HomeMy WebLinkAboutMS-22-02 - Plans - Record - 1068 Williston Road6
RIM=313.1
INV=308.0 OUT
7RIM=313.3
INV=308.2
INV=308.0
7B
OUT
CB
3
RIM=311.7
INV=306.4 OUT
CB
4
RIM=312.0
INV=306.7 OUT
CB
15RIM=308.2
INV=304.8
INV=305.1 OUT
CB
12RIM=312.8
INV=306.6
INV=306.5
INV=306.1
13
RD3
OUT
CB
8RIM=314.5
INV=309.0
INV=309.0
INV=309.2
INV=308.9
9C
YD 1
DS1
OUT
DMH
18
RIM=313.2
INV=308.3
INV=308.5
INV=308.5
INV=308.2
INV=308.5
17
21
6 IN
OUT
OUT
DMH
17RIM=313.0
INV=309.0
INV=309.0
INV=309.0
INV=309.0
RD2
16
DS3
OUT
CB
19
RIM=312.5
INV=308.3
INV=308.2
INV=309.0
INV=308.5
20
OUT
OUT
DMH
20
RIM=312.1
INV=308.5 OUT
CB
REMOVE EXISTING PIPE
AND CONNECT TO
EXISTING STRUCTURE AT
INV=302.0
15"H
D
P
E
18"HDPE
18"HDPE
15"HDPE
15"PVC
21
RIM=312.6
INV=309.2 OUT
CB
1
RIM=312.2
INV=302.3 2
DMH 24"HDPEELIMINATE EXISTING OUTFALL. PLUG
OUTLET. BACKFILL PIPE WITH
FLOWABLE FILL. COORDINATE ALL
WORK WITH VTRANS.
CORE NEW INVERT
AT 304.0 ADD MANHOLE FRAME AND
GRATE, ADJUST TO FINISH GRADE.
DOGHOUSE
MANHOLE
FIELD VERIFY
EXISTING INVERT
2
RIM=312.1
INV=306.1
INV=306.1
INV=304.1
INV=304.0
4
3
5
OUT
DMH
15"HDPE
9C
RIM=312.7
INV=310.2
INV=310.1
4-in In
OUT
YDI
16
RIM=313.1
INV=309.5
INV=309.4
DS2
OUT
CB
13RIM=312.6
INV=308.6
INV=308.5
13 B
OUT
CB
12"HDPE15"HDPE 15"HDPE15"HDPE1
5
"HD
P
E15"HDPE22
RIM=312.4
INV=307.2
INV=305.0
19
OUT
DMH
15"HDPE
5RIM=313.7
INV=307.6
INV=307.6
INV=308.2
INV=305.6
6
7
8
OUT
DMH
8"PVC
7BRIM=313.0
INV=309.5 OUT
CB
12"
H
D
P
E
TEMPORARY CB
YD 1
RIM=313.2
INV=309.2 OUT
YDI
12" HDPE ROOF DRAIN
CONNECTION
4" PERFORATED
PVC AT DRIP EDGE
15"HDPESUBSURFACE
INFILTRATION
SYSTEM #1
SUBSURFAC
E
INFILTRATI
O
N
SYSTEM #2
6"PVC @ 2%6"
P
V
C
@
2
%
REFER TO DOWNSPOUT
CONNECTION DETAIL (TYP FOR
4 AT ALL AWNING LOCATIONS)15"HDPE13 B
RIM=312.0
INV=308.7 OUT
CB
6"PV
C
@
2
%18"HDPE14
RIM=309.9
INV=304.8
INV=305.7
INV=305.1
INV=304.7
11
OUT
OUT
OUT
CB
GMP TO HOLD EXISTING POLE AND
REINSTALL GUY WIRE. COORDINATE
DRAINAGE WORK WITH GMP.
