HomeMy WebLinkAboutPermit Wastewater Allocation WWA-22-125
CITY OF SOUTH BURLINGTON
APPLICATION for WASTEWATER ALLOCATION
*Items marked with an asterisk must be filled in by ALL applicants
*APPLICANT INFORMATION
Applicant: ______________________________________________
Contact Person: ________________________________________________
Mailing Address: _______________________________________________
_______________________________________________
Telephone & Fax for Contact Person: __________________________________
Property Owner Name (if not applicant): _______________________________
Property Owner Mailing Address: ____________________________________
____________________________________
*Physical Location of Project: ________________________________
__________________ ______________________
*Signature of Applicant *Signature of Property Owner
(Both applicant and property owner MUST sign the application!)
*Project Information
If the project is a single-family home, please check one: ____New ____Existing
If not a single-family home, project name: __________________________
*Application or Permit Numbers: (from Planning & Zoning office)
#____-____-____
#____-____-____
#____-____-____
Engineer’s Information for flows over 1,000 gpd
Name of Engineer: ____________________________________________
Firm: _____________________________________________________
Mailing Address: _____________________________________________
Phone & Fax: ________________________________________________
PE License #: ________________________________________________
FOR INTERNAL USE ONLY
WWA Permit #___-____
*Flow Calculations
(You may substitute an engineer’s calculation or letter for the information requested
below)
For residential projects, list number of bedrooms and units requested:
Number of
Bedrooms
Number of Units
X
Gallons per day
per unit =
Total Flows
1 140
2 or more 210
TOTAL
Notes: ___________________________________________________
________________________________________________________
For commercial and industrial projects, list existing and proposed tenants, uses and
flows:
Tenant/ Type of use Number of Flows per Other Total
Business seats, SF, etc X unit Adjustments Flow
TOTAL
*Total development wastewater flow requested: ________gallons per
day
Flow characteristics (for commercial and industrial projects)
Volume:
____________________________________________________________
__________________________________________________
Flow rate:
____________________________________________________________
__________________________________________________
Strength:
____________________________________________________________
__________________________________________________
Please do not write below this line
Application & Recording Fee received: _____________ ________
Name Date
Receiving Plant: ______Airport Pkwy _____Bartlett Bay
City Center District: ____Yes _____No
Approved by Water Pollution Control Department (Commercial and Industrial
Projects)
______________________ _____________
Director of Water Pollution Control Date
Preliminary allocation issued: (payment of fee is not required)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation issued: (payment of fee is required, either in full or pro-rated for
projects with multiple zoning permits involved)
_______________________ _____________
Director of Planning and Zoning Date
Final allocation expires _________________with permit #____-____-____
(Date)
Zoning permit issued___________________with permit#____-____-____
(Date)
Associated WW connection permit (if applicable) #____-____-____
For extensions of Final Allocation Only
EXTENSION GRANTED ____________to______________
(Date) (Date of Expiration)
50% EXTENSION FEE PAID _________ $___________
(Date) (Amount)
Engineers Scientists Planners Designers
40 IDX Drive, Building 100 Suite 200, South Burlington, VT 05403
P 802.497.6100 www.vhb.com
May 25, 2022
Ref: 57913.01
Mr. Tom DiPietro
Director
Department of Public Works
City of South Burlington
180 Market Street
South Burlington, VT 05403
Re: Holiday Inn Redevelopment – Mixed-Use Building
1068 Williston Road, South Burlington
Wastewater Design Flow Calculations
Dear Tom,
The previously permitted Holiday Inn Redevelopment Project (“Project”), which consisted of the renovation of the
existing Holiday Inn building, a new Hampton Inn building and a new Mixed-Use residential/commercial building, has
since undergone design changes. These changes include minor modifications to the Mixed-Use building which have
resulted in changes to the wastewater design flows for the Project, as summarized below. On behalf of the landowner,
Champlain School Apartment Partnership, VHB is requesting additional allocation in the amount of 686 GPD for the
Mixed-Use building, there are no changes proposed for the previously permitted Holiday Inn and Hampton Inn
buildings.
Wastewater Demand
The newly proposed wastewater design flows for the modifications to the Mixed-Use building are calculated below,
followed by a table summarizing the previously allocated flows and proposed flows:
Table 1 Proposed Wastewater Design Flow Calculations* Mixed-Use Building
Use Quantity Unit GPD/Unit Wastewater Design Flow (GPD)
Residential Use
-Studio/One Bedroom Units** 72 Living Unit 140 10,080
-Two Bedroom Units 11 Living Unit 210 2,310
Store 5,789 Per 100 SF 4 232
Total 12,622
*Based on the State Environmental Protection Rules, Chapter 1, Subchapter 8, Table 8-1 and Table 8-3
**Based on design flow of 70 gallons per day per person at the max. residential occupancy proposed for each living unit
Department of Public Works
Ref: 57913.01
May 25, 2022
Page 2
Table 2 Project Wastewater Design Flow Summary
Building Previously Permitted Flow (GPD)
Change (GPD) Proposed Flow (GPD)
Holiday Inn 18,840 0 18,840
Hampton Inn 24,235 0 24,235
Mixed-Use 11,936 +686 12,622
Total 55,011 +686 55,697
The previously allocated wastewater demand for this parcel based on tabulated-unitized flows from proposed uses is
55,011 GPD. The proposed wastewater demands for this parcel are 18,840 GPD for the Holiday Inn building, 24,235
GPD for the Hampton Inn building, and 12,622 GPD for the Mixed-Use building for a total combined demand of
55,697 GPD. This represents an increase of 686 GPD.
Please let me know if you have any questions or need additional information.
Sincerely,
VHB
Stephanie Wyman, PE
Civil Engineer
cc: Peter Smiar, PE (Director of Land Development, VHB)
Deb Sherman (Larkin Realty)