HomeMy WebLinkAboutAgenda 05_SP-22-020_39 Bowdoin StreetCITY OF SOUTH BURLINGTON DEVELOPMENT REVIEW BOARD SP-22-020_39 Bowdoin Street_neagleychase_SC_2022-06- 21.docx DEPARTMENT OF PLANNING & ZONING Report preparation date: September 28, 2022 Plans received: September 21, 2022 39 Bowdoin Street Site Plan Application #SP-22-020 Meeting date: October 4, 2022 Owner Northeast Territories 20 South Crest Drive Burlington, VT 05401 Applicant Neagley & Chase Construction 66 Bowdoin Street, PO Box 2204 South Burlington, VT 05407-2204 Property Information Tax Parcel ID: 0257-00039 3.4 acres Industrial & Open Space Zoning District, Hinesburg Road North View Protection District, Airport Approach Cones Engineer Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 Location Map #SP-22-020 2 PROJECT DESCRPTION The warned project description is as follows: Site plan application #SP-22-020 of Neagley & Chase Construction to construct a single story 21,790 sf office building, create 2,160 sf of outdoor storage, and associated site improvements, 39 Bowdoin St. This application was reviewed by the Board on June 21, 2022. Since that date, the applicant has modified the proposal to be the following: Site plan application #SP-22-020 of Neagley & Chase Construction to construct a 12,840 sf contractor or building trade facility with supporting parking and infrastructure improvements, 39 Bowdoin St. Staff considers the applicant has incorrectly identified the use and square footage of the proposed structure, but the description above is accurate. CONTEXT This item was continued from the June 21, 2022 meeting and then comprehensively revised following a wetland delineation that found the wetland to be larger than previously thought. As a result, the applicant adjusted their plans in order to maintain compliance with all pertinent wetland and wetland buffer regulations. COMMENTS Development Review Planner Marla Keene and Development Review Planner I Marty Gillies (“Planning Staff”) have reviewed the plans submitted on September 21, 2022 and offer the following comments. Numbered comments for the Board’s attention are indicated in red. A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS The lot is currently undeveloped. IO Zoning District Required Proposed  Min. Lot Size, non-residential use 3 acres 4 acres Max. Building Height Flat Roof 40 ft 33 ft1 Max. Building Coverage 30% 6.6% Max. Overall Coverage 50% 21%  Max. Front Setback Coverage 30% 11.9 & 29.8% Min. Front Setback 50 ft 30.6 & 41.5 ft2 Min. Side Setback 35 ft 84 ft Min. Rear Setback 50 ft N/A 1. It appears the applicant’s proposed height is calculated based on the floor to ceiling height of the building, not the height as calculated from the average preconstruction grade of the site. Furthermore, there is a discrepancy between the stated height in the application (33 feet) and the height demonstrated in the elevations (roughly 25 feet). Staff recommends the Board require the applicant to provide a height measured from average pre-construction grade prior to closing the hearing. 2. The applicant is proposing to encroach into the front setback by approximately 19.4 feet on the south side of the property and by approximately 8.5 feet on the east side. The applicant has requested a setback waiver to reduce the front yard setbacks to 35 feet, but that will not be sufficient to accommodate the proposed #SP-22-020 3 building footprint. As such, Staff recommends the Board instead consider a waiver to reduce the front yard setback from 50 feet to 30 feet. 13.06 Airport Approach Cones All applications for development within the Airport Approach Cones, as shown on the Overlay Districts Map, involving new or expanded buildings or structures shall provide documentation that either a Notice to the Federal Aviation Authority (FAA) is not required, or an application for a Determination of No Hazard has been submitted to the FAA. Where an application for Determination of No Hazard has been submitted, no zoning permit for construction shall be issued without demonstration of receipt of an issued Determination. The property is located entirely within an airport approach cone. The applicant has provided a Determination of No Hazard to Air Navigation, issued March 7, 2022. Staff considers this criterion met. 10.02G Hinesburg Road-North View Protection Zone (1) No part of any structure within the Hinesburg Road-North View Protection Zone shall exceed an elevation of 393.5 feet above mean sea level plus 5.8 feet for each 1000 feet that said part of said structure is horizontally distant from the Hinesburg Road-North View Protection Zone Base Line shown on the above referenced Scenic View Protection Overlay District Map. Based on the applicant’s testimony that the building is 33 ft in height, and the proposed grade of 348 ft, Staff estimates that, prior to discussion of height, the highest this flat roof could reasonably be is 381 ft. Since this is below the elevation of the baseline, 10.02G(1) is met. (2) Landscaping and other vegetation located within the Hinesburg Road-North View Protection Zone shall be maintained so that it does not exceed an elevation of 393.5 feet above mean sea level plus 5.8 feet for each 1000 feet that said landscaping or vegetation is horizontally distant from the Hinesburg Road - North View Protection Zone Base Line shown on the above referenced Scenic View Protection Overlay District Map. The nearest trees are located approximately 2,500 ft from the baseline, which results in a maximum allowable tree height of 408 ft. The nearest trees are proposed to be at elevation 344, with a max height of 50 – 60 ft, or 404 ft. Staff considers this criterion met. B) SITE PLAN REVIEW STANDARDS 14.06 General Review Standards A. Relationship of Proposed Structures to the Site. (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. The DRB shall consider the following: (a) Street Frontage. Maintain internally-consistent building setbacks and landscaping along the street. #SP-22-020 4 (b) Building Placement, Orientation. Maintain or establish a consistent orientation to the street and, where a prevalent pattern exists, shall continue the manner in which the site’s existing building foundations relate to the site’s topography and grade. (c) Transition Contrast in Scale. Minimize and mitigate abrupt contrasts in scale between existing, planned or approved development, and proposed development. (d) Pedestrian Orientation. Improve and enhance pedestrian connections and walkability within the area proposed for development. (e) Solar Gain. Orient their rooflines to maximize solar gain potential, to the extent possible within the context of the overall standards of these regulations. The building is proposed to have one loading dock facing east. The loading dock doors will be at grade with the proposed base of the building, though the ground will be lower. Both the south and east-facing facades include over a dozen windows and are fronted by landscaping features, including maple trees and ornamental plantings, including shrubs and perennials. The proposed entry is located in the southwest corner of the building, on the west façade. The applicant has attempted to integrate the proposed parklet into this area of the building to connect the west side of the building to the frontage along the south side, and to the street. Transitions are discussed under 14.06(C) below. Adequacy of planting and pedestrian movement are discussed elsewhere in this document. For the proposed 11,317 sf building, twenty-three (23) parking spaces are provided. Staff considers parking area to be adequate. (2) Parking: (a) Parking shall be located to the rear or sides of buildings. Any side of a building facing a public street shall be considered a front side of a building for the purposes of this subsection. This criterion is met. B. Relationship of Structures and Site to Adjoining Area. (1) The Development Review Board shall encourage the use of a combination of common materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. (2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. (3) To accomplish (1) and (2), the DRB shall consider: (a) Pattern and Rhythm. Update or maintain or extend the overall pattern of development defined by the planned or existing street grid, block configurations, position and orientation of principal buildings, prevalence of attached or detached building types. #SP-22-020 5 (b) Architectural Features. Respond to recurring or representative architectural features that define neighborhood character, without adhering to a particular architectural style. (c) Privacy. Limit impacts and intrusions to privacy on adjoining properties, including side and back yard areas through context sensitive design. The applicant has provided elevations of the proposed building. The building is proposed to be clad in metal panels. The adjacent sites in Meadowland Business Park have a similar architectural style, with the exception of the existing Neagley and Chase building which is partially constructed of brick. Staff considers this criterion to be met. C. Site Amenity Requirement (1) Sites are required to include a specific minimum area for appropriate Site Amenities. This section does not apply to projects within the City Center FBC District (which are governed by Section 8.08). (2) Applicability. Applications for the following shall be required to provide Site Amenities: (a) Any non-residential development over 5,000 SF. (b) Additions or expansions exceeding 5,000 SF for existing non-residential structures. (c) Any residential development, including conversion of non-residential structures to residential use. The proposed facility exceeds 5,000 sf in size and therefore these standards apply. (3) The required area shall be: (a) For Non-Residential development, a minimum of 6% of non-residential building gross floor area. (b) For Residential development, determined by number of units as: (i) For fewer than 10 units, 100 square feet per unit; (ii) For 10 to 19 units, 85 square feet per unit; or (iii) For 20 or more units, 60 square feet per unit. The proposed 11,317 sf building requires a minimum of 680 sf of Site Amenity. The proposed Site Amenity is a 1,338 sf parklet located near the southwest corner of the building, directly adjacent to the proposed primary entrance and existing public sidewalk. The proposed site Amenity features four paperbark maples. Presently, no seating structures are proposed as part of the parklet. 