Loading...
HomeMy WebLinkAboutAgenda 05_MS-22-02_1068 Williston Rd_Champlain School Apartments Ptsp#MS-22-02 1 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING CHAMPLAIN SCHOOL APARTMENTS PARTNERSHIP – 1068 WILLISTON ROAD MISCELLANEOUS APPLICATION #MS-21-05 FINDINGS OF FACT AND DECISION Miscellaneous application #MS-22-02 of Champlain School Apartments Partnership to amend a previous approval for encroachment into a Class II wetland buffer. The amendment consists of expanding the area of impact for the purpose of temporary construction impacts, 1068 Williston Road. The Development Review Board held a public hearing on July 6, 2022. The applicant was represented by __. Board member Stephanie Wyman was recused from this application and did not participate in the decision. Based on the plans and materials contained in the document file for this application, the Development Review Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The proposed project is located within the Form Based Code T4 zoning district, meaning its site plan will be reviewed administratively. No subdivision is necessary for the project. The Project is proposed to consist of renovations to the existing Holiday Inn building at 1068 Williston Road, construction of a new building located between the existing building and Williston Road, and construction of a second new building located between the existing building and the hotel to the east. The City’s Official Map includes a planned north-south street extending opposite the existing north end of Dorset Street, turning to the east within the first 150 feet. This new street will be the primary frontage for the two new buildings and the renovated Holiday Inn. 2. The applicant previously received Development Review Board approval under MS-21-05 for 702 square feet of Class II wetland buffer impacts. Since that approval, the regulations governing wetland impacts have changed. 12.06 WETLAND PROTECTION STANDARDS 12.06D Standards for Wetlands Protection (1) Class I and Class II Wetlands. Development is generally prohibited within Class I wetlands, Class II wetlands, and their associated buffers. All lands within a Class I wetlands, Class II wetlands, and their associated buffers, shall be left in an undisturbed, naturally vegetated condition. However, an applicant may seek approval for a Restricted Infrastructure Encroachment under this section or to modify this standard per the regulations in Section 12.06(F). The applicant is seeking modification, discussed below. (3) Landscaping and Fencing. Landscaping and/or fencing shall be installed along the outside perimeter of the wetlands buffer to clearly identify and protect wetlands buffer. The DRB may waive this requirement, if petitioned by the applicant, if there is existing forest and/or landscaping along the border of wetland buffer or other clear, existing demarcation. The design and installation of any such landscaping or fencing must accommodate wildlife passage. The undisturbed portion of the wetland buffer is not proposed to be landscaped or fenced. There is an existing wooded area which is proposed to remain at the edge of the undisturbed area. The Board #MS-22-02 2 finds the existing forest meets this criterion and waives the requirement for additional landscaping and/or fencing. F. Modifications. (1) Types