Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SP-22-045 - Plans - Non-Record - 1650 Shelburne Road
Goss Jeep1650 Shelburne RoadSouth Burlington, VT 05403DRAWING LISTCONSULTANTS:OWNER/APPLICANT:SUBJECT PROPERTY:TAX MAPZONING MAPORTHO MAPDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C001 COVER SHEET.DWG PLOTTED: 10/4/2022 9:56 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC001COVER SHEET MHDSDNA10/04/2022 SYMBOL LEGENDLINETYPE LEGEND>>>>>>XXXXFMFMUDFDUGTUDFDUGTOHTOHTWW(W)RDRD(ST)SS(S)Date:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C002 LEGEND & NOTES.DWG PLOTTED: 10/4/2022 8:25 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPC GENERAL NOTESSURVEY NOTESSURVEY NOTESC002SITE LEGEND AND NOTES MHDSDNA10/04/2022 SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVEEwAVeBSOIL BOUNDARYDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C100 EXISTING CONDITIONS.DWG PLOTTED: 10/4/2022 8:29 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCEXISTING UTILITY NOTESC100EXISTING CONDITIONS PLAN MHDMJD1" = 20'10/04/2022GEOTECHINCAL INVESTIGATIONSITE SOILS SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVEDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C101 DEMOLITION PLAN.DWG PLOTTED: 10/4/2022 8:33 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC101DEMOLITION PLAN MHDMJD1" = 20'10/04/2022DEMOLITION ITEMSDEMOLITION NOTES SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVEDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C102 SITE PLAN.DWG PLOTTED: 10/4/2022 9:27 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC102SITE LAYOUT PLAN MHDMJD1" = 20'10/04/2022SITE NOTESPROPOSED LEGENDZONING REQUIREMENTSPARKING ANALYSIS SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVEDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C103 GRADING & UTILITY PLAN.DWG PLOTTED: 10/4/2022 9:41 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC103GRADING & UTILITY PLAN MHDMJD1" = 20'10/04/2022STORMWATER STRUCTURE SCHEDULESTORMWATER PIPE SCHEDULESANITARY SCHEDULENATURAL GAS SCHEDULE SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVEEwAVeBSOIL BOUNDARYEROSION CONTROL LEGENDDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C201 EPSC PLAN.DWG PLOTTED: 10/4/2022 9:52 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC104EROSION PREVENTION & SEDIMENT CONTROL (EPSC) PLAN MHDMJD1" = 20'10/04/2022 STONE DRIP EDGE AT BUILDING DETAILBOULDER WALLPAVEMENT MARKING DETAILTYPICAL STAIR DETAILTYPICAL RISER & TREAD DETAILCONCRETE STAIR DETAILSIGN AND POST DETAILSBOLLARD DETAILCONCRETE WHEEL STOP DETAILTYPICAL PAVEMENT PATCH DETAILBIKE RACK DETAILCONCRETE SIDEWALK/PAD DETAILDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C500 DETAILS.DWG PLOTTED: 10/4/2022 9:01 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC500SITE DETAILS MHDSDNA10/04/2022 TYPICAL STORM DRAIN TRENCH DETAILINSULATION OVER SHALLOW DRAIN DETAILSTORM DRAIN CLEANOUTSITE/EARTHWORK SPECIFICATIONSSURFACE INFILTRATION BASINDRAINAGE MANHOLE DETAILFLARED END SECTION W/STONE APRONDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C500 DETAILS.DWG