3. The Snippet/Parklet Site Amenity must primarily feature year-round, fixed, high-quality seating. Staff recommends the Board require the applicant to demonstrate compliance with this requirement. 14.07 Specific Review Standards In all Zoning Districts and the City Center Form Based Codes District, the following standards shall apply: #SP-22-020 6 A. Environmental Protection Standards. All proposed development shall be subject to the applicable requirements of Article 12, Environmental Protection Standards. The property contains a wetland, wetland buffer, and river corridor. The river corridor is contained entirely within the wetland and wetland buffer. The applicant is proposing minor grading outside of the wetland buffer and is proposing to appropriately fence the fill used for this project in order to avoid impacts to the wetland buffer. The applicant is also proposing to construct the proposed sewer connection within the approved class II wetland buffer. While public infrastructure may be allowed within a Class III wetland or buffer, no such exemption exists for Class II wetlands and their buffers, therefore Staff considers the proposed encroachment to be prohibited. 4. Staff recommends the board require the applicant to modify their proposal to connect the proposed project to the existing City sewer line outside of the Class II wetland buffer. B. Site Design Features. All proposed development shall comply with standards for the placement of buildings, parking and loading areas, landscaping and screening, open space, stormwater, lighting, and other applicable standards related to site design pursuant to these Land Development Regulations. These standards are contained in Article 13 and are discussed below. C. Access and Circulation. All proposed development shall comply with site access and circulation standards of Section 15.A.14. Much of 15.A.14 pertains to the construction of streets, which are not applicable to this application. The applicable sections of 15.A.14 follow. 15.A.14 (D) Functional Capacity and Transit Oriented Development. The nearest signalized intersection or those intersections specified by the DRB shall have an overall level of service “D” or better, at the peak street hour, including the anticipated impact of the fully developed proposed PUD or subdivision. In addition, the level of service of each through movement on the major roadway shall have a level of service of “D” or better at full buildout. Traffic was reviewed with the prior application. However, since the project is significantly modified, Staff has performed a new review. The applicant has estimated traffic based on 5,659 sf of General Industrial use and 5,659 sf of Warehousing use. Staff considers that a more accurate reflection of the proposed use of the building from a traffic perspective is 12,840 sf of Contractor/Building Trade Facility use. Staff does not have access to the current version of the ITE manual, however, Staff considers there are uses such as Specialty Trade Contractor that may more accurately reflect the proposed use of the structure when calculating traffic impacts. 5. Staff recommends the Board require the applicant to revise the trip generation calculations using the updated building square footage and proposed use. 6. Staff further recommends the Board establish as part of their decision an approved PM Peak Hour Trip Generation for the purpose of calculating traffic impact fees. #SP-22-020 7 15.A.14(E) Access and Circulation. The applicant must demonstrate that the street network is arranged to meet applicable access management, traffic, and pedestrian circulation standards under these Regulations, including criteria for site plans under Article 14, Transect Zone Subdivisions under Article 9, or a type of Planned Unit Development under Article 15.C; and, for state highways, VTrans Access Management Program Guidelines in effect at the time of application. Unless otherwise specified under these regulations, the street network, including the location and arrangement of streets, must be designed to: (1)-(6) not applicable (7) Provide for safe access to abutting properties for motorists, cyclists, and pedestrians, including safe sight distances, access separation distances, and accommodations for high-accident locations. (8) Align access point with existing intersections or curb cuts and consolidate existing access points or curb cuts within the subdivision, to the extent physically and functionally feasible. Staff considers the pedestrian access to be adequate and supports the proposed driveway widths. At previous hearings, the Board asked the applicant whether the curb cut on Bowdoin St could be re-configured to align with the existing curb cut on the opposite side of the street. One potential advantage is that this would result in trucks making their maneuvers on the site rather than in the public way. Staff notes the provided plan presents a similar curb cut configuration as the 2019 sketch plan configuration. 7. Staff considers there are no substantial topographical challenges, and recommends the Board discuss with the applicant whether to modify their site plan to construct the driveway so that it both aligns with the driveway on the opposite side of Bowdoin Street and with the drive aisle, to ease internal circulation and allow the trucks to back to the loading docks from the parking lot rather than from the street. (9) Minimize vehicular access point (curb cuts) to abutting properties and building lots along pedestrian oriented street frontage; and provide, where feasible, shared vehicular access to frontage and other abutting building lots via rear alleys, side streets, service lanes, shared driveways, or rear cross connections between adjoining parcels. The street network in this location is such that Bowdoin Street cannot be extended much further due to the location of the interstate, and Meadowland Drive cannot be extended much further due to the location of Muddy Brook and its associated wetland complex. Because of the wetland to the west, no connection to the west may occur. The northern property is occupied by the Department of Homeland Security, and as such no cross lot connection to the north is recommended. Staff considers this criterion met. D. Transportation Demand Management (TDM) [reserved] #SP-22-020 8 E. Building Form. Development within the City Center Form Based Code District, the Urban Design Overlay District, and other districts with supplemental building form standards shall adhere to the standards contained therein. Not applicable. F. Streetscape Improvements. A proposed new construction or extension/expansion of an existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section 8.11(D) within the City Center Form Based Code, or Section 3.15(D) in all other zoning districts, shall be required to upgrade adjacent sidewalks, greenbelts, and related street furniture (trees, benches, etc.) to the standards contained within the applicable Street Type and Building Envelope Standard. Nothing in this subsection shall be construed to limit requirements for additional upgrades as necessary to meet the requirements of these Regulations. Staff considers Bowdoin Street to be an Industrial Access Road, which requires a 10-ft wide recreation path and street trees. The applicant is proposing street trees. There is an existing 5-ft bituminous walk on the side of the street facing the subject property. Given the nature of the street and its limited potential for expansion, Staff considers the existing facility to be sufficient. Staff considers this criterion met. F. Access to Abutting Properties. The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. Staff considers no reservation of land to be necessary. G. Utility Services. Electric, telephone and other wire-served utility lines and service connections shall be underground insofar as feasible and subject to state public utilities regulations. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and Services, shall also be met. Wire-served utilities are proposed to be underground. The Director of Public Works reviewed the proposed plan on 6/1/2022 and indicated there were no comments on this application. Staff considers the revised plans to be less impactful therefore did not provide the plans for Public Works review. Staff anticipates changes necessitated for connection to public infrastructure will be of the magnitude allowed as field changes. The South Burlington Water Department Director reviewed the plans on May 27, 2022 and offered several comments, which the applicant testifies to have incorporated as of September 21, 2022. H. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance with any recycling, composting, or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). Small receptacles intended for use by households or the public (ie, non-dumpster, non-large drum) shall not be required to be fenced or screened. #SP-22-020 9 8. The proposed dumpster location is to be screened, but Staff considers insufficient information about the screening is provided to confirm whether this criterion is met. The material is called out as “screen board or other material as per owners request.” Staff recommends the Board require the applicant to demonstrate compliance with this criterion as a condition of approval. C) SUPPLEMENTAL REGULATIONS 13.02 Off Street Parking and Loading F. Access management Requirements. It is the intent of the City to minimize traffic and pedestrian conflicts caused by vehicular driveways on public roadways by reducing the number of required driveways and by minimizing the number of vehicles utilizing such driveways off public roadways. All applicants must make an effort to reduce these impacts. All commercial lots (retail, restaurant, office, service uses, excluding residential, agricultural and industrial uses) located adjacent to other commercial lots must provide a driveway connection to any adjacent commercial lot. If the adjacent property owner does not want to provide for that connection, the applicant must provide an easement to do so in the future when circumstances may change. This driveway connection or easement should be located where vehicular and pedestrian circulation is most feasible. As discussed above, Staff considers cross-lot connections to not be viable. However, in the case of a site plan, the Board only has the authority to waive dimensional requirements. 