Loading...
HomeMy WebLinkAboutSP-03-15 - Decision - 0049 Commerce AvenueC� #SP-03-15 FINDINGS OF FACT & DECISION STATE OF VERMONT COUNTY OF CHITTENDEN CITY OF SOUTH BURLINGTON Re: Findings of fact, site plan application #SP-03-15 of Ken Smith to amend a previously approved plan for a 35,000 sq. ft. building for a multiple number of tenants and a multiple number of commercial and industrial uses. The amendment consists of eliminating proposed outside storage from within a wetland buffer area, 49 Commerce Avenue. On the 15' day of July 2003, the South Burlington Development Review Board approved the request of Ken Smith for site plan approval under Section 14.04 (F) of the South Burlington Land Development Regulations, based on the following findings: 1. This project consists of amending a previously approved site plan for a 35,000 sq. ft. building for a multiple number of tenants and a multiple number of commercial and industrial uses. The amendment consists of eliminating proposed outside storage from within a wetland buffer area. The approval for the outside storage was granted on 11/6/01. 2. The owner of record is James Barron. 3. This property located at 49 Commerce Avenue lies within the Mixed Industrial and Commercial District. The property is bound to the north by Commerce Avenue, on the east and west by light commercial industry, and the south by undeveloped land and wetlands. 4. The only issues affecting this application are coverage and landscaping/screening. 5. Coverage: Overall coverage is being reduced from 68.7% to 67% (maximum allowed is 70%). 11 Page #2 6. Landscaping/screening: The previously approved proposal included $4860 in additional plantings along the rear of the outside storage area on top of a proposed berm. The plantings and the berm are no longer proposed. The previously approved plan included a fence with an evergreen buffer to screen the new outside storage area. This fence and screen do not appear on the plan, which are no longer needed given that this area will be used for vehicle parking, summer storage of snowplows and sander bodies and winter storage of lawn care equipment trailers. Two (2) areas would be used for bark mulch storage and an area has been designated for a screened dumpster area. DECISION Er CONDITIONS Based on the above Findings of Fact, the South Burlington Development Review Board approves site plan application #SP-03-15 of Ken Smith to amend a previously approved plan for a 35,000 sq. ft. building for a multiple number of tenants and a multiple number of commercial and industrial uses. The amendment consists of eliminating proposed outside storage from within a wetland buffer area, 49 Commerce Avenue, as depicted on a plan entitled, "K.P. Smith Lots 25-26 Commerce Avenue, South Burlington, VT", prepared by Lamoureux £r Dickinson Consulting Engineers, Inc., dated 3f28/03, last revised on 7/2/03, with the following stipulations: 1. All previous approvals and stipulations, which are not superseded by this approval, shall remain in effect. 2. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.02 of the Land Development Regulations or this approval is null and void. 3. The applicant shall obtain a Certificate of Occupancy/Compliance from the Administrative Officer prior to the use of the outside storage area. I Page #3 4. Any change to the site plan shall require approval by the South Burlington Development Review Board. ----- - ------- Comer Jerk Date South Burlington Development Review Board Please note: You have the right to appeal this decision to the Vermont Environmental Court, pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is issued. The fee is $150.00. If you fail to appeal this decision, your right to challenge this decision at some future time may be lost because you waited too long. You will be bound by the decision, pursuant to 24 VSA 4472 (d) (exclusivity of remedy; finality).