PLOTTED: 10/4/2022 9:04 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC501STORMWATER DETAILS AND EARTHWORK NOTES MHDSDNA10/04/2022K.L.M.N. GENERAL EROSION CONTROL NOTESTREE PROTECTION DETAILEROSION CONTROL BLANKETSTABILIZED CONSTRUCTION ENTRANCE DETAILCONCRETE WASHOUT DETAILSILT FENCE DETAILDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date S:\PROJECTS\0-2020\20001 GOSS JEEP\DWG\SHEET FILES\20001 - C500 DETAILS.DWG PLOTTED: 10/4/2022 9:05 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURESPCC502EROSION PROTECTION AND SEDIMENT CONTROL DETAILS MHDSDNA10/04/2022 SHELBURNE ROAD (RT. 7)NORTH BOUNDSHELBURNE ROAD (RT. 7) SOUTH BOUNDGREEN MOUNTAIN DRIVE2NSGG6HQM3TMH9HPLQF3TMH4IVRS3IVRS3IVRS3IVRS4TMH5HPLQF5HPDate:Scale:Drawn By:Checked By:Sheet Title: Project Title:StampEV Project #No.Description Date C:\J MILLER LANDSCAPE ARCHITECTURE\JOBS\2022\2022.28.GOSS JEEP\0_CURRENT\2022.28.GOSS JEEP LANDSCAPE PLAN.REV1.DWG PLOTTED: 9/29/2022 9:58 AM 208 Flynn Avenue, Suite 2A, Burlington, VT 05401 s 802-863-6225 85 Mechanic Street, Suite E2-3, Lebanon, NH 03766 s 603-442-9333 414 Union Street, Schenectady, NY 12305 s (518) 205-9141 www.engineeringventures.com20001Goss Jeep Renovation & Addition South Burlington, Chittenden, Vermont Goss Jeep 1650 Shelburne Rd. South Burlington, VT 05403 (802) 652-5046 ENGINEERING VENTURES PCL100PROPOSED PLANTING PLAN JPMJPM1" = 20'10/04/2022 DN 3725 SFShowroom 124 SFWomen's 134 SFMen's 482 SFLounge & Cafe 4432 SF Service Department 118 SF Serv. Mngr. 513 SF Parts 46 SFStairs 65 SFTech BR. 249 SFRetail 143 SFOffice 219 SFBreak Room 40 SFElec. 148 SF Sales Mngr. 111 SF Sales Mnger.14 SFCl. 84 SFGuest Entry 1461 SFService Drive Wagoneer Display & Cloud Above 6'-0"18'-3"6'-0"11'-8"6'-0"12'-4"6'-0"120'-11"3'-10"3'-4"53'-2"39'-0"35'-2"3'-4" 2'-6"2'-11"13'-4"3'-0"13'-4"6'-0"44'-5"15'-11"6'-5"45'-0"6'-0"11'-8"6'-0"187'-2" 66'-4"18'-11" 85'-3"41'-1"60'-10" 187'-2"99'-4"41'-0"39'-0"6'-3"6'-4" 3'-4" 5'-6"5'-6"5'-6" 4'-2" 4'-2" A A 1 1 4 4 3 3 2 2 B B C C UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-1 1/8" = 1'-0"1 Presentation First Floor Plan N 1176 SFParts Storage 61 SFFiles 221 SFConference 339 SF Parts Storage 77 SF Storage 199 SFEmployee Break 52 SFToilet 32 SF Data 112 SFOffice 74 SF Office 180 SF Manager;s Office 215 SF Circulation 66'-4"120'-11" 6'-0"18'-3"6'-0"11'-8"24'-4"23'-7"45'-0"6'-5"6'-0"44'-5"15'-11"30'-4"39'-0"7'-4"60'-4"39'-0"66'-4"18'-11"41'-1"60'-10"75'-1"187'-2" A A 1 1 4 4 3 3 2 2 B B C C UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-2 1/8" = 1'-0"1 2 - Second Floor - Presentation Plan N First Floor 0'-0" First Floor 0'-0" T.O. Existing Parapet 20'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" Second Floor 10'-0" ACM-J1 ACM-J2 ACM-J3 GL-1 CW-1 EXP-J2 Sidewalk -8'-4" Sidewalk -8'-4" ACM-J3 10'-0"2'-0" 8'-0" GL-2 T.O. New Parapet 26'-0" T.O. New Parapet 26'-0" First Floor 0'-0" First Floor 0'-0" T.O. Existing Parapet 20'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" Second Floor 10'-0" ACM-J3EXP-J2 ACM-J1 ACM-J2 ACM-J3 T.O. New Parapet 26'-0" T.O. New Parapet 