Loading...
HomeMy WebLinkAboutSD-07-65 - Decision - 0030 Community Drive#SD-07-65 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING TECHNOLOGY PARK -15 LOT SUBDIVISION 5'0 COMMUNITY DRIVE FINAL PLAT APPLICATION #SD-07-65 FINDINGS OF FACT AND DECISION Technology Park Partners, hereafter referred to as the applicant, is requesting final plat approval of a planned unit development to subdivide a 177.2 acre parcel into fifteen (15) lots ranging in size from 3.98 acres to 29.44 acres, 30 Community Drive. The Development Review Board held a public hearing Tuesday, October 16, 2007, Tuesday, November 6, 2007, and Tuesday, November 20, 2007. Jeremy Matosky represented the applicant. Based on testimony provided at the above mentioned public hearing and the plans and supporting materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The applicant is requesting final plat approval of a planned unit development to subdivide a 177.2 acre parcel into fifteen (15) lots ranging in size from 3.98 acres to 29.44 acres, 30 Community Drive. 2. The owners of record of the subject property are Technology Park Associates, Inc.; PMF Energy, Inc.; and Axinn-Vermont, Inc. 3. The subject property is located in the Mixed Industrial & Commercial (Mixed IC) Zoning District. 4. The plans submitted consist of a 28 page set of plans, page two (2) entitled, "Subdivision Plat Technology Park 115 Kimball Avenue South Burlington, VT.", prepared by Trudell Consulting Engineers, Inc., dated 10/3/07. - 1 — #SD-07-65 Zoning District & Dimensional Requirements Table 1. Dimensional Requirements Lots IC Zoning District Required Existing Proposed 4 Min. Lot Size 40,000 SF 3.98 acres Max. Building Coverage 40% Max. Overall Coverage 70% Min. Front Setback 30 ft. n/a Min. Side Setback 10 ft. I n/a Min. Rear Setback 30 ft. n/a �l zoning compliance • additional information needed The applicant has submitted data providing proposed coverage information for new lots #7 and 8A which are currently developed. This information indicated that all coverage requirements will be met. SUBDIVISION CRITERIA Pursuant to Section 15.18 of the South Burlington Land Development Regulations, subdivisions should comply with the following standards and conditions: Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project. According to Section 15.13 of the South Burlington Land Development Regulations, the existing public water system should be extended so as to provide the necessary quantity of water, at acceptable pressure. According to Section 15.13 of the South Burlington Land Development Regulations, the subdivider or developer should connect to the public sewer system or provide a community wastewater system approved by the City and the State in any subdivision where off -lot wastewater is proposed. Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. Although no buildings are proposed as part of this application, the applicant should submit grading and erosion control plans for the construction of Community Way, the widening of Community Drive, and any utility improvements which will disturb soil. The applicant has submitted grading and erosion control details. However, staff also recommends a plan which shows the location of the proposed erosion control measures. The project incorporates access, circulation, and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. -2— #SD-07-65 Most of the lots in the proposed subdivision will be accessible via the existing road, Community Drive, or the proposed road, Community Way. The applicant is proposing to access lots 2, 3, and 4 via a shared, private access road, called Technology Park Way, from the eastern leg of Community Drive. This is acceptable. The Board previously discussed this issue and agreed that they shall review traffic on a building by building basis as each lot is developed under site plan review. The Board is supportive of this method. However, applicant must submit a new traffic impact study when the overall p.m. peak hour trip generation for the property exceeds 900 vehicle trip ends. The recreation path Committee has stated their preference in obtaining a pedestrian easement along the interstate. The Board will determine the possibility of a pedestrian easement and its location on a case by case basis as part of site plan review for buildings along the interstate. A right-of-way between lot 13 and lot 8C currently exists to access Tilley Drive. The Board and the applicant discussed this matter and mutually agreed that the applicant shall post a bond to cover the improvements until such time as the improvements should be made. At this time, it is not logical to pave a portion of roadway that has not been completely designed. The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. The plans that the applicant submitted depict a significant amount of wetlands on the subject property. The Board proposes to deal with any proposed impacts to wetlands or wetland buffers as they arise when new buildings or infrastructure is