction grade prior to closing the hearing. We have attached Sheet HB-1.0 which calculates the average existing grade and compares that with the proposed finish floor elevation and proposed building height yielding a final permitting building height of 31.79 feet. 2. The applicant is proposing to encroach into the front setback by approximately 19.4 feet on the south side of the property and by approximately 8.5 feet on the east side. The applicant has requested a setback waiver to reduce the front yard setbacks to 35 feet, but that will not be sufficient to accommodate the proposed building footprint. As such, Staff recommends the Board instead consider a waiver to reduce the front yard setback from 50 feet to 30 feet. We concur with the observations of the proposed building footprint location and concur with this recommendation which was reviewed during the last hearing. 3. The Snippet/Parklet Site Amenity must primarily feature year-round, fixed, high-quality seating. Staff recommends the Board require the applicant to demonstrate compliance with this requirement. We have attached a new landscaping plan, Sheet L1.1, which adopts the features outlined above. 8x11 images of the proposed furniture and landscaping trees are also attached. Mr. Marty Gillies Page 2 of 4 November 7, 2022 4. Staff recommends the board require the applicant to modify their proposal to connect the proposed project to the existing City sewer line outside of the Class II wetland buffer. The Site Utility Plan (Sheet C2.3) has been revised to no longer utilize the existing sewer stub originally approved by the City nut a new service that runs southerly into Meadowland Drive which will now require an open cut of the roadway surface. Plans also revised to integrate these changes are reflected on the Attached Sheet C2.2 Grading and Drainage plan, C3.0 – EPSC Plan and C4.1 – Utility Details. 5. Staff recommends the Board require the applicant to revise the trip generation calculations using the updated building square footage and proposed use.. An addendum to the original Traffic Impact Assessment to address the project size has been prepared by Mr. Roger Dickinson, P.E. and recommends that the PM Peak Hour VTE value be set at 16. 6. Staff further recommends the Board establish as part of their decision an approved PM Peak Hour Trip Generation for the purpose of calculating traffic impact fees. Please see above. 7. Staff considers there are no substantial topographical challenges, and recommends the Board discuss with the applicant whether to modify their site plan to construct the driveway so that it both aligns with the driveway on the opposite side of Bowdoin Street and with the drive aisle, to ease internal circulation and allow the trucks to back to the loading docks from the parking lot rather than from the street. We developed a series of plans which superimpose the design truck on: A. The originally proposed plans (Sheet T1.0) B. The drive-in and back-into the truck loading area through a curb cut located opposite of the CBA Building driveway. a. Compared to the originally proposed configuration this adds 2843 SF (orange hatch) and eliminates 505 SF (Blue hatch) for as net increase of 2337 SF b. Technically this is possible but requires that the cab swing out into the street to accommodate the back-in movement. C. Sheet T1.3 Shows the effort to pull out of the Loading Dock while using the relocated curb cut, the truck would need to drive over the curb and trees on the east side of the Bowdoin Street. D. Sheet T1.2 shows the requirements to pull out of the aligned curb cut, back-in to the CBA driveway to head back south. This too has impacts on the curbing and street trees. a. This option requires the relocation of the solid waste enclosure facility to the west and a reduction in the size of the island (increase in impervious surface. In summary, the alternate driveway curb cut alignment cannot accommodate the turning movements into the site without a large increase in impervious area nor can it Mr. Marty Gillies Page 3 of 4 November 7, 2022 accommodate the egress movements with traveling over curbs and street trees. turning movements. 8. The proposed dumpster location is to be screened, but Staff considers insufficient information about the screening is provided to confirm whether this criterion is met. The material is called out as “screen board or other material as per owners request.” Staff recommends the Board require the applicant to demonstrate compliance with this criterion as a condition of approval. Sheet C4.4 was mistakenly left out of the last submission. It is attached with this information which includes the proposed screening detail. 9. The applicant has proposed a 20-ft wide access easement to the property to the north in accordance with this requirement. Staff recommends the Board require the applicant to provide a draft easement document prior to closing the hearing. A Draft deed for the future access to the north is attached. 10. Staff has been unable to locate turning movement information in the revised materials provided on 9/21. Staff continues to recommend the Board require the applicant to address the Fire Chief’s comments which pertain to site design prior to closing the hearing. We understand at the last hearing that this issue had been acknowledged by staff as being acceptable. 11. Staff recommends the Board require the applicant to provide long-term bicycle parking at the site, noting that 50% of the required long-term bicycle parking requirement can be met by private office space. As such, Staff considers that the applicant must provide one additional long- term bicycle parking space and an associated clothes locker, and recommends that the Board require the applicant to do so prior to closing the hearing. The required locker and storage position has been added to the Floor Plan Sheet A2.0 12. Staff recommends the Board require the applicant to fully meet this requirement and revise the distribution of the shade trees prior to closing the hearing. We understand at the last hearing that this issue had been acknowledged by staff as being acceptable. 13. Staff recommends the Board require the applicant to fully meet this requirement by providing a more diverse mix of tree species. The proposed Landscaping Plan Sheet L1.1 depicts the amended proposed tree species mixture for the project. 14. Staff recommends the Board require the applicant to clarify where the snow storage areas will be located prior to closing the hearing. The snow storage areas are on Sheet C1.1. These have been removed from Sheet C2.1 to avoid any ambiguity. 15. Staff recommends the Board require the applicant to provide a project cost and values of each of the landscaping elements included in the landscaping plan before the conclusion of the hearing. 16. One of the lights included in a cut sheet submitted by the applicant does not meet the downcast and shielded requirements. Staff recommends the board include a condition that only the lights specified on the plans, and not all the lights included in the cut sheets, be permitted. This is acceptable Mr. Marty Gillies Page 4 of 4 November 7, 2022 17. Staff recommends the Board discuss with the applicant how the roof will comply with the standard. If the applicant demonstrates satisfactory compliance with this requirement, Staff considers demonstration of it on the plans can be a condition of approval. A Note has ben added to Sheet A1.0 requiring PV enabling power accommodations. This completes our general summary of the current status of the revisions made for the project