26'-0" UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-3 1/8" = 1'-0"1 Proposed North Elevation 1/8" = 1'-0"2 Proposed East Elevation Exterior Finish Schedule Keynote Number Material Manufacturer Pattern/Product Line Color/Finish Type/Size Remarks Sorting ACM-4 Brake Metal Alpolic -Color to match adjacent ACM .032 gage Brake Metal Parapet Cap 2' - 0" ACM-C1 Aluminum Composite Metal Panel Alpolic Stack Bond Silver Metalic (MTLC BSX SILVER)-Field Facade 3' - 0" ACM-C2 Aluminum Composite Metal Panel Alpolic -High Polished Aluminum (DM HPA SLVR) -Entry Arch Accent 3' - 0" ACM-J1 Aluminum Composite Metal Panel Alpolic Stack Bond Mica MRO Anthracite Gray (4MM)23" x 72" finish face (thickness: 4mm) Field Facade 1' - 0" ACM-J2 Aluminum Composite Metal Panel Alpolic Stack Bond Harvest Trail Bamboo (4 MM QCP) 8" x 48" finish face (thickness: 4mm) Accent Facade 1' - 0" ACM-J3 Aluminum Composite Metal Panel Alpolic -High Polished Aluminum (DM HPA)DM HPA (thickness: 3 mm) Trim 1' - 0" B-1 0' - 0" CW-1 Curtain Wall Framing Kawneer butt-jointed Clear Anodized -Showroom Exterrior Curtain Wall 3' - 6" EIFS-1 EIFS STO CORP -Medium Sand Oyster #21612 --0' - 0" EIFS-2 EIFS STO CORP -to Match ACM-J1 Anthracite --0' - 0" EXP-C1 Exterior Paint Benjamin Moore -1612 Pelican Gray Flat Exterior Field Paint 5' - 0" EXP-C2 Exterior Paint Benjamin Moore -1615 Rock Gray Flat Exterior Trim Paint 5' - 0" EXP-J1 Exterior Paint Sherwin Williams -SW 7067 Cityscape Satin Exterior Field Paint 4' - 0" EXP-J2 Exterior Paint Sherwin Williams -SW 6991 Black Magic Satin Exterior Accent Paint 4' - 0" GL-1 Storefront Framing Vitro Solarban Low E on Acuity, butt jointed Clear Anodized (thickness: 1" insulated) Entrance Exterior Storefront 3' - 6" GL-2 Storefront Framing Mapes Rabbet R+ butt jointed High Polished Aluminum (DM HPA)(thickness: 2" insulated spandrel) Entrance Exterior Storefront 3' - 6" GL-C2 Spandrel Glass Vitro Architectural Glass (aka PPG) or equivalent Insulating Glass System PPG Black --0' - 0" HSRD Rytec High Speed Roll Up Door Representative: Brady Bell 0' - 0" SF-1 Storefront Framing Kawneer TRIFAB 451 System -butt jointed Entrance Exterior Storefront 0' - 0" First Floor 0'-0" First Floor 0'-0" T.O. Existing Parapet 20'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" Second Floor 10'-0" ACM-J1 ACM-J2 CW-1 ACM-J3 GL-1 EXP-J2 Sidewalk -8'-4" Sidewalk -8'-4" ACM-J3 8'-0"2'-0"10'-0"T.O. New Parapet 26'-0" T.O. New Parapet 26'-0" GL-2 First Floor 0'-0" First Floor 0'-0" T.O. Existing Parapet 20'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" Second Floor 10'-0" CW-1 GL-1 ACM-J1 ACM-J2 ACM-J3 ACM-J3 Sidewalk -8'-4" Sidewalk -8'-4" ACM-J2 8'-0"2'-0"10'-0"ACM-J1 GL-2 T.O. New Parapet 26'-0" T.O. New Parapet 26'-0"8'-0"UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-4 1/8" = 1'-0"1 Proposed South Elevation 1/8" = 1'-0"2 Proposed West Elevation Exterior Finish Schedule Keynote Number Material Manufacturer Pattern/Product Line Color/Finish Type/Size Remarks Sorting ACM-4 Brake Metal Alpolic -Color to match adjacent ACM .032 gage Brake Metal Parapet Cap 2' - 0" ACM-C1 