HomeMy WebLinkAboutSP-22-019 - Supplemental - 0055 Green Mountain Drive (21)1 Marla Keene From:David Marshall <dmarshall@cea-vt.com> Sent:Tuesday, April 5, 2022 2:05 PM To:Marla Keene Cc:Dexter Mahaffey; Russell Colvin; Alex Aftuck; Andrew Furtsch; droy@wiemannlamphere.com Subject:EXTERNAL: FW: 55 Green Mountain Dr - SP & CU completeness Attachments:55 GMD - Existing Dumpster Encloure.jpg; C3.2 EPSC Notes and Details - Date 22-03-18.pdf; C0.0 Overall exiting & Proposed Conditions Plan - Date 22-03-18.pdf; C1.0 Existing & Proposed Conditions Plan - Date 22-03-18 Last Revised 22-04-04.pdf; C1.1 EPSC Site Plan - Date 22-04-04.pdf; C2.0 Site Details - Date 22-03-18.pdf; C3.0 Specifications - Date 22-03-18.pdf; C3.1 Specifications - Date 22-03-18.pdf This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Hi Marla- Please find embedded below our responses to the review comments related to this application. Best Regards David S. Marshall, P.E. Civil Engineering Associates, Inc. 10 Mansfield View Lane South Burlington, VT 05403 P 802-864-2323 x310 F 864-2271 From: David Roy [mailto:droy@wiemannlamphere.com] Sent: Friday, April 01, 2022 4:37 PM To: Dexter Mahaffey; David Marshall; Andrew Furtsch; Russell Colvin; Alex Aftuck Subject: Fwd: 55 Green Mountain Dr – SP & CU completeness All, I just received this from Marla. ---------- Forwarded message --------- From: Marla Keene <mkeene@sburl.com> Date: Fri, Apr 1, 2022 at 4:07 PM Subject: 55 Green Mountain Dr – SP & CU completeness To: David Roy <droy@wiemannlamphere.com> David, 2 We have reviewed the materials submitted in conjunction with the above-referenced applications and note the following are required in order to be considered complete and eligible for scheduling. Let me know if you have questions. Application Requirement Project-Specific Notes Completed application form; one (1) digital copy of plans; and a list of the owners or record of abutting property owners Plans are required to be submitted as individual sheets and contain the sheet number and date in the file name (additional information, such as plan name, may also be included in the file name as desired)These are individually attached , named as requested. The location of any outdoor storage for equipment and materials if any, and the location, type and design of all solid waste- related facilities, including dumpsters and recycling bins. This may be included but is not labeled. Waste disposal areas must be fully enclosed; if they are not today, this must be part of the proposed work. The existing dumpster enclosure on 55 GMD is depicted in the attached photo (fully enclosable) and is now called out on Sheet C1.0 Detailed specifications and locations of planting, landscaping, screening, and/or buffering materials. You mention removal of one tree in your narrative. All plantings are required to be retained and if removed, must be replaced. Plans must show existing vegetation to verify compliance with approved plan. Well, the LDR’s call for all trees 6” and greater to be shown on the plan. We did not remove any trees >6”. It was not clear from the last City approval that there were any trees on the north side of the property which were “regulated” trees required as part of the previous site plan approvals or whether these trees had been subsequently established outside of that process. A list of existing vegetation, with the location, type, and size of existing trees of six inches or greater in caliper. See above This information was shown and labeled on the originally submitted site plans in the area of the work. A written plan to preserve and protect significant existing vegetation during and after construction. Such plan will be of sufficient detail that the City of South Burlington will be able to inspect the site during construction to ensure that existing vegetation is protected as per the plan. This may be shown on EPSC. An EPSC Plan has been created (Sheet C1.1) which depicts the tree protection measures to be employed. Detailed erosion control plan demonstrating compliance with these regulations An EPSC plan is required This is now attached as Sheet C1.1. EPSC Details are on Sheet C3.2 and was part of original plan submittal Proposed stormwater management system, including (as applicable) location, supporting design data and copies of computations used In order to determine if stormwater management is required, please confirm new and disturbed impervious areas. The 3 as a basis for the design capacities and performance of stormwater management facilities. additional impervious areas were previously identified in the application forms as part of the pre and post lot coverage totals. Sincerely, Marla Keene, PE Development Review Planner City of South Burlington 180 Market Street South Burlington, VT 05403 (802) 846-4106 www.southburlingtonvt.gov Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation. -- David P Roy President 525 Hercules Drive, Suite Two Colchester, Vermont 05446 4 To help protect your priv acy, Microsoft Office prevented automatic download of this picture from the Internet. Phone: 802.655.5020 Direct: 802.861.0438 www.wiemannlamphere.com Creative / Sustainable / Solutions