Loading...
HomeMy WebLinkAbout1840 Spear Street - Infrastructure - 11/9/2007FV51640, southburlinoon PLANNING & ZONING December 5, 2008 Joe Segale, PE South Village Communities, LLC 70 South Winooski Avenue Burlington, VT 05401-3830 Re: Letter of Credit Reduction - #ZP-07-389 Dear Mr. Segale: This is in response to your letter of December 4, 2008 requesting a reduction in the amount of your Letter of Credit value at $730,000. Your request to reduce the Letter of Credit to $73,000 is hereby approved. Please provide the City with a new Letter of Credit for the reduced amount. If you require further information, please let me know. jSinc a J. air Administrative Officer 575 Dorset Street South Burlington, VT 05403 tel 802.846.4106 fax 802.846.4101 www.sburl.com ANA- �outhvillage aecov FUl December 4, 2008 Mr. Ray Belair, Administrative Officer South Burlington Department of Planning and Zoning 575 Dorset Street South Burlington, VT 05403 Re: Zoning Permit ZP-07-389 Letter of Credit Reduction Request Dear Mr. Belair: This letter requests City approval to reduce the Letter of Credit for the work allowed under the above referenced zoning permit. The Letter of Credit is valued at $730,000 and covers the following items: • Construction of the northeast stormwater detention pond with connections to Drainage Manhole #5; • Construction of the northwest stormwater detention pond with connections to Catch Basin 1; • Installation of the water main from Midland Avenue to the Allen Road roundabout and along Allen Road East to Spear Street with connections to existing water mains at Midland Avenue and Spear Street; • Installation of the sewer force main from a new connection on Allen Road to a force main air release structure to be installed approximately 700 feet east of Spear Street; • Miscellaneous water and sewer service lines to serve lots 7, 8, 9, 10, 12, 14, 13, 54, 55, 56, and 57; and • Associated erosion control measures. The approved cost estimate for this work is attached for your information. All of these items are complete. As allowed in paragraph 12 of the Subdivision Letter of Credit Agreement, we are requesting City approval to reduce the letter of credit value to 10%, or $73,000. Please feel free to contact me at 802-863-8323 with any questions. Sincerely; 7 Joe Segale, P.E., Project Manager ents UL I-1( Ud: "jH I-KUI`I: 1-i I T Ur �DUU I N tiUKL.0 A tr7CtS` tD-ti i I U;=tJbJ1JJ7 r-. 1 October 10, 2007 Post-ItO Fax Note 7671 o—1, peg ,� To Fro S Co./Dept. Co. Phone M Phona n Fax N Fax 4 The Retro, BUI L D E R S& DEVELOPERS Mr. William Szymanski, City Engineer South Burlington Department of Public Works c/o Planning and Zoning Department 575 Dorset Street South Burlington, VT OS403 Re: South Village Public Infrastructure Cost Estimate for Winter EPSC Phases Dear Mr. Szymanski: We are requesting your review and approval of the attached cost estimate for the value of public infrastructure that can be constructed within the constraints of the project's winter EPSC plan over a four week period starting on October 22, 2007. The attached plans highlight the components that we anticipate completing during this tune period, The schedule also recognizes the City's November 151h deadline for waterline work. The estimated value of this work is $730,000 and generally includes; Construction of the northeast and northwest stormwater detention ponds; • Installation of the water main from Midland Avenue