application materials. If you should have any questions, please feel free to contact me at 864-2323 x310. Respectfully, David S. Marshall, P.E. Project Engineer Attachments: Site Plan Application Package Site Plan Application (1 digital copy Plans HB-1.0 – Building Height Calculation A1.0 – Building Elevations A2.0 – Building Floor Plan L1.1 – Landscaping Plan C2.1 – Site Plan C2.2 – Grading and Drain age plan C2.3 - Site Utility Plan C3.0 – EPSC Plan C4.1 – Site Utility Details C4.4 – Misc. Details T1.0 – Traffic Plan T1.1 – Traffic Plan T1.2 – Traffic Plan T1.3 – Traffic Plan 8x11 Materials Proposed Furniture Specimen Tree Graphics TIA Addendum Draft Access Easement Deed cc: (All w/ enclosures, 11x17 plans); M. Neagley CEA File 19145.00 P:\AutoCADD Projects\2019\19145\3-Permitting\1-Local Applications\4-Site Plan\Submittal\Supplemental 22-10-21\0 - Gillies - Lot 7 MBP Site Plan Cover Letter 221107.rtf REF.UP REF.100' - 0"75' - 0" 125' - 0"30' - 0"5' - 6"72 SF VESTIBULE 101 752 SF LOBBY 102 15' - 5 1/2"12' - 6"12' - 6"12' - 6"12' - 6"13' - 2 1/2"20' - 6" 234 SF PRESIDENT 105 234 SF CEO 106 234 SF VP 107 234 SF BD 108 237 SF ACCOUNTING 109 311 SF PE 110 142 SF PM5 111 142 SF PM4 112 142 SF PM3 113 142 SF PM2 114 142 SF PM1 115 163 SF EST 116 207 SF BID/EST 117 3091 SF SHOP 118 423 SF CONFERENCE ROOM 119 5' - 0"7' - 0"252 SF STORAGE 120 62 SF BATHROOM 122 228 SF COPIER/PRINTER 123 40 SF IT 124 53 SF JC 125 156 SF KITCHEN 126 443 SF LOADING DOCK 127 MEZZANINE ABOVE EXIT EXIT 302 SF OFFICE MAN. RECEPTION 128 DISPLAY-GALLERY 52 SF BATHROOM 121 6' - 6"6' - 0"16' - 0"141 SF EST 132 8' - 10"6' - 7"6' - 9 1/2"6' - 9 1/2" 47 SF BATHROOM 134 6' - 0"145 SF SMALL CONFERENCEROOM 137 163 SF OFFICE 138 182 SF OFFICE 139 56 SF SHOP BATHROOM 140 PLOTTER WORK COUNTER STORAGE/MAIL 14' - 9 1/2"11' - 6"11' - 2 1/2"12' - 5 1/2"5' - 1"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"EXIT MIN. 1' - 6" CANOPY ABOVE LOADING DOCKS, LANDINGS, STAIRS AND WALKS - SEE CIVIL/STRUCTURAL SIDEWALK TO DRIVEWAY (PUBLIC WAY) METAL STAIRS, 7" RISERS CONC. FILLED PANS. MTL HANDRAIL BOTH SIDES. 26' - 6" PATIO SEE CIVIL88' - 0"18' - 0"734 SF MECHANICALROOM 130 119 SF OFFICE 131 OPEN TO SHOP BELOW MEZZANINE 10 PERSON MAX (TOTAL OFFICE SPACE = 780 SF) 118 SF OFFICE 135505 SF OPEN OFFICE 136 42" HIGH GUARDRAIL WITH 4' REMOVABLE SECTION. project name:sheet title: sheet no. scale: project no. checked by: drawn by: proj. date: sheet date:project address:P 802.879.51537 CARMICHAEL ST. ESSEX JUNCTION, VT 05452SCOTTPARTNERS.COMF 802.872.2764 1/8" = 1'-0"9/21/2022 1:04:46 PMS:\1-S+P-Projects\1-COMMERCIAL\Neagley-Chase Offices 2022\Drawings\Revit\2022.09.21_NCC Office_R23.rvtNEAGLEY & CHASE NEWOFFICESProject Number JBA JN Issue Date PROPOSED PLAN A2.009/21/2022 ZONING DRAWINGS_NOT FOR CONSTRUCTION Enter address here09/21/2022 1/8" = 1'-0"1FIRST FLOOR PROPOSED PLAN 1/8" = 1'-0"2MEZZANINE EXIT No Date Revisions 1 11-7-22 Added Bike Storage7,708.56 sq ft One long Term Bike Stage space and Locker. 1,673.18 sq ft 11,523.47 sq ft SSSSSSSS S S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST STS T S T SETCETCETCETCETCETCS T WWWWWWWWWWW W W W W W W W W W W W W W WWWWW S G G G G G G G G G G G G G G G 343 3 4 4 34 6 339 339 338 334 338336 EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK351350349348348347347346346 34 5344 3 4 4 3 4 3341339 339 338 337 3378" MAPLE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR T T 3492" SPRUCE 346345RTSTSTSTSTD D D D STS S ETC ETC W W ST 348347 346 G(5) HB (15) PV (10) EP (10) AP (4) AG (1) TO (9) SA (3) AFA (17) HQ (6) PO (17) HR (13) AP JC GT (10) MD (11) F (6) JC (4) IV (1) JC (3) IV (1) JC (3) JC GT GT PATIO GT (3) HB (4) LM OVER PERGOLA (7) HF (9) HF ENTRY SIGN GB SNOW STORAGE AREA ( T Y P . ) SNOW STORAGE AREA ( T Y P . )DSM DSM SAL 1" = 