9. The applicant has proposed a 20-ft wide access easement to the property to the north in accordance with this requirement. Staff recommends the Board require the applicant to provide a draft easement document prior to closing the hearing. G. Design requirements for Parking Spaces, Parking Aisles, Lighting and Landscaping (1) Design requirements for off-street parking and loading are provided in Table 13-2 and Figure 13-1, Section 13.04, Landscaping , Screening, and Street Trees, and Section 13.07, Exterior Lighting. All paved parking spaces shall be striped or otherwise physically delimited. Dimensional requirements are met. Parking lot landscaping and lighting are further discussed below. (2) The location of parking areas and loading docks shall prevent conflicts with entering and existing traffic onto a public street and prevent conflicts between vehicles and pedestrians. The distance between access points and parking areas shall be adequate to minimize blockage and prevent back-ups onto the public street. As noted above, the location of the loading dock requires trucks to reverse in Bowdoin Street. Staff recommends the Board require the applicant to revise the driveway to allow trucks to reverse within the site. (3) Provision shall be made for access by police, fire and emergency vehicles. The Fire Chief reviewed the plans on 6/1/2022 and provided the following comments. Our Office has had an opportunity to review the sketch plans for the 39 Bowdoin St application. As the building is set back from street we will need to ensure FD Aerial access via the parking lots on North and West sides. The traffic pattern and parking #SP-22-020 10 lot infrastructure need to accommodate the apparatus (1990 WB-40 – straight dual rear axle design). The building will need fire sprinkler and standpipe coverage as well. The applicant indicated on 6/8 that the proposed building will be sprinklered and that they would provide supplemental information depicting the turning movement around the building as well as the proposed FDC location. 10. Staff has been unable to locate turning movement information in the revised materials provided on 9/21. Staff continues to recommend the Board require the applicant to address the Fire Chief’s comments which pertain to site design prior to closing the hearing. (4) Pedestrian safety. Insofar as practicable, pedestrian and bicycle circulation shall be separated from motor vehicle circulation. Safe and convenient pedestrian circulation, including appropriate sidewalks, shall be provided on the site and its approaches. The pedestrian circulation on site shall be designed to minimize adverse effects of vehicular traffic on sidewalks and recreation paths. Staff considers appropriate pedestrian accommodations have been provided. (5) Bicycle parking or storage facility. See Section 13.03 (6) Stormwater management strategies that facilitate infiltration including but not limited to recessed planting islands, bioretention facilities, and pervious parking spaces are encouraged in the design of any off-street parking or loading area. Stormwater management is discussed under 13.05 below. 13.03 Bicycle Parking and Storage. The applicant has provided two bicycle racks, providing parking for four bicycles. Required Bike Parking Required Short Term (1 per 5k sf office, 1 per 20k sf contractor facility, minimum 4) 4 Long Term (50% of short term retail and office, 1 per unit) 2 Clothes Lockers 1 Long-term bicycle parking requirements include providing a secure storage location that supports a bicycle upright, allows secure locking of the frame and wheel, and protects the entire bicycle against theft and weather. These requirements can be met by providing a bicycle storage room inside the building or by providing bicycle lockers, or other private enclosures, outside of the building. Additionally, 50% of the long-term parking requirement can be met by secure, private office spaces, given that they are on the first floor, accessible, and of a sufficient size. 11. Staff recommends the Board require the applicant to provide long-term bicycle parking at the site, noting that 50% of the required long-term bicycle parking requirement can be met by private office space. As #SP-22-020 11 such, Staff considers that the applicant must provide one additional long-term bicycle parking space and an associated clothes locker, and recommends that the Board require the applicant to do so prior to closing the hearing. 13.04 Landscaping, Screening & Street Trees B. Except for parking spaces accessory to a one-family or two-family dwelling, all off-street parking areas subject to review by the Development Review Board, shall be curbed and landscaped with appropriate trees, shrubs, and other plants including ground covers, as approved by the Development Review Board. Sections of recessed curb are permitted if their purpose is to allow stormwater runoff from the adjacent parking area to reach stormwater collection, treatment and management infrastructure. The Development Review Board shall consider the adequacy of the proposed landscaping to assure the establishment of a safe, convenient, and attractive parking area and the privacy and comfort of abutting properties. (1) All off-street parking areas shall be landscaped around the perimeter of the lot with trees, shrubs and other plants. Perimeter planting shall be set back from the curb sufficiently to allow for snow storage. The purpose of perimeter planting shall be to mitigate the view of the parking lot from the public way and from adjacent uses and properties, and to provide shade and canopy for the parking lot. In some situations it may be necessary both for surveillance purposes and for the perception of safety to install the size and type of plants that leave visual access between the parking lot to the public way or other pedestrian areas. Parking areas are proposed to be curbed. A minimum number of trees are proposed around the perimeter of the parking areas. (2) In all parking areas containing twenty-eight (28) or more contiguous parking spaces and/or in parking lots with more than a single circulation lane, at least ten percent (10%) of the interior of the parking lot shall be landscaped islands planted with trees, shrubs and other plants. Such requirement shall not apply to structured parking or below-ground parking. The proposed parking area includes only twenty-three (23) parking spaces. As such, this criterion is not applicable. (3) All interior and perimeter planting shall be protected by curbing unless specifically designed as a collection and treatment area for management of stormwater runoff as per 13.04(B)(5)(c) below. Interior planted islands shall have a minimum dimension of six (6) feet on any one side, and shall have a minimum square footage of sixty (60) square feet. Large islands are encouraged. Curbing is provided. Staff considers this criterion met. (4) Landscaping Requirements (a) Landscaping shall include a variety of trees, shrubs, grasses and ground covers. All planting shall be species hardy for the region and, if located in areas receiving road runoff or salt spray, shall be salt-tolerant. Staff considers this criterion met. (b) At least one (1) major deciduous shade tree shall be provided within or near the perimeter of each parking area, for every five (5) parking spaces. The trees shall be placed #SP-22-020 12 evenly throughout the parking lot to provide shade and reduce glare. Trees shall be placed a minimum of thirty (30) feet apart. 23 parking spaces are provided, requiring 5 shade trees. 3 shade trees are provided, and all 3 are proposed to be located on the east side of the parking area, adjacent to the building. 12. Staff recommends the Board require the applicant to fully meet this requirement and revise the distribution of the shade trees prior to closing the hearing. (c) Trees shall have a caliper equal to or greater than two and one-half (2 ½) inches when measured on the tree stem, six (6) inches above the root ball. This criterion is met. (c) Where more than ten (10) trees are installed, a mix of species is encouraged; the species should be grouped or located in a manner that reinforces the design and layout of the parking lot and the site. The applicant is proposing to install twelve trees, elven of which are maples. The twelfth tree is a five-foot-high evergreen. 13. Staff recommends the Board require the applicant to fully meet this requirement by providing a more diverse mix of tree species. (e) Within the City Center FBC District, landscaping required within this section shall not count towards meeting minimum landscape budget requirements as detailed in Section 13.04(G). This criterion is not applicable. (7) Snow storage areas must be specified and located in an area that minimizes the potential for erosion and contaminated runoff into any adjacent or nearby surface waters. Snow storage areas are shown in different locations on different plans submitted by the applicant. Specifically, the snow storage areas shown on Sheet C2.1 conflict with those shown on Sheet L1.1. 