11
RIM=312.5
INV=306.0
INV=305.7
INV=305.6
RD4
12
OUT
CB
312.2313.8 TC313.3 BC
313.7
313 TC312.5 BC
309.5 TC
309 BC
309.5 TC
309 BC
308.5
309 TC
308.5 BC
TC/BC 313.7
TC/BC 313.95
313.7 313.7
313.3
313.7 TC/BC313.8 TC313.3 BC
314.0 TC313.5 BC313.4 TC/BC
313.7
313.9 TC313.4 BC
313.9
313.7
313.4
313.2
313.9 TC313.4 BC
313.7 TC/BC
312.8
312.5
313.0 TC312.5 BC
313.9
313.5 BC
313.6
313.8
313.7
313.7
313.6
313.6
313.6
313.85313.85
313.85
313.85313.85
313.6313.4
313.8
313.7 313.6
313.4
313.7
313.32
312.7
313.32
313.5 TC313.0 BC
313.7
313.7
312.8312.8
312.9
310.5 TC
308.5
FFE=309.0
311.5 TC
313.3
313.5 BC
313.7 TC313.7 BC
314.2 TC313.7 BC
314.0 TC313.5 BC314.0 TC313.5 BC
314.2 TC
313.7 BC
313.9 TC313.4 BC
313.7
GTDGTDGTD GTD
313.7
313.3
313.3
313.6
313.7
314.2
314.1
314.0
313.9
313.2
313.1
312.2
312.1
312.8
312.9
313.3 TC312.8 BC
313.1 TC312.6 BC
313.3 TC312.8 BC
312.5 TC312.0 BC
313.8313.7 TC313.1 BC
WILLISTON ROADTO I-89
5' DIA.
CAPPED
10" SDR 35 PVC
ROOF DRAIN
INV = 309.8
TOTAL GSF = 59,815 SF
FFE = 313.95'
HOLIDAY INN
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-USE BUILDING
FLUSH CURB
FLUSH CURB
BEGIN TRANSITION
CURB
FLUSH CURB
FLUSH CURB
FLUSH CURB
FLUSH CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION CURB
FLUSH CURB
BEGIN
TRANSITION
CURB
FLUSH CURB
BEGIN
TRANSITION
CURB
BEGIN
TRANSITION
CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION
CURB
REMOVE EXISTING DRIVEWAY,
RESTORE TO PERVIOUS GRASS
SURFACE, GRADE TO DRAIN
TOTAL GSF = 59,815 SF
FFE = 313.95'
HOLIDAY INN
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-USE BUILDING
FLUSH CURB
FLUSH CURB
BEGIN TRANSITION
CURB
FLUSH CURB
FLUSH CURB
FLUSH CURB
FLUSH CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION CURB
FLUSH CURB
BEGIN
TRANSITION
CURB
FLUSH CURB
BEGIN
TRANSITION
CURB
BEGIN
TRANSITION
CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION
CURB
BEGIN TRANSITION
CURB
PROPOSED
LOBBY
ADDITION
PROPOSED
POOL
ADDITION
(RENOVATION OF EXISTING
BUILDING)
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Grading and
Drainage Plan
C3.01
5
CHS PBS
Feet6030015
Local Comments 10/8/21 SMW1
Local Comments 11/15/21 SMW2
Act 250 Submission 11/17/21 SMW3
DEC Submittal 01/12/22 PBS4
Local Submittal 05/18/2022 PBS5
Ground Floor
Ground Floo
r
Second Floor
Second Floo
r
PLANTING PLAN 4.10 PLANTING PLAN 4.20
PRIVACY SCREEN
WALL
PUBLICLY ACCESSIBLE
GREEN ROOF
SECOND FLOOR
PRIVATE TERRACES
TOTAL GSF = 59,815 SF
FFE = 313.95'
TOTAL GSF = 83,927 SF
HOLIDAY INN
FFE = 314.5'
(RENOVATION OF EXISTING
BUILDING)
PROPOSED
LOBBY
ADDITION
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-USE BUILDING
PROPOSED
POOL
ADDITION
FUTURE PHASE
DECIDUOUS TREES QTY BOTANICAL NAME COMMON NAME SIZE
ARA 4 Acer rubrum `Armstrong`Armstrong Red Maple 2 1/2 - 3" CAL.
AF 4 Acer x freemanii `Sienna`Sienna Glen Maple 2 1/2 - 3" CAL./ B&B
BN 5 Betula nigra `Heritage`Multi-Stem Heritage River Birch 12 -14` HT.
GBP 6 Ginkgo biloba `Princeton Sentry`Princeton Sentry Ginkgo 2 1/2 - 3" CAL.
GT 17 Gleditsia triacanthos `Draves` TM Street Keeper Honey Locust 2 1/2 - 3" CAL.
TC2 1 Tilia cordata `Greenspire`Greenspire Littleleaf Linden 2 1/2 - 3" CAL.
EVERGREEN TREES QTY BOTANICAL NAME COMMON NAME SIZE
TO 16 Thuja occidentalis `Nigra`Dark American Arborvitae 5 - 6` HT.
SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE
EF 51 Euonymus fortunei Wintercreeper #2 CONT.
