Loading...
HomeMy WebLinkAboutAgenda 05_95 Swift StreetNVT STATE PLANE GRID False Northing: 0.0000False Easting: 1640416.6667Origin Latitude: 42°30'00.0000"NCentral Meridian: 72°30'00.0000"WUS Survey FootTransverse MercatorNAD83 Vermont State PlanesVT83 www.stantec.com Tel. Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden. Stantec without delay. Stantec. Reproduction or use for any purpose other than that Consultants Legend Notes Drawing No. Scale Revision Title Client/Project Project No. Sheet of Permit-Seal Chkd.Dwn.Dsgn.YY.MM.DD File Name: ByIssued Appd.YY.MM.DD ByRevision Appd.YY.MM.DD ORIGINAL SHEET - ANSI D SOUTH BURLINGTON, VT 05403 802.864.0223 195311743 011 1" = 20' STP MM19(10) 0 20 40 0 10 20 SCALE IN FEET LINDENWOO DRIVE DETENTION POND WETLAND IMPACT SHEET 193 TILLEY DRIVE, SUITE 101 2 0 5 205210 210210215215215 22022022022015 "CM P 15"CMP 4"PVC 15"CMP 4"PVC DIRT PATH 8"CHERRY 34"OAK ARMH 104 WATCH NEIGHBORHOOD 30"MAPLE PATH CROSSING VEHICLES 5"MAPLE 6"MAPLE 48"OAK 7"MAPLE 8"APPLE 12"APPLE BRICK PLANTER BASE 3'TALL 05 200 210 220 230230 200 210 220 230230 15+2515+5015+7516+0016+2516+5016+7517+0017+2517+5017+7518+0018+2518+5018+7519+00 RIM EL = 220.83' CB9 INV OUT = 216.29' INV IN = 216.59' 15.00" X 60.21' SLOPE =0.50% INV OUT = 215.94' INV IN = 216.19' 15.00" X 50.30' SLOPE =0.50% INV OUT = 215.72' INV IN = 216.14' 15.00" X 85.75' SLOPE =0.50% INV OUT = 216.24' INV IN = 216.39' 15.00" X 29.39' SLOPE =0.50% INV OUT = 216.49' INV IN = 216.73' 15.00" X 48.73' SLOPE =0.50% RIM EL =222.00' CB7 RIM EL =222.00' CB8 RIM EL =222.00' CB6 RIM EL =222.65' CB5 06 TANK #1 PRETREATMENT 07 08 09 EXIST. 24" WATER 8.33' INSULATION BOARD 215215220 220220NOVEMBER 2017 DELINEATED BY GILMAN & BRIGGS IN EXISTING CLASS II WETLAND (PER VT DEC GUIDANCE)50' WETLAND BUFFER(ASSUMED) EXIST. SEWER (ASSUMED) EXIST. SEWER (ASSUMED) EXIST. SEWER 16+00 18+00 18+4318+43 17+0016+00BURLINGTON)(PER CITY OF SOUTH 100' WETLAND BUFFER TEMPORARY BUFFER IMPACT = 64 SF IMPACT = 107 SF TEMPORARY BUFFER IMPACT = 303 SF TEMPORARY BUFFER IMPACT = 28 SF PERMANENT BUFFER IMPACT = 148 SF PERMANENT WETLAND PERMANENT BUFFER IMPACT = 28 SF PERMANENT WETLAND IMPACT = 148 SF IMPACT = 36 SF TEMPORARY WETLAND IMPACT = 16 SF TEMPORARY WETLAND TEMPORARY BUFFER IMPACT = 410 SF TEMPORARY WETLAND IMPACT = 52 SF PERMANENT BUFFER IMPACT = 28 SF PERMANENT WETLAND IMPACT = 148 SF TEMPORARY WETLAND IMPACT = 52 SF +TEMPORARY BUFFER IMPACT = 5362 SF IMPACT TOTALS PER VT DEC REQUIREMENTS BURLINGTON REQUIREMENTS IMPACT TOTALS PER CITY 0F SOUTH www.stantec.com Tel. Copyright Reserved The Contractor shall verify and be responsible for all dimensions. DO NOT