14. Staff recommends the Board require the applicant to clarify where the snow storage areas will be located prior to closing the hearing. C. Screening or buffering. The Development Review Board will require landscaping, fencing, land shaping and/or screening along property boundaries (lot lines) whenever it determines that a) two adjacent sites are dissimilar and should be screened or buffered from each other, or b) a property’s appearance should be improved, which property is covered excessively with pavement or structures or is otherwise insufficiently landscaped, or c) a commercial, industrial, and multi-family use abuts a residential district or institutional use, or (d) a parking or loading area is adjacent to or visible from a public street. Staff considers the project to be similar to adjacent uses and this criterion to be not applicable. D. Front Yards of Non-Residential and Multi-Family Uses. In the case of non-residential and multi- family uses, the required front yard and/or the frontage along designated arterial and collector streets (see Article 3, Section 3.06 for this list) shall be suitably landscaped and maintained in good appearance. Landscape elements that reduce stormwater runoff and promote stormwater infiltration #SP-22-020 13 are encouraged. The Development Review Board shall require the applicant to meet the provisions of sections 13.04(F) and (G). The applicant is proposing a suitable amount of landscaping in the front yards, including a conveyance swale. As such, Staff considers this criterion met. G(3) Landscaping Budget Requirements. The Development Review Board shall require minimum planting costs for all site plans, as shown in Table 13-4 below. In evaluating landscaping requirements, some credit may be granted for existing trees or for site improvements other than tree planting as long as the objectives of this section are not reduced. The costs below are cumulative; for example, a landscaping budget shall be required to show a planned expenditure of three percent of the first $250,000 in construction or improvement cost plus two percent of the next $250,000 in construction or improvement cost, plus one percent of the remaining cost over $500,000. The landscaping budget shall be prepared by a landscape architect or professional landscape designer. The applicant has provided neither a project cost calculation nor a valuation of the landscaping elements to be installed. As such, it is impossible to calculate whether the applicant has met the minimum requirements for landscaping requirements. 15. Staff recommends the Board require the applicant to provide a project cost and values of each of the landscaping elements included in the landscaping plan before the conclusion of the hearing. 13.05 Stormwater Management Stormwater standards apply when one-half acre or more of impervious surface exists or is proposed to exist, and where 5,000 sf of impervious is created or reconstructed. The City Stormwater Section will review these plans prior to the scheduled DRB hearing on Thursday, October 6th, and Staff will provide an update including those comments at that time. 13.07 Exterior Lighting Lighting requirements are summarized as follows. (1) Fixtures must be downcast and shielded (2) Illumination must be evenly distributed (3) Fixtures must be placed to minimize lighting from becoming a nuisance (4) Poles shall be rustproof metal, cast iron, fiberglass, finished wood or similar structural material, with a decorative surface or finish (5) Poles & building mounted fixtures may be no higher than 30-ft (6) Poles must be located in safe locations Specific requirements for maximum illumination levels are included in Appendix A and are limited to 3 foot candles average at ground level. The applicant has provided a photometric drawing indicating this criterion is met. #SP-22-020 14 16. One of the lights included in a cut sheet submitted by the applicant does not meet the downcast and shielded requirements. Staff recommends the board include a condition that only the lights specified on the plans, and not all the lights included in the cut sheets, be permitted. 13.08 Outdoor Storage and Display The applicant is proposing to use a 705 sf screened area accessible as outdoor storage A. Outdoor Storage. Outdoor storage of goods, materials, vehicles for other than daily use, and equipment shall be subject to the following provisions: (1) Any outdoor storage shall be appurtenant to the primary use of the property and shall be allowed only in nonresidential districts and upon approval of the DRB in conjunction with a site plan, conditional use and/or PUD application. Staff considers this criterion met. (2) The Development Review Board may require that outdoor storage areas in connection with commercial or industrial uses be enclosed and/or screened where the storage area may comprise an attractive nuisance, where the proposed use of the storage areas present opportunities for theft, or where the Board finds that said storage areas are in view of residentially-zoned parcels. The applicant is proposing to enclose the area with a 6-foot to 7-foot chain link fence with plastic slats. Staff considers this criterion met. 3.18 Energy Standards All new buildings are subject to the Stretch Energy Code pursuant to Section 3.18: Residential and Commercial Building Energy Standards of the LDRs. This now includes provision of a solar-ready roof. 17. Staff recommends the Board discuss with the applicant how the roof will comply with the standard. If the applicant demonstrates satisfactory compliance with this requirement, Staff considers demonstration of it on the plans can be a condition of approval. RECOMMENDATION Staff recommends that the Board work with the applicant to address the issues identified herein. Respectfully submitted, Marla Keene, Development Review Planner CIVIL ENGINEERING ASSOCIATES, INC. 10 Mansfield View Lane Phone:802-864-2323 South Burlington, VT 05403 Fax:802-864-2271 E-Mail: dmarshall@cea-vt.com September 21, 2022 Ms. Marla Keene, PEDevelopment Review Planner City of South Burlington Planning & Zoning 575 Dorset StreetSouth Burlington, Vermont 05403 Re:Northeast Territories, Inc.39 Bowdoin Street SP-22-020 Lot 7 at Meadowland Business Park Site Plan Application for Proposed Office Space and Contractor’s Yard Revised Site Layout Dear Ms. Keene: Based upon the updated wetland delineation for the property, we have revised the site plan to avoid the newly delineated wetlands and the 50-foot buffer except for the connection to the existing sewer service stub. Similar to the original plan submittal package, this proposal includes the two pints of access as a means of maximizing circulation opportunities around the building tobenefit both day to day operations as well as access for emergency services. Unlike the original application, this update now includes the required site amenity area chosen to be located at the main entrance on the southwest corner of thebuilding. This building entrance orientation is similar to that used by Logic Supply on the next lot to the west. We have updated the original application cover letter herein: The primary components of this application include: 1.The creation of a new 11,317 SF Contractor’s Yard facility on Lot 7 with afront yard setback waiver request from 50-feet to 35-feet. 2.Creation of 23 parking spaces 3.Extension of underground utility service lines from Meadowland Drive into thesite. View Protection Zone -The proposed facility is located well below the Hinesburg Road North View Protection Zone Overlay. The street tree plantings have been Ms.Marla KeenePage2of9 September 21, 2022 chosen so as to minimize the potential for the street trees to extend vertically up into the VPZ with a 64-foot (408 base line –344 finish grade)maximum height.Wepreviouslysubmittedan image indicating these values. Airport Approach Cone –The project has received FAA approval for its placement at this location (attached) Street Access –With frontage on two streets, the project is seeking to maximize perimeter circulation pattern by proposing curb cuts on both Meadowland Drive andBowdoin Street. Fire Access -The multiple driveway access points will maximize emergency vehicle circulation opportunities. Setback Waiver –As part of the City’s review of the same site layout in 2019 it indicated in the Staff report that: The applicants proposed site plan requires waiver of front setback requirements from 50 feet to 35 feet.The Board may grant setback waivers up to five feet from the property line.At this time it does not appear that other dimensionalwaiverswillberequired.Staff has no concerns with the proposed layout as it pertains to dimensional requirements. This was reinforced during the Sketch Plan review of this project. Cross Lot Access -The applicant has not proposed a physical cross lot access at this time as the Homeland Security facility as no historical interest in enabling improved access to the property due to security concerns. The applicant has shown a reservation for a future access easement to Lots 8&9 to the north (HomelandSecurity) in case there was ever a change in land use that would benefit from that circulation opportunity. Stormwater –Lot 7 is burdened with a high groundwater table and low rates of permeability due primarily to the presence of the Vergennes Clay soil type which soil mapping shows occupying the majority of this portion of the Meadowland Business Park.This soil type was reconfirmed with subsurface soil explorations in the vicinity of the proposed building footprint.As such, the opportunity for on-site infiltration of stormwater cannot be achieved as otherwise required in Article 12.03 the LandDevelopment Regulations.Lacking the ability to infiltrate, Article 12 requires that the applicant implement LID approaches where possible and to comply with the State Stormwater Rules. The latter requirement is consistent with the current Individual Permit State Stormwater authorization issued for the Business Park which requires Ms.Marla KeenePage3of9 September 21, 2022 that all future development projects meet the standards of the current State Stormwater Rules. The applicant is proposing to utilize underground stormwater chambers as a means of meeting the stormwater treatment and peak flow management requirements from the property as there is no space to enable the use of a Tier 2 STP.The area to the wets of the west parking may be subject to a future requirement to remove some of that fill material reducing the viability of placing a gravel wetland in that area. Traffic –A Traffic Impact Study was developed by Lamoureaux & Dickenson for the original 21,000 SF building project.The PM Peak hour trip end generation wasinternally revised to reflect the elimination of the office space and the downsizing of the Contractor’s yard to yield a PM Peak hour trip generation value of 6 VTE.When the original PM Peak Hour VTEs were applied to the existing and future background traffic levels at the Meadowland Drive-Hinesburg Road intersection, the TIS indicated that the turning movements at the intersection do not trigger the warrants for the installation of a traffic signal system at this time.More on this in Item 7 below. Landscaping –The proposed landscaping plans were developed by CynthiaKnaupf, Landscape Architect. Lighting –Site lighting is being provided through the use of a combination building mounted downcast LED luminaires and area lights for the parking lots. Project Schedule –The project schedule calls for construction to commence in the early Summer 2023 and be completed in Winter of 2023. Earthwork –The project is designed to be a no net export project. The amount of granular material to be imported into the site is approximately 2,100 CY. In support of hopefully reducing the number of open issues, we have developed responses to some of the earlier staff comments as they relate to this updated proposal. We have inserted the “red” staff recommendations as a starting point in support of the applicant’s responses 1.It appears the applicant’s proposed height is calculated based on the floor to ceiling height of the building,not the height as calculated from the average preconstruction grade of the site. The project involves significant regrading of the site,therefore Staff recommends the Board require the applicant to provide a height measured from average pre-construction grade prior to closing the hearing.This calculation is depicted on Sheet HB-1.0. Ms.Marla KeenePage4of9 September 21, 2022 2. Staff recommends the Board discuss whether either street facing façade should be reconfigured to have more interest and have the principal entry face south Staff also notes that there is presently no entry to the space labelled “tenant space 2” on the architectural plans.As the building has been reduced in size the tenant space has been eliminated. The proposed entry remains in the southwest corner of the building on the west façade. The amenity space has been integrated into this area of the building to engage the west side of the building to the street. This technique was used at Logic Supply which is located on the next lot to the west. 3. The applicant is proposing to alter existing grade by leveling the site, roughly holding the elevation at Bowdoin Street and installing a retaining wall along the wetland buffer. The retaining wall has a maximum height of approximately nine (9) feet, occurring at it’s northwestern corner. The building therefore does not particularly conform to existing topography. Staff recommends the Board discuss whether they consider this criterion met. The Board may wish to request renderings in support of this criterion.The original retaining wall on the west side of the property has been eliminated.The remaining project area is intended to mimic the abutting streets. In this case as Meadowland Drive roadway surface passes the property is was constructed in a fill. The proposed fill at the west end of the property is intended to facilitate access to Meadowland Drive 4.Staff recommends the Board direct the applicant to include a Site Amenity of at least 1,307 s.f. using one or more of the allowable Site Amenity Types in Article 11C of the Land Development Regulations.The smaller building now only requires a Site Amenity Area of 680 SF. This is depicted in greatest detail on the site landscaping plan prepared by Cynthia Knauf.(L1.1) 5. Staff recommends the Board ask the applicant to describe how they proposed to avoid temporary wetland impacts during construction and determine what additional information should be included either on the EPSC plans or in the conditions of approval to enforce that no impacts shall be acceptable. There is no longer any allowance within the LDR for the Board to allow impacts within Class II wetland buffers for new construction.The project has eliminated the originally proposed segmental retaining wall and now proposes minor grading outside of the wetland buffer. Provisions for temporary installation of silt fence along the limits of fill have been integrated into the plan. 6. Staff recommends the Board ask the applicant to clarify the proposed use of the building. If it is proposed to be entirely office, Staff recommends the Board require the applicant to update the TIS prior to closing the hearing. The applicant’s provided floor plan seems to indicate some of the spaces are not yet assigned. Staff considers that if the applicant wishes to not designate the entirety of the building at this time, they may permit a portion as vacant, though when the applicant later wishes to assigning a use, it will require an Ms.Marla KeenePage5of9 September 21, 2022 amendment to the site plan with associated TIA update.The intent of the LUC chosen in the TIA was to identify the equivalent of 11,317 SF Contractor’s Yard use. The office use has been eliminated so the original traffic study is conservative in its findings.. 7. Staff further recommends the Board establish as part of their decision an approved PM Peak Hour Trip Generation for the purpose of calculating traffic impact fees. In order to do this, the applicant must commit to a distribution of uses.The PM Peak Hour Trip end generation of the hybrid uses (LUC 110 and LUC 130)originally chosen by the traffic consultant along with the General Office LUC 720 created a PM Peak Hour trip generation of 27 VTE.The downsizing of the contractor’s yard and the elimination of the office component reduces the PM Peak hour trip generation to 6 VTE. Proposed 11,317 SF/2 = 5,659 SF of LUC 110 General Industrial/original 6,960 SF x original 6 VTE = 4.9 VTE ` Plus Proposed 11,317 SF/2 = 5,659 SF of LUC 130 Warehousing/original 6,960 SF x original 1 VTE =0.8 VTE 8. BFJ did not have the grading plans available when they made their comment. Staff considers there are no substantial topographical challenges, and recommends the Board require the applicant to modify their site plan to align the driveway so that it both aligns with the driveway on the opposite side of Bowdoin Street and with the drive aisle.When this same plan was presented to Staff as part of the On-Logic campus proposal in 2019, we were asked to consolidate the truck loading and vehicular curb cuts into one. This application reflects the guidance we received at that time. We can resurrect the earliest concept of a direct connection from the east end of the north parking area easterly out to Bowdoin Street to align with the CBA office building driveway across the way. It should be pointed out that the westerly curb cut out on to Meadowland Drive will receive the majority of the turning movements as that is the shortest way for egress from the property to most destination points. Therefore conflicts with CBA traffic movements will be occur on a less frequent basis. 9. Staff recommends the Board determine whether to require the applicant to upgrade the existing facility.The existing infrastructure is consistent with the City approved master plan for the Meadowland Business Park. Lacking any goals of the City to implement supplemental pedestrian ways to the north of the Business Park, the width of the existing sidewalk, which is consistent with City standards, appears to be adequate without further widening. 10. As of packet publication, the Director of Public Works had not yet had an opportunity to review the plans. Staff anticipates having an update at the time of the hearing.We look forward to seeing this when it is available. The South Burlington Water Department Director reviewed the plans on May 27, 2022 and offers the following comments. Ms.Marla KeenePage6of9 September 21, 2022 1.Plans must include a note stating “All water lines and appurtenances shall be installed in accordance with the Champlain Water District Specifications and Details for the Installation of Water Lines and Appurtenances, current edition.” 2.Record Drawings prepared by a VT licensed Professional Engineer shall be provided to the South Burlington Water Department in pdf.and Auto-CAD format.Drawings shall include ties to all gate valves and curb stops to sub-meter accuracy. 3.Existing line diameter must be confirmed prior to connection. 4.Tee for fire hydrant and sprinkler line shall be an anchor tee.The hydrant isolation valve and sprinkler line valve shall be secured to the tee with Foster Glands.5.New fire hydrant to include 4”Stortz connection and spring-loaded hydrant flag. 6.Fire hydrant shall be considered private since it will be on a fire sprinkler line dedicated to this facility. 7.New in-line valve before hydrant to be installed with restraining glands. 8.Refer to and specify CWD Specifications for C-900 installation requirements including the installation of a tracing wire with independent termination boxes.All ferrous materials incorporated in the installation of the PVC pipe shall be polyethylene encased.Tap proposed for sprinkler line outside of building for an appropriately sized domestic water service to be run independently into building. Provide curb stop and box in Department approved location.Water service material to be copper unless approved otherwise by the SBWD. These comments have been integrated into the site utility plan and the supporting details. 11. Staff recommends the Board require the applicant to comply with the comments of the SBWD Director prior to issuance of a zoning permit.Most of these items were already included In the specifications portion of the plan set.The same specifications used for the Water Dept. approval of the 105 Swift Street building, which had the exact same comment wording from the Water Dept..,was used for this project.The Storts connection requirement was added on Sheet C5.4. 12. The applicant has proposed a 20-ft wide access easement to the property to the north in accordance with this requirement. Staff recommends the Board require the applicant to provide a draft easement document prior to closing the hearing. Our Office has had an opportunity to review the sketch plans for the 39 Bowdoin St application. As the building is set back from street we will need to ensure FD Aerial access via the parking lots on North and West sides.The traffic pattern and parking lot infrastructure need to accommodate the apparatus (1990 WB-40 –straight dual rear axle design).The building will need fire sprinkler and standpipe coverage as well. 13. Staff recommends the Board require the applicant to address those of the Fire Chief’s comments that pertain to site design prior to closing the hearing.The proposed building will be sprinklered. We have attached supplemental information in the form of an Ms.Marla KeenePage7of9 September 21, 2022 AutoTurn generated worksheet (F1.0)depicting the turning movement around the building as well as the proposed FDC location. 