Loading...
HomeMy WebLinkAboutSD-22-05 - Supplemental - 0255 Kennedy Drive (13)O’Brien Brothers Final Plat March 15, 2022 Site Plan Preliminary and Final Site Plan Changes Current Site Plan Preliminary Plat Plan Architecture Preliminary and Final Lot 13 Elevation: West Preliminary Lot 13 Elevations East Preliminary Lot 13 Elevations South (Right) and North Preliminary Lot 15 Kennedy Elevation Lot 15 Parking Side/East Elevation Preliminary Lot 15 Elevation South (Left) and North Preliminary Common Spaces Preliminary and Final Lot 13 Amenities Ground Floor Preliminary Plat Current Lot 13 Fitness Mood Board Lot 13 Amenities Floor 1 and Floor 2 Preliminary Plat Current Second floor Work From Home Lot 13 Coffee Shop Mood Board Lot 13 and 15 Work from Home Mood Board Lot 15 Amenities Preliminary Plat Ground Floor Lot 15 Amenities Current Ground Floor –Floor 5 Package Room, Work From Home, Hearth Room and Game Room, Cardio Room, Chef Lounge for Family Gatherings Lot 13 and Lot 15 Club/Hearth Room Mood Board Lot 15 Chef’s Kitchen Mood Board Common Area Artwork Mood Board Landscape Elements Preliminary and Final Roof Top Courtyard Lot 13 Preliminary Current Courtyard Adjustments Food Truck Area Preliminary Current Front Terrace Lot 15 Preliminary Current Front Terrace Lot 15 Lot 13 Four Way Intersection Preliminary Plat March 2020 30 Final Plat December 2021 31 Renderings Renderings Two Brothers Kennedy Drive •Project includes 150 trees •Project includes 589 ornamental grasses Lot 13 Fitness Mood Board Current Lot 13 Coffee Shop Mood Board Lot 13 and 15 Work from Home Mood Board Lot 13 and Lot 15 Club/Hearth Room Mood Board Lot 15 Chef’s Kitchen Mood Board Common Area Artwork Mood Board