JP2 42 Juniperus horizontalis `Plumosa Compacta`Creeping Juniper 18 - 24" SPD
MD 61 Microbiota decussata Siberian Carpet Cypress/Russian Arborvitae 18 - 24" SPD
PN2 151 Physocarpus opulifolius Ninebark 18 - 24" SPD
SB 65 Spiraea bumalda `Anthony Waterer`Anthony Waterer Spirea 18 - 24" SPD
PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE
HSO 38 Hemerocallis x `Stella de Oro`Stella de Oro Daylily 1 GAL.
HG 10 Hosta x 'Guacamole'Guacamole Hosta 1 GAL.
NF 11 Nepeta x faassenii Catmint 1 GAL.
VINES QTY BOTANICAL NAME COMMON NAME SIZE
PQV 8 Parthenocissus quinquefolia Virgina Creeper #1 POT
GRASSES QTY BOTANICAL NAME COMMON NAME SIZE
CA 119 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 2 GAL.
DS 46 Deschampsia cespitosa `Schottland`Schottland Hair Grass 2 GAL.
PVS 47 Panicum virgatum `Shenandoah`Shenendoah Switch Grass 2 GAL.
SH 33 Sporobolus heterolepis Prairie Dropseed 2 GAL.
PLANT SCHEDULE - Phase 2
GREEN ROOF:
LIVE ROOF DEEP SYSTEM - 842 TRAYS (1'x2') - MIXED PERENNIALS
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Planting Plan Key
L4.00
19
JKH MKW
Feet6030015
PHASE 3
Local Comments 10/8/21 SMW1
Local Comments 11/15/21 MKW2
Act 250 Submission 11/17/2021 SMW3
Local Comments 12/17/21 MKW4
Local Comments 05/18/22 SMW5
Ground Floo
r
Ground Flo
o
r
Second Flo
o
r
Second Floo
r
INTERSTATE 89
1 ARA
1 ARA
15 SH 18 SH
5 CA
22 SB10 CA
17 SB
2 ARA
3 TO
4 BN
1 BN
8 MD
11 NF
19 PVS
10 HSO
2 AF 46 DS
22 CA
6 PVS
6 PVS
37 EF
9 CA
7 EF 7 EF
3 TO
1 TC2
9 GT
8 CA
8 CA
8 CA
9 CA
9 HSO
6 GT
1 GT
1 GT
3 TO
26 SB
38 CA
2 TO
2 TO
3 TO
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2
13 PN2 8 PN2
13 PN2
16 PVS 53 MD
16 JP2
1 AF
1 AF
21 JP2
5 JP2
8 HSO
10 HG
11 HSO
2 PQV
2 PQV2 PQV2 PQV
842-GREEN R
O
O
F
T
R
A
Y
S
PRIVACY SCREEN
WALL
PUBLICLY ACCESSIBLE
GREEN ROOF
SECOND FLOOR
PRIVATE TERRACES
PR
O
P
E
R
T
Y
L
I
N
E
TOTAL GSF = 59,815 SF
FFE = 313.95'
HOLIDAY INN
(RENOVATION OF EXISTING
BUILDING)
PROPOSED
LOBBY
ADDITION
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-USE BUILDING
PROPOSED
POOL
ADDITION
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Phase 2 Planting Plan
L4.01
20
JKH MKW
Feet4020010
Local Comments 10/8/21 SMW1
Local Comments 11/15/21 MKW2
Act 250 Submission 11/17/2021 SMW3
Local Comments 12/17/21 MKW4
Local Comments 05/18/22 SMW5
Ground Flo
o
r
Second Floo
r
INTERSTATE 89 WILLISTON ROADUS ROUTE 2DOR
S
E
T
S
T
R
E
E
T
1 ARA
1 ARA
15 SH 18 SH
5 CA
22 SB10 CA
3 TO
4 BN
1 BN
8 MD
11 NF
19 PVS
10 HSO
2 AF 46 DS
22 CA
6 PVS
6 PVS
7 EF 7 EF
6 GBP
8 CA
8 CA
8 CA
9 CA
9 HSO
16 PVS 53 MD
5 JP2
2 PQV
2 PQV2 PQV2 PQV
842-GREEN
R
O
O
F
T
R
A
Y
S
PRIVACY SCREEN
WALL
PUBLICLY ACCESSIBLE
GREEN ROOF
SECOND FLOOR
PRIVATE TERRACES
TOTAL GSF = 59,815 SF
FFE = 313.95'
TOTAL GSF = 83,927 SF
HOLIDAY INN
FFE = 314.5'
(RENOVATION OF EXISTING
BUILDING)
PROPOSED
LOBBY
ADDITION
TOTAL GSF = 136,561 SF
