CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
SOUTH BURLINGTON CITY CENTER, LLC – LOT M6, 0 MARKET STREET
SITE PLAN APPLICATION #SP-22-042
FINDINGS OF FACT AND DECISION
South Burlington City Center, LLC, hereinafter referred to as the applicant, is seeking site plan approval
for a presently undeveloped lot. The proposal consists of clearing, grubbing, removing stumps from, and
placing fill on the property presently known as Lot M6, 0 Market Street.
Based on the plans and materials contained in the document file for this application, the Administrative
Officer finds, concludes, and decides the following:
FINDINGS OF FACT
1. The applicant is seeking approval for a proposal to clear, grub, remove stumps from, and place fill on
the property presently known as Lot M6, 0 Market Street.
2. The owner of record of the subject property is South Burlington City Center, LLC.
3. The subject property is located in the Form Based Code Transect Zones 4 & 5 and the Transit Overlay
District, and includes portions within Class II wetland & wetland buffers.
4. A complete application was received on August 17, 2022.
5. The plans submitted consist of a Subdivision Plat, prepared by Lamoureux & Dickinson on
07/15/2019; and an Erosion Prevention & Sediment Control Plan (sheet no. 3) prepared by
Lamoureux & Dickinson on 07/12/2022 and annotated by Snyder Construction on 08/02/2022.
6. Article 14.11.F.1 of the Land Development Regulations requires approval in connection with the
approval of a site plan for all projects that involve the removal from land or the placing on land of
fill, gravel, sand, loam, topsoil, or other similar material in an amount equal to or greater than
twenty (20) cubic yards, except when incidental to or in connection with the construction of a
structure on the same lot. As such, the proposed project requires administrative approval of a Site
Plan Amendment and the associated Zoning Permit.
Only the standards below are affected by this application. All other standards shall continue to be met.
A) ARTICLE 8: CITY CENTER FORM BASED CODE DISTRICT
The property is located in the City Center Form Based Code T4 and T5 zoning districts. Since no building
is proposed, the standards of Article 8 are not applicable. LDR 14.04B(2) dictates that applications
within the Form Based Code districts be reviewed administratively except as specifically enumerated.
B) SITE PLAN REVIEW STANDARDS
14.07 Specific Review Standards
A. Environmental Protection Standards. All proposed development shall be subject to the
applicable requirements of Article 12, Environmental Protection Standards.
#SP-22-042
2
Standards of Article 12 are discussed below.
14.11 Site Plan and Conditional Use Review: Specific Uses and Standards
F. Alteration of Existing Grade.
The applicant is proposing to bring in fill to create positive drainage on this lot. The amount of fill
to be placed on this property is unknown but is anticipated to exceed 20 cubic yards, therefore
Article 14.11.F applies.
(2) Standards and Conditions for Approval.
a. The Development Review Board shall review a request under this Section for
compliance with the standards contained in this Section 14.11(F) and Section 3.07,
Height of Structures of these regulations. An application under this section shall
include the submittal of a site plan, planned unit development or subdivision plat
application showing the area to be filled or removed, and the existing grade and
proposed grade created by removal or addition of material.
A complete Site Plan Amendment Application was submitted with the necessary
supporting documents. As such, the Administrative Officer finds this criterion met.
b. The Development Review Board, in granting approval may impose any conditions it
deems necessary, including, but not limited to, the following
i. Duration or phasing of the permit for any length of time.
No condition is imposed with respect to permit duration or phasing.
ii. Submission of an acceptable plan for the rehabilitation of the site at the
conclusion of the operations, including grading, seeding and planting,
fencing, drainage, and other appropriate measures.
An acceptable plan detailing the site rehabilitation was submitted with the Site
Plan Amendment application, meeting this criterion.
iii. Provision of a suitable bond or other security in accordance with Section
15.A.20 adequate to assure compliance with the provisions of these
Regulations.
No bond is necessary for this project.
iv. Determination of what shall constitute pre-construction grade under
Section 3.07, Height of Structures.
The pe-construction grade in the City Center Form Based Codes District is
defined by the current adopted LDRs as the average of the pre-construction
grade along the adjacent street(s).
C) ARTICLE 12: ENVIRONMENTAL PROTECTION STANDARDS
The project is located in a Class II wetland and wetland buffer.
12.06 Wetland Protection Standards
D. Standards for Wetlands Protection.
#SP-22-042
3
(1) Class I and Class II Wetlands. Development is generally prohibited within Class I wetlands, Class
II wetlands, and their associated buffers. All lands within a Class I wetlands, Class II wetlands,
and their associated buffers, shall be left in an undisturbed, naturally vegetated condition.
However, an applicant may seek approval for a Restricted Infrastructure Encroachment under
this section or to modify this standard per the regulations in Section 12.06(F).
The Applicant has obtained approval to place fill and clear trees within the wetland and wetland
buffers in question as part of Conditional Use application #CU-18-01. The Administrative Officer
finds this standard sufficiently modified and the criterion met.
DECISION
Based on the above Findings of Fact, the Administrative Officer herby approves site plan application #SP-
22-042 of South Burlington City Center, LLC, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval will remain
in effect.
2. The Administrative Officer concurrently issues Zoning Permit #ZP-22-339.
3. This project must be completed as shown on the plans submitted by the applicant and on file
in the South Burlington Department of Planning and Zoning.
4. The applicant must obtain a zoning permit within six (6) months from the date of this decision or
this approval expires and is null and void. The applicant may submit a request for an extension to
obtain a zoning permit under the terms outlined in Section 17.04 of the LDR’s, but the request
must be submitted prior to the expiration of this approval.
5. Any change to the site plan will require approval by the South Burlington Development
Review Board or the Administrative Officer.
6. There shall be no use of herbicides, pesticides, and/ or non -organic fertilizers within either
the wetlands or the associated buffers.
7. Outside of the approved impacts, there will be no mowing within 50 feet of the wetlands
nor can the wetland buffer be turned into lawn. Brush - hogging will be allowed no more
than three (3) times per year.
8. The proposed project must adhere to standards for erosion control as set forth in Section
16. 03 of the South Burlington Land Development Regulations. In addition, the grading plan
must meet the standards set forth in Section 16. 04 of the South Burlington Land
Development Regulations.
Signed on this 22nd day of _September , 2022 by
Marla Keene, Acting Administrative Officer
#SP-22-042
4
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a
Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be
accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.