14. Staff recommends the Board require the applicant to provide one additional short term bicycle parking space, unless the outcome of the above discussion regarding uses results in a different configuration.One additional space has been added to the plans. 15.It is not clear whether this criterion is met.Staff recommends the Board require the applicant to provide a computation demonstrating compliance with this criterion prior to closing the hearing.In case the northeastern spaces associated with the storage area are converted to parking spaces,we developed a plan showing the 10% green spaces compliance. This is attached as Sheet WS-1.0.The current application has reduced the number of parking spaces to 23 which negates the need to demonstrate compliance with the 10% internal green space requirement. 16. Staff recommends the Board require the applicant to better distribute the shade trees, and add two additional shade trees, prior to closing the hearing. Staff considers there will opportunities for reconfiguring and adding shade trees when the eastern driveway is modified to align with the driveway on the other side of Bowdoin Street, and there is an opportunity for providing a shade tree along the southern driveway.The applicant has retained Cynthia Knauf Landscape Architect to craft the existing landscaping plan. 17. Some of the trees are measured in height, not caliper. Staff recommends the Board discuss with the applicant that they will need to provide trees that are at least two and one-half inches in caliper at installation, regardless of how they are considered by the nursery, and include this as a condition of approval.The Landscaping Schedule on the landscaping sheet shows that the minimum caliper is 2.5”. 18. Snow storage does not appear to be shown on the plans. Staff recommends the Board require the applicant to show snow storage on the plans, or to direct the Board as to where it is shown.The proposed snow storage areas have been added to the revised Sheet L1.1. 19. Since the applicant has not met the required minimum landscaping budget with trees and shrubs (discussed immediately below), Staff recommends the Board require the applicant to improve compliance with this criterion along Meadowland Drive and in the required site amenity prior to allowing credit for perennials and ornamental grasses.The proposed plan meets the landscaping obligations. 20. The required minimum landscaping budget is $41,750 for an estimated project cost of $3,425,000. Staff notes that landscaping budget is required for the full value of initial fit-up, and recommends the Board clarify with the applicant whether the estimated project cost includes full interior fit up or only the fit-up shown on the provided floor plans. If full fit-up is Ms.Marla KeenePage8of9 September 21, 2022 not included, additional landscaping budget will be required at a later date. Staff notes the applicant may over-landscape now and apply the excess landscaping as value towards future initial fit-up. Otherwise a site plan amendment will be required at the time of fit-up of additional areas. 13.05 Stormwater Management Stormwater standards apply when one-half acre or more of impervious surface exists or is proposed to exist,and where 5,000 sf of impervious is created or reconstructed. The City Stormwater Section reviewed the proposed plans on 5/31/2022 and offers the following comments. 1.The proposed project is located in the Potash Brook watershed. 2.The project proposes to create greater than 1 acre of impervious area and disturb greater than 1 acre of land. 3.The cover letter provided with the application indicates that underground detentionchambersareproposedforstormwatertreatment.While the applicant has considered Tier1stormwater treatment practices as infeasible,the applicant is required to consider Tier 2stormwater treatment practices,in accordance with the Vermont StormwaterManagementManual.4.The proposed 12”HDPE storm drain from CB#7 is shown connecting into an existingcatchbasinatelevation339.9’.The applicant should make sure this pipe has adequatecover. 5.DHM#7 is missing a rim elevation. 6.Silt fence on Sheet C3.0 is called out with “turn-outs”.Applicant should confirm if “j- hook” is a better terminology for what is proposed.The maximum drainage area for overland flow to a silt fence shall not exceed ¼acre per 100 feet of fence. 21. Staff recommends the Board require the applicant to address the comments of the CityStormwaterSectionpriortoclosingthehearing.We have addressed Items 4-6.We askthat the Board defer to the State of Vermont’s technical review of the currently pendingoperational stormwater permit application. The applicant is acceptable to a condition ofapproval that the State GP 3-9050 authorization be produced prior to the issuance ofZoning Permit for the project. 22.The applicant is proposing a number of wall mounted fixtures that are not in proximity to doors or to areas which will be used for access.While these fixtures are not prohibited, Staff recommends the Board discuss with the applicant why they are proposed, as the City’s lighting standards tend to favor less lighting over more.These have been removed from the project. 23.The applicant is proposing to use the six north eastern most parking spaces as outdoor storage.Staff recommends the Board require the applicant to update all plans to reflect this area as outdoor storage.This reduces the number of required shade trees and affects the computation of required interior parking lot landscaping.Updates to those landscaping elements should be made simultaneously with updates to reflect the outdoor Ms.Marla KeenePage9of9 September 21, 2022 storage area.We have added the proposed outdoor storage area on the plans. The interior parking green space is no longer a requirement with 23 spaces. If the storage is converted back then demonstration of compliance with the interior green space requirement will need to be met. 24.The applicant is proposing to enclose the area with a six to seven foot chain link fence with plastic slats.Staff recommends the Board require the aforementioned plan updates to reflect the proposed fence type.This callout may be found on Sheet C2.1 This completes our general summary of the current status of the revisions made proposed project application materials.If you should have any questions, please feel free to contact me at 864-2323 x310. Respectfully, David S. Marshall, P.E. Project Engineer Attachments: Site Plan Application Package Site Plan Application (1 digital copyApplication Fee of $1877.50 ($275 Base Fee +$13 +10,000 SF x 0.10 + 11,790 SF x $0.05/SF))Paid Adjoiner ListSite Plan Submittal Summary IO District Design StandardsTraffic Impact StudySite Lighting Cuts Natural Resource MappingFlood Plain & River Corridor FEMA FirmetteANR Atlas Wetland MappingHabitat Blocks ANR Atlas Slopes Mapping FAA PermitW&S Design Flows SummaryVPZ–HRN Worksheet Wetland Evaluation Form cc:(All w/ enclosures, 11x17 plans);M. Neagley CEA File 19145.00 P:\AutoCADD Projects\2019\19145\3-Permitting\1-Local Applications\4-Site Plan\0 -Keene -Lot 7 MBP Site Plan Cover Letter 220921.rtf FIRST FLOOR0' - 0" HIGH ROOF22' - 0" LOW ROOF14' - 0" MEZZANINE12' - 0" METL SPAN SLATE GRAY METL SPAN TERRACOTTA METL SPAN COPPER METALLIC FIRST FLOOR0' - 0" HIGH ROOF22' - 0" LOW ROOF14' - 0" MEZZANINE12' - 0" METL SPAN TERRACOTTA KAWNEER SUN SHADES METL SPAN SLATE GRAY METAL SPAN COPPER METALLIC FIRST FLOOR0' - 0" HIGH ROOF22' - 0" MEZZANINE12' - 0" METL SPAN SLATE GRAY METL SPAN TERRACOTTA FIRST FLOOR0' - 0" HIGH ROOF22' - 0" LOW ROOF14' - 0" MEZZANINE12' - 0" METL SPAN SLATE GRAY METL SPAN COPPER MAETALLIC project name:sheet title: sheet no. scale: project no. checked by: drawn by: proj. date: sheet date:project address:P 802.879.51537 CARMICHAEL ST. ESSEX JUNCTION, VT 05452SCOTTPARTNERS.COMF 802.872.2764 1/8" = 1'-0"9/21/2022 1:05:00 PMS:\1-S+P-Projects\1-COMMERCIAL\Neagley-Chase Offices 2022\Drawings\Revit\2022.09.21_NCC Office_R23.rvtNEAGLEY & CHASE NEWOFFICESProject Number JBA JN Issue Date EXTERIORELEVATIONS A4.009/21/2022 ZONING DRAWINGS_NOT FOR CONSTRUCTION Enter address here09/21/2022 1/8" = 1'-0"1North 1/8" = 1'-0"2South 1/8" = 1'-0"3East 1/8" = 1'-0"4West No Date Revisions 1 REF.UP REF.100' - 0"75' - 0" 125' - 0"30' - 0"5' - 6"72 SF VESTIBULE 101 752 SF LOBBY 102 15' - 5 1/2"12' - 6"12' - 6"12' - 6"12' - 6"13' - 2 1/2"20' - 6" 234 SF PRESIDENT 105 234 SF CEO 106 234 SF VP 107 234 SF BD 108 237 SF ACCOUNTING 109 311 SF PE 110 142 SF PM5 111 142 SF PM4 112 142 SF PM3 113 142 SF PM2 114 142 SF PM1 115 163 SF EST 116 207 SF BID/EST 117 3091 SF SHOP 118 423 SF CONFERENCE ROOM 119 5' - 0"7' - 0"252 SF STORAGE 120 62 SF BATHROOM 122 228 SF COPIER/PRINTER 123 40 SF IT 124 53 SF JC 125 156 SF KITCHEN 126 443 SF LOADING DOCK 127 MEZZANINE ABOVE EXIT EXIT 302 SF OFFICE MAN. RECEPTION 128 DISPLAY-GALLERY 52 SF BATHROOM 121 6' - 6"6' - 0"16' - 0"141 SF EST 132 8' - 10"6' - 7"6' - 9 1/2"6' - 9 1/2" 47 SF BATHROOM 134 6' - 0"145 SF SMALL CONFERENCEROOM 137 163 SF OFFICE 138 182 SF OFFICE 139 56 SF SHOP BATHROOM 140 PLOTTER WORK COUNTER STORAGE/MAIL 14' - 9 1/2"11' - 6"11' - 2 1/2"12' - 5 1/2"5' - 1"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"EXIT MIN. 1' - 6" CANOPY ABOVE LOADING DOCKS, LANDINGS, STAIRS AND WALKS - SEE CIVIL/STRUCTURAL SIDEWALK TO DRIVEWAY (PUBLIC WAY) METAL STAIRS, 7" RISERS CONC. FILLED PANS. MTL HANDRAIL BOTH SIDES. 