to the Allen Road roundabout and along Allen Road East to Spear Street. The cost includes connections at Midland Avenue and Spear Street; Installation of the sewer force main from its connection on Allen Road to a force main air release structure that will be installed approximately 700 feet east of Spear Street; • Other water, sewer, and storm water drainage lines as highlighted on the plans; and Associated erosion control measures. As a heads up, we plan to submit an estimate in early November that accounts for work completed by then and the value of work that will continue through mid -December. Please feel free to contact me at 802.863-8323 with any questions, �I Sincerely; ge Segale, P.E., Projec Manager Attachments d�C U Yu�L x75 �u/) D, K tU_2 cc: Ray Belair; Dave Marshall, Civil Engineering Associates; Randy Laframboise, S.D. Ireland 1339 www.retrovest.cor 70 South Winooski Avenue Burlington, VT 05401-3830 802-863-3323 800-679.1929 F 802-863 South Village Public Intrastructure Cost Estimate for Winter EPSC Phases Uctober 22-Nov 1b, 2UU/ Sediment & Erosion Control 3 Daily Temporary Stabilization 4 Strip & Stockpile Topsoil 5 Laydown Areas 6 Construction Entrances 7 Topsoil Placement 8 Erosion Control Matting 9 Final Hay Mulch 10 Drainage Inlet Protection 11 Silt Fence 12 Construction Fence 13 Permanent Seeding 14 Temporary Seeding 15 Remaining Permanent Site Reclaim. 16 Polymer Blocks (Allowance) 17 Polymer Floc Log Flume (Allowance) 18 2.5" Sed. Basin Floating Skimmer 19 3" Sed. Basin Floating Skimmer 20 4" Sed. Basin Floating Skimmer 21 Inspection/Reporting Requirements 22 All Remaining EPSC Measures Demolition 23 Clearing 24 Grubbing 25 Mass Rock Overblast (Allowance) 26 Trench Rock & Boulder (>1 CY) 27 All other Demolition Items Water 28 Water System Connection - East 29 Water Connection (TS&V) - West 30 Jack & Bore - West 31 Pressure Reducing Vault Complete 32 12" Water Main 33 12" Gate Valve 34 8" Water Main 35 8" Gate Valve 36 Air Release Structure 37 Fire Hydrants 38 1" Copper Water Service 39 1" Water Service Corp & Curb Stop 40 Type I Insulation (2" Thick) 41 All Remaining Water Installations Sewer 42 12" Sewer Main 43 8" Sewer Main 44 6" Sewer Main 45 Sanitary Manholes 46 4" Sewer Service Line 47 6" Force Main 48 6" FM Directional Bore & Connection 49 Force Main Air Release Structure 50 Pump Station & Storage 51 6" Relief Drain at Low Point 52 All Remaining Sewer Work Qtv Ilnit I In it Prica Tntalc 0.12 LS $30,000 $3,600 3 Acres $3,000 $9,000 0 LS $12,500 $0 1 LS $7,000 $7,000 5000 SY $1.00 $5,000 1920 SY $1.25 $2,400 4800 SY $0,27 $1,296 0 EA $100.00 $0 1200 LF $1.25 $1,500 6000 LF $1.00 $6,000 0 SY $0.54 $0 1200 SY $0.30 $360 0 SY $0.00 $0 0 EA $150 $0 0 EA $750 $0 0 EA $1,000 $0 1 EA $1,000 $1,000 1 EA $1,500 $1,500 0.12 LS $4,000 $480 0.12 LS $65,000 $7,800 $46,936 ON Unit Unit Price Tntalc 1 Acres $4,000 $4,000 1 Acres $4,000 $4,000 0 CY $10 $0 500 CY $75 $37,500 0.2 LS $2,500 $500 $46,000 ON Unit Unit Price Totals 1 LS $500 $500 1 LS $13,000 $13,000 1 LS $30,000 $30,000 1 LS $31,750 $31,750 3420 LF $49 $167,580 14 EA $2,000 $28,000 580 LF $35 $20,300 3 EA $1,300 $3,900 2 EA $5,200 $10,400 8 EA $3,400 $27,200 390 LF $22 $8,580 13 EA $300 $3,900 0 SY $8 $0 0.5 LS $10,500 $5,250 $350,360 Qtv Unit Unit Price Totals 295 LF $45 $13,275 170 LF $36.50 $6,205 0 LF $35 $0 3 EA $3,500 $10,500 840 LF $17 $14,280 1240 LF $20 $24,800 1 LS $9,000 $9,000 1 EA $6,100 $6,100 