FFE = 313.9'
MULTI-USE BUILDING
PROPOSED
ADDITION
FUTURE PHASE
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Phase 2 Planting Plan
L4.02
21
JKH MKW
Feet4020010
PHASE 3
Local Comments 10/8/21 SMW1
Local Comments 11/15/21 MKW2
Act 250 Submission 11/17/2021 SMW3
Local Comments 12/17/21 MKW4
Local Comments 05/18/22 SMW5
UP2013-SC-1
EDGE OF DELINEATED
WETLAND (TYP)
2013-3
50-FT WETLAND BUFFER (TYP)
VHB NATURAL RESOURCE
STUDY AREA (TYP.)WILLISTON ROADTO I-89
STANDARD SILT FENCE (TYP)
LIMIT OF DISTURBANCE (TYP)
PROJECT DEMARCATION (TYP)WILLISTON ROADTO I-189
STABILIZED
CONSTRUCTION
ENTRANCE 2193 SQFT
HOLIDAY INN
HAMPTON INN
PROPOSED MIXED-USE BUILDING
PERMANENT WETLAND BUFFER IMPACT
APPROX. 2,180 SF (0.031 AC)
PROPOSED GAS LINE
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved for Construction
Sept. 25, 2019
22
57913.01
Wetland Impact Exhibit
W1.01
1
SMW PBS
Feet6030015
DRB Submission 9/23/2021 PBS1
DRB/DEC Submission 5/9/2022 PBS2
WILLISTON ROADTO I-89
SUBSURFACE INFILTRATION SYSTEM #1
SUBSURFAC
E
I
N
F
I
L
T
R
A
T
I
O
N
SYSTEM #2
HOLIDAY INN
MULTI-USE BUILDING
FUTURE PHASE
POTENTIAL TEMPORARY SOIL
STOCKPILE LOCATION
PROJECT DEMARCATION (TYP)
LIMIT OF DISTURBANCE (TYP)
STANDARD SILT FENCE (TYP)
INLET PROTECTION (TYP)
SURROUND TEMPORARY SOIL STOCKPILE WITH
FILTER SOCKS, GRAVEL BAGS, OR SILTFENCE. IF
STOCKPILE IS TO REMAIN FOR MORE THAN 14
CONSECUTIVE CALENDAR DAYS STABILIZE WITH
TEMPORARY MULCH MATERIAL.
LIMITS OF VEGETATION PROTECTION
LIMITS OF TREE PROTECTION (TYP)
CONSTRUCTION LAYDOWN
AREA
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Erosion and
Sediment Control Plan
C6.01
8
CHS PBS
Feet6030015
NOTE:
1.AREAS DRAINING TO STORMWATER INFILTRATION SYSTEMS OR
BIORETENTION AREAS SHALL RECEIVE FINAL STABILIZATION PRIOR TO
ALLOWING RUNOFF TO DRAIN TO THE TREATMENT SYSTEMS.
Local Comments 8/30/21 SMW1
Local Comments 11/15/21 SMW2
Act 250 Submission 11/17/2021 SMW3
Local Submittal 05/18/22 PBS4
Ground Floo
r
Ground Floo
r
Second Floo
r
Second Floo
r
GAS SERVICE (TYP)
PROPERTY LINE
FIXED BOLLARD
(TYP.)3.01
C
BRICK PAVERS
(TYP.)3.00
B
3.01
D
BIKE RACK
5ea (10 bikes)3.00
A
16
13
10
23
23
22
12
8
2
3
6' SCREEN FENCE
3.01
E
13
BRICK PAVERS
(TYP.)3.00
B
BIKE RACK
8ea (16 bikes)3.00
A
LANDSCAPE
TRELLIS/PERGOLA
2
BENCHES (8ea.)
COVERED SITTING AREA
FUTURE PHASE
3.01
D BENCHES (3ea.)
GREEN ROOF
GREEN ROOF
of
Project Number
Sheet
Drawing Number
Drawing Title
Issued for
Checked byDesigned by
Appvd.DateRevisionNo.vhb.comDate
40 IDX Drive, Building 100
Suite 200
South Burlington, VT 05403
Holiday Inn
Redevelopment
1068 Williston Rd.
South Burlington, Vermont
Review
Not Approved For Construction
July 29, 2021
27
57913.01
Landscape
Layout and Materials
L2.00
16
MKW MPH
Feet6030015
PHASE 3
Local Comments 10/8/21 SMW1
Local Comments 11/15/21 MKW2
Act 250 Submission 11/17/2021 SMW3
Local Comments 05/20/2022 SMW4