Loading...
HomeMy WebLinkAboutSP-22-031 - Supplemental - 1068 Williston Road (8) 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com Application Number SP-______-__________ (office use only) APPLICATION FOR SITE PLAN REVIEW (City Center FBC District) All information requested on this application must be completed in full. Failure to provide the requested information either on this application form or on the site plan will result in your application being rejected and a delay in the review. 1. Street Address of Project: _________________________________________________________________ 2. Brief project description (explain what you want approval for): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 3. Applicant Name __________________________________ Address________________________________ _______________________________________ Email _____________________________________ Telephone_________________________________ 4. Primary Contact (person who will receive all correspondence from Staff) Name __________________________________ Address________________________________ _______________________________________ Email _____________________________________ Telephone_________________________________ 5. Owner(s) of Record (Name(s) as shown on deed, mailing address, phone and fax #): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 6. Project Summary a. Existing Uses on Property (including description and size of each separate use): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ 1068 Williston Rd. Amend current site plan approval (SP-21-035) for revisions to the residential Multi-Family Building, consisting of increasing the number of residential units from 74 to 83, and eliminating the second level parking inside the Champlain School Apartments Partnership JoeLarkin@LarkinRealty.net 410 Shelburne Road Burlington, Vermont 05401 802-864-7444 Peter Smiar, PE 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 psmiar@vhb.com 802-497-6165 Champlain School Apartments Partnership 410 Shelburne Road Burlington, Vermont 05401 JoeLarkin@LarkinRealty.net 802-864-7444 Existing use of property is a hotel with 173 total rooms, conference center, and a 150 seat restaurant. There are currently 229 existing parking spaces on site. building and eliminating the north parking deck in favor of new underground parking underneath the building. Split the previously approved Phase 2 of the project into 2 phases, with the Multi-Family Building being Phase 2A. 2 b. Proposed Uses on property (include description and size of each new use and existing uses to remain): ___________________________________________________________________________ ___________________________________________________________________________ ___________________________________________________________________________ c. Building size (GFA) Existing _______________ Proposed _______________ d. Residential Units Existing _______________ Proposed _______________ e. Does this project require meeting Section 18.01, Inclusionary Zoning?  Yes  No If yes to above, please indicate below the number of dwelling units that will be reserved in perpetuity for households in each income category. Please see 18.01(C) for the proportion that must be devoted to each income category and how to calculate fractional dwelling units. Affordable Units #s 80% of Median _______ 100% of Median _______ 120% of Median _______ f. Qualifying open space (SF) Existing _______________ Proposed _______________ 7. Project Details. a. Completed Submission checklist □ b. Completed BES checklist & self-evaluation □ c. Supporting documents and narrative for certain circumstances (including but not limited to): i. Section 8.06, Special Standards; Section 8.07 Materials; Section 8.08 Open Space Standards; Section 8.09 Nonconformities ii. Article 10, Overlay Districts iii. Article 12, Surface Water Protection Standards iv. Article 13, Supplemental Requirements 8. Total area to be disturbed during construction (sq. ft.) ______________* * Projects disturbing more than one-half acre of land must follow the City’s specifications for erosion control in Article 16 and Stormwater Management in Article 12 of the Land Development Regulations. Projects disturbing more than one acre require a permit from the Vermont Department of Environmental Conservation. 9. Cost Estimates. a. Building (including interior renovations). $____________________ b. Landscaping: $____________________ c. Other site improvements (please list with cost): ____________________________________ ____________________________________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________ 10. Traffic / Trip Generation. 96,400 SF 136,561 SF Multi-Family Building (including parking garage) 98,033 SF Mutli-Family Building (excluding parking garage) 0 83 X X 0 16,689 SF 184,989 SF 11 N/A N/A Multi-Family $18,000,000 X Proposed use of the property is the two previously approved hotels and the updated Multi-Family building which includes 83 residential units with approximately 5,800 SF of retail space. No change $296,325 (for Phase 2)