Loading...
HomeMy WebLinkAboutSD-22-11 - Supplemental - 0760 Shelburne Road (18)TRUDELL CONSULTING ENGINEERS (TCE) WILLISTON, VT 05495 VEHICULAR TRIP GENERATION PROJECT NAME:Bourne, South Burlington ANALYST:R. Dickinson PROJECT #:22-523 CHECKED: SOURCE:TRIP GENERATION, ITE, 11TH EDITION EXISTING ITE AVG.-- AM PEAK HOUR ---- PM PEAK HOUR -- LAND-USE DESCRIPTION L.U.C.SIZE UNITS WKDY ENTER EXIT TOTAL ENTER EXIT TOTAL SMALL OFFICE BUILDING 712 3,800 SQ. FT.55 5 1 6 3 5 8 AUTOMOBILE PARTS AND SERVICE CENTER 943 2,200 SQ. FT.37 3 1 4 2 3 5 CONVENIENCE STORE/GAS STATION (2-8 VFP)945 2,300 SQ. FT.1,436 47 46 93 56 56 112 TOTALS 1,528 55 48 103 61 64 125 VTE/DAY VTE/HOUR VTE/HOUR Plus trips for the former Pizza Hut, based upon the land area and LDR Table 10-1 10 PM TOTAL =135 PROPOSED ITE AVG.-- AM PEAK HOUR ---- PM PEAK HOUR -- LAND-USE DESCRIPTION L.U.C.SIZE UNITS WKDY ENTER EXIT TOTAL ENTER EXIT TOTAL MULTIFAMILY HOUSING (LOW-RISE)220 27 UNITS 182 3 8 11 9 5 14 STRIP RETAIL PLAZA (<40 KSF)822 8,350 SQ. FT.455 16 10 26 34 34 68 TOTALS 637 19 18 37 43 39 82 VTE/DAY VTE/HOUR VTE/HOUR S:\_TCE PROJECTS\2022\523-Bourne-Commercial-S Burlington\06-Traffic\TRIPGEN 11th ed, 6/17/2022