Loading...
HomeMy WebLinkAboutZP-22-421 - 1200 Airport Drive 10/28/2022Paul Yeric 10/25/2022 PRIMARY:BTV-T01SHEET NUMBER:SCALE:DATE:APPROVED BY:CHECKED BY:DRAWN BY:PROJECT NUMBER:SHEET TITLE:TITLE SHEETREVISIONS:REV NO.:DATE:DESCRIPTION:BY:REGISTRATION STAMP:4/8/2022 - C:\bms\wsp-pb-us-pw-02\wsp__aaron.campbell\d0524847\BTV-T01 TITLE SHEET.dwg EV CHARGER ROLL-OUT PHASE 1BURLINGTON INTERNATIONAL AIRPORT1200 AIRPORT BLVDSOUTH BURLINGTON, VT (05403)UTILITY DISCLAIMER:ALL UNDERGROUND UTILITY INFORMATION DEPICTED ON THESE PLANS IS BASEDON UTILITY FEATURES OBSERVED AND/OR UTILITY PLANS PROVIDED BY PROPERTYOWNER (IF PROVIDED). A SUBSURFACE INVESTIGATION WAS NOT PERFORMED BYTHE ENGINEER. CONTRACTOR IS RESPONSIBLE FOR VERIFYING THEPRESENCE/ABSENCE OF SUBSURFACE UTILITIES PRIOR TO COMMENCEMENT OFEXCAVATION ACTIVITIES. CONTRACTOR SHALL AT THEIR OWN EXPENSE, SURVEYTHE SUBSURFACE UTILITIES AND CONTACT THEIR LOCAL "DIGSAFE". WSP ASSUMESNO RESPONSIBILITY FOR THE ACCURACIES OF THE UNDERGROUND UTILITIES.AREA OF WORK:100 SUMMER STREET13TH FLOORBOSTON, MA 02110T: 617-426-7330F: 617-482-8487WSP.COMTHE HERTZ CORPORATION8501 WILLIAMS ROADESTERO, FL 33928AS NOTEDOCT 3, 2022AJCJRFJLWBTV QTA FACILITYSHEET INDEXDRAWING NO.DRAWING NAMEBTV-T01TITLE SHEETBTV-E01GENERAL NOTES, SYMBOLS, AND ABBREVIATIONSBTV-E02ELECTRICAL ONE LINE DIAGRAMBTV-E03ELECTRICAL SITE PLANBTV-E04ELECTRICAL DETAILS GENERAL:1.PROVIDE ALL MATERIALS, LABOR, EQUIPMENT, SERVICES TO PERFORM ALL OPERATIONSIN CONNECTION WITH THE ELECTRICAL WORK. CONTACTOR SHALL FURNISH ALLMATERIAL AND LABOR FOR ALL THE WORKS REQUIRED FOR THE COMPLETEINSTALLATION AND TESTING OF FULLY FUNCTIONAL ELECTRIC VEHICLE (EV) CHARGINGSTATIONS.2.THE DRAWINGS AND GENERAL REQUIREMENTS CONTAINED IN THE CONTRACT, GOVERNTHIS WORK. WHERE ITEMS OF GENERAL CONDITIONS ARE REPEATED HEREIN, IT ISINTENDED TO QUALIFY OR TO CALL PARTICULAR ATTENTION TO THEM; IT IS NOTINTENDED THAT ANY OTHER PARTS OF THE GENERAL CONDITIONS SHALL BE ASSUMEDTO BE OMITTED.3.PROCURE AND PAY FOR ALL CERTIFICATES, FEES, TESTS, INSPECTIONS, BONDS,DEPOSITS, AND ESCROW ACCOUNTS, REQUIRED FOR COMPLETE INSTALLATION OF THEWORK. GIVE ALL NOTICES REQUIRED BY LAW, ORDINANCES, OR THE RULES ANDREGULATIONS OF THE VARIOUS AUTHORITIES. COMPLY WITH ALL ORDERS OF THE LOCALDEPARTMENT OF BUILDINGS, COUNTRY DEPARTMENT OF HEALTH, FIRE MARSHAL, ETC.DELIVER TO THE OWNER'S REPRESENTIVE ALL PERMITS AND CERTIFICATES OFAPPROVAL ISSUED BY ALL TOWN, COUNTRY, AND STATE AGENCIES HAVING JURISDICTIONIN CONNECTION WITH THIS WORK, BEFORE THE CERTIFICATE FOR THE FINAL PAYMENT ISISSUED.4.WORKING SPACE FOR ALL ELECTRICAL EQUIPMENT OPERATING AT 600V VOLTS OR LESSTO GROUND AND LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, SERVICING, ORMAINTENANCE WHILE ENERGIZED SHALL COMPLY WITH NEC, ARTICLE 110.26.5.CONTRACTOR SHALL MAINTAIN OPERATION OF THE ELECTRICAL SERVICE DURINGCONSTRUCTION. CONTRACTOR SHALL COORDINATE ALL REQUIRED PANELBOARDSHUTDOWNS WITH ELECTRICAL DEPARTED AND ALL EFFECTED ENTITIES 7 DAYS INADVANCE IN WRITING.6.UNLESS OTHERWISE NOTED, ALL EQUIPMENT AND MATERIALS SHALL BE NEW AND SHALLBEAR UL LISTING AND LABELING WHERE SUCH STANDARD HAS BEEN ESTABLISHED FORTHAT TYPE OF EQUIPMENT/MATERIAL7.ENTIRE ELECTRICAL INSTALLATION SHALL BE IN ACCORDANCE WITH THE LATEST EDITION(UNLESS NOTED OTHERWISE) OF THE FOLLOWING CODES AND STANDARDS:7.1.STATE AND LOCAL CODES7.2.NATIONAL ELECTRICAL CODE (NFPA 70)7.3.NATIONAL ELECTRICAL SAFETY CODE (NFPA 70E)7.4.NATIONAL FIRE ALARM CODE (NFPA 72)7.5.NATIONAL LIFE SAFETY CODE (NFPA 101)7.6.NATIONAL ELECTRICAL CONTRACTORS ASSOCIATIONEQUIPMENT:1.ALL ACCEPTABLE EQUIVALENT ITEMS (EQUIPMENT, DEVICES, ETC.) SHALL BE SUBMITTEDFOR REVIEW AND ACCEPTED. ANY ITEMS PURCHASED AND/OR INSTALLED AND NOTACCEPTED SHALL BE SUBJECT TO FULL REPLACEMENT OF ITEM(S) AT COST TOCONTRACTOR, AND NO COST TO OWNER OR DESIGN FIRM. REFER TO CONTRACTORSRESPONSIBILITIES SECTION.2.WORKING SPACE FOR ALL ELECTRICAL EQUIPMENT OPERATING AT 600V VOLTS OR LESSTO GROUND AND LIKELY TO REQUIRE EXAMINATION, ADJUSTMENT, SERVICING, ORMAINTENANCE WHILE ENERGIZED SHALL COMPLY WITH NEC, ARTICLE 110.26.3.TRANSFORMERS: A. FACTORY ASSEMBLED AND TESTED, AIR COOLED UNITS FOR 3 PHASE, 60 HZ. SERVICE. B. COILS: COPPER CONTINUOUS WINDINGS WITHOUT SPLICES EXCEPT FOR TAPS. BRAZED OR PRESSURE INTERNAL COIL CONNECTIONS. C. INSULATION CLASS: 220°C, UL COMPONENT RECOGNIZED SYSTEM OF 80°C RISE ABOVE 40°C AMBIENT TEMPERATURE. D. TAPS: TWO 2.5% TAPS ABOVE AND FOUR 2.5% TAPS BELOW RATED PRIMARY VOLTAGE. E. COMPLY WITH NEMA ST 20 AND SHALL BE UL 1561 LISTED. F. ENCLOSURE: 1. INDOOR LOCATION, DRY CLEAN LOCATION: NEMA 250, TYPE 1. 2. OUTDOOR LOCATION, OTHER LOCATIONS: NEMA 250, TYPE 3R. G. FINISH: ANSI 61 GRAY4.PANELBOARDS A. FACTORY ASSEMBLED AND TESTED, DEAD FRONT PANELBOARDS FOR 1 OR 3 PHASE (AS INDICATED ON CONTRACT DRAWINGS), 60 HZ. NEMA PB 1 LISTED. B. FINISHES: 1. PANELS AND TRIM: GALVANIZED STEEL, FACTORY FINISHED, TWO COAT BAKED-ONFINISH OF PRIME COAT AND THERMOSETTING TOPCOAT. 2. BACK BOX: GALVANIZED STEEL 3. DOORS: SECURED WITH VAULT TYPE LATCH WITH TUMBLER LOCK, KEYED ALIKE. C. ENCLOSURE: 1. INDOOR LOCATION, DRY CLEAN LOCATION: NEMA 250, TYPE 1. 2. OUTDOOR LOCATION, OTHER LOCATIONS: NEMA 250, TYPE 3R. D. INCOMING MAINS: TOP OR BOTTOM TO ACCOMMODATE FIELD CONDITIONS. E. PHASE, NEUTRAL, GROUND BUS: 1. MATERIAL: HARD DRAWN COPPER, 98% CONDUCTIVITY 2. MATERIAL: MINIMUM PHASE AND NEUTRAL BUS SIZE SHALL BE 225A. 3. EQUIPMENT GROUND BUS: ADEQUATE FOR FEEDER AND BRANCH CIRCUIT CONDUCTORS. BONDED TO BOX. F. CONDUCTOR CONNECTORS: 1. MATERIAL: TIN-PLATED COPPER 2. MAIN AND NEUTRAL LUGS: MECHANICAL TYPE 3. GROUND LUGS AND BUS CONFIGURED TERMINATIONS: MECHANICAL TYPE 4. SUITABLE FOR SIZE AND QUANTITY OF CONDUCTORS 5. SUB-FEED (DOUBLE LUGS): MECHANICAL TYPE SUITABLE FOR CONDUCTOR MATERIAL. LOCATED AT SAME END OF BUS AS INCOMING LUGS OR MAIN DEVICE. G. BREAKERS: BOLT ON, KAIC RATING AS INDICATED ON CONTRACT DRAWINGS, MIN. 10 KAIC.5. DISCONNECT SWITCHES: FUSED AND NON-FUSED A. NEMA KS 1, TYPE HD; CLIPS TO ACCOMODATED FUSES. B. LOCKABLE HANDLE C. ENCLOSURE: 1. INDOOR LOCATION, DRY CLEAN LOCATION: NEMA 250, TYPE 1. 2. OUTDOOR LOCATION, OTHER LOCATIONS: NEMA 250, TYPE 3R.ELECTRICAL RACEWAYS:1.MINIMUM SIZE CONDUIT SHALL BE 3/4" (UNLESS NOTED OTHERWISE).2.ABOVE GROUND/EXPOSED: (RGS) SHALL BE GALVANIZED THREADABLE, STEEL CONDUIT,MINIMUM 3/4" INCH STEEL THREADLESS CONNECTORS AND COUPLINGS SHALL BE USED.CONCRETE TYPE COUPLINGS SHALL BE USED WHERE BURIED IN CONCRETE ORMASONRY. WHERE INSTALLED IN WET LOCATIONS COUPLINGS SHALL COMPLY WITH NEC314.15. THREADLESS COUPLINGS CONNECTIONS SHALL NOT BE USED ON THREADEDCONDUIT ENDS UNLESS LISTED FOR THE PURPOSE.3.INSTALL RACEWAY CONCEALED BEHIND BUILDING SURFACES WHERE EVER POSSIBLE.ROUTE CONDUIT CONCEALED IN ACCESSIBLE AREAS PARALLEL AND PERPENDICULAR TOWALLS. WHERE RACEWAYS MUST BE RUN EXPOSED, THEY SHALL BE NEATLY ARRANGEDON THE PIPE HANGERS, SUPPORTS, TOGETHER WITH FITTINGS DESIGN FOR THEPURPOSE, INSTALLED PARALLEL AND PERPENDICULAR TO WALLS, BEAMS, COLUMNS,FLOORS AND CEILINGS IN A NEAT WORKMANLIKE MANNER TO FOLLOW THE SURFACECONTOURS AS MUCH AS POSSIBLE.4.RACEWAYS IN CLOSE PROXIMITY OF OTHER TRADES, SHALL BE ARRANGED TO ALLOWFOR PROPER CLEARANCE FOR