scale the drawing - any errors or omissions shall be reported to The Copyrights to all designs and drawings are the property of authorized by Stantec is forbidden. Stantec without delay. Stantec. Reproduction or use for any purpose other than that Consultants Legend Notes Drawing No. Scale Revision Title Client/Project Project No. Sheet of Permit-Seal Chkd.Dwn.Dsgn.YY.MM.DD File Name: ByIssued Appd.YY.MM.DD ByRevision Appd.YY.MM.DD ORIGINAL SHEET - ANSI D 195311743 0 SOUTH BURLINGTON, VT 05403 802.864.0223 10 22 PLAN AND PROFILE SHEET 2 1" = 20' STP MM19(10) CP-2 0 20 40 0 10 20 SCALE IN FEET LINDENWOO DRIVE DETENTION POND MATCHLINE STA. 15+25 SEE SHEET CP-1 03 04 05 06 07 09 CONSTRUCT STONE FILL TYPE II, AT OUTLET OUTLET STRUCTURE AT STA. 17+11, LT CONSTRUCT NEW DETENTION POND INSTALL 18" X 58' CPEP STA. 17+00, LT TO STA. 17+06, LT NVT STATE PLANE GRID False Northing: 0.0000False Easting: 1640416.6667Origin Latitude: 42°30'00.0000"NCentral Meridian: 72°30'00.0000"WUS Survey FootTransverse MercatorNAD83 Vermont State PlanesVT83 CATCH BASIN AT STA. 15+49 CONSTRUCT NEW PRECAST REINFORCED CONCRETE INSTALL 15" X 62' CPEP(SL) STA. 15+49, C/L. TO STA. 16+13, C/L CATCH BASIN AT STA. 16+13, C/L CONSTRUCT NEW PRECAST REINFORCED CONCRETE INSTALL 15" X 52' CPEP(SL) STA. 16+13, C/L TO STA. 16+68, C/L CATCH BASIN AT STA. 17+57, CL CONSTRUCT NEW PRECAST PREINFORCED CONCRETE INSTALL 15" X 86' CPEP(SL) STA. 16+68, C/L TO STA. 17+57, C/L CATCH BASIN CONSTRUCTION) SHALL BE CONSIDERED INCIDENTAL TO (CONNECTING TO EXISTING PIPE CONNECT TO EXISTING 15" CSP CATCH BASIN AT STA. 18+43, CL CONSTRUCT NEW PRECAST REINFORCED CONCRETE INSTALL 15" X 50' CPEP(SL) STA. 17+91, C/L TO STA. 18+43, C/L 08 TANK AT STA. 17+91, CL CONSTRUCT NEW PRECAST PRE TREATMENT INSTALL 18" X 14' CPEP(SL) STA. 16+68, C/L TO STA. 16+68, LT CATCH BASIN AT STA. 17+91, CL CONSTRUCT NEW PRECAST PREINFORCED CONCRETE INSTALL 15" X 30' CPEP(SL) STA. 17+57, C/L TO STA. 17+91, C/L PIPE LENGTHS SHOWN IN CONSTRUCTION NOTES ARE PAY LENGTH. PIPE LENGTHS SHOWN IN PROFILE ARE ACTUAL LENGTH. NOTE: SYMBOL BOTANICAL NAME QTY SIZE COMMENTCOMMON NAME AS SUGAR MAPLE 1 'GREEN MOUNTAIN' ACER SACCHARUM CAL. 2.5"-3" ROZZI BREWER & SANDRA REESE, ROBERT JACQUELINE S. WEINSTOCK, GLEN S. & LORETTA MARRIOTT, CITY OF SOUTH BURLINGTON VOL. 63, PG. 242 SOUTH BURLINGTON, EASEMENT TO CITY OF B & B 16+39.2-17+52.5, LT. SPECIAL PROVISION (SPLIT RAIL FENCE) 193 TILLEY DRIVE, SUITE 101 2 0 5 205210 210210215215215 22022022022015 "CM P 15"CMP 4"PVC 15"CMP 4"PVC DIRT PATH 8"CHERRY 34"OAK ARMH 104 WATCH NEIGHBORHOOD 30"MAPLE PATH CROSSING VEHICLES 5"MAPLE 6"MAPLE 48"OAK 7"MAPLE 8"APPLE 12"APPLE