HomeMy WebLinkAboutSP-03-50 - Decision - 0062 Tilley DriveCITY OF SOUTH BURLINGTON
DEPARTMENT OF PLANNING & ZONING
PIZZAGALLI PROPERTIES, LLC — 62 TILLEY DRIVE
SITE PLAN #SP-03-50
FINDINGS OF FACT AND DECISION
Pizzagalli Properties, LLC, hereafter referred to as the "Applicant", is requesting site plan
approval to amend a previously approved site plan for a 30,000 sq. ft. general office
building. The amendment consists of. 1) converting 8,000 sq. ft. of general office use to
medical office, and 2) reducing the size of the building by 100 sq. ft., 62 Tilley Drive.
Based on the plans and supporting material contained in the document file for this
application, the Administrative Officer finds, concludes, and decides as follows:
FINDINGS OF FACT
1. This project consists of amending a previously approved site plan for a 30,000 sq.
ft. general office building. The amendment consists of. 1) reducing the size of the
building by 100 sq. ft. resulting in a GFA of 29,900 sq. ft., and 2) converting
8,000 sq. ft. of general office use to medical office use with the remaining 21,900
sq. ft. for general office use.
2. This property located at 62 Tilley Drive lies within the I-O District and Traffic
Overlay Zone 5.
3. The owner of record of this property is Pizzagalli Properties, LLC.
DIMENSIONAL REQUIREMENTS
1. Pursuant to the previous application, the site plan complies with all setback and
coverage requirements. This application presents no changes from the previous
application.
SITE PLAN REVIEW STANDARDS
Vehicular Access
2. Access on the site is adequate and remains unchanged by this application.
Circulation
3. Circulation on the site is adequate and remains unchanged by this application.
C � �
Parking
4. Table 13-2 of the Land Development Regulations sets forth the parking
requirements for commercial uses. Pursuant to this table, the 8,000 sq. ft. of
medical office use and 21, 900 sq. ft. of general office use will require a total of
117 parking spaces. The Applicant is proposing 120 spaces including five (5)
handicapped spaces.
5. Pursuant to Section 13.01(G)(5) of the Land Development Regulations, bicycle
parking shall be provided for employees on the subject property. The plans show
that two (2) bike racks are proposed.
6. Pursuant to Section 13.06(B) of the Land Development Regulations internal
landscaping of the parking area does not apply.
Landscaping
7. There is no minimum landscaping requirement associated with the proposed
change in use. A copy of the previously approved landscaping plan should be
submitted to be attached to the site plan to make a complete set of plans.
Pursuant to Section 13.06(B)(4) of the Land Development Regulations, snow
storage areas must be shown on the plans. The plans must be revised to show the
snow storage area.
Outdoor Lighting
9. Pursuant to Section 13.07(A) of the Land Development Regulations, all exterior
lighting must be shielded and downcasting to prevent light from spilling onto adjacent
properties and rights -of -way. There are no changes to previously approved lighting.
Pursuant to Sections 14.06 and 14.07 of the Land Development Regulations, the
following review standards shall apply to site plan applications:
TRAFFIC
This property is located in Traffic Overlay District, Zone 5 which would allow this
property to generate a maximum of 220 vehicle trip ends (vte's) during the p.m. peak
hour. ITE estimates the approved general office building to generate 113 p.m. peak hour
vte's. ITE estimates the proposed mix of medical and general office uses to generate
133.55 vte's during the p.m. peak hour for a 20.55 vte increase.
(a) The relationship of the proposed development to goals and objectives set forth in the
City of South Burlington Comprehensive Plan.
10. The Comprehensive Plan states that the City should encourage development while
protecting natural resources and promoting a healthy and safe environment. The
proposed change in use is in keeping with the recommended actions of the
Comprehensive Plan.
(b) The site shall be planned to accomplish a desirable transition from structure to site,
from structure to structure, and to provide for adequate planting, safe pedestrian
movement, and adequate parking areas.
11. The proposed change in use will be in keeping with this goal.
(c) Parking shall be located to the rear or sides of buildings to the greatest extent
practicable.