proposed. Additionally, the 100 year floodplain overlay does impact several parcels in this subdivision. Any development in the floodplain overlay district shall be subject to all of the conditions and limitations of Section 10.01 of the South Burlington Land Development Regulations. Finally, the subject property abuts both the Potash and Muddy Brooks. These brooks have a buffer width of 100' in which no new development shall take place. These stream buffers shall be subject to all conditions and limitations as stated in Article 12.01(C) of the South Burlington Land Development Regulations. The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The proposed project is in keeping with the planned development patterns of the IC Zoning District. Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. As buildings and other associated development are not proposed as part of this application, this criteria in not applicable at this time. However, the Board does note that Lot 8c is -3— #SD-07-65 mostly un-developable. This creates an appropriate stream buffer and open space between the subject site and the O'Brien property to the west. The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. The South Burlington Fire Chief has reviewed and approved of the plans for the proposed subdivision. Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. The applicant has proposed a 20 foot recreation path easement and 10 foot paved bike path that runs along the northerly edge of the property. The Board is supportive of the proposed design which has been approved as part of a related application. Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. The Board has already commented on the location and implementation of sidewalks and recreation paths. The Director of Public Works has reviewed the plans in a memo dated 10/16/07. The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The proposed subdivision of this property is in conformance with the South Burlington Comprehensive Plan. Lot Layout According to Section 15.10 of the South Burlington Land Development Regulations, a minimum width to length ratio of one to five (1:5) should be used as a guideline by the Development Review Board in evaluating lot proportions. Square or roughly square lots should not be approved. The fifteen (15) proposed lots meet the goals of this requirement. Landscaping As there are no buildings proposed as part of this application, there is no minimum landscaping budget. However, given that roads are planned as part of this proposal, street trees shall be planted in accordance with Section 13.06(F) of the South Burlington Land Development Regulations. The applicant has proposed a street tree planting plan which appears at this time to meet the satisfaction of the Board. -4— #SD-07-65 PLANNED UNIT DEVELOPMENT STANDARDS Pursuant to Section 15.18 of the Land Development Regulations, the Development Review Board shall consider the following in its review of subdivision and Planned Unit Development (PUD) applications: (a) Sufficient water supply and wastewater disposal capacity is available to meet the needs of the project in conformance with applicable State and City requirements, as evidenced by a City water allocation, City wastewater allocation, and/or Vermont Water and Wastewater Permit from the Department of Environmental Conservation. Pursuant to Section 15.13(B) (1), municipal water service must be extended to serve the proposed development. The South Burlington Water Department reviewed the plans and provided comments in a letter dated 10/17/07. (b) Sufficient grading and erosion controls will be utilized during and after construction to prevent soil erosion and runoff from creating unhealthy or dangerous conditions on the subject property and adjacent properties. It has already been stated that the applicant shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. (c) The project incorporates access, circulation and traffic management strategies sufficient to prevent unreasonable congestion of adjacent roads. Access and circulation issues have already been addressed as part of the Subdivision review criteria. Traffic generation and related impact fees will be handled when building development is proposed for the subject lots. (d) The project's design respects and will provide suitable protection to wetlands, streams, wildlife habitat as identified in the Open Space Strategy, and any unique natural features on the site. This criterion has already been addressed. (e) The project is designed to be visually compatible with the planned development patterns in the area, as specified in the Comprehensive Plan and the purpose of the zoning district(s) in which it is located. The proposed development is in keeping with the goals for development within the Mixed Industrial/ Commercial Zoning District. -5— #SD-07-65 (fl Open space areas on the site have been located in such a way as to maximize opportunities for creating contiguous open spaces between adjoining parcels and/or stream buffer areas. This criterion has already been addressed. (g) The layout of a subdivision or PUD has been reviewed by the Fire Chief or (designee) to ensure that adequate fire protection can be provided. This criterion has already been addressed. (h) Roads, recreation paths, stormwater facilities, sidewalks, landscaping, utility lines and lighting have been designed in a manner that is compatible with the extension of such services and infrastructure to adjacent landowners. This criterion has already been addressed. (i) Roads, utilities, sidewalks, recreation paths, and lighting are designed in a manner that is consistent with City utility and roadway plans and maintenance standards. This criterion has already been addressed. 