Loading...
HomeMy WebLinkAboutSP-22-019 - Supplemental - 0055 Green Mountain Drive (10)1 2 3 4 5 A B C D E F 50C (10' -0") 50C (10' -0") 50C (10' -0") 50C (8' -0") CLEAR 5'-0" 59 (9' -0") 50C (10' -0") 104 102 101 100 CLEAR7'-0"ALIGN FINISHES 103 EXISTING RAIN LEADER AND COLUMN ENCLOSURE NEW/ RECYCLED CARPET AT THIS ROOM EXISTING ROOM DIVIDER7'-0" H PADDING 7'-0" H PADDING AT ALL COLUMNS 7'-0" HIGH PADDING AT WALLS 7'-0" HIGH PADDING AT WALLS 7'-0" HIGH PADDING AT WALLS ALIGN FINISHES NEW FLOORING AT GYMNASIUM AREA (23) LOCKERS/CUBBIES (46) IF DOUBLE HEIGHT 3'-1"3'-1"3'-1"4'-0"6'-0"3'-1" TOILET PARTITIONS 3'-1"5'-6"4'-0" 3'-1" 4'-0"3'-1"5'-6"6'-0"INFILL AT DEMO'D DOOR FULL HEIGHT GYMNASIUM CURTAIN FULL HEIGHT GYMNASIUM CURTAIN FULL HEIGHT GYMNASIUM CURTAIN EXISTING SPRINKLER CLOSET EXISTING ELECTRICAL PANELS 6,094 SF GYMNASIUM 130 636 SF ENTRY 100 369 SF GYM STORAGE 133 374 SF LOCKER ROOM 140 123 SF CHANGING ROOM B 142 178 SF CHANGING ROOM C 143 58 SF STORAGE 134 180 SF OFFICE 144 162 SF OFFICE 145 160 SF OFFICE 146 163 SF OFFICE 147 35 SF VESTIBULE 130A 44 SF VEST. 100A 185 SF OFFICE 110 184 SF OFFICE 111 195 SF OFFICE 112184 SF OFFICE 113 254 SF OFFICE 114479 SF CLASSROOM 116 172 SF WOMENS ROOM 122 174 SF MENS ROOM 123 1,020 SF CORRIDOR 102 590 SF CLASSROOM 126 308 SF CLASSROOM 127 462 SF STORAGE 128 112 SF OFFICE 129 277 SF BREAK ROOM 121 58 SF WC 124 1,404 SF CORRIDOR 101 703 SF CLASSROOM 120 61 SF WC 125 228 SF CHANGING ROOM A 141 RELOCATE EXISTING CASEWORK TO BREAK ROOM, (OR NEW CASEWORK?) 6'-8 1/2" 50C (10' -0") 50C (10' -0") 120B 50D (10' -0") (2) NEW RESTROOMS 50C (10' -0") 124 NEW PARTITIONS, ALIGN FINISHES WITH EXISTING INFILL DEMO'D DOOR NEW DOORS 525 Hercules Drive Suite Two Colchester, VT 05446 802.655.5020 802.622.6567 wiemannlamphere.com SCALE: DRAWN BY:CHECKED BY: PROJECT NO: SHEET TITLE: SHEET NUMBER:PRINTED: FILENAME: PROGRESS PRINT DATE: 1/8" = 1'-0"12/15/2021 3:40:09 PMC:\Users\AAftuck\Documents\2021066_R22_SD_ARCH_aaftuck.rvt12/15/2021 3:40:09 PM55 GREEN MOUNTAIN DRIVECheckerAuthor 2021066 FLOOR PLAN- COMPLETE A1.31VERMONTSOUTH BURLINGTONPROJECT STATUSNOT FOR CONSTRUCTIONVT COMMONS#DATE REVISION DESCRIPTION A1.31 1/8" = 1'-0" 1 LEVEL 1-COMPLETE 1 2 3 4 5 A B C D E F3'-8"4'-6 15/16"EXISTING SPRINKLER CLOSET EXISTING ELECTRICAL PANELS WT 50 5/8" GYPSUM WALL BOARD FULL DEPTH SOUND ATTENUATING INSULATION, REF. SPECS 3 5/8" MTL. STUD, REF. SPEC 5/8" GYPSUM WALL BOARD 50B 50C 50D SIM. TO WT EXCEPT: FULL DEPTH SOUND ATTENUATING NOT REQUIRED, NOTE: ** 1 HR RATING STILL REQUIRED** 50 1 HOUR RATED WALL CONST. REFERENCE UL U465 SIM. TO WT EXCEPT: 1 HOUR FIRE RATING NOT REQUIRED50 SIM. TO WT EXCEPT: FULL DEPTH SOUND ATTENUATING NOT REQUIRED, 1 HOUR FIRE RATING NOT REQUIRED 50 4 7/8" IDENTIFY ALL FIRE AND SMOKE RATED PARTITIONS PER SPECIFICATIONS AND IBC REQUIREMENTS WT 5/8" GYPSUM WALL BOARD 1 5/8" MTL. STUD, REF. SPEC 59B 59C SIM. TO WT EXCEPT: 2 1/2" METAL STUDS, REF. SPEC59 SIM. TO WT EXCEPT: 3 5/8" METAL STUDS, REF. SPEC59 59 59D SIM. TO WT ADD SOUND ATTENUATION INSULATION WITH SPECIFIED BATT SUPPORT SYSTEM 59C 525 Hercules Drive Suite Two Colchester, VT 05446 802.655.5020 802.622.6567 wiemannlamphere.com SCALE: DRAWN BY:CHECKED BY: PROJECT NO: SHEET TITLE: SHEET NUMBER:PRINTED:FILENAME:PROGRESS PRINT DATE: As indicated 12/15/2021 3:40:04 PM C:\Users\AAftuck\Documents\2021066_R22_SD_ARCH_aaftuck.rvt12/15/2021 3:40:04 PM55 GREEN MOUNTAIN DRIVECheckerAuthor 2021066 EXISTING FLOOR PLAN A1.01VERMONTSOUTH BURLINGTONPROJECT STATUSNOT FOR CONSTRUCTIONVT COMMONS#DATE REVISION DESCRIPTION A1.01 1/8" = 1'-0" 1 LEVEL 1-EXISTING A1.01 1" = 1'-0" 2 WT-50 A1.01 1" = 1'-0" 3 WT-59 (ONE SIDED ASSEMBLY)