26' - 6" PATIO SEE CIVIL88' - 0"18' - 0"734 SF MECHANICALROOM 130 119 SF OFFICE 131 OPEN TO SHOP BELOW MEZZANINE 10 PERSON MAX (TOTAL OFFICE SPACE = 780 SF) 118 SF OFFICE 135505 SF OPEN OFFICE 136 42" HIGH GUARDRAIL WITH 4' REMOVABLE SECTION. project name:sheet title: sheet no. scale: project no. checked by: drawn by: proj. date: sheet date:project address:P 802.879.51537 CARMICHAEL ST. ESSEX JUNCTION, VT 05452SCOTTPARTNERS.COMF 802.872.2764 1/8" = 1'-0"9/21/2022 1:04:46 PMS:\1-S+P-Projects\1-COMMERCIAL\Neagley-Chase Offices 2022\Drawings\Revit\2022.09.21_NCC Office_R23.rvtNEAGLEY & CHASE NEWOFFICESProject Number JBA JN Issue Date PROPOSED PLAN A2.009/21/2022 ZONING DRAWINGS_NOT FOR CONSTRUCTION Enter address here09/21/2022 1/8" = 1'-0"1FIRST FLOOR PROPOSED PLAN 1/8" = 1'-0"2MEZZANINE EXIT No Date Revisions D REXISTING HOUSE EXISTING GARAGE 390 388 386390 390 390 396397 399 393 392391390 391 391 391395395 391 393394 389387388 389 386 385 387 385 384 MEA D O W L A N D D R I V EFM 388 384 395 394 393 392 393 396 392 398 391 394 394 395 395 390 391 392 393394395396397 356 355 35 0 360347 346346 357356 359347348350351 353352 355 34334 7 348 34 9 351358359355 356355356357354 352354 354 353349347346.4346355355 353 354 353 358352 354 35 8 346 S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S S D D D D D D D D D D D D D D D D n/f GRANDVIEW FARM, LLC n/f GPT PROPERTIES TRUST n/f CHASE PROPERTIES n/f NEAGLEY & CHASE CONSTRUCTION n/f NORTHEAST TERRITORIES, INC. n/f GREENFIELD CAPITOL, LLC n/f MEADOWLANDS BUSINESS COMPLEX CONDOMINIUMS, LLC n/f GREENFIELD CAPITOL, LLC n/f SBRC PROPERTIES, LLC n/f BURLINGTON PROPERTIES LIMITED PARTNERSHIP n/f THE ROCK OF GREATER BURLINGTON INC. n/f SUPERTEMP REALTY, LLC n/f BURLINGTON PROPERTIES LIMITED PARTNERSHIP 1" = 150'C1.0 OVERALL SITE PLAN 1.UTILITIES SHOWN DO NOT PURPORT TO CONSTITUTE OR REPRESENT ALL UTILITIES LOCATED UPON OR ADJACENT TO THE SURVEYED PREMISES. EXISTING UTILITY LOCATIONS ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL FIELD VERIFY ALL UTILITY CONFLICTS. ALL DISCREPANCIES SHALL BE REPORTED TO THE ENGINEER. THE CONTRACTOR SHALL CONTACT DIG SAFE (888-344-7233) PRIOR TO ANY CONSTRUCTION. 2.ALL EXISTING UTILITIES NOT INCORPORATED INTO THE FINAL DESIGN SHALL BE REMOVED OR ABANDONED AS INDICATED ON THE PLANS OR DIRECTED BY THE ENGINEER. 3.THE CONTRACTOR SHALL MAINTAIN AS-BUILT PLANS (WITH TIES) FOR ALL UNDERGROUND UTILITIES. THOSE PLANS SHALL BE SUBMITTED TO THE OWNER AT THE COMPLETION OF THE PROJECT. 4.THE CONTRACTOR SHALL REPAIR/RESTORE ALL DISTURBED AREAS (ON OR OFF THE SITE) AS A DIRECT OR INDIRECT RESULT OF THE CONSTRUCTION. 5.ALL GRASSED AREAS SHALL BE MAINTAINED UNTIL FULL VEGETATION IS ESTABLISHED. 6.MAINTAIN ALL TREES OUTSIDE OF CONSTRUCTION LIMITS. 7.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY FOR COMPLETE AND OPERABLE FACILITIES AND UTILITIES. 8.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR ALL ITEMS AND MATERIALS INCORPORATED INTO THE SITE WORK. WORK SHALL NOT BEGIN ON ANY ITEM UNTIL SHOP DRAWING APPROVAL IS GRANTED. 9.IN ADDITION TO THE REQUIREMENTS SET IN THESE PLANS AND SPECIFICATIONS, THE CONTRACTOR SHALL COMPLETE THE WORK IN ACCORDANCE WITH ALL PERMIT CONDITIONS AND ANY LOCAL PUBLIC WORKS STANDARDS. 10.THE TOLERANCE FOR FINISH GRADES FOR ALL PAVEMENT, WALKWAYS AND LAWN AREAS SHALL BE 0.1 FEET. 11.ANY DEWATERING NECESSARY FOR THE COMPLETION OF THE SITEWORK SHALL BE CONSIDERED AS PART OF THE CONTRACT AND SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 12.THE CONTRACTOR SHALL COORDINATE ALL WORK WITHIN TOWN ROAD R.O.W. WITH TOWN AUTHORITIES. 13.THE CONTRACTOR SHALL INSTALL THE ELECTRICAL, CABLE AND TELEPHONE SERVICES IN ACCORDANCE WITH THE UTILITY COMPANIES REQUIREMENTS. 14.EXISTING PAVEMENT AND TREE STUMPS TO BE REMOVED SHALL BE DISPOSED OF AT AN APPROVED OFF-SITE LOCATION. ALL PAVEMENT CUTS SHALL BE MADE WITH A PAVEMENT SAW. 15.IF THERE ARE ANY CONFLICTS OR INCONSISTENCIES WITH THE PLANS OR SPECIFICATIONS, THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR VERIFICATION BEFORE WORK CONTINUES ON THE ITEM IN QUESTION. 16.PROPERTY LINE INFORMATION IS APPROXIMATE AND BASED ON EXISTING TAX MAP INFORMATION. THIS PLAN IS NOT A BOUNDARY SURVEY AND IS NOT INTENDED TO BE USED AS ONE. 17.IF THE BUILDING IS TO BE SPRINKLERED, BACKFLOW PREVENTION SHALL BE PROVIDED IN ACCORDANCE WITH AWWA M14. THE SITE CONTRACTOR SHALL CONSTRUCT THE WATER LINE TO TWO FEET ABOVE THE FINISHED FLOOR. SEE MECHANICAL PLANS FOR RISER DETAIL. 18.THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING TESTING AND INSPECTION SERVICES INDICATED IN THE CONTRACT DOCUMENTS, TYPICAL FOR CONCRETE AND SOIL TESTING. 19.THE CONTRACTOR IS RESPONSIBLE FOR ALL LAYOUT AND FIELD ENGINEERING REQUIRED FOR COMPLETION OF THE PROJECT. CIVIL ENGINEERING ASSOCIATES WILL PROVIDE AN AUTOCAD FILE WHERE APPLICABLE. 20.THE OWNER SHALL BE RESPONSIBLE FOR THE INSTALLATION OF ANY AND ALL SAFETY FENCES OR RAILS ABOVE EXISTING AND PROPOSED WALLS. THE OWNER SHALL VERIFY LOCAL, STATE AND INSURANCE REQUIREMENT GUIDELINES FOR THE INSTALLATION AND VERIFY ANY AND ALL PERMITTING REQUIREMENTS. GENERAL NOTES PROJECT LOCATION DSM DSM SAL 19145 APR. 7, 2022 A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89HINESBURG ROADME A D O W L A N D D R MEADOWLAND DR.BOWDOIN ST.THOMPSON ST.RAN D ALL ST. KNOLL CIR. NEAGLEY & CHASE OFFICE BUILDING 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:44:47 PM SSSSSSSS S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST STEEESSSSSETCETCETCETC ETCST SETCETCETCETCETCETCSTG G GGGGGGGG WWWWWWW W W W W W W W W WWWWWW W EX. HYDRANT W W W ST STW 8" D.I.W36' OF 8" D.I. WATER SERVICE W/ CAP & THRUST BLOCK SSSSSSWWWWWWWWW W W W W W W ST ST ST S S S S D D G G15" HDPE 15" HDPE EXISTING STORM WATER PONDS S S S S S EX. CB RIM 341.3 INV. 338.6 (4" E) INV. 336.9 (18" N) EX. UTILITY CABINET (TYP.) 18" HDPE w/ F.E.S. INV. 335.8 18" HDPE G G G G G G G G G G G G G G G EX. CB RIM 347.7 EX. CB RIM 347.7 18" HDPE EX. 8" WATER SERVICE INV. UNKNOWN APPROX. LOCATION 8" PVC SEWER SERV. INV. UNKNOWN 8" D.I. WATER MAIN10" D.I. WATER MAIN 76'X3'X6' CONCRETE BOX CULVERT8" PVC 8" PVC 8" PVC EX. SMH RIM 346.3 INV. 335.5 (CL) EX. SMH RIM 340.3 INV. 332.6 (CL) SEWER SERV.18" HDPEBOWDOIN ST.MEADOWLAND DR.THOMPSON ST.APPROXIMATE LIMITS OF SOIL STOCKPILE 50' SETBACK 50' SETBACK35' SETBACK 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 337336SIGNSPRING?WET 8" OAK 8" OAK8" OAK 8" MAPLE 8" MAPLE 8" MAPLE (2) WATER DIG SAFE MARKINGS 4" SPRUCE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE CMF FLUCH 58" CRF FLUCH 58" CRF FLUSH(4) 6" FIR 2" FIR EX. CB RIM 341.4 INV. 339.3 (4" E) INV. 336.3 (18" E) INV. 336.3 (18" S) INV. 336.2 (18" NW)340338339349345 346 339 341 4" LINDEN 4" LINDEN 4" LINDEN 4" LINDEN 4" LINDEN 2" SPRUCE 710.87' 715.19'230.22'230.51'LOT 7 3.96 AC. TREE REMOVAL (TYP.)8" D.I.2" LOCUST DSM DSM SAL 1" = 30' 19145 C1.1 EXISTING CONDITIONS SITE PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 89 116 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/27/22 DSM REVISED WETLAND DELINEATION P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 12:24:54 PM SSSSSSSS S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST STEEESSSSSETCETCETCETC ETCS T SS ETCETCETCETCETCETCETCSTSTETC G G GGGGGGGG WWWWWWW W W W W W W W W WWWWWWW W W W STST STSTWW 350 350 350 350 35 0 35 0 34 0 340340 340 STST SSSSSSWWWWWWWWWWW W W W W W W W ST ST ST ST E UTS S S S S S D G GGS S S S S S G G G G G G G G G G G G G G GBOWDOIN ST.MEADOWLAND DR.THOMPSON ST.50' SETBACK 50' SETBACK35' SETBACK PROPOSED BUILDING 11,317 SF F.F.E. 348.0 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 337336340338339349345 346 339 341 710.87' 715.19'230.22'230.51'LOT 7 3.96 AC. D D D D DSM DSM SAL 1" = 30' 19145 C2.0 PROPOSED CONDITIONS OVERALL SITE PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:43:12 PM SSSSSSSS S S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST STST S T SETCETCETCETCETCETCETCETCS T STST WWWWWWWWWWW W W W W W W W W W W W W W WWWWWW W W W W S D G G G G G G G G G G G G G G GBOWDOIN ST.MEADOWLAND DR. 5 PROPOSED BUILDING 11,317 SF F.F.E. 348.0 PROPOSED SWALE 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK 30.7' SETBACK (WAIVER OF 19.3') 40.1' SETBACK (WAIVER OF 9.9') 10" CONC. RETAINING WALL DUMPSTER ENCLOSURE 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 337T T340338339 349345 346 339 341 2' TAPERED CURB 6' TAPERED CURB 2' TAPERED CURB 30'20' FIRE DEPT. CONNECTION 346345RT348348349347347348349349347LOT 7 3.96 AC. PROPOSED OUTDOOR STORAGE AREA - 6-7' HIGH CHAIN LINK FENCING WITH PLASTIC SLAT INSERTS AND DOUBLE GATE 612 BIKE RACK ACCESSIBLE PARKING SIGN 6' TAPERED CURB 6' TAPERED CURB (TYP.)22'9'(TYP.)18' (TYP.) 60'60'NEW SEGMENTAL RETAINING WALL 2 0 '348347346345 346 347346 345 34 5 346 347 346 346 343 345 3463455' CONCRETE SIDEWALK (TYP.)100.3'SNOW STORAGE SNOW STORAGE SNOW STORAGE BOLLARD BOLLARD 347 PATIO DSM DSM SAL 1" = 20' 19145 C2.1 PROPOSED SITE IMPROVEMENTS PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT 30% (MAX.)FRONT YARD COVERAGE ZONING DISTRICT: INDUSTRIAL OPEN SPACE DISTRICT DIMENSIONAL SUMMARY - 3.0 AC. REQ'D. LOT FRONTAGE LOT AREA PROPOSED 3.96 AC. BUILD. COVERAGE LOT COVERAGE 30% (MAX.) 50% (MAX.) 100.3' FRONT SETBACK SIDE SETBACK 50' 35' 35'REAR SETBACK N/A 17.6% 6.6% MEADOWLAND DRIVE 715' BOWDOIN STREET 253' MEADOWLAND DRIVE 11.9% BOWDOIN STREET 29.8% THOMPSON STREET 230' MEADOWLAND DRIVE 30.7' BOWDOIN STREET 40.1' THOMPSON STREET 545.5'P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:46:35 PM SSSSSSSSSSSTS S S S S S S SETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST ST ST ST S T SETCETCETCETCETCETCETCETCETC ST S T STST WWWWWWWWWWWWW W W W W W W W W W W W W W W W W WWWWWW W W W W W W W S S D S EX. CB RIM 341.3 INV. 338.6 (4" E) INV. 336.9 (18" N) 18" HDPE w/ F.E.S. INV. 335.8 G G G G G G G G G G G G G G G G G G G EX. CB RIM 347.7 EX. CB RIM 347.7 18" HDPE 18" HDPEBOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 ROOF DRAIN CONNECTION INV. 342.2 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK CB #5 RIM 343.9 INV. 341.9 (12" N) INV. 342.0 (8" S)351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 3373368" OAK 8" OAK 8" OAK 8" MAPLE 8" MAPLE 4" SPRUCE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR 2" FIR EX. CB RIM 341.4 INV. 339.3 (4" E) INV. 336.3 (18" E) INV. 336.3 (18" S) INV. 336.2 (18" NW) 8 L.F. - 8" HDPE (PLACE 2" RIGID INSULATION OVER PIPE) T T340338339 349345 346 339 341 4" LINDEN 4" LINDEN 4" LINDEN 4" LINDEN 2" SPRUCE + 347.9 344.0 +TC 347.7 BC 347.2 +346345RT5.0%348348349347347348349349347LOT 7 3.96 AC. EX. CB RIM 351.8 INV. 346.2 (18" W) D D D ST D STS S ETC ETC W W CB #1 RIM 343.9 INV. 339.0 (15" N) INV. 342.1 (12" NE) INV. 338.9 (18" E) INV. 338.8 (18" W) ST CB #3 RIM 344.2 INV. 340.8 (15" SE) CB #4 RIM 344.8 INV. 340.9 (12" E) INV. 340.8 (12" SW) DMH #3 RIM 347.0 INV. 341.7 (12" S) INV. 341.6 (12" W) DMH #2 RIM 345.9 INV. 340.5 (15" NE) INV. 340.5 (15" NW) INV. 340.9 (12" E) INV. 340.4 (15" S) DMH #1 RIM 346.8 INV. 340.4 (15" N) INV. 340.4 (12" W) INV. 340.3 (15" S) TREATMENT UNIT RIM 346.9 INV. 340.1 (15" N) INV. 339.5 (15" S)64 L.F. 15" HDPE 