6) The project is consistent with the goals and objectives of the Comprehensive Plan for the affected district(s). The project is consistent with the goals and objectives of the Comprehensive Plan. Phasing The applicant has proposed the following phasing plan: The entire roadway widening (up to 32' wide — no curbs) will be constructed at one time in accordance with the approved subdivision plans. A 5' concrete sidewalk will also be constructed at that time along the outside of the Community Drive Loop. The installation of approved street trees shall also be completed at that time. This work shall be completed upon the completion of construction of a second new building, on any lot, after Lot 2*, or within 4 years of subdivision, which ever first occurs. In addition, the applicant shall post a construction bond for the cost of these improvements and agree that these improvements shall be completed within 4 years of subdivision approval regardless. The 80' section of Tilley Drive Extension shall be bonded for up to 10 years. If this section of roadway is not completed within the 10 year period, the applicant shall apply to the Development Review Board for an extension of time. #SD-07-65 COMMUNITY WAY The subdivision design includes Community Way, an approximately 800 foot long dead end cul-de-sac to serve Lot 9, 10 and 11. This road construction will include all related private and municipal utilities including a planned sewage pump station. Community Way shall be substantially completed, per the approved site plans and applicable City standards, no later than 6 months from the date of the Certificate of Occupancy for any building to be constructed on Lot 9, 10, or 11. A suitable construction bond will be posted to cover Community Way improvements prior to recording the final subdivision plat. RECREATION PATH The proposed 10' wide bike/recreation path along Kimball Avenue shall be completed, per the approved site plans and applicable City standards, no later than 6 months from the date of the Certificate of Occupancy for the building constructed on Lot 2. A suitable construction bond will be posted to cover said recreation path improvements prior to recording the final subdivision plat. * Note this is the same condition as the approved ACT 250 subdivision (#4C0190-5C) which the City stipulated to in April 2007. TRAFFIC The Board will require a traffic impact study when the overall p.m. peak hour trip generation for the subdivision exceeds 900 vehicle trip ends. Other A portion of the property is located within the Airport Approach Cone. Therefore, the property shall be subject to the regulations associated with such. DECISION Motion by Gayle Quimby, seconded by Roger Farley., to approve Final Plat Application #SD-07-65 of Technology Park Partners, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect, except as amended herein. 2. This project shall be completed as shown on the plat submitted by the applicant, and on file in the South Burlington Department of Planning and Zoning. 3. Prior to recording the mylars, the submitted plans shall be revised for final construction to show the changes below and shall require approval of the Administrative Officer. Four (4) copies of the approved revised "Final Construction" plans shall be submitted to the Administrative Officer prior to recording: -7— #SD-07-65 a. The plans shall be revised to comply with the recommendations of the City Engineer. b. The plans shall be revised to comply with the recommendations of the Director of Public Works. Final Construction Plans and Details for roadway widening and other improvements shall be submitted, reviewed and approved by the Director of Public Works. c. The plans shall be revised to comply with the recommendations of the City Arborist. A Final Street Planting Plans and Details for street trees shall be submitted, reviewed and approved by the City Arborist. d. The plans shall be revised to comply with the recommendations of the South Burlington Water Department. Final Construction Plans and Details for municipal water main improvements shall be submitted, reviewed and approved by the South Burlington Water Department. 