0 LS $110,000 $0 0 LS $8,000 $0 0 LS $2,500 $0 $t$4,160 Page 1 of 2 10/9/2007 South Village Public Infrastructure Cost Estimate for Winter EPSC Phases October 22-Nov 16, 2007 Drainage 77 42" HDPE Storm Line 78 30" HDPE Storm Line 79 24" HDPE Storm Line 80 18" HDPE Storm Line 81 15" HDPE Storm Line 82 12" HDPE Foundation Line 83 10" HDPE Foundation Line 84 8" HDPE Foundation Line 85 6" HDPE Foundation Line 86 4" HDPE Foundation Line 87 Foundation Drain Cleanouts 88 4' Diameter Catch Basin 89 5' Diameter Catch Basin 90 8' Diameter Catch Basin 91 4' Manhole 92 5' Manhole 93 8' Manhole 94 Flared End Sections 95 Detention Basin (NW) 96 Detention Basin (SW) 97 Detention Basin (NE) 98 All Remaining Drainage Work Traffic Control 112 Flaggers 113 Portable Message Signs 114 Permanent Signs and Posts 115 Temporary Construction Signage 116 Temporary Pavement Markings 117 Permanent Pavement Markings 118 Traffic Light Foundations 119 Traffic Light Superstructure 120 Traffic Light Controller 121 Remaining Traffic Light Work 122 Remaining Traffic Control Work Qty Unit Unit Price Totals 440 LF $80 $35,200 0 LF $60 $0 0 LF $49 $0 0 LF $34 $0 0 LF $29 $0 0 LF $35 $0 0 LF $32.50 $0 0 LF $23 $0 0 LF $0 $0 0 LF $20 $0 0 EA $200 $0 0 EA $2,100 $0 0 EA $2,550 $0 2 EA $7,500 $15,000 0 EA $2,300 $0 0 LF $2,800 $0 1 EA $8,500 $8,500 0 LS $3,250 $0 1 LS $40,000 $40,000 0 LS $110,000 $0 1 LS $91,500 $91,500 0.16 LS $30,000 $4,800 $195,000 Qty Unit Unit Price Totals 160 Hr $25 $4,000 1 EA/Mo $1,400 $1,400 0 LS $20,000 $0 0 LS $1,500 $0 0 LS $11,000 $0 0 LS $32,000 $0 0 LS $12,600 $0 0 LS $38,000 $0 0 LS $42,000 $0 0 LS $50,925 $0 0 LS $41,700 $0 $5,400 --)ummary Erosion Prevention & Sediment Control $46,936 Demolition $46,000 Water System $350,360 Sewer System $84,160 Drainage $195,000 Traffic Control $5,400 Total $727.856 Page 2 of 2 10/9/2007 SUBDIVISION LETTER OF CREDIT AGREEMENT THIS AGREEMENT, executed in triplicate between South Village Communities, LLC hereinafter referred to as "DEVEL hereinafter referred to as "BANK", and the City of South Burlington as "MUNICIPALITY". WITNESSETH: I WHEREAS, Developer has received final subdivision approval from the MUNICIPALITY'S Development Review Board for the development of a subdivision consisting of 157 lots with related improvements, in a development to be known as "South Village Communities", as depicted on and in accordance with the specifications as set forth on sheets S 1. 1, S 1.2, S 1.3, and S 1.4 on the final master plat plan entitled "South Village Master Plan", last revised August 7, 2007 prepared by Civil Engineering Associates, as recorded in Slide 503, pages 4-6 and Slide 504 pages 1-2; and sheet S1.3 on the phase 1 final plat entitled "South Village Phase 1 Plans", last revised August 10, 2007 prepared by Civil Engineering Associates, as recorded in Slide 503, page 3 of the Land Records of the City of South Burlington; WHEREAS DEVELOPER is required by said approval, at its own expense, to complete the construction of the development site in accordance with the plan approved by the Development Review Board; WHEREAS the parties to the Agreement wish to establish a mechanism to secure the obligations of the DEVELOPER for the work as set forth above; and WHEREAS the BANK executes this Agreement solely in the capacity of issuer of a Letter of Credit hereinafter specified; NOW, THEREFORE, the parties hereby covenant and agree as follows: 1. DEVELOPER