Loading...
HomeMy WebLinkAboutZP-22-262 - 0045 San Remo Drive 7/14/2022Sewer Qty Description GPD Existing Building 20 Employees x 15 GPD /Employee =300 Subtotal 300 Proposed Land Use 19 Therapists/Employees x 13 GPD /Therapist =247 65 Clients x 4 GPD /Client =260 Subtotal 507 Supplemental Sewer Alloocation required 207 Water Existing Building 20 Employees x 15 GPD /Employee =300 Subtotal 300 Proposed Land Use 19 Therapists/Employees x 13 GPD /Therapist =247 65 Clients x 4 GPD /Client =260 Subtotal 507 Supplemental Sewer Alloocation required 207 Unit Design Flow 45 San Remo Drive Building Change of Use Water & Sewer Design Flows Friday, July 01, 2022 (SF)(VTE)(VTE)(VTE) Description LUC Area Weekday AM PM Existing Single Tenant Office 715 8,828 99 16 15 Total 99 16 15 Proposed Medical Office Clinic 630 8,828 337 33 32 Total 337 33 32 Change in Trip Generation 238 17 17 NFI Vermont, Inc. Proposed Change in Use Traffic Generation Summary 45 San Remo Drive, So. Burlington