4. Prior to recording the mylars, the applicant shall post a bond, the amount to be approved by the City Engineer, for the construction of the Tilley Drive connection. This bond shall be in effect for 10 years or until the City accepts the street. If this road connection is not constructed within 10 years from the date of this final plat decision, the applicant shall apply to the Development Review Board for an extension. 5. Prior to recording the mylars, the City Engineer shall review and approve of the Final Construction Plans for the proposed subdivision. 6. Prior to recording the mylars, the Public Works Director shall review and approve of the Final Construction Plans for the proposed subdivision. 7. The applicant shall provide the Development Review Board with an updated traffic impact analysis for the subdivision when the estimated number of p.m. peak hour trip ends for the entire subdivision exceeds 900 vehicle trip ends. 8. Pursuant to Section 15.13(E) of the Land Development Regulations, any new utility lines, services, and service modifications should be underground. 9. The subject property is located within the Airport Approach Cone and shall be subject to the standards set forth in Section 13.03 of the South Burlington Land Development Regulations. 10. The applicant shall widen the existing Community Drive to thirty two (32) feet wide. Curbs are not required. The entire roadway widening shall be constructed at one time in accordance with the approved subdivision plans. At the same time, an 8' wide bituminous recreation (bike) path shall be constructed from Station 0+40 to 19+50 along the westerly side of Community Drive (west) as shown on the plans. The remainder of the Community Drive shall have 5' wide concrete sidewalk constructed at that time along the outside of the loop as shown on the plans. The installation of approved street trees shall also be completed at that time. This work shall be completed prior to completion of construction of a IM. #SD-07-65 second new building, on any lot, after Lot 2, or no later than 4 years from the date of this approval, whichever occurs first. Notwithstanding this deadline, the applicant shall post a suitable construction bond for the cost of these improvements and agree that these improvements shall be completed no later than 4 years from the date of this approval. 11. The decision as to whether there shall be a pedestrian path easement along the interstate right-of-way, shall be determined on a case by case basis at the time of site plan review for buildings along the interstate. 12. Community Way shall be 30' wide with curbing. Community Way shall be substantially completed, per the approved plans and applicable City standards, no later than 6 months from the date of the Certificate of Occupancy for any building to be constructed on Lot 9, 10, or 11. A suitable construction bond shall be posted to cover Community Way improvements prior to the issuance of a zoning permit for the construction of Community Way. The proposed sewage pump station shall be constructed to City Standards, and shall remain private. 13. The proposed 10' wide bike/recreation path along Kimball Avenue shall be completed, per the approved site plans and applicable City standards, no later than 6 months from the date of the Certificate of Occupancy for the building constructed on Lot 2. A suitable construction bond will be posted to cover said recreation path improvements prior to the issuance of a zoning permit for construction of the path. 14. Prior to issuance of a zoning permit for the improvements to Community Drive, the applicant shall post a $55,000 street tree landscaping bond and a road bond in an amount to be determined by the Administrative Officer. The street tree landscaping bond shall remain in full effect for three (3) years to assure that the landscaping has taken root and has a good chance of survival. 15. All the fire hydrants connected to the private fire suppression system shall be replaced within four (4) years from the date of this decision. 16. Any changes to the final plat plan shall require approval of the South Burlington Development Review Board. 17. The applicant shall file the final plat plans (subdivision plats sheets 1-4) in the South Burlington Land Records within 180 days. The mylar shall be signed by the Board Chair or Clerk prior to recording. Prior to recording the final plat plans, the applicant shall submit a copy of the survey plat in digital format. The format of this information shall be approved by the South Burlington GIS Coordinator. #SD-07-65 Mark Behr - e nay/abstain/not present Matthew Birmingham - yea/nay/abstaot pree John Dinklage - yea/nay/abstain of rn Roger Farley - ea nay/abstain/not present Eric Knudsen - e nay/abstain/not present Peter Plumeau gr nay/abstain/not present Gayle Quimby -ay/abstain/not present Motion carried by a vote of (:;- - D - D Pl> Signed this 60 day of WoMM-4%CM- 2007, by Mark Behr, Vice Chairman Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $225.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality). -10-