20' L1.1 PROPOSED PLANTING PLAN NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE OFFICE BUILDING Oct. 18, 2022 PATIO FURNITURE NEAGLEY & CHASE OFFICE BUILDING SOUTH BURLINGTON, VERMONT OCTOBER 18, 2022 METAL SQUARE PICNIC TABLE 4’X4’ METAL RECTANGULAR PICNIC TABLE 8-FEET LONG Page 1 TECHNICAL MEMORANDUM Project: Lot 7 - Meadowland Business Park, South Burlington Date:October 21, 2022 From: Roger Dickinson, PE, PTOE Subject: Traffic Impact Assessment Addendum The purpose of this Addendum is to identify the effects of a reduction in the size of the proposed development on Lot 7 in the Meadowlands Business Park (Meadowland Drive) on future traffic congestion and safety conditions. Originally proposed was a 21,790 sf warehouse/general light industrial/office building. The traffic impacts of that building were examined in a Traffic Impact Analysis prepared by Lamoureux & Dickinson Consulting Engineers, Inc., dated March 7, 2022. The newly proposed 13,200 sf building will provide 7,710 sf of specialty trade contractor (ITE LUC #180) space and 5,490 sf of warehousing (ITE LUC #150) space. This change will reduce the estimated weekday pm peak hour trip generation from 27 vte/hr (4 entering + 23 exiting) to 16 vte/hr (5 entering + 11 exiting). The above reduced building size and revised land-uses will improve future traffic congestion and safety conditions from what were originally projected in the TIA. The conclusion that a traffic signal is not warranted at the Hinesburg Rd/Meadowland Dr intersection remains unchanged. In addition, the calculated local and state transportation impact fees will also be proportionately reduced. SSSSSSSSSSSTS S S S S S S SETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST ST ST ST S T SETCETCETCETCETCETCETCETCETC ST S T STST WWWWWWWWWWWWW W W W W W W W W W W W W W W W W WWWWWW W W W W W W W S S D S EX. UTILITY CABINET (TYP.) G G G G G G G G G G G G G G G G G G G EX. 8" WATER SERVICE INV. UNKNOWN APPROX. LOCATION 8" PVC SEWER SERV. INV. UNKNOWN 8" D.I. WATER MAIN10" D.I. WATER MAIN 8" PVC 8" PVC EX. SMH RIM 346.3 INV. 335.5 (CL) EX. SMH RIM 340.3 INV. 332.6 (CL)BOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK PROPOSED HYDRANT ASSEMBLY 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 3373368" OAK 8" OAK 8" OAK 8" MAPLE 8" MAPLE (2) WATER DIG SAFE MARKINGS 4" SPRUCE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR 2" FIR T T PROPOSED SPRINKLER ROOM ±68 L.F. - 6" SDR 35 PVC(2% MIN. SLOPE)115 L.F. - 8 " C 9 0 0 P V C340338339 349345 346 339 341 4" LINDEN 4" LINDEN 4" LINDEN 4" LINDEN 2" SPRUCE NEW GATE VALVE AND VALVE BOX 346345RT348348349347347348349349347LOT 7 3.96 AC. FIRE DEPARTMENT CONNECTION 98.7' 2" TYPE 'K' DOMESTIC SERVICE w/ 2" GATE VALVE & VALVE BOX 8" D.I.6" CL 52 D.I.P. 8"x6" TEE PROPOSED ELEC., TEL. & CABLE SERVICE D D D ST D STETC ETC W W ST 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 CONTRACTOR SHALL CONFIRM EX. PIPE SIZE PRIOR TO CONNECTION GSWYE CONNECTION INV. 335.3± DSM DSM SAL 1" = 20' 19145 C2.3 PROPOSED CONDITIONS UTILITY PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE CHAMPLAIN WATER DISTRICT SPECIFICATIONS AND DETAILS FOR THE INSTALLATION OF WATER LINES AND APPURTENANCES, CURRENT EDITION, HENCEFORTH THE CWD SPECIFICATIONS. RECORD DRAWINGS PREPARED BY A VERMONT LICENSED PROFESSIONAL ENGINEER SHALL BE PROVIDED TO THE SOUTH BURLINGTON WATER DEPT. IN PDF AND AUTOCAD FORMAT. DRAWING SHALL INCLUDE TIES TO ALL GATE VALVES AND CURB STOPS TO SUB-METER ACCURACY. APR. 7, 2022 4/28/22 DSM REVISED PER CWD COMMENTS 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT 11/7/22 DSM REVISED SEWER SERVICE ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ETCETCETCETCETCETCETCETCETCETCETC ST S T STSTSTST WWWWWWWWWWWWWWWW W W STSTW W W W W ST ST ST STSTSTSTSTSTSTW WWD D G