will, at its own expense, complete the following construction as depicted and in accordance with the specifications set forth in said final plat and related documents: • Construction of the northeast stormwater detention pond with connections to Drainage Manhole #5; • Construction of the northwest stormwater detention pond with connections to Catch Basin 1; Post -it® Fax Note 7671 Date / b p#goes To I v From Co./Dept. Co. Phone # Phone # Fax # Fax # • Installation of the water main from Midland Avenue to the Allen Road roundabout and along Allen Road East to Spear Street with connections to existing water mains at Midland Avenue and Spear Street; • Installation of the sewer force main from a new connection on Allen Road to a force main air release structure to be installed approximately 700 feet east of Spear Street; • Miscellaneous water and sewer service lines to serve lots 7, 8, 9, 10, 12, 14, 13, 54, 55, 56, and 57; and • Associated erosion control measures. 2. The Developer shall complete the improvements set forth in Paragraph 1 no later than December 31, 2007. 3. DEVELOPER shall replace or repair any defective or improper work or materials which may be recognized within one year after completion of the improvements set forth in Paragraph 1. For the purpose of this Agreement "completion" shall be deemed to have occurred when the MUNICIPALITY has inspected and approved the construction of all the improvements required by this Agreement and issued written notice to the DEVELOPER that the construction is complete. 4. For the guarantee of DEVELOPER's performance of all requirements hereunder set forth, DEVELOPER has caused the BANK to issue its Irrevocable Letter of Credit in favor of the MUNICIPALITY, the original of which is attached to the MUNICIPALITY'S copy of this Agreement, and a copy of which is attached to the DEVELOPER's copy of this Agreement. During the term of this Agreement, DEVELOPER shall cause the attached Letter of Credit to be renewed at least thirty (30) days before the maturity date thereof. Failure of the DEVELOPER to deliver evidence of such renewal to MUNICIPALITY thirty (30) days prior to the date of expiration of said Letter of Credit shall constitute a default of the terms of this Agreement. 5. Said Irrevocable Letter of Credit provides that the drafts drawn under said credit, must be accompanied by a written statement signed by a duly authorized agent of the MUNICIPALITY, that in the judgment of the MUNICIPALITY, the DEVELOPER is in default under the terms of this Agreement, and that the funds to be drawn by the draft are in payment for, or in anticipation of payment for materials, labor and services required for completion of the improvements identified in Paragraph 1. Payment of each draft will be made at sight when presented to the BANK by the MUNICIPALITY, the payment limited only by the aggregate amounts presented in 2 relationship to the maximum amount of the Letter of Credit. If DEVELOPER shall be in default of the Agreement for seven (7) days because of its failure to provide evidence of renewal of the Letter of Credit, required in paragraph 4 above, the MUNICIPALITY shall notify DEVELOPER by certified mail of said default. DEVELOPER shall then within three (3) business days provide MUNICIPALITY with evidence of said renewal of Letter of Credit or MUNICIPALITY may notify BANK of such default and request payment under said Letter of Credit. 