Loading...
HomeMy WebLinkAboutSP-22-003 - Supplemental - 1795 Shelburne Road (18) C A T A M O U N T c o n s u l t i n g e n g i n e e r s, p l l c PO Box 65067 l Burlington, VT 05406 l (802) 598-8081 l www.ccevt.com May 23, 2022 Marla Keene Development Review Planner City of South Burlington 180 Market St. South Burlington, VT 05403 Re: Supplemental & Revised Information for Application for Site Plan Review Proposed Addition to Mazda Dealership 1795 Shelburne Rd. South Burlington, VT 05403 Dear Marla, For simplicity, and to have all the most recent and complete information and plans in one location, please find attached the following revised and supplemental items in support of the minor building addition proposed for the existing Mazda car dealership located at 1795 Shelburne Rd. in South Burlington, VT – · One (1) full size, revised, proposed plan set that includes the following plan sheets – o 21012 A01 A01 RTU Study 3-1-22 o 21012 A400 Exterior Elevations 5-20-22 o 19020 C1.0 Existing Conditions Site Plan 5-13-22 o 19020 C2.0 Proposed Conditions Site Plan 5-13-22 o 19020 C3.0 Proposed Site Details Plan 5-13-22 o 19020 C3.1 Proposed Site Details Plan 5-13-22 o 2104 L-1 Landscape Plan 5-16-22 o 2104 L-2 Planting Plan 5-16-22 o 2104 L-3 Construction Details 3-28-22 o 2104 L-4 Planting Details 3-28-22 · 2104 Probable Cost of Planting 5-16-22 prepared by TKLA · 2104 Landscaping Budget 5-16-22 prepared by TKLA · Autosaver Construction Setup 1-31-22 · Peak Mechanical Roof Drain Scoping Report 4-28-22 · Existing Bike Rack Pictures and Dimensions 2 · South Burlington Mazda Easement Deed Draft The purpose of these revised and supplemental plans and information is to attempt to address the staff and DRB comments received during the March 2, 2022 and May 17, 2022 DRB meetings to the best of our ability prior to the hearing on June 7, 2022. In regards to the proposed architectural, civil and landscaping plan changes made to address the comments, here is a brief summary of the revisions made – · A front door entry has been added to the eastern (Shelburne Rd. frontage) face of the building. The door has been shifted slightly and the entry revised to have sidelights, wider mullions and a small projecting canopy over the doorway. The paneling above the doorway has also been realigned so that the paneling is symmetrical with the doorway. This is best all viewed on the revised “21012 A400 Exterior Elevations 5- 20-22” pdf. · Correspondingly, the front sidewalk and patio area has been modified to accommodate the front entrance, as well as provide direct pedestrian connection to the Shelburne Rd. sidewalk via a new set of concrete steps. A variation in sidewalk materials and pavers is proposed to further accentuate the front door and increase the aesthetic of the front sidewalk and patio area. This is best viewed on the revised “2104 L-2 Planting Plan 5-16-22” pdf. · A cornice has been added along the top of entire street facing façade and building addition. · The existing trash and recycling dumpsters will be slightly relocated and enclosed with a 6’ tall, slatted, chain link fence and gates. · To accommodate the revised entrance and patio area, the drainage and landscaping was revised accordingly. · Lastly, a new Construction Setup site plan has been added to the submission as provided by the general contractor, outlining the intended temporary setup while the dealership is under construction. In addition to these plan changes and supplemental information, we’d also like to take this opportunity to address the staff comments noted in the DRB staff report dated May 17, 2022, although some of this will be redundant to the testimony provided during the previous DRB meetings. These are addressed in the numerical order they were presented in red in the May 17, 2022 staff report – 1. A front door entry has been added to the eastern (Shelburne Rd. frontage) face of the building and access provided to this new entry via new concrete stairs and sidewalk from the Shelburne Rd. sidewalk. The door, façade, accenting windows and paneling have been revised to further accentuate the doorway. 2. The proposed concrete steps and sidewalk access is direct as possible in accomplishing pedestrian accessibility to property in general and with the primary (north) entryway. 3 3. Per the attached “21012 A400 Exterior Elevations 5-20-22” plan, a metal coping has been added to the top of the parapet to comply with the requirement to have a cornice or something similar. 4. A proposed 30 ft. wide by 20 ft. deep future access easement has been added to the southwest property adjacent to the existing parking area in this location. Additionally, a draft easement deed has been provided in conjunction with this easement. 5. The proposed landscaping plans, budget and probable cost of planting have all been updated to address previous comments regarding these items. Previous items, including hardscape substructures and replacement of an existing tree, have been removed from the budget and additional landscaping proposed. This is best viewed on the revised “2104 L- 1 Landscaping Plan 5-16-22”, “2104 L-2 Planting Plan 5-16-22”, “2104 Landscape Budget 5-16-22” and “2104 Probable Cost of Planting 5-16-22” pdfs. 6. A column has been added to the probable cost of planting spreadsheet to include caliper on all proposed trees. This is best viewed on the revised “2104 Probable Cost of Planting 5-16-22” pdf. 7. The proposed landscaping plans, budget and probable cost of planting have all been updated to address previous comments regarding these items. 8. Again, the proposed landscaping plans, budget and probable cost of planting have all been updated to address previous comments regarding these items. 9. A temporary construction site plan has been provided to outline the access and functionality of the site during construction. This is best viewed on the “Autosaver Construction Setup 1-31-22” pdf. We hope this summary, revised plan set and supplemental information is sufficient in providing the necessary information for Site Plan review. If upon review of the revised and supporting information you have any questions or concerns, please feel free to contact us. Sincerely, JeffJeffJeffJeff Jeffrey Olesky, P.E. Cc: Abel Toll (Owner Representative), via email Nate Weeks (Applicant Representative), via email