of Development. An applicant may request a modification, in writing, from the rules of this section for any development in the following areas only: (a) Development in a Class II wetland and associated buffer within the Form-Based Code Zoning Districts. The project is located in the T4 Form Based Code zoning district. The applicant is requesting modification to allow 2,180 sf of Class II wetland buffer impacts for the purpose of excavation for underground parking, utility installation and minor regrading along the east property line. The buffer area will be developed to include a multifamily residential building and adjacent grassed area. (2) Modification Standards. The Development Review Board may grant a modification from the rules of this Section only if a modification application meets all of the following standards: (a) The modification shall be the minimum required to accommodate the proposed development; The modification is the minimum necessary for the proposed development. The Board finds this criterion met. (b) The proposed development will not have an undue adverse effect on the planned character of the area, as defined by the purpose statement of the zoning district within which the project is located, or on public health and safety; The proposed development must be found to be consistent with the objectives of the T4 zoning district in order to receive administrative site plan approval. The Board finds this criterion met. (c) The proposed development will not have an undue adverse effect on the ability of the property to adequately treat stormwater from the site; and, The proposed development’s stormwater treatment system is on the west side of the site, while the wetland impacts are on the east. (d) The proposed development will not have an undue adverse effect upon specific wetland functions and values identified in the field delineation. The applicant has received draft wetland permit 2018-826.02 for the proposed impacts, which includes the following language The Secretary has determined that the proposed project … will have no undue adverse impacts to the protected functions and values of the subject Class II wetlands or the adjacent wetland complex. The Board finds the applicant must demonstrate the draft wetland permit has been finalized prior to issuance of a zoning permit for the revised impacts. DECISION The South Burlington Development Review Board hereby approves miscellaneous application #MS-21-05 of Champlain School Apartments Partnership, subject to the following stipulations: #MS-22-02 3 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plan submitted by the applicant and on file in the South Burlington Department of Planning and Zoning. 3. The Board waives the requirement to provide landscaping and/or fencing along the perimeter of the wetland buffer due to the presence of an existing wooded area to remain. 4. The applicant shall obtain a site plan approval for the proposed project within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 5. Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer. 6. There shall be no use of herbicides, pesticides, and/or non-organic fertilizers within either the wetlands or the associated buffers. 