6. The DEVELOPER and MUNICIPALITY hereby agree that the sum of Seven Hundred and Thirty Thousand Dollars ($730,000) shall be sufficient to secure DEVELOPER'S obligations under this agreement but shall not relieve DEVELOPER from the obligation to pay any additional costs, if actual costs exceed the above -stated cost. 7. The MUNICIPALITY will promptly submit to the DEVELOPER a copy of any draft it submits to the BANK. The consent of the DEVELOPER to payment of said draft by BANK to the MUNICIPALITY under said Letter of Credit shall not be required. 8. The MUNICIPALITY shall not file with the BANK a Statement of Default until ten (10) days after notice has been sent to the DEVELOPER, by certified mail, setting forth its intention to do so. 9. All funds drawn on the BANK by the MUNICIPALITY pursuant to the Letter of Credit shall be used solely by the MUNICIPALITY for the purpose of completing construction of the improvements identified in Paragraph 1. Any work contracted for by the MUNICIPALITY pursuant hereto shall be let on a contractual basis, or on a time and material basis, or shall be performed by the MUNICIPALITY's own work force and equipment, or shall be accomplished in such other manner as in the judgment of the MUNICIPALITY shall accomplish the work more expeditiously and economically. 10. If payments are drawn on the BANK by the MUNICIPALITY pursuant to said Letter of Credit, and it shall later develop that a portion of the monies drawn are in excess of the MUNICIPALITY's needs, any such excess amount shall be refunded by the MUNICIPALITY to the BANK, to be credited by said BANK to the DEVELOPER. 11. This Agreement and said Letter of Credit shall terminate and shall be of no force and effect upon completion of one year warranty period as described in the above Paragraph 3. If the MUNICIPALITY has not delivered any written notice to the DEVELOPER of any defective or improper work or materials in the construction of the improvements within the twelve (12) month period, or if notice has been given 3 and the defective work or materials have been corrected by the DEVELOPER, the MUNICIPALITY shall forthwith notify the BANK in writing that the Letter of Credit may be cancelled, and shall return the original Letter of Credit to the BANK, and both the DEVELOPER and the BANK shall be released from all obligations hereunder and under said Letter of Credit. 12. Upon request of DEVELOPER, but only at the sole discretion of the MUNICIPALITY, the MUNICIPALITY may agree to reduce the amount of said Letter of Credit required hereunder if the MUNICIPALITY believes that the full amount of said Letter of Credit is no longer necessary to protect its interest, and shall notify the BANK in writing of such reduction in the amount of the Letter of Credit. 13. The BANK may not modify the Letter of Credit without first receiving written consent of the MUNICIPALITY. 14. DEVELOPER hereby agrees to indemnify and hold BANK harmless from all claims, causes of action or liability of any kind arising out of this Agreement or the issuance by BANK of this Letter of Credit, including attorney's fees, as long as BANK follows the terms and conditions outlined in said Letter of Credit. 