SERVICING, MAXIMUM HEADROOM, ETC. AND TO PRESENTA NEAT APPEARANCE. MAINTAIN ADEQUATE CLEARANCE BETWEEN CONDUIT AND PIPINGWITH A MINIMUM OF 12 INCHES CLEARANCE BETWEEN CONDUIT AND SURFACES WITHTEMPERATURES EXCEEDING 104 DEGREES FAHRENHEIT.5.JOIN RACEWAYS WITH FITTINGS DESIGN AND APPROVED FOR THE PURPOSE AND MAKEJOINTS TIGHT. WHERE JOINTS CANNOT BE MADE TIGHT, USE BONDING JUMPERS TOPROVIDE ELECTRICAL CONTINUITY OF THE RACEWAY SYSTEM. MAKE RACEWAYTERMINATIONS TIGHT. WHERE SUBJECT TO VIBRATION OR DAMPNESS, USE INSULATIONBUSHINGS TO PROTECT CONDUCTORS. CUT CONDUIT SQUARE USING SAW OR PIPEUTTER AND DE-BURR CUT ENDS.6.USE CONDUIT HUBS OR SEALING LOCKNUTS TO FASTEN CONDUIT TO BOXES IN DAMP ANDWET LOCATIONS.7.SUPPORT CONDUIT USING STEEL OR MALLEABLE IRON SINGLE OR DOUBLE HOLECONDUIT STRAPS, LAY-IN ADJUSTABLE HEIGHTS, CLEVIS HANGERS AND SPLIT HANGERSAS REQUIRED. FASTEN CONDUIT SUPPORTS TO BUILDING STRUCTURE AND SURFACES.DO NOT ATTACHED CONDUIT SUPPORTS TO CEILING SUPPORT WIRES, OR ANY OTHERCONDUIT, PIPE, DUCT, ETC. DO NOT SUPPORT CONDUIT WITH WIRE OR OTHER PIPEHANGER STRAPS.8.BELOW GRADE/CONCEALED: PVC SCHEDULE 40 CONDUIT NEMA TC2 UL 651, WITHMATCHING FITTINGS BY THE SAME MANUFACTURER AS THE CONDUIT. COMPLYING WITHNEMA TC 3 AND UL 51413.9.CONDUIT AND SUPPORTS VISIBLE TO THE PATRONS SHALL BE PAINTED TO MATCHADJACENT WALL/STRUCTURE.10.CONDUIT SHALL NOT BE INSTALLED IN LOCATIONS VISIBLE FROM THE FRONT OFBUSINESS.11.EXPANSION-DEFLECTION FITTINGS SHALL BE INSTALLED FOR EACH RACEWAY TYPE USEDIN ACCORDANCE WITH NEC WIRING METHODS AND MATERIALS AND AS EACH CONDUITCROSSES BUILDING EXPANSION JOINTS.12.PROVIDE A NYLON PULL CORD IN ALL EMPTY/SPARE CONDUITS. CAP ALL SPARECONDUITS.13.LABELING SHALL COMPLY WITH REQUIREMENTS OF NEC AND UL.14.ELECTRICAL CONTRACTOR SHALL PROVIDE ADEQUATE AND PROPER SUPPORT FOR ALLELECTRICAL JUNCTION BOXES, DEVICES, ETC. BUILT IN OR MOUNTED ON CEILINGS.15.MINIMUM SIZE CONDUIT SHALL BE 3/4" (UNLESS NOTED OTHERWISE).16.CONDUIT ROUTINGS AND DEVICE/EQUIPMENT LOCATIONS SHOWN ARE DIAGRAMMATICONLY. WHILE FOLLOWING NEC, CONTRACTOR SHALL FIELD ROUTE AND LOCATE ASREQUIRED. CONDUIT ROUTINGS SHALL BE ROUTED PARALLEL TO BUILDING STRUCTURE.17.CONTRACTOR SHALL PROVIDE PULL BOXES IN POWER CIRCUIT CONDUIT AS REQUIREDTO LIMIT THE NUMBER OF BENDS TO A MAXIMUM OF 270° OR THREE 90° BENDS.18.PENETRATIONS FOR ELECTRICAL CONDUITS THROUGH FIRE RATED WALLS SHALL BEPROPERLY STOPPED IN ACCORDANCE WITH NFPA 70 AND 101. REFER TO CONTRACTORSRESPONSIBILITIES SECTION. AND CUTTING, PATCHING, SEALING SECTION.19.WHEN EXISTING CONDUITS ARE TO BE REUSED, REMOVE EXISTING CONDUCTORS,MANDREL, BRUSH, AND SWAB CONDUIT PRIOR TO INSTALLING NEW CONDUCTORS.MANDREL SHALL BE 1/4" SMALLER THAN THE INSIDE DIAMETER OF THE CONDUIT. NOTIFYENGINEER IF CONDUIT IS NOT SUITABLE FOR REUSE20.PULL AND JUNCTION BOXES:A. MATERIAL: 16 GAUGE STEELB. MINIMUM SIZE: 8"x8"x4" UNLESS NOTED OTHERWISE. COMPLY WITH NEC ARTICLE 314 AND 314.28 FOR MINIMUM SIZE REQUIREMENTS.C. COVER: HINGEDD. ENCLOSURE: 1. INDOOR LOCATION, DRY CLEAN LOCATION: NEMA 250, TYPE 1. 2. OUTDOOR LOCATION, OTHER LOCATIONS: NEMA 250, TYPE 3R.E . FINISH: POWDER COAT, ANSI 61 GRAY.21.HANDHOLES:A. MATERIAL: POLYMER CONCRETE (QUAZITE OR EQUAL)B. MINIMUM SIZE: 6"x8". UNLESS NOTED OTHERWISE.C. RATING: PARKING LOT: ANSI/SCTE-77, Tier 15 ratingD. SKID RESISTANCE SURFACE FOR COVERE. LOGO SHALL READ "ELECTRICAL"ABBREVIATIONS:CONTRACTORS RESPONSIBILITIES:1.THE CONTRACTOR SHALL REVIEW AND BE FAMILIAR WITH ALL CONTRACT DRAWINGSPRIOR TO ELECTRICAL EQUIPMENT AND MATERIAL INSTALLATION. LOCATIONS SHOWNFOR CONNECTIONS TO EQUIPMENT ARE DIAGRAMMATIC. INSTALL FOR