Loading...
HomeMy WebLinkAboutSD-22-05 - Supplemental - 0255 Kennedy Drive (8)Phase Proposed Land-Use ITE Land-Use Category Enter Exit 71 single-family units 210 13 40 44 duplex (low-rise-multifamily) units 220 5 17 Subtotal 18 57 416 mid-rise multi-family units 221 36 102 3,600 sf general office 710 3 1 Subtotal 39 103 Total 57 160 Phase Proposed Land-Use ITE Land-Use Category Enter Exit 71 single family units (detached)?210 14 40 44 duplex (low-rise-multifamily) units 220 9 28 Subtotal 23 68 416 mid-rise multi-family units 221 39 132 3,600 sf general office 710 5 1 Subtotal 44 133 Total 67 201 Enter Exit Lots 5-9 5 11 Lots 10-15 5 30 Total Development 10 41 Analysis Difference AM Peak Project Trip Generation: BFJ Analysis AM Peak Hou Project Trip Generation: L & D Analysis Lots 10-15 Lots 5-9 Lots 5-9 AM Peak Hou Lots 10-15 Total Enter Exit Total 53 46 27 73 22 18 10 28 75 64 37 101 138 106 68 174 4 1 4 5 142 107 72 179 217 171 109 280 Total Enter Exit Total ITE method utilized: 54 45 27 72 ITE best fit 37 25 15 40 ITE best fit 91 70 42 112 171 99 63 162 ITE best fit 6 1 4 5 ITE Average 177 100 67 167 268 170 109 279 Total Enter Exit Total 16 6 5 11 35 -7 -5 -12 51 -1 0 -1 e (BFJ minus L&D) PM Peak ur PM Peak Hour ur PM Peak Hour