Aluminum Composite Metal Panel Alpolic Stack Bond Silver Metalic (MTLC BSX SILVER)-Field Facade 3' - 0" ACM-C2 Aluminum Composite Metal Panel Alpolic -High Polished Aluminum (DM HPA SLVR) -Entry Arch Accent 3' - 0" ACM-J1 Aluminum Composite Metal Panel Alpolic Stack Bond Mica MRO Anthracite Gray (4MM)23" x 72" finish face (thickness: 4mm) Field Facade 1' - 0" ACM-J2 Aluminum Composite Metal Panel Alpolic Stack Bond Harvest Trail Bamboo (4 MM QCP) 8" x 48" finish face (thickness: 4mm) Accent Facade 1' - 0" ACM-J3 Aluminum Composite Metal Panel Alpolic -High Polished Aluminum (DM HPA)DM HPA (thickness: 3 mm) Trim 1' - 0" B-1 0' - 0" CW-1 Curtain Wall Framing Kawneer butt-jointed Clear Anodized -Showroom Exterrior Curtain Wall 3' - 6" EIFS-1 EIFS STO CORP -Medium Sand Oyster #21612 --0' - 0" EIFS-2 EIFS STO CORP -to Match ACM-J1 Anthracite --0' - 0" EXP-C1 Exterior Paint Benjamin Moore -1612 Pelican Gray Flat Exterior Field Paint 5' - 0" EXP-C2 Exterior Paint Benjamin Moore -1615 Rock Gray Flat Exterior Trim Paint 5' - 0" EXP-J1 Exterior Paint Sherwin Williams -SW 7067 Cityscape Satin Exterior Field Paint 4' - 0" EXP-J2 Exterior Paint Sherwin Williams -SW 6991 Black Magic Satin Exterior Accent Paint 4' - 0" GL-1 Storefront Framing Vitro Solarban Low E on Acuity, butt jointed Clear Anodized (thickness: 1" insulated) Entrance Exterior Storefront 3' - 6" GL-2 Storefront Framing Mapes Rabbet R+ butt jointed High Polished Aluminum (DM HPA)(thickness: 2" insulated spandrel) Entrance Exterior Storefront 3' - 6" GL-C2 Spandrel Glass Vitro Architectural Glass (aka PPG) or equivalent Insulating Glass System PPG Black --0' - 0" HSRD Rytec High Speed Roll Up Door Representative: Brady Bell 0' - 0" SF-1 Storefront Framing Kawneer TRIFAB 451 System -butt jointed Entrance Exterior Storefront 0' - 0" UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-5 View From Green Mountain Drive UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-6 View From Shelburne Ave First Floor 0'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" ACM-J1 GL-1 CW-1 EXP-J2 ACM-J2 ACM-J3 Sidewalk -8'-4"20'-0"8'-0"2'-0"10'-0"T.O. New Parapet 26'-0" A301 3 A B C 3'-0"First Floor 0'-0" T.O. Existing Parapet 20'-0" Second Floor 10'-0" ACM-J2 ACM-J3ACM-J1 CW-1 GL-1 EXP-J2 3'-0"10'-0"3"5'-9"2'-1"10'-0"3'-4"8'-0"4'-4"7'-4"4'-0"6'-0"26'-0"8'-0"2'-0"10'-0"ACM-J2 Sidewalk -8'-4" T.O. New Parapet 26'-0"10'-0"A B C UNDER THE COPYRIGHT ACT, 17 U.S.C. AS AMENDED DECEMBER 1, 1990, ALSO KNOWN AS THE "ARCHITECTURAL WORKSPROTECTION ACT OF 1990", THESE DOCUMENTS ARE COPYRIGHTED AND ARE SUBJECT TO COPYRIGHT PROTECTION AS AN"ARCHITECTURAL WORK". THE DESIGN, SPATIAL FORMS, IDEAS, COMPOSITIONS AND ARRANGEMENT OF ITEMS DELINEATEDIN THIS SET OF PLANS ARE PROPRIETARY OF SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA). UNAUTHORIZED USE OF THESEPLANS CAN LEGALLY RESULT IN THE CESSATION OF SUCH CONSTRUCTION OR BUILDING BEING SEIZED AND RAZED. 2022 SYVERTSEN RIGOSU ARCHITECTS, PLLC (SRA)© 10.04.2022 Goss Jeep Renovation & Addition Goss Jeep SD-7 1/8" = 1'-0"1 Building Section 1 1/8" = 1'-0"2 Building Section 2