10 L.F. - 15" HDPE 13 L.F. 15" HDPE 21 L.F. 15" HDPE 9 L.F. 12" HDPE 87 L.F. 12" HDPE TC 348.6 BC 348.1 + + 347.96 + TC 347.5 BC 347.5 + 347.3 + 347.75 TC 347.9 BC 347.4 + + TC 346.4 BC 345.9 + TC 346.8 BC 346.3 348.7 + + 348.0+ 347.3 + TC 345.9 BC 345.4 TC 347.1 BC 346.6 + + 346.0 + 347.2 TC 347.4 BC 346.9 + + 347.2 347.5 + + TC 347.6 BC 347.1 TC 347.0 BC 346.5 + TC 346.5 BC 346.0 + + TC 345.1 BC 344.6 TC 345.9 BC 345.4 + + TC 346.0 BC 345.5 TC 346.4 BC 345.9 + + 346.6347.0 + + 347.2 346.0 +345.0 +346.0 +347.0 + 90 L.F. 12" HDPE CB #2 RIM 345.5 INV. 343.0 (12" SW) TC 347.2 BC 346.7 +348347346345 346 347346 345 34 5 346 TC 345.5 BC 345.0 + TC 348.2 BC 347.7 + 347 346 346 T/WALL EL. 347.0 343 345 346345WETLAND BUFFER IMPACT - 1,020 S.F. 346.5 + 347.96 +347.7 + 347.45 + 347.5 + 347.6 + 347.75 ++ 347.6 + 347.0 346.8 + 347.3 + 348.9± +349.3 + 348.0 + + 344.5 TC 346.7 BC 346.7 + TC 346.8 BC 346.8 + + 346.3 TC 347.1 BC 346.6 + 347 GDSM DSM SAL 1" = 20' 19145 C2.2 PROPOSED CONDITIONS GRADING & DRAINAGE PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:37:28 PM SSSSSSSSSSSTS S S S S S S SETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST ST ST ST S T SETCETCETCETCETCETCETCETCETC ST S T STST WWWWWWWWWWWWW W W W W W W W W W W W W W W W W WWWWWW W W W W W W W S S D S EX. UTILITY CABINET (TYP.) G G G G G G G G G G G G G G G G G G G EX. 8" WATER SERVICE INV. UNKNOWN APPROX. LOCATION 8" PVC SEWER SERV. INV. UNKNOWN 8" D.I. WATER MAIN10" D.I. WATER MAIN 8" PVC 8" PVC EX. SMH RIM 346.3 INV. 335.5 (CL) EX. SMH RIM 340.3 INV. 332.6 (CL)BOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 50' W E T L A N D B U F F E R EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK PROPOSED HYDRANT ASSEMBLY 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 3373368" OAK 8" OAK 8" OAK 8" MAPLE 8" MAPLE (2) WATER DIG SAFE MARKINGS 4" SPRUCE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR 2" FIR T T PROPOSED SPRINKLER ROOM ±138 L.F. - 6" SDR 35 PV C (2% MIN. SLOPE) 115 L.F. - 8 " C 9 0 0 P V C340338339 349345 346 339 341 4" LINDEN 4" LINDEN 4" LINDEN 4" LINDEN 2" SPRUCE NEW GATE VALVE AND VALVE BOX 346345RT348348349347347348349349347LOT 7 3.96 AC. FIRE DEPARTMENT CONNECTION 98.7' 2" TYPE 'K' DOMESTIC SERVICE w/ 2" GATE VALVE & VALVE BOX 8" D.I.6" CL 52 D.I.P. 8"x6" TEE C.O. PROPOSED ELEC., TEL. & CABLE SERVICE D D D ST D STS S C.O.C.O. C.O. ETC ETC W W ST 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345347 CONTRACTOR SHALL CONFIRM EX. PIPE SIZE PRIOR TO CONNECTION GDSM DSM SAL 1" = 20' 19145 C2.3 PROPOSED CONDITIONS UTILITY PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING ALL WATER LINES AND APPURTENANCES SHALL BE INSTALLED IN ACCORDANCE WITH THE CHAMPLAIN WATER DISTRICT SPECIFICATIONS AND DETAILS FOR THE INSTALLATION OF WATER LINES AND APPURTENANCES, CURRENT EDITION, HENCEFORTH THE CWD SPECIFICATIONS. RECORD DRAWINGS PREPARED BY A VERMONT LICENSED PROFESSIONAL ENGINEER SHALL BE PROVIDED TO THE SOUTH BURLINGTON WATER DEPT. IN PDF AND AUTOCAD FORMAT. DRAWING SHALL INCLUDE TIES TO ALL GATE VALVES AND CURB STOPS TO SUB-METER ACCURACY. APR. 7, 2022 4/28/22 DSM REVISED PER CWD COMMENTS 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:37:41 PM SSSSSSS S S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST STST S T SETCETCETCETCETCETCETCS T ST WWWWWWWWWWW W W W W W W W W W W W W WWWWW S G G G G G G G G G G G G GBOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 3378" OAK 8" OAK 8" OAK 8" MAPLE 8" MAPLE 2" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR 2" FIR T T340338339 349345 346 339 341 4" LINDEN 4" LINDEN 4" LINDEN 2" SPRUCE RTD D D D 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.3 0.3 0.2 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.3 0.4 0.5 0.5 0.6 0.7 0.7 0.6 0.6 0.5 0.3 0.2 0.2 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.2 0.3 0.4 0.6 0.8 0.9 0.9 1.0 1.1 1.2 1.2 1.1 0.9 0.7 0.6 0.5 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 0.4 0.5 0.3 0.6 0.9 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.5 1.3 1.1 0.9 0.9 1.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.4 0.6 0.8 0.9 0.3 0.6 1.0 1.4 1.4 1.3 1.3 1.3 1.6 1.9 1.7 1.5 1.4 1.3 1.3 1.4 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.4 0.7 1.1 1.3 0.2 0.3 0.6 0.8 0.7 0.5 0.5 0.4 0.8 1.0 1.4 1.5 1.3 1.3 1.3 1.2 0.0 0.0 0.0 0.1 0.1 0.1 0.2 0.2 0.3 0.4 0.6 1.1 1.3 0.0 0.1 0.1 0.2 0.3 0.4 0.6 0.8 0.8 0.6 0.4 0.4 0.5 0.0 0.0 0.0 0.1 0.2 0.3 0.3 0.5 0.9 0.8 0.3 0.4 0.5 0.0 0.0 0.0 0.1 0.3 0.7 1.9 2.1 0.2 0.2 0.2 0.2 0.2 0.0 0.0 0.1 0.2 0.3 0.5 0.6 0.9 2.4 4.3 0.0 0.1 0.1 0.0 0.0 0.0 0.1 0.3 0.9 3.0 4.4 0.0 0.0 0.1 0.2 0.5 0.8 1.0 1.1 2.3 3.9 0.0 0.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.5 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.3 0.6 0.8 0.8 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.7 1.1 1.3 0.6 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.1 0.1 0.1 0.2 0.5 0.8 1.3 1.4 0.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.0 0.1 0.2 0.2 0.3 0.6 0.9 1.3 1.3 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.0 0.1 0.1 0.3 0.4 0.5 0.6 0.8 1.2 1.4 0.6 0.3 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.6 0.8 0.9 0.9 1.2 1.4 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 0.8 1.2 1.4 1.1 1.2 1.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.6 0.9 1.4 1.6 0.7 1.0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.6 1.0 1.5 1.3 1.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.9 1.4 1.3 0.5 0.3 1.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.5 0.8 1.3 1.3 0.5 0.5 1.1 0.9 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.0 0.0 0.0 0.1 0.5 0.9 1.3 1.4 0.9 0.9 2.2 3.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.2 0.0 0.0 0.1 0.4 0.8 1.2 1.5 1.1 0.7 2.4 4.3 0.0 0.0 0.0 0.1 0.2 0.5 1.4 1.3 0.0 0.0 0.1 0.3 0.7 1.1 1.3 1.1 0.9 0.6 P1 P1 W1 W1 W1 P1 P1 DSM DSM SAL 1" = 20' 19145 C2.4 PROPOSED LIGHTING PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 LIGHTING LEVEL LEGEND LIGHTING CALCULATION SUMMARY LUMINAIRE SCHEDULE TYP SYMBOL DESCRIPTION LAMP LUMENS MOUNTING HEIGHT QTY W1 321W 2310 P1 HUBBLE OUTDOOR LIGHTING 4(1) RAR1-80L-50-4K7-4W-UNV-A-DB-NXSPW_F 50W 6245 WALL - 12.5' POLE - 22' HUBBLE OUTDOOR LIGHTING (1) SG1-20-4K7-FT-UNV-DB-PCU-CS 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:42:33 PM STST ST ST ST ST ST ST ST ST ST ST ST ST S T ST S T STST S S D G G G G G G G G G G G G G G G G G G G PROPOSED BUILDING 11,317 SF F.F.E. 348.0 351350350350349349348348348348347347347347346346 34634534 5 345344 3443 4 4 344343 3433 4 3 343 342 3423 4 2 342 341 341341341 340 340 339 339 338 338 337 337336T T340338339 349345 346 339 341 346345RT348348349347347348349349347LOT 7 3.96 AC. D D D ST D STS S ETC ETC ST 348347346345 346 347346 345 34 5 346 347 346 346 343 345 346345 TEMPORARY CONSTRUCTION ENTRANCE OR SWEEP STREET ON DAILY BASIS INLET PROTECTION (TYP. OF 5 PLACES) PREVENT CONSTRUCTION FLOWS FROM ENTERING THE INFILTRATION SYSTEM DURING CONSTRUCTION TEMPORARY TREE PROTECTION (TYP.) TEMPORARY CONSTRUCTION ENTRANCE OR SWEEP STREET ON DAILY BASIS PLACE 4" TOPSOIL. SEED, FERTILIZE AND EROSION CONTROL MATTING ON ALL DISTURBED SURFACES (TYP.) INSTALL STONE CHECK DAMS AT 100' INTERVAL ORANGE CONSTRUCTION LIMITS TAPE (TYP.) ORANGE CONSTRUCTION LIMITS TAPE (TYP.) PLACE 4" TOPSOIL. SEED, FERTILIZE AND EROSION CONTROL MATTING ON ALL DISTURBED SURFACES (TYP.) INSTALL SILT FENCE WITH J-HOOKS (TYP.) INSTALL SILT FENCE WITH J-HOOKS (TYP.) INSTALL SILT FENCE WITH J-HOOKS (TYP.) 347 GDSM DSM SAL 1" = 20' 19145 C3.0 EPSC PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 6/8/22 DSM REVISED PER CITY COMMENTS 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:38:06 PM WWWWWWWWWWWWW W W W W W W W W W W W W W W W W WWWWWW W W W W W W W S S D EX. 8" WATER SERVICE INV. UNKNOWN 8" D.I. WATER MAIN10" D.I. WATER MAIN BOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 PROPOSED HYDRANT ASSEMBLY (2) WATER DIG SAFE MARKINGS T T PROPOSED SPRINKLER ROOM 115 L.F. - 8 " C 9 0 0 P V C NEW GATE VALVE AND VALVE BOX RTLOT 7 3.96 AC. FIRE DEPARTMENT CONNECTION 98.7' 2" TYPE 'K' DOMESTIC SERVICE w/ 2" GATE VALVE & VALVE BOX 8" D.I.6" CL 52 D.I.P. 8"x6" TEE D D D D W W CONTRACTOR SHALL CONFIRM EX. PIPE SIZE PRIOR TO CONNECTION DSM DSM SAL 1" = 20' 19145 F1.0 FIRE DEPARTMENT ACCESS PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 NEAGLEY & CHASE OFFICE BUILDING APR. 7, 2022 9/21/22 DSM REVISED SITE LAYOUT P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:42:10 PM SSSSSSSS S S S S S ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ETC ST ST ST ST ST ST ST ST ST ST STS T S T SETCETCETCETCETCETCS T WWWWWWWWWWW W W W W W W W W W W W W W WWWWW S G G G G G G G G G G G G G G G PROPOSED BUILDING 11,317 SF F.F.E. 348.0 EXISTING BIT. CONC. SHAR E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK351350349348348347347346346 34 5344 3 4 4 3 4 3341339 339 338 337 3378" MAPLE 2" SPRUCE 2" SPRUCE 4" SPRUCE (3) 4" SPRUCE (2) 4" SPRUCE 4" SPRUCE 4" SPRUCE (3) 4" SPRUCE 4" SPRUCE 2" SPRUCE 2" SPRUCE (4) 6" FIR T T 3492" SPRUCE 346345RTSTSTSTSTD D D D STS S ETC ETC W W ST 348347 346 (5) HB (15) PV (10) EP (10) AP (4) AG (1) TO (9) SA (3) AFA (17) HQ (6) PO (17) HR (13) AP JC AFR (10) MD (11) F (6) JC (4) IV (1) JC (3) IV (1) JC (3) JC AFR AFR PATIO AFR (3) HB (4) LM OVER PERGOLA (7) HF (9) HF DSM DSM SAL 1" = 20' L1.1 SEPT. 21, 2022 PROPOSED PLANTING PLAN NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE OFFICE BUILDING Snow Storage Area (Typ.) S D BOWDOIN ST.MEADOWLAND DR. PROPOSED BUILDING 11,317 SF F.F.E. 348.0 EXISTING BIT. CONC. SHA R E D U S E P A T H EXISTING 5' BIT. CONC. SIDEWALK T T LOT 7 3.96 AC. DSM DSM SAL 1" = 20' 19145 WS1.0 APR. 7, 2022 PARKING LOT GREEN SPACE PLAN A C CIVIL ENGINEERING ASSOCIATES, INC. E 10 MANSFIELD VIEW LANE, SOUTH BURLINGTON, VT 05403 802-864-2323 FAX: 802-864-2271 web: www.cea-vt.com NORTHEAST TERRITORIES, INC. 20 SOUTH CREST BURLINGTON, VERMONT LOT 7 MEADOWLAND BUSINESS PARK SOUTH BURLINGTON, VERMONT NEAGLEY & CHASE CONSTRUCTION 66 BOWDOIN ST., STE. 100 SOUTH BURLINGTON, VERMONT LOCATION MAP 1" = 2000' PROJECT LOCATION 116 89 ONLOGIC PARKING LOT GREEN SPACE COMPLIANCE TOTAL PARKING LOT AREA 13,358 S.F. GREEN SPACE REQUIRED 1,336 S.F. GREEN SPACE PROVIDED 1,460 S.F.P:\AutoCADD Projects\2019\19145\1-CADD Files-\dwg\19145 - Site.dwg, 9/21/2022 1:41:53 PM