Loading...
HomeMy WebLinkAboutSP-22-023 - Supplemental - 0095 Swift Street (15)1 Marla Keene From:Christine Gingras Sent:Friday, April 29, 2022 5:49 PM To:Marla Keene Subject:RE: Lindenwood Site application Attachments:Project Property Map.pdf; Project Property Map_satellite.pdf; VTrans Standard E-1.pdf; Clearing Plan Sheet_4_27_2022.pdf Hi Marla, Please see the responses to your comments below and the documents attached. Please call if anything needs further discussion. Thank you! Christine From: Marla Keene <mkeene@southburlingtonvt.gov> Sent: Friday, April 22, 2022 10:56 AM To: Christine Gingras <CGingras@southburlingtonvt.gov> Subject: RE: Lindenwood Site application Hi Christine, I’ve taken a look at this and there are a few items which are not totally clear/complete. I understand we are expecting some neighbor interest in the project. Because of these two factors, I’m not going to be able to put it on the 5/4 hearing date, but I can offer you the 5/17 hearing. I’d like to do this as a draft decision, so let’s connect and see if we can get these issues ironed out. Feel free to call; I tried you but I don’t think you’re in the office today. My direct line is 846- 4138. Application Requirement Project-Specific Notes Response: Boundaries and area of existing subject property(ies), proposed property lines, continues properties, boundaries of all zoning districts, transects, and overlay districts, and all designations on the City's Official Map, and lots within the proposed subdivision numbered. We do need a plan showing the project area in relationship to the overall property. This can be something you do in GIS; doesn’t have to be a civil drawing. I understand the project from the provided plans, but this is a requirement we are strict about. Please see the two Project Property Map PDFs attached (with and without satellite image). Location of existing restrictions on land, such as easements and covenants. Any? Please see Sheet 9 and Sheet 10 of original submittal packet for all easement information. The project is located completely within the City right-of-way on Lindenwood Dr, the City-owned park parcel, and a City drainage easement in the backyard of a Brewer Parkway residence. Existing water courses & buffers, wetlands & buffers, base flood elevations if located in an area of special flood hazard, wooded areas, ledge outcrops, and other natural features. The wetland buffer is 100-ft. I only see a 50-ft buffer. Please see “Wetland Impact Sheet w Local” in original submittal packet. 2 Detailed specifications and locations of planting, landscaping, screening, and/or buffering materials. I see one plant provided but no information on what it is or how it will be planted. I think some general information about why there’s a single plant proposed would be helpful, in addition to the required planting details. Please see VTrans Standard E-1 attached. This tree planting standard is referenced on the cover sheet under the index of standards list. One deciduous tree is proposed to replace the one deciduous 6” maple tree that is being removed. A list of existing vegetation, with the location, type, and size of existing trees of six inches or greater in caliper. It is a bit unclear whether you’re meeting this requirement. I see some trees called out but then some general wooded areas. This project was surveyed per VTrans standards which does not identify individual trees in wooded areas. The only tree greater than six inches being removed is the 6” maple where the pretreatment tank will be. Size and type of trees along Lindenwood Drive are called out on the plans – none of these will be impacted by the project. A written plan to preserve and protect significant existing vegetation during and after construction. Such plan will be of sufficient detail that the City of South Burlington will be able to inspect the site during construction to ensure that existing vegetation is protected as per the plan. The proposed treeline is doubled, so it is unclear where you’re proposing the limit of tree clearing Please see the Clearing Plan Sheet attached which shows exactly where the clearing is to occur. The protective measures will be the PDF fence and Barrier Fence as shown on the Sheet 14 and 15 of the original submittal. Marla Keene, PE Development Review Planner City of South Burlington (802) 846-4106 From: Christine Gingras <CGingras@southburlingtonvt.gov> Sent: Friday, April 15, 2022 4:32 PM To: Marla Keene <mkeene@southburlingtonvt.gov> Subject: Lindenwood Site application Hi Marla, Please see the attached site application and supporting materials for proposed stormwater project on Lindenwood Dr/Farrell Street Park. Thanks for your time and sorry for the delay. Have a great weekend, Christine Christine Gingras, PE Stormwater Project Manager Department of Public Works City of South Burlington 104 Landfill Road South Burlington, VT 05403 cgingras@southburlingtonvt.gov Cell (717) 574-1018 3 (802) 658-7961 Ext. 6111 www.sbvt.gov Notice - Under Vermont’s Public Records Act, all e-mail, e-mail attachments as well as paper copies of documents received or prepared for use in matters concerning City business, concerning a City official or staff, or containing information relating to City business are likely to be regarded as public records which may be inspected by any person upon request, unless otherwise made confidential by law. If you have received this message in error, please notify us immediately by return email. Thank you for your cooperation.