EASE OFMAINTENANCE AND TO SUIT EQUIPMENT.2.THE CONTRACTOR SHALL VERIFY AND COORDINATE EXISTING CONDITIONS SHOWN ONDRAWINGS. IF THERE IS A DISCREPANCY BETWEEN DRAWINGS, IT IS THE CONTRACTORSRESPONSIBILITY TO NOTIFY THE ENGINEER PRIOR TO PERFORMING THE WORK.3.ALL COSTS OF INVESTIGATION AND/OR REDESIGN DUE TO CONTRACTOR IMPROPERINSTALLATION OF THE ELECTRICAL EQUIPMENT OR OTHER ITEMS NOT IN CONFORMANCEWITH THE CONTRACT DOCUMENTS SHALL BE AT THE CONTRACTORS EXPENSE.4.MAINTAIN AND PROTECT ALL EQUIPMENT, MATERIALS, AND TOOLS FROM LOSS ORDAMAGE FROM ALL CAUSES UNTIL FINAL ACCEPTANCE BY THE AUTHORITY WITHJURISDICTION/OWNER.5.ALL ELECTRICAL EQUIPMENT INCLUDING CONDUIT RUNS AND APPURTENANCES WHICHARE TO REMAIN SHALL BE PROTECTED FROM DAMAGE RESULTING FROM THECONTRACTOR'S OPERATIONS. ANY SUCH DAMAGES TO EQUIPMENT AND MATERIALS ARETO BE REPAIRED OR REPLACED AT NO ADDITIONAL COST TO THE AUTHORITY.6.IT IS REQUIRED THAT THE WORK INDICATED BE CARRIED OUT WITH A MINIMUMINTERFERENCE TO THE ESTABLISHED ROUTINE OF THE EXISTING BUILDINGS, AND THATALL WORK BE PERFORMED WITHIN REQUIRED CONTRACT TIME. ANY WORK NECESSARYTO BE PERFORMED AFTER REGULAR WORKING HOURS, SHALL BE PERFORMED WITHOUTADDITIONAL EXPENSE TO THE OWNER.7.THE OWNER'S REPRESENTATIVE SHALL BE NOTIFIED, IN WRITING, WHEN INTERRUPTIONOF THE PRESENTLY MAINTAINED SERVICES, MECHANICAL, ELECTRICAL OR OTHERWISE ISREQUIRED. WRITING PERMISSION SHALL BE OBTAINED FORM THE OWNER'SREPRESENTATIVE PRIOR TO COMMENCING WITH THE SHUT-DOWN.8.ALL CONSTRUCTION AND OTHER MATERIALS SHALL BE STORED AT THE DESIGNATEDSTORAGE AREA AND ON COMPLETION OF WORK OR AS DEEMED NECESSARY ALLSURPLUS/REFUSE/DEBRIS MATERIAL SHALL BE REMOVED AND LEGALLY DISPOSED OFFSITE.9.CONTRACTOR SHALL MAINTAIN OPERATION OF THE ELECTRICAL SERVICE DURINGCONSTRUCTION. CONTRACTOR SHALL COORDINATE ALL REQUIRED PANELBOARDSHUTDOWNS WITH AIRPORT AND HERTZ ELECTRICAL DEPARTMENTS AND ALL EFFECTEDENTITIES.10.CONTRACTOR SHALL MAINTAIN A SET OF PRINTS AND MARK-UP DURING CONSTRUCTIONTO REFLECT "AS-BUILT" CONDITIONS. PRINTS SHALL BE DELIVERED TO THE ENGINEERUPON COMPLETION OF THE PROJECT.11.CONTRACTOR SHALL SCAN EACH LOCATION PRIOR TO PENETRATING ANY WALL, CEILING,OR FLOOR SURFACE.GROUNDING:1.COMPLY WITH REQUIREMENTS OF THE AUTHORITY HAVING JURISDICTION, NEC, UL ANDIEEE STANDARDS. SIZE GROUND CONDUCTORS IN ACCORDANCE WITH THE NATIONALELECTRIC CODE EXCEPT WHERE LARGER SIZES ARE INDICATED. ALL GROUNDCONDUCTORS SHALL BE COPPER AND NOT SMALLER THAN NO. 12 AWG. PROVIDE ACOMPLETE ASSEMBLY OF MATERIALS REQUIRED FOR GROUNDING AND BONDING.2.GROUNDING BUSHINGS SHALL BE HOT-DIPPED GALVANIZED BODY, MOLDED PHENOLICINSULATION, RATED AT 150 DEGREE CELSIUS WITH COPPER-TINNED LAY-IN LUG. PROVIDEFOR ALL INCOMING AND OUTGOING CONDUITS TO THE DISTRIBUTION EQUIPMENT.3.GROUND RODS SHALL BE STEEL CORE, COPPER JACKETED TYPE, HIGH STRENGTH STEELALLOY CORE WITH A MOLTEN-WELDED COVERING AND CONICAL POINT WITH CHAMFEREDGE AT TOP. DRIVING HEADS SHALL BE USED TO PROTECT TOPS OF RODS DURINGDRIVING. MINIMUM SIZE ROD SHALL BE 3/4 INCH DIAMETER AND 10 FOOT LONG. GROUNDROODS SHALL BE VERTICALLY DRIVEN TO THEIR FULL LENGTH BELOW DESIGNELEVATIONS WITH THE TOPS 12 INCHES BELOW SUB-GRADE.4.GROUND CONNECTORS FOR CONNECTING CABLE TO PIPE SHALL BE HIGH COPPER ALLOYOR BRONZE FITTINGS. PROVIDE AN OFFSET STEEL TONGUE FOR CONNECTIONS TO STEELAND A DRILLED TONGUE FOR CONNECTION TO COPPER BUS BAR.5.PARTS OF THE ELECTRICAL INSTALLATION TO BE GROUNDED AND BONDED SHALLINCLUDE BUT NOT BE LIMITED TO ELECTRICAL EQUIPMENT, RACEWAYS, BOXES, CABINETSAND OTHER NON-CURRENT CARRYING METAL PARTS OF THE WIRING SYSTEM, METALCONDUIT, SWITCHGEAR, HOUSING