Loading...
HomeMy WebLinkAboutSP-22-023 - Supplemental - 0095 Swift Street (7)  208 Flynn Avenue, Suite 2A, Burlington, VT 05401    Tel:  802‐863‐6225    Fax:  802‐863‐6306  85 Mechanic Street, Suite E2‐3, Lebanon, NH 03766     Tel:  603‐442‐9333    Fax:  603‐664‐4244  414 Union Street, Schenectady, NY 12305    Tel:  518‐399‐6023    SOUTH BURLINGTON FLOW RESTORATION PROJECT  PB0050: LINDENWOOD DRIVE  INFILTRATION TESTING REPORT  April 10, 2018  Engineering Ventures performed infiltration feasibility testing at the eastern end of Lindenwold,  in the area of a proposed infiltration facility, on December 19, 2017.  Soil Borings were  performed by Mike’s Boring and Coring, LLC on December 12, 2017 at locations recommended  by Engineering Ventures.  A 4” diameter vertical PVC pipe was installed and capped during the  boring work for the infiltration test.  The elevation of the bottom of the 4” diameter PVC was  approximately 206.0 (Approximately 6’ below existing grade at the infiltration testing location).    A Borehole Infiltration Test was performed at the location, using Section 4.3.3.2.5 of the  Vermont Stormwater Treatment Standards, latest revision as a guideline.  The test involved  filling the 4” PVC with 24” of water, and monitoring the water level by measuring the drop from  the top of the casing for 30 min.  This procedure was repeated until a stable infiltration rate was  obtained, with the 4” PVC being refilled to be at the initial 24” water level mark.  The results of  the test performed are shown in the following table:    Time Interval Initial Height  from Top of  Casing  Final Height  from Top of  Casing  Measured Drop  per 30 min  Measured  Drop per hour  10:00– 10: 30 3’‐8.5” 4’‐0.75” 4.25” / 30 min. 8.5”/hr  10:30 – 11:00 3’‐8” 3’‐8” 0” / 30 min 0”/hr  11:00‐11:30 3’‐8” 3’‐8.5” 0.5” / 30 min 1”/hr  11:30 – 12:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  12:00 – 12:30 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  12:30 – 1:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  1:00 – 1:30  3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  1:30 – 2:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  2:00 – 2:30 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr    Stabilized Average Measured Infiltration Rate = 0” / hr     S:\PROJECTS\0‐2017\17594 So. Burlington Flow Restoration\Project Specific\Lindenwood\Infiltration Feaibility Testing‐Lindenwood.docx