Loading...
HomeMy WebLinkAboutSP-22-003 - Supplemental - 1795 Shelburne Road (6)South Burlington Mazda Proposed Landscape Budget TKLA Date of last revision: 5-16-22 Item Probable Cost of ConstructionPlant Materials – Refer to L-1 Plant Schedule $19,133Retaining Wall Stone Facing & Stone Capstones 4,950Patio @ Table 150 SF Brick Pavers 3,000Patio @ Bike Racks – 75 SF Brick Pavers 1,500Patio @ Entrance – 100 SF Brick Pavers 2,000Opinion of Probable Cost of Construction $30,583 Plant Materials Notes: The cost of 1 Birch to replace 1 existing Birch that died is not included. Retaining Wall Notes: Stone facing 24” on one side only, ends, and partial backside = ±80 SF stone facing @ $45 / Face Foot = $3,600 30 LF X 12” Granite Capstones - 30 LF X 12” = 30 SF @ $45 / SF = $1,350 Cost for reinforced concrete core and footing is not included in these unit costs Patio Notes: Pine Hall Full Range Clay Brick Pavers $20 SF for Bricks and Installation Cost for base is not included in this unit cost