7. Outside of the approved impacts, there will be no mowing within 50 feet of the wetlands nor can the wetland buffer be turned into lawn. Brush-hogging will be allowed no more than three (3) times per year. 8. The proposed project must adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan must meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. Dan Albrecht Yea Nay Abstain Not Present Mark Behr Yea Nay Abstain Not Present Frank Kochman Yea Nay Abstain Not Present Quin Mann Yea Nay Abstain Not Present Dawn Philibert Yea Nay Abstain Not Present John Stern Yea Nay Abstain Not Present Motion carried by a vote of _-_-_. Signed this ___ day of July, 2022, by _____________________________________ Dawn Philibert, Chair PLEASE NOTE: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail with the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal also must be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-951-1740 or https://www.vermontjudiciary.org/environmental for more information on filing requirements, deadlines, fees and mailing address. #MS-22-02 4 The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist. 2013-SC-12013-JB-3 2013-2 2013-4 2013-3 2013-JB-4 Fu AdE AdA MyC Br ScB AdA An HlB HlE ScBAdAAdA INTERSTATE 89 SINTERSTATE 89 NWILLISTON RD I NT E R S T AT E 8 9 N E NT R ANC E / E X IT INTERSTATE 89 S ENTRANCE/EXITDORSET STLARCH RD INTERSTATE 89 SLARCH RD INTERSTATE 89 N ENTRANCE/EXIT INTERSTATE 89 N ENTRANCE/EXIT INTERSTATE 89 NWILLISTON RDINTERSTATE 89 NINTERSTATE 89 NIN TERSTATE 89 S EN TRAN CE/EXIT§¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89 §¨¦I-89§¨¦I-89 §¨¦I-89 South Burlington Holiday Inn Site South Burlington, Vermont Wetland/Waters Delineation Review Map Background Imagery by USDA NAIP (Collected in 2016)ANR (Vermont Agency of Natural Resources - Various Dates)*VCGI (Vermont Center for Geographic Information - Various Dates)*VTrans (Vermont Agency of Transportation - 2017)*VHB - 2015/2018 *Obtained through VCGI (Vermont Open GeoData Portal) i 0 200 400100 Feet November 13, 2018 \\vhb\gis\proj\SBurlington\57644.00 Carpionato S. Burlington\gis\Project\Larkin-SoBu-2018 Review_rev.mxd2018 Delineation Review Study Area Delineated Wetlands (VHB)Wetland Boundary (VHB) Presumed Class II Buffers (VHB) Delineated Streams (VHB)VSWIVSWIVSWIVSWI Wetland (ANR) Waterbody (VCGI)Stream (VCGI) River Corridor (ANR) Soils (VCGI) 2-Foot Contours County Boundary (VCGI)Town Boundary (VCGI) Parcel Boundary (VCGI) Interstate (VTrans) US Route (VTrans)Vermont State Highway (VTrans) Town Road (VTrans) VHB Study AreaApproximately 11 Acres44.470847 -73.179807 UP2013-SC-1 EDGE OF DELINEATED WETLAND (TYP) 2013-3 50-FT WETLAND BUFFER (TYP) VHB NATURAL RESOURCE STUDY AREA (TYP.)WILLISTON ROADTO I-89 STANDARD SILT FENCE (TYP) LIMIT OF DISTURBANCE (TYP) PROJECT DEMARCATION (TYP)WILLISTON ROADTO I-189 STABILIZED CONSTRUCTION ENTRANCE 2193 SQFT HOLIDAY INN HAMPTON INN PROPOSED MIXED-USE BUILDING PERMANENT WETLAND BUFFER IMPACT APPROX. 