AND NEUTRALS OF TRANSFORMERS, LIGHTINGFIXTURES, PANEL DEVICES, FENCES AROUND ELECTRICAL EQUIPMENT AS APPLICABLE TOEQUIPMENT INSTALLED ON THIS PROJECT.6.USE EXOTHERMIC WELDING PROCESS FOR UNDERGROUND, PERMANENTLY CONCEALEDAND INACCESSIBLE CONNECTIONS TO FORM SOLID METAL JOINTS. MAKE ACCESSIBLEGROUND CONNECTIONS WITH MECHANICAL PRESSURE TYPE GROUND CONNECTIONSUNLESS OTHERWISE NOTED.7.APPLY CORROSION-RESISTANT FINISH TO FILED-CONNECTIONS, BURIED METALLICGROUND AND BOND PRODUCTS, AND PLACES WHERE FACTORY APPLIED PROTECTIVECOATINGS HAVE BEEN DESTROYED, WHICH ARE SUBJECTED TO CORROSIVE ACTION.ELECTRICAL WIRING AND CABLES:1.ALL WIRE SHALL BE HIGH CONDUCTIVITY COPPER WITH THWN-2 INSULATED WITHAPPROVED CU TERMINATIONS, UNO.2.PULL CONDUCTORS SIMULTANEOUSLY WITH UL LISTED PULLING COMPOUNDS ORLUBRICANT. USE PULL ROPE, FISH TAPE, AND CABLE GRIPS THAT WILL NOT DAMAGE THECABLES. USE MANUFACTURER PROVIDED INSTRUCTIONS AND LUBRICATING MATERIALSTO NOT DAMAGE CABLE.3.ALL ELECTRICAL CIRCUITS SHALL INCLUDE A GREEN GROUND CONDUCTOR SIZED PERNEC 250.4.POWER CONDUCTORS SHALL BE AS FOLLOWS:208Y/120V SYSTEM:PHASE A - BLACK.PHASE B - RED.PHASE C - BLUE.NEUTRAL - WHITE.GROUND - GREEN.480Y/277V SYSTEM:PHASE A - BROWN.PHASE B - ORANGE.PHASE C - YELLOW.NEUTRAL - GRAY.GREEN W/ YELLOW STRIPE.TRENCHING:1.ALL UNDERGROUND UTILITY INFORMATION DEPICTED ON THESE PLANS IS BASED ONUTILITY FEATURES OBSERVED AND/OR UTILITY PLANS PROVIDED BY PROPERY OWNER (IFPROVIDED). A SUBSURFACE INVESTIGATION WAS NOT PERFORMED BY THE ENGINEER.CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE PRESENCE/ABSENSE OFSUBSURFACE UTILITIES PRIOR TO COMMENCEMENT OF EXCAVATION ACTIVITIES.CONTRACTOR SHALL AT THEIR OWN EXPENSE, SURVEY THE SUBSURFACE UTILITIES ANDCONTACT THEIR LOCAL "DIGSAFE". WSP ASSUMES NO RESPONSIBILITY FOR THEACCURACIES OF THE UNDERGROUND UTILITIES.2.CONTRACTOR SHALL TRENCH AS DETAILED IN THESE CONTRACT DRAWINGS. TOPSURFACE (ASPHALT, CONCRETE, ETC.) SHALL BE RESTORED TO MATCH EXISTINGSURFACE TYPE.3.ALL UNDERGROUND CONDUITS AND WIRING SHALL COMPLY WITH NEC 300.5 REFER TONEC TABLE 300.5 FOR MINIMUM BURIAL DEPTH REQUIREMENTS.CUTTING, PATCHING, AND SEALING:1.THE CONTRACTOR SHALL REVIEW AND BE FAMILIAR WITH ALL CONTRACT DRAWINGSPRIOR TO ELECTRICAL EQUIPMENT AND MATERIAL INSTALLATION. LOCATIONS SHOWNFOR CONNECTIONS TO EQUIPMENT ARE DIAGRAMMATIC. INSTALL FOR EASE OFMAINTENANCE AND TO SUIT EQUIPMENT.2.CUTTING, ROUGH, AND FINISHING PATCHING SHALL BE INCLUDED IN THE CONTRACTOR'SSCOPE. PROPERLY CLOSE AND PATCH HOLES AND OPENINGS IN NEW AND EXISTINGFLOOR, WALL, AND CEILING SURFACES RESULTING FROM THIS WORK. MATCH ADJACENTUNDISTURBED SURFACES AND FINISHES.3.ALL HOLES AND VOIDS CREATED BY THE CONTRACTOR THROUGH FIRE RATED FLOORSAND WALLS SHALL BE SEALED WITH AN INTUMESCENT SEALANT AND FIRE BARRIERRATED FOR 4 HOURS IN ACCORDANCE WITH ASTM E 814 USING 3M (OR APPROVED EQUAL)FIRE STOPPING PRODUCTS. INSTALL PER MANUFACTURERS' INSTRUCTIONS.TESTING:1.WIRE AND CABLE: PERFORM INSULATION RESISTANCE AND CONTINUITY TESTS FOR ALLCONDUCTORS. THESE SHALL BE COMPLETED PRIOR TO ENERGIZING AND WHILE NOTCONNECTED TO AN ENERGY SOURCE. INVESTIGATE AND TAKE REMEDIAL ACTION WHENCONTINUITY VALUES EXCEED 1 OHM AND/OR INSULATION RESISTANCE TESTS LESS THAN5 MEGAOHMS.2.GROUND RESISTANCE TESTS: RESISTANCE OF THE ELECTRICAL SYSTEM GROUNDINGSHALL BE TESTED TO GROUND AT THE MAIN GROUND ELECTRODE CONNECTION AND ATTHE CONNECTION TO THE BUILDING STEEL GROUND TO ENSURE THAT THE GROUNDRESISTIVITY VALUES DO NOT EXCEED 25 OHMS.3.CONTRACTOR TO PROVIDE COMPLETE SELECTIVE COORDINATION STUDY FOR THEPROJECT'S POWER DISTRIBUTION