CITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING AND ZONING
CITY OF BURLINGTON/BURLINGTON INTERNATIONAL AIRPORT
1200 AIRPORT DRIVE
SITE PLAN APPLICATION #SP-22-034
FINDINGS OF FACT AND DECISION
Site plan #SP-22-034 of Burlington International Airport & BTV Hotel, LLC to amend a previously
approved plan for a 111-room hotel. The amendment consists of increasing the number of rooms to
119, adding rooftop equipment, removing ground level equipment, minor changes to interior amenities,
and minor architectural modifications, 1200 Airport Drive.
Based on the document file for this application, the Administrative Officer finds, concludes, and decides
as follows:
FINDINGS OF FACT
1. The project consists of site plan application #SP-22-034 of Burlington International Airport &
BTV Hotel, LLC to amend a previously approved plan for a 111-room hotel. The amendment
consists of increasing the number of rooms to 119, adding rooftop equipment, removing ground
level equipment, minor changes to interior amenities, and minor architectural modifications,
1200 Airport Drive.
2. The owner of record of the subject property is the City of Burlington, Burlington International
Airport.
3. The hotel was previously approved by the Development Review Board on November 12, 2020
(Application #SD-20-22). The applicant obtained a one year extension of approval from the
Administrative Officer in accordance with the procedure in 17.04B(3) on February 3, 2021,
extending the date on which the approval would expire without issuance of a zoning permit to
May 11, 2022.
4. The complete application was received on May 10, 2022. Revised materials were most recently
received on July 19, 2022.
5. The subject property is located in the Airport Zoning District and the Transit Overlay District.
6. Development within the airport district must be reviewed pursuant to site plan provisions of
Article 14, unless it otherwise triggers PUD or subdivision standards.
7. The plans submitted consist of the following:
Sheet No. Plan Description Prepared by Last Revised Date
LA200 Materials Plan SE Group 06/10/2022
LA201 Rendered Site Plan SE Group 06/10/2022
LA400 Planting Plan SE Group 06/10/2022
LA500 Lighting Plan SE Group 06/10/2022
C101 General Notes-Legend-Index Stantec 06/08/2022
C102 Existing Conditions Stantec 06/08/2022
C103 Site Layout Plan Stantec 06/15/2022
C107 Site Grading & Drainage Stantec 06/15/2022
C109 Utility Plan Stantec 06/15/2022
#SP-22-034
2
2 of 4
C116 EPSC Plan Stantec 06/15/2022
A101 Lobby Level Plan Rabideau Architects 06/16/2022
A102 Second Level Plan Rabideau Architects 06/16/2022
A103 Third Level Plan Rabideau Architects 06/16/2022
A104 Fourth Level Plan Rabideau Architects 06/16/2022
A105 Fifth Level Plan Rabideau Architects 06/16/2022
A201 Exterior Building Elevations Rabideau Architects 06/16/2022
A202 Exterior Building Elevations Rabideau Architects 06/16/2022
A901 3D Views Rabideau Architects 06/16/2022
Only the standards below are affected by this application. All other standards will continue to be met.
A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS
Setbacks, Coverages & Lot Dimensions
Airport Zoning District Required Existing Proposed
Min. Lot Size 3 ac 913.11 ac No change
Max. Building Coverage 30 % Unknown No change
Max. Overall Coverage 50 % 35.4%2 35.6%
Min. Front Setback 50 ft. Unknown 50 ft.
Min. Side Setback 35 ft. Unknown No change
Min. Rear Setback 50 ft. N/A N/A
Max. Front Setback Coverage 30% Unknown Unknown
@ Max. Height (flat roof) 65 ft. Unknown 65 ft.
√ Zoning Compliance
@ Waiver from 35 ft to 65 ft approved in approval #SP-20-22
1. PUD approved in #MP-21-02 has been subtracted from Airport PUD of 942 acres.
2. Includes permitted projects that have not yet completed construction
The Development Review Board approved a waiver to allow the maximum height of the building to be 65 ft
in approval #SD-20-22. The revised rooftop mechanical equipment exceeds the approved height of 65 ft
measured from average pre-construction grade. The definition of height excludes air conditioning
equipment from the calculation of height. The height of the building is otherwise unchanged from that
which was approved in #SD-20-22.
B) SITE PLAN REVIEW STANDARDS
14.06 General Review Standards
B. Relationship of Structures and Site to Adjoining Area
(1) The Development Review Board shall encourage the use of a combination of common materials and
architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens
and visual interruptions to create attractive transitions between buildings of different architectural styles.
No changes affecting compliance with these criteria are proposed.
#SP-22-034
3
3 of 4
14.07 Specific Review Standards
No changes affecting compliance with these criteria are proposed.
C) OTHER
Traffic
The applicant estimates that the Project will generate 40 PM peak hour vehicle trips, an increase from
38 as concluded in SD-20-22 resulting from the additional rooms. The applicant has updated their study
of the previously-approved study of the Rochester airport hotel which concluded that the on-airport
hotel generates trips 40 to 47% less than the standard ITE value. 40 trips includes this reduction. The
Administrative Officer finds the project will be considered to generate 40 PM peak hour vehicle trips for
the purpose of calculating traffic impact fees.
Wastewater
The applicant has provided an estimate of water and wastewater flows at 14,890 GPD for the revised
hotel. The administrative officer finds the applicant must obtain final water and wastewater allocation
and connection permits prior to issuance of a zoning permit.
Energy Standards
The Administrative Officer notes that all new building sections are subject to the Stretch Code pursuant
to Section 3.15: Residential and Commercial Building Energy Standards of the LDRs.
DECISION
Based on the above Findings of Fact, the Administrative Officer hereby approves site plan application
#SP-22-034, subject to the following conditions:
1. All previous approvals and stipulations which are not superseded by this approval shall remain in
effect.
2. This project shall be completed as shown on the plan(s) and shall be on file in the South Burlington
Department of Planning and Zoning.
3. The applicant must obtain final water and wastewater allocation and connection permits prior to
issuance of a zoning permit.
4. The applicant must obtain a zoning permit within six (6) months from the date of this decision or
this approval expires and is null and void. The applicant may submit a request for an extension
to obtain a zoning permit under the terms outlined in Section 17.04 of the LDR’s, but the
request must be submitted prior to the expiration of this approval.
5. The applicant shall obtain a Certificate of Occupancy from the Administrative Officer prior to the
use of the hotel.
6. Any change to the site plan shall require approval by the South Burlington Administrative Officer
or the Development Review Board, as allowed under the Land Development Regulations.
Signed on this 20 day of July, 2022 by
#SP-22-034
4
4 of 4
Marla Keene, Acting Administrative Officer
PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a
Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be
accompanied with a $233 filing fee and be filed within 15 days of the date of this decision.
The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state
permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist.