HomeMy WebLinkAboutSP-18-03 - Decision - 0062 Tilley Drive#SP-18-03 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING PIZZAGALLI PROPERTIES, LLC — 62 TILLEY DRIVE SITE PLAN APPLICATION #SP-18-03 FINDINGS OF FACT AND DECISION Pizzagalli Properties, LLC, hereinafter referred to as the applicant, is seeking after -the - fact approval to amend a previously approved plan for a 29,900 sq. ft. office building, which consists of 28,116 sq. ft. of medical office use, and 1,784 sq. ft. of common area. The amendment consists of: 1) installing an additional dumpster enclosure, and 2) replacing one (1) parking space, 62 Tilley Drive. Based on the plans and materials contained in the document file for this application, the Administrative Officer finds, concludes, and decides the following: FINDINGS OF FACT 1. Pizzagalli Properties, LLC is seeking after -the -fact approval to amend a previously approved plan for a 29,900 sq. ft. office building, which consists of 28,116 sq. ft. of medical office use, and 1,784 sq. ft. of common area. The amendment consists of: 1) installing an additional dumpster enclosure, and 2) replacing one (1) parking space, 62 Tilley Drive. 2. The owner of record of the subject property is Pizzagalli Properties, LLC. 3. The subject property is located in the Industrial & Open Space Zoning District. 4. The application was received on January 17, 2018. 5. The plan submitted consists of a two (2) page set of plans, page one (1) is entitled "Mountain View Business Park 62 Tilley Drive", prepared by Donald L. Hamlin Consulting Engineers, Inc., dated 12/19/17, and last revised on 01/04/18. DIMENSIONAL REQUIREMENTS 6. The only change will be to overall coverage which is increasing to 33.63% (maximum allowed is 50%). SITE PLAN REVIEW STANDARDS Section 14.06 of the South Burlington Land Development Regulations establishes the following general review standards for all site plan applications: Only the standards below are affected by this application. All other standards will continue to be met. Vehicle and Bicycle Parking - 1 — #S P-18-03 7. The applicant will comply with Section 13.14 of the LDRs to include the new type and location for bicycle racks, to accommodate the partial requirement of four (4) (50% of requirement) short-term bicycle parking spaces (the full requirement is six (6) spaces). These bicycle racks must be on a paved surface of at least 2' X 6'. 8. One (1) parking space is being added to the side of the building to replace the one lost due to adding the additional dumpster enclosure. The vehicular parking requirement is 141 spaces and there are 141 parking spaces available, including eight (8) handicapped spaces. The project information notes relating to parking need to be updated to reflect the accurate parking requirement and the accurate number of parking spaces on the lot. DECISION Based on the above Findings of Fact, the Administrative Officer herby approves site plan application #SP-18-03 of Pizzagalli Properties, LLC, subject to the following conditions: 1. All previous approvals and stipulations which are not superseded by this approval shall remain in effect. 2. This project must be completed as shown on the plan and shall be on file in the South Burlington Department of Planning and Zoning. 3. The plans must be revised to show the changes below and will require approval of the Administrative Officer. Three (3) hard copies of the approved revised plans must be submitted to the Administrative Officer prior to zoning permit issuance. a. The project information notes relating to parking must be updated to reflect the accurate parking requirement and the accurate number of parking spaces on the lot. 4. The applicant must obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 5. The applicant must obtain a Certificate of Occupancy from the Administrative Officer upon completion of the installation of the site modifications. 6. Any change to the site plan will require approval by the South Burlington Development Review Board or the Administrative Officer. hJ Signed on this day of �/�IV , 2018 by -2— #SP-18-03 Ra mond 1. Belair, Administrative Officer PLEASE NOTE: Pursuant to 24 VSA §4465, an interested person may appeal this decision by filing a Notice of Appeal with the secretary of the Development Review Board. This Notice of Appeal must be accompanied with a $233 filing fee and be filed within 15 days of the date of this decision. The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist. -3—