SYSTEM, AS REQUIRED BY LATEST NFPA 70E AND IEEE,COORDINATION STUDY SHALL BE SUBMITTED WHEN COMPLETE TO THE ENGINEER FORREVIEW AND APPROVAL. CONTRACTOR SHALL PROVIDE ALL FINAL DEVICE OVERCURRENTPROTECTIVE SETTINGS AS REQUIRED BY THE COORDINATION STUDY, THE ELECTRICALCONTRACTOR SHALL PROVIDE A SHORT CIRCUIT COORDINATION REPORT AND ARC FLASHSTUDY USING SKM TOOLS. CONTRACTOR SHALL ADJUST TRIP SETTINGS IN THE FIELDBASED ON COORDINATION STUDY RESULTS. CONTRACTOR SHALL FURNISH AND INSTALLALL ARC FLASH LABELS ON EQUIPMENT AS DETAILED IN NFPA 70E AND IEEE.1Ø HOME RUN TO PANEL AND CIRCUIT AS INDICATED1Ø HOME RUN TO PANEL AND CIRCUIT AS INDICATED3Ø HOME RUN TO PANEL AND CIRCUIT AS INDICATEDDUPLEX RECEPTACLEXXXX = GFCI : GROUND FAULT CURRENT INTERUPTERXX = WP : WEATHER PROOFQUAD RECEPTACLECONDUIT ROUTED EXPOSED - 3/4" MIN.CONDUIT ROUTED CONCEALED - 1" MINCONDUIT TURNING UPCONDUIT TURNING DOWNXXXAFLEXIBLE CONNECTION TO EQUIPMENTXXXA600V FUSED DISCONNECT SWITCHXXXA = SIZE600V DISCONNECT SWITCHXXXA = SIZEHOME RUN TO PANEL, CIRCUIT AS INDICATEDGROUNDNEUTRALNUMBER OF PHASESELECTRICAL UTILITY METERMEVNEW ELECTRIC VEHICLE CHARGING STATIONDEMOLITION WORKEVEXISTING ELECTRIC VEHICLE CHARGING STATIONAMPEREALTERNATING CURRENTABOVE FINISHED FLOORAMPERES INTERRUPTING CAPACITYAMERICAN WIRE GAUGECENTERLINECONDUITCIRCUIT BREAKERCIRCUITCOMMUNICATIONCURRENT TRANSFORMERCOPPERDIAMETERDIRECT CURRENTDISCONNECTDISTRIBUTIONELECTRICEXISTING TO REMAINELECTRIC VEHICLEELECTRIC VEHICLE CHARGEREXISTINGEXTERIORGROUND FAULT CIRCUIT INTERRUPTERGROUNDINSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERSISOLATED GROUNDJUNCTION BOXTHOUSAND AMPERES INTERRUPTING CURRENTTHOUSAND CIRCULAR MILSLIQUID-TIGHT FLEXIBLE METALLIC CONDUITLIGHTINGMAXIMUMMANUFACTURERMINIMUMMOUNTEDNATIONAL ELECTRICAL CODENON-FUSEDNATIONAL FIRE PROTECTION ASSOCIATIONNOT IN CONTRACTNORMALLY CLOSEDNUMBER, NORMALLY OPENPOLEPANELPOTENTIAL TRANSFORMERPOUND PER SQUARE INCHRECEPTACLERIGID GALVANIZED STEELROOMSURGE PROTECTION DEVICESTAINLESS STEELTWISTED SHIELDEDTYPICALUNDERWRITERS LABORATORIESUNLESS NOTED OTHERWISEUNINTERRUPTIBLE POWER SUPPLYVOLTWEATHERPROOFWIRETRANSFORMERIMPEDANCEAACAFFAICAWGâ„„CCBCKTCOMMCTCUDIADCDISCDISTELECETR.EVEVCEXISTEXTGF OR GFCIG OR GNDIEEEIGJBKAICKCMILLFMCLGT, LTGMAXMFRMINMTDNECNFNFPANICNCNOPPNLPTPSIRECRGSRMSPDSSTSTYPULUNOUPSVWWPXFMRZJBJUNCTION BOXKEYED NOTE AS INDICATED######XXXXXX### KVAZ%PSTRANSFORMERP = PRIMARY VOLTAGES = SECONDARY VOLTAGE### KVA = TRANSFORMER RATINGZ% = TRANSFORMER IMPEDANCEGROUNDELECTRICAL SYMBOLS:HHHANDHOLESEISMIC:1.CERTIFIED CERTIFIED SEISMIC RESTRAINTS SHALL BE INSTALLED TO MEET STATE AND LOCAL BUILDING CODE.IMAGE/PHOTOGRAPH AS INDICATEDAUTILITY ELECTRIC SERVICE:1.CONTRACTOR SHALL PROVIDE NEW UTILITY SERVICE AS SHOWN ON THE DRAWINGS.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL REQUIRED UTILITY COORDINATION,PERMITTING, CONNECTION APPLICATIONS, AND CONNECTION FEES.2.CONTRACTOR SHALL COORDINATE WITH GREEN MOUNTAIN POWER FOR ELECTRICSERVICE CONNECTION, CONTACT:GREEN MOUNTAIN POWERCORY SULLIVANDISTRIBUTION DESIGN COORDINATOR(802) 825 - 0684CORY.SULLIVAN@GREENMOUNTAINPOWER.COMPRIMARY:BTV-E01SHEET NUMBER:SCALE:DATE:APPROVED BY:CHECKED BY:DRAWN BY:AS NOTEDPROJECT NUMBER:SHEET TITLE:GENERAL NOTES, SYMBOLS,REVISIONS:REV NO.:DATE:DESCRIPTION:BY:REGISTRATION STAMP:4/8/2022 - C:\bms\wsp-pb-us-pw-02\wsp__aaron.campbell\d0524847\BTV-E01 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS_.dwg AND ABBREVIATIONSTHE HERTZ CORPORATION8501 WILLIAMS ROADESTERO, FL 33928100 SUMMER STREET13TH FLOORBOSTON, MA 02110T: 617-426-7330F: 617-482-8487WSP.COMOCT 3, 2022AJCJRFJLW PRIMARY:BTV-E02SHEET