HomeMy WebLinkAboutSP-11-58 - Decision - 0030 Community Drive#SP-11-58
CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING & ZONING
SYMQUEST GROUP, INC. — 30 COMMUNITY DRIVE
SITE PLAN APPLICATION #SP-11-58
FINDINGS OF FACT AND DECISION
Symquest Group, Inc., hereinafter referred to as the applicant, is requesting site plan
approval to amend a previously approved site plan for a 275,000 sq. ft. commercial, and
industrial building consisting of 129,343 sq. ft. of general office, 10,000 sq. ft. of
warehouse use, 82,257 sq. ft. light manufacturing use, 10,000 sq. ft. indoor recreation
use, 2,000 sq. ft. retail food establishment use, 41,000 sq. ft. research and testing
laboratory use and 400 sq. ft. of shot -order restaurant (accessory) use, 30 Community
Drive. The amendment consists of adding a 150KW emergency generator, 30
Community Drive.
Based on the document file for this application, the Administrative Officer finds,
concludes, and decides as follows:
FINDINGS OF FACT
1. This project consists of site plan approval to amend a previously approved site
plan for a 275,000 sq. ft. commercial, and industrial building consisting of
129,343 sq. ft. of general office, 10,000 sq. ft. of warehouse use, 82,257 sq. ft.
light manufacturing use, 10,000 sq. ft. indoor recreation use, 2,000 sq. ft. retail
food establishment use, 41,000 sq. ft. research and testing laboratory use, and
400 sq. ft. of shot -order restaurant (accessory) use, 30 Community Drive. The
amendment consists of adding a 150KW emergency generator, 30 Community
Drive.
2. The owner of record of the subject property is 30 Community Drive, LLC
3. The subject property is located in the Mixed Industrial & Commercial (Mixed IC)
Zoning District.
4. The application was received on December 6, 2011.
5. The plans submitted is entitled, "SYMQUEST 30 Community Drive South
Burlington, Vermont", prepared by Trudell Consulting Engineers, dated 11/22/10,
and last revised on 12/13/11.
DIMENSIONAL REQUIREMENTS
7. Dimensional requirements are not being affected by this application.
8. Setback requirements are being met.
-1-
#SP-11-58
SITE PLAN REVIEW STANDARDS
Vehicular access
9. Access is provided via six (6) curb cuts from Community Drive. No changes are
proposed.
Circulation
10. Circulation on the site is adequate.
Parking
11. No changes to parking.
12. Pursuant to Section 13.01(G) (5) of the Land Development Regulations, bicycle
parking shall be provided on the subject property. Multiple bicycle racks are
shown on the plan.
13. Pursuant to Section 13.01(B) of the Land Development Regulations, internal
landscaping of the parking area does not apply.
Landscaping
14. The applicant is proposing to add $2,723 of new landscaping to screen the
generator.
15. Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow
storage areas must be shown on the plan. Only some of the snow storage areas
are shown on the plan. All the other snow storage areas should be shown.
Outdoor Lighting
16. No lighting changes are proposed.
Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the
following review standards shall apply to the site plan applications:
-2-
#SP-11-58
Traffic
17. No additional traffic is expected to be generated by this proposal.
(a) The relationship of the proposed development to goals and objects set
forth in the City of South Burlington Comprehensive Plan,
18. The Comprehensive Plan states that the City should encourage development
while protecting natural resources and promoting a healthy and safe
environment. The proposed project is in keeping with the recommended actions
of the Comprehensive Plan.
(b)The site shall be planned to accomplish a desirable transition from
structure to site, from structure to structure, and to provide for adequate
planting, safe pedestrian movement, and adequate parking areas
19. The building is existing. The proposal is in keeping with this requirement.
(c) Parking shall be located to the rear or sides of buildings
20. Parking is located on the sides and rear of the building. All parking is
existing with no additional parking proposed.
21. Section 13.01 of the Land Development Regulations requires that bicycle parking
or storage facilities be provided for employees, residents, and visitors to the site.
It has already been noted that a multiple number of bicycle racks are shown on
the plan.
(d) Without restricting the permissible limits of the applicable zoning
district, the height and scale of each building shall be compatible with its
site and existing or adjoining buildings
22. The building is existing and no changes are proposed.
(e) Newly installed utility service modifications necessitated by exterior
alterations or building expansions shall, to the extent feasible, be
underground,
23. The plans do not indicate changes in utility service.
(t) The combination of common materials and architectural
characteristics, landscaping, buffers, screens and visual interruptions to
cerate attractive transitions between buildings or different architectural
styles shall be encouraged,
24. The building is existing and no changes are proposed.
-3-
5
#SP-11-58
(g) Proposed structures shall be related harmoniously to themselves, the
terrain and to existing buildings and roads in the vicinity that have a visual
relationship to the proposed structures
25. The building is existing and no changes are proposed.
In addition, to the above general review standards, site plan applications shall meet the
following specific standards set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any lot for provision of access
to abutting properties whenever such access is deemed necessary to reduce
curb cuts onto an arterial or collector street, to provide additional access for
emergency or other purposes, or to improve general access and circulation in
the area,
26. The reservation of land is not necessary.
(b) Electric, telephone, and other wire -served utility lines and service
connections shall be underground. Any utility installations remaining above
ground shall be located so as to have a harmonious relation to neighboring
properties and to the site,
27. No changes to existing underground utilities.
(c) All dumpsters and other facilities to handle solid waste, including
compliance with any recycling or other requirements, shall be accessible,
secure and properly screened with opaque fencing to ensure that trash and
debris do not escape the enclosure(s),
28. Screened dumpster locations are noted on the plan.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves Site
Plan #SP-10-27 to amend a previously approved site plan for a 275,000 sq. ft.
commercial, and industrial building consisting of 131,000 sq. ft. of general office,
10,000 sq. ft. of warehouse use, 81,000 sq. ft. light manufacturing use, 10,000 sq.
ft. indoor recreation use, 2,000 sq. ft. retail food establishment use, and 41,000 sq.
ft. research and testing laboratory use, 30 Community Drive. The amendment
consists of adding a 15OKW emergency generator, 30 Community Drive, based on
the following conditions:
-4-
#S P-11-58
1. All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2. The applicant shall obtain a zoning permit within six (6) months pursuant to
Section 17.04 of the Land Development Regulations or this approval is null and
void.
3. Prior to permit issuance, the applicant shall post a $2,723 landscaping bond. This
bond shall remain in full effect for three (3) years to assure that the landscaping
has taken root and has a good chance or survival.
4. The Applicant shall obtain a Certificate of Occupancy from the Administrative
Officer prior to the use of the generator.
5. Any change to the site plan shall require approval by the South Burlington
Administrative Officer or the Development Review Board.
Signed on this -(�- day of , 2011 by
Ray and I Belair, Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision
by filing a Notice of Appeal with the secretary of the Development Review Board. This
Notice of Appeal must be accompanied with a $233 filing fee and be filed within 15 days
of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain
relevant state permits for this project. Call 802.879.5676 to speak with the regional
Permit Specialist.
-5-