15. This agreement shall be binding on all parties hereto and their respective heirs, executers, administrators, successors, and assigns. Dated at ? r I/ r , Vermont, this day of �V , 2007 IN T E RRESEN E OF: eR-�- Aa'H� - By Duly Authorized Agent (DEVELOPER) See Attached Irrevocable Standby Letter of Credit No. 61670563 Duly Authorized Agent (BANK) Dated at Vermont, this day of 7%�' , 2007 By. c'9,--, , Duly Authorized Agent (CITY OF SOUTH BURLINGTON) 5 Citibank,N. . DATE: OCT.18, 2007 IRREVOCABLE STANDBY LETTER OF CREDIT NO. 61670663 BENEFICIARY' CITY OF SOUTH BURLINGTON, VT ("MUNICIPALITY") 575 DORSET ST. SOUTH SUALINGTON, VERMONT 05403 GENTLEMEN. BY ORDER OF OUR CLLENT, DAVID SCHEUER, C`O RETROVEST FOR THE ACCOUNT OF SOUTH VILLAGE COMMUNITIES, LLC (THE 'DEVELOPER'), WE HEREBY OPEN OUR IRREVOCABLE STANDBY LETTER OF CREDIT NO, 61670563, IN YOUR FAVOR FOR. AN AMOUNT NOT TO EXCEED IN AGGREGATE U80730,000.00 (SEVEN HUNDRED THIRTY THOUSAND AND 0100 UNITED STATES DOLLARS), EFFECTIVE IMMEDIATELY AND EXPIRING AT THE OFFICE OF OUR SERVICER,, CITICORP NORTH AMERICA, INC. AT 3800 CITIBANK CENTER, BUILDING B. 3RD FLOOR, TAMPA, FLOM DA 33610 ATTN_ US STANDBY UNIT OR SUCH OTHER OFFICE AS WE MAY ADVISE YOU FROM TIME TO TIME (THE'OFFICE'), ON DECEMBER 31, 2007, FUNDS HEREUNDER ARE AVAILABLE TO YOU AGAINST PRESENTATION OF YOUR SIGHT DRAFT(% DRAWN ON US, MENTIONING THEREON OUR LETTER OF CREDIT NUMBER 81670563, ACCOMPANIED BY YOUR WRITTEN AND DATED STATEMENT, SIGNED BY A DULY AUTHORIZED AGENT OF THE MUNICIPALITY, STATING THE FOLLOWING: `WE HEREBY CERTIFY THAT THE DEVELOPER IS IN DEFAULT UNDER THE TERMS OF THE SUBDIVISION AGREEMENT, AND THE DRAFT REPRESENTS PAYMENT FOR MATERIALS, LABOR AND SERVICES REQUIRED FOR COMPLETION OF THE IMPROVEMENTS CONTAINED IN AGREEMENT FOR THE DEVELOPMENT OF A SUBDIVISION CONSISTING OF 167 LOTS WITH RELATED IMPROVEMENTS, KNOWN AS -SOUTH VILLAGE COMMUNITIES.,' UPON REQUEST OF DEVELOPER., BUT ONLY AT THE SOLE DISCRETION OF THE MUNICIPALITY, THE MUNICIPALITY MAY AGREE TO REDUCE THE AMOUNT OF SAID LETTER OF CREDIT REQUIRED HEREUNDER IF THE MUNICIPALITY BELIEVES THAT THE FULL AMOUNT OF SAID LETTER OF CREDIT IS NO LONGER NECESSARY TO PROTECT ITS INTEREST, AND SHALL_ NOTIFY THE BANK IN WRITING OF SUCH REDUCTION IN THE AMOUNT OF THE LETTER OF CREDIT. IT IS A CONDITION OF THIS LETTER OF CREDIT THAT IT SHALL BE DEEMED AUTOMATICALLY EXTENDED, WITHOUT AMENDMENT, FOR ADDITIONAL PERIOD(S) OF ONE YEAR FROM THE EXPIRY DATE HEREOF, OR ANY FUTURE EXPIRATION DATE, UNLESS AT LEAST THIRTY (30) DAYS PRIOR TO A14Y EXPIRATION DATE WE NOTIFY YOU BY REGISTERED MAIL OR BY ANY OTHER RECEI PTED MEANS THAT WE ELECT NOT TO CONSIDER THIS LETTER OF CREDIT RENEWED FOR ANY SUCH ADDITIONAL PERIOD. UPON SUCH NOTICE Page 1 of 2 I Citibank,N.A. TO YOU, YOU MAY DRAW ONUS AT SIGHT FOR AN AMOUNT NOT TO EXCEED THE BALANCE REMAINING IN THIS LETTER OF CREDIT WITHIN THE THEN -APPLICABLE EXPIRY DATE, BY PRESENTATION OF YOUR DRAFT AND DATED STATEMENT PURPORTEDLY SIGNED BY ONE OF YOUR OFFICIALS j READING EXACTLY AS FOLLOWS: "THE AMOUNT OF THIS DRAWING USD ..._....... UNDER CITIBANK, N.A. LETTER OF CREDIT NUMBER 61670563 REPRESENTS FUNDS DUE US AS WE HAVE RECEIVED NOTICE FROM CITIBANK, N-A. OF THEIR DECISION NOT TO AUTOMATICALLY EXTEND LETTER OF CREDIT NUMBER 61670563 AND THE DEVELOPER FAILED TO PROVIDE EVIDENCE OF RENEWAL OF THE LETTER OF CREDIT." WE HEREBY AGREE WITH YOU TO HONOR EACH DRAFT DRAWN UNDER AND IN COMPLIANCE WITH THE TERMS AND CONDITIONS OF THIS LETTER OF CREDIT IF PRESENTED, TOGETHER WITH THE DOCUMENTS SPECIFIED AT THIS OFFICE ON OR BEFORE THE STATED EXPIRATION DATE, { SHOULD YOU HAVE OCCASION TO COMMUNICATE WITH US REGARDING THIS LETTER OF