NUMBER:SCALE:DATE:APPROVED BY:CHECKED BY:DRAWN BY:PROJECT NUMBER:SHEET TITLE:REVISIONS:REV NO.:DATE:DESCRIPTION:BY:REGISTRATION STAMP:4/8/2022 - C:\bms\wsp-pb-us-pw-02\wsp__aaron.campbell\d0524847\BTV-E02 ELECTRICAL ONE LINE DIAGRAM.dwg ELECTRICAL ONE LINEDIAGRAMEXISTING VAULT MOUNTUTILITY TRANSFORMER480/277V 3PH, 4W, 300kVAT1-150kVA480V-208/120VNEMA 3R60A400A60A60A60A60A60AEVEVEVEVEVEV60A NFDISCONNECT (NEMA 3R)(TYP FOR 8)NEW HERTZ-EVC (NEMA 3R)200A FUSEDSERVICE ENTRANCE RATEDDISCONNECT - NEMA 3R(2) SETS OF (4-250KCMIL), 1/0 GND4" RGS C2#6, #10 GND (TYP FOR 8)100 SUMMER STREET13TH FLOORBOSTON, MA 02110T: 617-426-7330F: 617-482-8487WSP.COMTHE HERTZ CORPORATION8501 WILLIAMS ROADESTERO, FL 33928NOTES:1.REFER TO SHEET BTV-E01 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.2.EXISTING UTILITY TRANSFORMER FEEDS QTA AND GLYCOL PUMP STATION. ALLREQUIRED OUTAGES SHALL BE COORDINATED WITH BURLINGTON INTERNATIONALAIRPORT AND GREEN MOUNTAIN POWER.3-4/0, 1/0 GND3" RGS C2#6, #10 GND (TYP FOR 8)CHARGER #1 CHARGER #2 CHARGER #3 CHARGER #4 CHARGER #5 CHARGER #6 60A60AEVEVCHARGER #7 CHARGER #8 3-4/0, #4 GND3" PVC-80 CMMETERAS NOTEDOCT 3, 2022AJCJRFJLWNOTE 23-4/0, #4 GND3" PVC-80 C1/0 GND TO (2) 5/8" x 10'-0"COPPER CLAD GROUND RODS XXUTX G G X X X X X X X X X X X X X X X X GGGUTGUEUEXUEUEUEUEGUE UE UE UE UEUEGUE XXXXXXXXXXXXXXXXXXXXXXXXXUEXXXXUEUEUEUTUTUT UT UT UT X XXXGUEXXXXXXXPRIMARY:BTV-E03SHEET NUMBER:SCALE:DATE:APPROVED BY:CHECKED BY:DRAWN BY:PROJECT NUMBER:SHEET TITLE:ELECTRICAL SITE PLANREVISIONS:REV NO.:DATE:DESCRIPTION:BY:REGISTRATION STAMP:A-ABTV-E044/8/2022 - C:\bms\wsp-pb-us-pw-02\wsp__aaron.campbell\d0524847\BTV-E03 ELECTRICAL SITE PLAN.dwg2-3" PVC-80 C (SEE ABOVE FORCONTINUATION TO EXISTINGUTILITY TRANSFORMER VAULT)NOTE 2 (TYP)1-BTV SITE PLANN.T.S.2-BTV ENLARGED PLANN.T.S.SEE ENLARGED PLAN(THIS SHEET)100 SUMMER STREET13TH FLOORBOSTON, MA 02110T: 617-426-7330F: 617-482-8487WSP.COMTHE HERTZ CORPORATION8501 WILLIAMS ROADESTERO, FL 33928NOTES:1.REFER TO SHEET BTV-E01 FOR GENERAL NOTES, SYMBOLS, ANDABBREVIATIONS.2.REFER TO INSTALLATION DETAILS ON SHEET BTV-E04.3.ELECTRICAL EQUIPMENT SHALL BE MOUNTED ON FREE STANDINGSTAINLESS STEEL STRUT CHANNEL RACK. SEE SHEET BTV-E04 FORDETAILS. EQUIPMENT SHALL HAVE PHENOLIC IDENTIFICATION TAGS.BOLLARDS SHALL BE INSTALLED IN FRONT OF THE RACK SPACED AT3'-0".4.TRENCH IN GRASS AREA ALONG FENCE LINE. NOT ALL EXISTINGUNDERGROUND UTILITIES SHOWN. EXERCISE CAUTION AND HANDEXCAVATE AS REQUIRED TO AVOID DAMAGE TO EXISTING UTILITIES.5.SET TRANSFORMER ON 4" CONCRETE PAD, SIZED AS REQUIRED.PROVIDE 6" OF GRAVEL BASE BENEATH PAD.6.CORE SIDE WALL OF EXISTING TRANSFORMER VAULT TOACCOMMODATE NEW CONDUITS. COORDINATE WITH GREEN MOUNTAINPOWER FOR CORING AND FINAL CONNECTIONS TO TRANSFORMER.7.EXISTING UTILITY TRANSFORMER FEEDS QTA AND GLYCOL PUMPSTATION. ALL REQUIRED OUTAGES SHALL BE COORDINATED WITHBURLINGTON INTERNATIONAL AIRPORT AND GREEN MOUNTAIN POWER.FREE STANDING STAINLESSSTEEL STRUT CHANNEL RACK(NOTE 3)SERVICEDISCT1 (NOTE 5)HERTZ-EVCDISC-1 (ABOVE)DISC-2 (BELOW)DISC-3 (ABOVE)DISC-4 (BELOW)CHARGER #3CHARGER #4CHARGER #7CHARGER #8AIRSIDE/LANDSIDE CHAINLINK FENCE BARRIEREXISTING 300KVA UTILITYTRANSFORMER GREEN MOUNTAINPOWER, VAULT MOUNTED (NOTE 6)HANDHOLE2-3" PVC-80 C (NOTE 4):(1) T1 FEEDER(1) SPAREDISC-5 (ABOVE)DISC-6 (BELOW)WPGFCICHARGER #1CHARGER #2DISC-7 (ABOVE)DISC-8 (BELOW)CHARGER #5CHARGER #6B-BBTV-E04METERAS NOTEDOCT 3, 2022AJCJRFJLWQTA BUILDING(NOTE 7)CONDUITS TRENCHED THROUGH PARKING LOT.SAW CUT AND RESTORE EXISTING PAVEMENT1-1" PVC SCHED 80 C (TYP EACH DUALCHARGER POST) 1-EV CHARGING STATION TYPICAL ENLARGED PLANN.T.S.BOLLARDSTRIPING (TYP)-424" MIN1" C (PVC SCH 80)GRADECONCRETE FOUNDATION (SEE DETAIL 3 THIS SHEET)BOLLARD (TYP)NEW POST MOUNTED EVCHARGING STATION4-EV CHARGING STATION - ON GRADE - CONDUIT ROUTINGN.T.S.DETAIL SPECIFIC NOTES:1. ALL EXPOSED BOLLARD SHALL BEPAINTED WITH CATALYZED EPOXY PAINT.