G G G G G GBOWDOIN ST.5 PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK 10" CONC. RETAINING WALL 351350350349349348348348347347347346346 34 5 345344 3443 4 4 343 3433 4 3 342 3423 4 2 341 341341340 340 339 339 338 338 337 337340338339345 346 339 341 346345RT348348349347347348349349347LOT 7 3.96 AC. 612 NEW SEGMENTAL RETAINING WALL 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 DSM DSM SAL 1" = 20' 19145 T1.1 TRAFFIC PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING OCT. 20, 2022 Turn into Site and Back into Loading Dock Reduction in pavement surface with realigned entrance. Additioonal Pavement required to accommodate a re-ligned curb cut 505.24 2,842.94 ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST S T ETCETCETCETCETCETCETCETCETCETCETC ST S T STSTSTST WWWWWWWWWWWWWWWWW W W STSTW W W W W ST ST ST STSTSTSTSTSTW WWD D G G G G G G G GBOWDOIN ST.5 PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHARE D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK10" CONC. RETAINING WALL 351350350349349348348348347347347346346 34 5 345344 3443 4 4 343 3433 4 3 342 3423 4 2 341 341341340 340 339 339 338 338 337 337T T340338339 345 346 339 341 346345RT348348349347347348349349347LOT 7 3.96 AC. 612 NEW SEGMENTAL RETAINING WALL 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 DSM DSM SAL 1" = 20' 19145 T1.2 TRAFFIC PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING OCT. 20, 2022 Egress from Alternate Curb Cut and Back-up into CBA Driveway57.96 95.25 Proposed Curb Cut Realignment. Proposed driveway curbcut to be eliminated Conflict with Over-drive at CBA Driveway257.03 SSSSSSSS S S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST STST S T SETCETCETCETCETCETCETCETCS T STST WWWWWWWWWWW W W W W W W W W W W W W W WWWWWW W W W W S D G G G G G G G G G G G G G G GBOWDOIN ST.MEADOWLAND DR. 5 PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK 10" CONC. RETAINING WALL 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 337T T340338339 349345 346 339 341 346345RT348348349347347348349349347LOT 7 3.96 AC. 612 NEW SEGMENTAL RETAINING WALL 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 DSM DSM SAL 1" = 20' 19145 C2.1 PROPOSED SITE IMPROVEMENTS PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT 30% (MAX.)FRONT YARD COVERAGE ZONING DISTRICT: INDUSTRIAL OPEN SPACE DISTRICT DIMENSIONAL SUMMARY - 3.0 AC. REQ'D. LOT FRONTAGE LOT AREA PROPOSED 3.96 AC. BUILD. COVERAGE LOT COVERAGE 30% (MAX.) 50% (MAX.) 100.3' FRONT SETBACK SIDE SETBACK 50' 35' 35'REAR SETBACK N/A 17.6% 6.6% MEADOWLAND DRIVE 715' BOWDOIN STREET 253' MEADOWLAND DRIVE 11.9% BOWDOIN STREET 29.8% THOMPSON STREET 230' MEADOWLAND DRIVE 30.7' BOWDOIN STREET 40.1' THOMPSON STREET 545.5'P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 10/10/2022 7:05:45 AMT1.3 TRAFFIC PLAN Egress from site conflct with Bowdoin Street curn and trees Elimination of originally proposed Curb Cut Conflict with Bowdoin Street curb and street tree. Alternate Re-aligned Curb Cut 379.46 SETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST S T ETCETCETCETCETCETCETCETCETCETCETC ST S T STSTSTST WWWWWWWWWWWWWWWWW W W STSTW W W W W ST ST ST STSTSTSTSTSTSTW WWD D G G G G G G G GBOWDOIN ST.5 PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SH A R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK 10" CONC. RETAINING WALL 351350350349349348348348347347347346346 34 5 345344 3443 4 4 343 3433 4 3 342 3423 4 2 341 341341340 340 339 339 338 338 337 337T T340338339 345 346 339 341 346345RT348348349347347348349349347LOT 7 3.96 AC. 612 NEW SEGMENTAL RETAINING WALL 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 DSM DSM SAL 1" = 20' 19145 T1.0 TRAFFIC PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING OCT. 20, 2022 Egress Movement from Originally Prposed Curb Cut