2,180 SF (0.031 AC) PROPOSED GAS LINE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved for Construction Sept. 25, 2019 22 57913.01 Wetland Impact Exhibit W1.01 1 SMW PBS Feet6030015 DRB Submission 9/23/2021 PBS1 DRB/DEC Submission 5/9/2022 PBS2 6 RIM=313.1 INV=308.0 OUT 7RIM=313.3 INV=308.2 INV=308.0 7B OUT CB 3 RIM=311.7 INV=306.4 OUT CB 4 RIM=312.0 INV=306.7 OUT CB 15RIM=308.2 INV=304.8 INV=305.1 OUT CB 12RIM=312.8 INV=306.6 INV=306.5 INV=306.1 13 RD3 OUT CB 8RIM=314.5 INV=309.0 INV=309.0 INV=309.2 INV=308.9 9C YD 1 DS1 OUT DMH 18 RIM=313.2 INV=308.3 INV=308.5 INV=308.5 INV=308.2 INV=308.5 17 21 6 IN OUT OUT DMH 17RIM=313.0 INV=309.0 INV=309.0 INV=309.0 INV=309.0 RD2 16 DS3 OUT CB 19 RIM=312.5 INV=308.3 INV=308.2 INV=309.0 INV=308.5 20 OUT OUT DMH 20 RIM=312.1 INV=308.5 OUT CB REMOVE EXISTING PIPE AND CONNECT TO EXISTING STRUCTURE AT INV=302.0 15"H D P E 18"HDPE 18"HDPE 15"HDPE 15"PVC 21 RIM=312.6 INV=309.2 OUT CB 1 RIM=312.2 INV=302.3 2 DMH 24"HDPEELIMINATE EXISTING OUTFALL. PLUG OUTLET. BACKFILL PIPE WITH FLOWABLE FILL. COORDINATE ALL WORK WITH VTRANS. CORE NEW INVERT AT 304.0 ADD MANHOLE FRAME AND GRATE, ADJUST TO FINISH GRADE. DOGHOUSE MANHOLE FIELD VERIFY EXISTING INVERT 2 RIM=312.1 INV=306.1 INV=306.1 INV=304.1 INV=304.0 4 3 5 OUT DMH 15"HDPE 9C RIM=312.7 INV=310.2 INV=310.1 4-in In OUT YDI 16 RIM=313.1 INV=309.5 INV=309.4 DS2 OUT CB 13RIM=312.6 INV=308.6 INV=308.5 13 B OUT CB 12"HDPE15"HDPE 15"HDPE15"HDPE1 5 "HD P E15"HDPE22 RIM=312.4 INV=307.2 INV=305.0 19 OUT DMH 15"HDPE 5RIM=313.7 INV=307.6 INV=307.6 INV=308.2 INV=305.6 6 7 8 OUT DMH 8"PVC 7BRIM=313.0 INV=309.5 OUT CB 12" H D P E TEMPORARY CB YD 1 RIM=313.2 INV=309.2 OUT YDI 12" HDPE ROOF DRAIN CONNECTION 4" PERFORATED PVC AT DRIP EDGE 15"HDPESUBSURFACE INFILTRATION SYSTEM #1 SUBSURFAC E INFILTRATI O N SYSTEM #2 6"PVC @ 2%6" P V C @ 2 % REFER TO DOWNSPOUT CONNECTION DETAIL (TYP FOR 4 AT ALL AWNING LOCATIONS)15"HDPE13 B RIM=312.0 INV=308.7 OUT CB 6"PV C @ 2 %18"HDPE14 RIM=309.9 INV=304.8 INV=305.7 INV=305.1 INV=304.7 11 OUT OUT OUT CB GMP TO HOLD EXISTING POLE AND REINSTALL GUY WIRE. COORDINATE DRAINAGE WORK WITH GMP. 11 RIM=312.5 INV=306.0 INV=305.7 INV=305.6 RD4 12 OUT CB 312.2313.8 TC313.3 BC 313.7 313 TC312.5 BC 309.5 TC 309 BC 309.5 TC 309 BC 308.5 309 TC 308.5 BC TC/BC 313.7 TC/BC 313.95 313.7 313.7 313.3 313.7 TC/BC313.8 TC313.3 BC 314.0 TC313.5 BC313.4 TC/BC 313.7 313.9 TC313.4 BC 313.9 313.7 313.4 313.2 313.9 TC313.4 BC 313.7 TC/BC 312.8 312.5 313.0 TC312.5 BC 313.9 313.5 BC 313.6 313.8 313.7 313.7 313.6 313.6 313.6 313.85313.85 313.85 313.85313.85 313.6313.4 313.8 313.7 313.6 313.4 313.7 313.32 312.7 313.32 313.5 TC313.0 BC 313.7 313.7 312.8312.8 312.9 310.5 TC 308.5 FFE=309.0 311.5 TC 313.3 313.5 BC 313.7 TC313.7 BC 314.2 TC313.7 BC 314.0 TC313.5 BC314.0 TC313.5 BC 314.2 TC 313.7 BC 313.9 TC313.4 BC 313.7 GTDGTDGTD GTD 313.7 313.3 313.3 313.6 313.7 314.2 314.1 314.0 313.9 313.2 313.1 312.2 312.1 312.8 312.9 313.3 TC312.8 BC 313.1 TC312.6 BC 313.3 TC312.8 BC 312.5 TC312.0 BC 313.8313.7 TC313.1 BC WILLISTON ROADTO I-89 5' DIA. CAPPED 10" SDR 35 PVC ROOF DRAIN INV = 309.8 TOTAL GSF = 59,815 SF FFE = 313.95' HOLIDAY INN TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-USE BUILDING FLUSH CURB FLUSH CURB BEGIN TRANSITION CURB FLUSH CURB FLUSH CURB FLUSH CURB FLUSH CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB FLUSH CURB BEGIN TRANSITION CURB FLUSH CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB REMOVE EXISTING DRIVEWAY, RESTORE TO PERVIOUS GRASS SURFACE, GRADE TO DRAIN TOTAL GSF = 59,815 SF FFE = 313.95' HOLIDAY INN TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-USE BUILDING FLUSH CURB FLUSH CURB BEGIN TRANSITION CURB FLUSH CURB FLUSH CURB FLUSH CURB FLUSH CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB FLUSH CURB BEGIN TRANSITION CURB FLUSH CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB BEGIN TRANSITION CURB PROPOSED LOBBY ADDITION PROPOSED POOL ADDITION (RENOVATION OF EXISTING BUILDING) of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Grading and Drainage Plan C3.01 5 CHS PBS Feet6030015 Local Comments 10/8/21 SMW1 Local Comments 11/15/21 SMW2 Act 250 Submission 11/17/21 SMW3 DEC Submittal 01/12/22 PBS4 Local Submittal 05/18/2022 PBS5 WILLISTON ROADTO I-89 SUBSURFACE INFILTRATION SYSTEM #1 SUBSURFAC E I N F I L T R A T I O N SYSTEM #2 HOLIDAY INN MULTI-USE BUILDING FUTURE PHASE POTENTIAL TEMPORARY SOIL STOCKPILE LOCATION PROJECT DEMARCATION (TYP) LIMIT OF DISTURBANCE (TYP) STANDARD SILT FENCE (TYP) INLET PROTECTION (TYP) SURROUND TEMPORARY SOIL STOCKPILE WITH FILTER SOCKS, GRAVEL BAGS, OR SILTFENCE. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 CONSECUTIVE CALENDAR DAYS STABILIZE WITH TEMPORARY MULCH MATERIAL. LIMITS OF VEGETATION PROTECTION LIMITS OF TREE PROTECTION (TYP) CONSTRUCTION LAYDOWN AREA of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Erosion and Sediment Control Plan C6.01 8 CHS PBS Feet6030015 NOTE: 1.AREAS DRAINING TO STORMWATER INFILTRATION SYSTEMS OR BIORETENTION AREAS SHALL RECEIVE FINAL STABILIZATION PRIOR TO ALLOWING RUNOFF TO DRAIN TO THE TREATMENT SYSTEMS. Local Comments 8/30/21 SMW1 Local Comments 11/15/21 SMW2 Act 250 Submission 11/17/2021 SMW3 Local Submittal 05/18/22 PBS4 Ground Floo r Ground Floo r Second Floo r Second Floo r GAS SERVICE (TYP) PROPERTY LINE FIXED BOLLARD (TYP.)3.01 C BRICK PAVERS (TYP.)3.00 B 3.01 D BIKE RACK 5ea (10 bikes)3.00 A 16 13 10 23 23 22 12 8 2 3 6' SCREEN FENCE 3.01 E 13 BRICK PAVERS (TYP.)3.00 B BIKE RACK 8ea (16 bikes)3.00 A LANDSCAPE TRELLIS/PERGOLA 2 BENCHES (8ea.) COVERED SITTING AREA FUTURE PHASE 3.01 D BENCHES (3ea.) GREEN ROOF GREEN ROOF of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Landscape Layout and Materials L2.00 16 MKW MPH Feet6030015 PHASE 3 Local Comments 10/8/21 SMW1 Local Comments 11/15/21 MKW2 Act 250 Submission 11/17/2021 SMW3 Local Comments 05/20/2022 SMW4 Ground Floor Ground Floo r Second Floor Second Floo r PLANTING PLAN 4.10 PLANTING PLAN 4.20 PRIVACY SCREEN WALL PUBLICLY ACCESSIBLE GREEN ROOF SECOND FLOOR PRIVATE TERRACES TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 83,927 SF HOLIDAY INN FFE = 314.5' (RENOVATION OF EXISTING BUILDING) PROPOSED LOBBY ADDITION TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-USE BUILDING PROPOSED POOL ADDITION FUTURE PHASE DECIDUOUS TREES QTY BOTANICAL NAME COMMON NAME SIZE ARA 4 Acer rubrum `Armstrong`Armstrong Red Maple 2 1/2 - 3" CAL. AF 4 Acer x freemanii `Sienna`Sienna Glen Maple 2 1/2 - 3" CAL./ B&B BN 5 Betula nigra `Heritage`Multi-Stem Heritage River Birch 12 -14` HT. GBP 6 Ginkgo biloba `Princeton Sentry`Princeton Sentry Ginkgo 2 1/2 - 3" CAL. GT 17 Gleditsia triacanthos `Draves` TM Street Keeper Honey Locust 2 1/2 - 3" CAL. TC2 1 Tilia cordata `Greenspire`Greenspire Littleleaf Linden 2 1/2 - 3" CAL. EVERGREEN TREES QTY BOTANICAL NAME COMMON NAME SIZE TO 16 Thuja occidentalis `Nigra`Dark American Arborvitae 5 - 6` HT. SHRUBS QTY BOTANICAL NAME COMMON NAME SIZE EF 51 Euonymus fortunei Wintercreeper #2 CONT. JP2 42 Juniperus horizontalis `Plumosa Compacta`Creeping Juniper 18 - 24" SPD