CREDIT, PLEASE DIRECT YOUR CORRESPONDENCE TO OUR OFFICE INDICATED ABOVE, MAKING SPECIFIC MENTION OF THE L.ETfER OF CREDIT NUMBER INDICATED ABOVE, EXCEPT AS FAR AS OTHERWISE EXPRESSLY STATED HEREIN, THIS STANDBY LETTER OF CREDIT IS SUBJECT TO THE INTERNATIONAL STANDBY PRACTICES (9SPI)&), INTERNATIONAL CHAMBER OF COMMERCE, PUBLICATION NO.590, AND AS TO MATTERS NOT GOVERNED BY THE ISP98, SHALL BE GOVERNED BY AND CONSTRUED IN ACCORDANCE WITH THE LAWS OF THE STATE OF NEW YORK AND APPLICABLE U.S: FEDERAL LAW. SINCERELY, 'I 'I 1 AUTHORIZED SIGNATURE(S) CITIBANK,N.A. I l I Post•It' Fax Note 7671 loe+e` C).lrj Ipages10- �( Sincerely; 1 e Segale, P.E., Projec Manager Attachments a+tee To coiclept. �i...�/ Phone M Fax � The Retro, October 10, 2007 B U I L D E R S 8 D E V E L O P E R S Mr. William Szymanski, City Engineer South Burlington Department of Public Works c/o Planning and Zoning Department 575 Dorset Street South Burlington, VT 05403 Re: South Village Public Infrastructure Cost Estimate for Winter EPSC Phases Dear Mr, Szymanski: Co. Phone n We are requesting your review and approval of the attached cost estimate for the value of public infrastructure that can be constructed within the constraints of the project's winter EPSC plan over a four week period starting on October 22, 2007. The attached plans highlight the components that we anticipate completing during this time period. The schedule also recognizes the City's November 1SLh deadline for waterline work. The estimated value of this work is $730,000 and generally includes: • Construction of the northeast and northwest stormwater detention ponds; • installation of the water main from Midland Avenue to the Allen Road roundabout and along Allen Road East to Spear Street. The cost includes connections at Midland Avenue and Spear Street; • Installation of the sewer force main from its connection on Allen Road to a force main air release structure that will be installed approximately 700 feet east of Spear Street; • Other water, sewer, and storm water drainage lines as highlighted on the plans; and Associated erosion control measures. As a heads up, we plan to submit an estimate in early November that accounts for work completed by then and the value of work that will continue through mid -December. Please feel free to contact me at B02.863-8323 with any questions, / ) Qe/c cz'eC U Yk`7C, U5 �U�) 7' cc: Ray Belair; Dave Marshall, Civil Engineering Associates; Randy Laframboise, S.D, Ireland i 70 South Winooski Avenue Burlington, VT 05401-3830 802-863.8323 800-679.1929 f 802-863-1339 www.retroves ,cor ,joutn vnlage Nuollc Intrastructure host Lstlmate for Winter LNSU i'nases Uctooer 22-Nov 1b, 2UU/ Sediment & Erosion Control 3 Daily Temporary Stabilization 4 Strip & Stockpile Topsoil 5 Laydown Areas 6 Construction Entrances 7 Topsoil Placement 8 Erosion Control Matting 9 Final Hay Mulch 10 Drainage Inlet Protection 11 Silt Fence 12 Construction Fence 13 Permanent Seeding 14 Temporary Seeding 15 Remaining Permanent Site Reclam. 16 Polymer Blocks (Allowance) 17 Polymer Floc Log Flume (Allowance) 18 2.5" Sed. Basin Floating Skimmer 19 3" Sed. Basin Floating Skimmer 20 4" Sed. Basin Floating Skimmer 21 Inspection/Reporting Requirements 22 All Remaining EPSC Measures Demolition 23 Clearing 24 Grubbing 25 Mass Rock Overblast (Allowance) 26 Trench Rock & Boulder (>1 CY) 27 All other Demolition Items Water 28 Water System Connection - East 29 Water Connection (TS&V) - West 30 Jack & Bore - West 31 Pressure Reducing Vault Complete 32 12" Water Main 33 12" Gate Valve 34 8" Water Main 35 8" Gate Valve 36 Air Release Structure 37 Fire Hydrants 38 1" Copper Water Service 39 1" Water Service Corp & Curb Stop 40 Type I Insulation (2" Thick) 41 All Remaining Water Installations Sewer 42 12" Sewer Main 43 8" Sewer Main 44 6" Sewer Main 45 Sanitary Manholes 46 4" Sewer Service Line 47 6" Force Main 48 6" FM Directional Bore & Connection 49 Force Main Air Release Structure 50 Pump Station & Storage 51 6" Relief Drain at Low Point 52 All Remaining Sewer Work ON Unit Unit Price Tntals 0.12 LS $30,000 $3,600 3 Acres $3,000 $9,000 0 LS $12,500 $0 1 LS $7,000 $7,000 5000 SY $1.00 $5,000 1920 SY $1,25 $2,400 4800 SY $0.27 $1,296 0 EA $100.00 $0 1200 LF $1.25 $1,500 6000 LF $1.00 $6,000 0 SY $0.54 $0 1200 SY $0.30 $360 0 SY $0.00 $0 0 EA $150 $0 0 EA $750 $0 0 EA $1,000 $0 1 EA $1,000 $1,000 1 EA $1,500 $1,500 0.12 LS $4,000 $480 0.12 LS $65,000 $7,800 $46,936 Qtv Unit Unit Prir.P Tntals 1 Acres $4,000 $4,000 1 Acres $4,000 $4,000 0 CY $10 $0 500 CY $75 $37,500 0.2 LS $2,500 $500 $46,000 Qtv Unit Unit Prir.e Tntals 1 LS $500 $500 1 LS $13,000 $13,000 1 LS $30,000 $30,000 1 LS $31,750 $31,750 3420 LF $49 $167,580 14 EA $2,000 $28,000 580 LF $35 $20,300 3 EA $1,300 $3,900 2 EA $5,200 $10,400 8 EA $3,400 $27,200 390 LF $22 $8.580 13 EA $300 $3,900 0 SY $8 $0 0.5 LS $10,500 $5,250 $350,360 Qtv Unit Unit Price Totals 295 LF $45 $13,275 170 LF $36.50 $6,205 0 LF $35 $0 3 EA $3,500 $10,500 840 LF $17 $14,280 1240 LF $20 $24,800 1 LS $9,000 $9,000 1 EA $6,100 $6,100 0 LS $110,000 $0 0 LS $8,000 $0 0 LS $2,500 $0 $ d4,'1 bU Page 1 of 2 10/9/2007 tioum vwage ruuiw [III1 -.1 1.- - -- , -- -- . -. . ---. Drainage 77 42" HDPE Storm Line 78 30" HDPE Storm Line 79 24" HDPE Storm Line 80 18" HDPE Storm Line 81 15" HDPE Storm Line 82 12" HDPE Foundation Line 83 10" HDPE Foundation Line 84 8" HDPE Foundation Line 85 6" HDPE Foundation Line 86 4" HDPE Foundation Line 87 Foundation Drain Cleanouts 88 4' Diameter Catch Basin 89 5' Diameter Catch Basin 90 8' Diameter Catch Basin 91 4' Manhole 92 5' Manhole 93 8' Manhole 94 Flared End Sections 95 Detention Basin (NW) 96 Detention Basin (SW) 97 Detention Basin (NE) 98 All Remaining Drainage Work Traffic Control 112 Flaggers 113 Portable Message Signs 114 Permanent Signs and Posts 115 Temporary Construction Signage 116 Temporary Pavement Markings 117 Permanent Pavement Markings 118 Traffic Light Foundations 119 Traffic Light Superstructure 120 Traffic Light Controller 121 Remaining Traffic Light Work 122 Remaining Traffic Control Work r)tv I ]nit Ilnit Price Totals 440 LF $80 $35,200 0 LF $60 $0 0 LF $49 $0 0 LF $34 $0 0 LF $29 $0 0 LF $35 $0 0 LF $32.50 $0 0 LF $23 $0 0 LF $0 $0 0 LF $20 $0 0 EA $200 $0 0 EA $2,100 $0 0 EA $2,550 $0 2 EA $7,500 $15,000 0 EA $2,300 $0 0 LF $2,800 $0 1 EA $8,500 $8,500 0 LS $3,250 $0 1 LS $40,000 $40,000 0 LS $110,000 $0 1 LS $91,500 $91,500 0.16 LS $30,000 $4,800 y-lya,uvv ()hi 1 Init I Init Pricy Totals 160 Hr $25 $4,000 1 EA/Mo $1,400 $1,400 0 LS $20,000 $0 0 LS $1,500 $0 0 LS $11,000 $0 0 LS $32,000 $0 0 LS $12,600 $0 0 LS $38,000 $0 0 LS $42,000 $0 0 LS $50.925 $0 0 LS $41,700 $0 zPa,4uu 5ummary Erosion Prevention & Sediment Control $46,936 Demolition $46,000 Water System $350,360 Sewer System $84,160 Drainage $195,000 Traffic Control $5,400 Total $727,856 Page 2 of 2 10/9/2007