12. This standard is being met.
(d) Without restricting the permissible limits of the applicable zoning district, the
height and scale of each building shall be compatible with it's site and existing or
adjoining buildings.
13. The proposed change in use will not alter the height or scale of the building. The
building will remain in compliance the above standard.
(e) Newly installed utility services and service modifications necessitated by exterior
alterations or building expansions shall, to an extent feasible, be underground.
14. The plans do not indicate changes in utility services.
09 The combination of common materials and architectural characteristics,
landscaping, buffers, screens and visual interruptions to create attractive transitions
between buildings of different architectural styles shall be encouraged.
15. Adequate landscaping exists for the proposal.
(g) Proposed structures shall be related harmoniously to themselves, the terrain and to
existing buildings and roads in the vicinity that have a visual relationship to the
proposed structures.
16. This standard is being met.
I
In addition to the above general review standards, site plan applications shall meet the
following specific standards as set forth in Section 14.07 of the Land Development
Regulations:
(a) The reservation of land may be required on any lot for provision of access to
abutting properties whenever such access is deemed necessary to reduce curb cuts onto
an arterial or collector street, to provide additional access for emergency or other
purposes, or to improve general access and circulation in the area.
17. The reservation of land is not necessary.
(b) Electric, telephone, and other wire -serviced utility lines and service connections
shall be underground. Any utility installations remaining above ground shall be
located so as to have a harmonious relation to neighboring properties and to the site.
18. No changes to existing underground utilities.
(c) All dumpsters and other facilities to handle solid waste, including compliance with
any recycling or other requirements, shall be accessible, secure and properly screened
with opaque fencing to ensure that trash and debris do not escape the enclosure(s).
19. The plans provided do not indicate any additional dumpsters resulting from the
change in use.
DECISION
The South Burlington Administrative Officer, pursuant to Section 14.09 of the Land
Development Regulations, approves the request of Pizzagalli Properties, LLC to amend a
previously approved site plan for a 30,000 sq. ft. general office building. The amendment
consists of. 1) reducing the size of the building by 100 sq. ft. resulting in a GFA of
29,900 sq. ft., and 2) converting 8,000 sq. ft. of general office use to medical office use
with the remaining 21,900 sq. ft. for general office use, 62 Tilley Drive, as depicted on a
plan entitled "Mountain View Business Park Hinesburg Road South Burlington,
Vermont", prepared by Donald L. Hamlin Consulting Engineers, Inc, dated 3/6/02, last
revised on 4/30/03, with the following stipulations:
1) All previous approvals and stipulations which are not superseded by this approval
shall remain in effect.
2) The plans shall be revised to show the changes below and shall require approval of the
Administrative Officer. Three (3) copies of the approved revised plans shall be submitted
to the Administrative Officer prior to permit issuance.
a) The site plan shall be revised to indicate the snow storage areas.
b) The site plan shall be revised to include the landscaping plan approved as part
of the 8/6/02 DRB approval.
3) For the purpose of calculating road impact fees under the South Burlington Impact
Fee Ordinance, the Administrative Officer estimates that the change in use will generate
20.55 additional vehicle trip ends during the P.M. peak hour.
4) The applicant shall obtain a zoning permit within six (6) months pursuant to Section
17.04 of the Land Development Regulations or this approval is null and void.
5) The applicant shall obtain a Certificate of Occupancy/Compliance from the
Administrative Officer prior to the use of the newly converted space.
6) Any change to the site plan shall require approval by the South Burlington
Development Review Board.
Signed this ff rA 2003, by
AW
Raymo A B , Administrative Officer
Please note: You have the right to appeal this decision to the Vermont Environmental Court,
pursuant to 24 VSA 4471 and VRCP 76 in writing, within 30 days of the date this decision is
issued. If you fail to appeal this decision your right to challenge this decision at some time in the
future may be lost because you waited too long. You will be bound by the decision, pursuant to
24 VSA 4472 (d) (exclusivity of remedy; finality).