MD 61 Microbiota decussata Siberian Carpet Cypress/Russian Arborvitae 18 - 24" SPD PN2 151 Physocarpus opulifolius Ninebark 18 - 24" SPD SB 65 Spiraea bumalda `Anthony Waterer`Anthony Waterer Spirea 18 - 24" SPD PERENNIALS QTY BOTANICAL NAME COMMON NAME SIZE HSO 38 Hemerocallis x `Stella de Oro`Stella de Oro Daylily 1 GAL. HG 10 Hosta x 'Guacamole'Guacamole Hosta 1 GAL. NF 11 Nepeta x faassenii Catmint 1 GAL. VINES QTY BOTANICAL NAME COMMON NAME SIZE PQV 8 Parthenocissus quinquefolia Virgina Creeper #1 POT GRASSES QTY BOTANICAL NAME COMMON NAME SIZE CA 119 Calamagrostis x acutiflora `Karl Foerster`Karl Foerster Feather Reed Grass 2 GAL. DS 46 Deschampsia cespitosa `Schottland`Schottland Hair Grass 2 GAL. PVS 47 Panicum virgatum `Shenandoah`Shenendoah Switch Grass 2 GAL. SH 33 Sporobolus heterolepis Prairie Dropseed 2 GAL. PLANT SCHEDULE - Phase 2 GREEN ROOF: LIVE ROOF DEEP SYSTEM - 842 TRAYS (1'x2') - MIXED PERENNIALS of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Planting Plan Key L4.00 19 JKH MKW Feet6030015 PHASE 3 Local Comments 10/8/21 SMW1 Local Comments 11/15/21 MKW2 Act 250 Submission 11/17/2021 SMW3 Local Comments 12/17/21 MKW4 Local Comments 05/18/22 SMW5 Ground Floo r Ground Flo o r Second Flo o r Second Floo r INTERSTATE 89 1 ARA 1 ARA 15 SH 18 SH 5 CA 22 SB10 CA 17 SB 2 ARA 3 TO 4 BN 1 BN 8 MD 11 NF 19 PVS 10 HSO 2 AF 46 DS 22 CA 6 PVS 6 PVS 37 EF 9 CA 7 EF 7 EF 3 TO 1 TC2 9 GT 8 CA 8 CA 8 CA 9 CA 9 HSO 6 GT 1 GT 1 GT 3 TO 26 SB 38 CA 2 TO 2 TO 3 TO 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 13 PN2 8 PN2 13 PN2 16 PVS 53 MD 16 JP2 1 AF 1 AF 21 JP2 5 JP2 8 HSO 10 HG 11 HSO 2 PQV 2 PQV2 PQV2 PQV 842-GREEN R O O F T R A Y S PRIVACY SCREEN WALL PUBLICLY ACCESSIBLE GREEN ROOF SECOND FLOOR PRIVATE TERRACES PR O P E R T Y L I N E TOTAL GSF = 59,815 SF FFE = 313.95' HOLIDAY INN (RENOVATION OF EXISTING BUILDING) PROPOSED LOBBY ADDITION TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-USE BUILDING PROPOSED POOL ADDITION of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Phase 2 Planting Plan L4.01 20 JKH MKW Feet4020010 Local Comments 10/8/21 SMW1 Local Comments 11/15/21 MKW2 Act 250 Submission 11/17/2021 SMW3 Local Comments 12/17/21 MKW4 Local Comments 05/18/22 SMW5 Ground Flo o r Second Floo r INTERSTATE 89 WILLISTON ROADUS ROUTE 2DOR S E T S T R E E T 1 ARA 1 ARA 15 SH 18 SH 5 CA 22 SB10 CA 3 TO 4 BN 1 BN 8 MD 11 NF 19 PVS 10 HSO 2 AF 46 DS 22 CA 6 PVS 6 PVS 7 EF 7 EF 6 GBP 8 CA 8 CA 8 CA 9 CA 9 HSO 16 PVS 53 MD 5 JP2 2 PQV 2 PQV2 PQV2 PQV 842-GREEN R O O F T R A Y S PRIVACY SCREEN WALL PUBLICLY ACCESSIBLE GREEN ROOF SECOND FLOOR PRIVATE TERRACES TOTAL GSF = 59,815 SF FFE = 313.95' TOTAL GSF = 83,927 SF HOLIDAY INN FFE = 314.5' (RENOVATION OF EXISTING BUILDING) PROPOSED LOBBY ADDITION TOTAL GSF = 136,561 SF FFE = 313.9' MULTI-USE BUILDING PROPOSED ADDITION FUTURE PHASE of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.vhb.comDate 40 IDX Drive, Building 100 Suite 200 South Burlington, VT 05403 Holiday Inn Redevelopment 1068 Williston Rd. South Burlington, Vermont Review Not Approved For Construction July 29, 2021 27 57913.01 Phase 2 Planting Plan L4.02 21 JKH MKW Feet4020010 PHASE 3 Local Comments 10/8/21 SMW1 Local Comments 11/15/21 MKW2 Act 250 Submission 11/17/2021 SMW3 Local Comments 12/17/21 MKW4 Local Comments 05/18/22 SMW5