(COLOR AS DIRECTED BY THE ENGINEER)2. A BITUMASTIC COATING SHALL BEAPPLIED TO ALL PIPE BELOW GRADE2-STEEL BOLLARDN.T.S.6"4'-6"3'-0"18"(MIN.)4" STEEL POST FILLEDWITH CONCRETEROUND CONCRETE FILL16" DIAMETERCONCRETEFINISHED GRADE1DETAIL SPECIFIC NOTES:1. CONTRACTOR SHALL CONFIRM ANY CONFLICTS WITH PRIVATEUTILITIES (WATER, GAS, ELECTRIC, CCTV, ETC.) PRIOR TOEXCAVATING OR DIGGING POSTS.2. CONDUIT AND CHARGES NOT SHOWN FOR CLARITY. POSTSHALL BE PAINTED WITH HIGH VISIBILITY YELLOWEXTERIOR-RATED PAINT.3. CONTRACTOR TO COORDINATE WITH HERTZ FOR CHARGINGSTATION POLES PRIOR TO ROUGH-IN.3-EV CHARGING STATION POLE DETAILN.T.S.2" MIN(CLEAR)CONDUIT6" x 6" 54", 1/4" THICK MINIMUMCHARGER POST PROVIDED BYCONTRACTORANCHOR BASE PLATE TO 1'-6"DIAMETER 3000 PSI CONCRETEFOUNDATION1/2" ISOLATION MATERIALWITH SEALANTTOP OF GRADE / PAVING2 - #3 TIES TOP AND BOTTOM(TYP)6 - #5 DWLS WITH #3 TIES ASSHOWN2' - 0"NEW TESLA EV CHARGER (TYP)4'L x 6"W x 4"HPARKING STOP (TYP)2' - 0"NEW TESLA EV CHARGER6" x 6" x 54" CHARGING POST(SEE DETAIL 3 THIS SHEET)NEW TESLA EV CHARGER (TYP)CHARGER CORDSTORAGE HOOK (TYP)CHARGER CORDSTORAGE HOOK (TYP)5-ELECTRICAL EQUIPMENT RACKN.T.S.DETAIL SPECIFIC NOTES:1. CONTRACTOR SHALL PROVIDE STRUT CHANNEL RACKINGSYSTEM SUITABLE FOR THE WEIGHT OF THE EQUIPMENT TO BEINSTALLED. CONTRACTOR SHALL FIELD MEASURE AND DESIGNASSEMBLY AS REQUIRED.2. PROVIDE BOLLARDS MINIMUM OF 3'-0" IN FRONT OF RACK,MAXIMUM 3'-0" SPACING. SEE DETAIL 2 THIS SHEET.3. ALL ELECTRICAL EQUIPMENT INSTALLED OUTDOORS SHALL BETYPE NEMA 3R.PANELHERTZ-EVCTRANSFORMERT1MTRT1DISC753124688-TYPICAL HANDHOLE DETAILSCALE: N.T.S.12"x22"(Nominal I.D.)Lifting Hole15 12"25"9 14"12"12"22"AAPRECAST CONCRETE ORRUBBER WHEEL STOPCOMPACTED SUBGRADEANSI/ASTM A615 DEFORMEDBILLET STEEL BARS (GRADE40, BAR DES. NO 3)PAINTED LINES (W/4")WHEEL STOP (TYP)6" POST WITH 2CHARGING STATIONS7-WHEEL STOPPERN.T.S.NOTE: CONTRACTOR SHALL CONFIRM ANY CONFLICTS WITHPRIVATE UTILITIES (WATER, GAS, ELECTRIC, CCTV, ETC.) PRIOR TOEXCAVATING OR DRIVING POSTS.PLANSECTION A-ASELF TAPPING SCREW (TYP)RUBBER GROMMET FORPENETRATION (TYP)RUBBER WASHER (TYP)EPOXY BETWEEN CHARGER AND6" x 6" POST TO SEAL AROUNDPENETRATIONDRILLED HOLE ON 6" x 6" POSTROUTE WIRING THROUGH PENETRATIONKNOCKOUT ON CHARGER6-TYPICAL CHARGER/POLE ATTACHMENT AND PENETRATION DETAILN.T.S.FRONT ELEVATIONSIDE ELEVATIONPRIMARY:BTV-E04SHEET NUMBER:SCALE:DATE:APPROVED BY:CHECKED BY:DRAWN BY:PROJECT NUMBER:SHEET TITLE:ELECTRICAL DETAILSREVISIONS:REV NO.:DATE:DESCRIPTION:BY:REGISTRATION STAMP:4/8/2022 - C:\bms\wsp-pb-us-pw-02\wsp__aaron.campbell\d0524847\BTV-E04 ELECTRICAL DETAILS 1.dwg 100 SUMMER STREET13TH FLOORBOSTON, MA 02110T: 617-426-7330F: 617-482-8487WSP.COMTHE HERTZ CORPORATION8501 WILLIAMS ROADESTERO, FL 33928NOTES:1.REFER TO SHEET BTV-E01 FOR GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS.1-5/8" STAINLESS STEEL STRUTCHANNEL. AS REQUIRED TOSUPPORT EQUIPMENT.10" DIA CONCRETEFOOTING, 4'-0" DEEPEV CHARGER DISCONNECT (TYP FOR 8)1" PVC-80 C TO CHARGING POST(TYP FOR 4)9"3"3"2"3" 2'-0" 7'-0"20'-0"PVMT 2'-0"BOLLARD1-5/8" STAINLESS STEEL STRUTCHANNEL. AS REQUIRED TOSUPPORT EQUIPMENT.6" CRUSHEDSTONEWARNINGTAPECLEANCOMPACTEDFILLSPACERSCLEANCOMPACTEDFILLDUCT BANKA-A-N.T.S.DUCT BANKB-B-N.T.S.6" CRUSHEDSTONEWARNINGTAPECLEANCOMPACTEDFILLSPACERSCLEANCOMPACTEDFILLAS NOTEDOCT 3, 2022AJCJRFJLW