BRICK PLANTER BASE 3'TALL 03 200 210 220 230230 200 210 220 230230 15+2515+5015+7516+0016+2516+5016+7517+0017+2517+5017+7518+0018+2518+5018+7519+00 RIM EL = 220.83' CB7 INV OUT = 216.29' INV IN = 216.59' 15.00" X 60.21' SLOPE =0.50% INV OUT = 215.94' INV IN = 216.19' 15.00" X 50.30' SLOPE =0.50% INV OUT = 215.72' INV IN = 216.14' 15.00" X 85.75' SLOPE =0.50% INV OUT = 216.24' INV IN = 216.39' 15.00" X 29.39' SLOPE =0.50% INV OUT = 216.49' INV IN = 216.73' 15.00" X 48.73' SLOPE =0.50% RIM EL =222.00' CB5 RIM EL =222.00' CB6 RIM EL =222.00' CB4 RIM EL =222.65' CB3 04 TANK #1 PRETREATMENT 05 06 07 EXIST. 24" WATER 8.33' INSULATION BOARD 215215220 220220NOVEMBER 2017 DELINEATED BY GILMAN & BRIGGS IN EXISTING CLASS II WETLAND (PER VT DEC GUIDANCE)50' WETLAND BUFFER(ASSUMED) EXIST. SEWER (ASSUMED) EXIST. SEWER (ASSUMED) EXIST. SEWER 16+00 STA 15+49.02PI SEED PER TURF ESTABLISHMENT DETAIL GRAVEL ACCESS ROAD, CAP WITH TOPSOIL AND RETAIN 5" MAPLE REMOVE 6" MAPLE EXISTING 15" CMP CUT, CAP AND ABANDON EASEMENT EXISTING DRAINAGE OUTLET STRUCTURE DRY DETENTION BASIN CATCH BASIN CSP TO PROPOSED CONNECT EXISTING 15" STA 17+57.28PI18+00 18+4318+43STA 18+43.41POESTA 1 6 +1 3. 2 3 P I STA 17+90.67PI FENCE PROPOSED SPLIT RAIL 6' GATE APPLE RETAIN 8" GEOMEMBRANE LINER 6' FENCE GATE PRETREATMENT TANK 2000 GALLON 17+0016+00(1)AS 03 04 07 09 CB3 CB4 CB7 05 06CB5 CB6 08 1,367 sf 911 sf541 sf1,029 sf 686 sf407 sf1,456 sf 1,920 sf2,433 sf 3,006 sf3,612 sf4,314 sf 5,078 sf 1,299 sf David P. WheelerAssistant Stormwater Superintendent104 Landfill Road, South Burlington, VT 05403tel. 802.658.7961 email. dwheeler@sburl.com   208 Flynn Avenue, Suite 2A, Burlington, VT 05401    Tel:  802‐863‐6225    Fax:  802‐863‐6306  85 Mechanic Street, Suite E2‐3, Lebanon, NH 03766     Tel:  603‐442‐9333    Fax:  603‐664‐4244  414 Union Street, Schenectady, NY 12305    Tel:  518‐399‐6023    SOUTH BURLINGTON FLOW RESTORATION PROJECT  PB0050: LINDENWOOD DRIVE  INFILTRATION TESTING REPORT  April 10, 2018  Engineering Ventures performed infiltration feasibility testing at the eastern end of Lindenwold,  in the area of a proposed infiltration facility, on December 19, 2017.  Soil Borings were  performed by Mike’s Boring and Coring, LLC on December 12, 2017 at locations recommended  by Engineering Ventures.  A 4” diameter vertical PVC pipe was installed and capped during the  boring work for the infiltration test.  The elevation of the bottom of the 4” diameter PVC was  approximately 206.0 (Approximately 6’ below existing grade at the infiltration testing location).    A Borehole Infiltration Test was performed at the location, using Section 4.3.3.2.5 of the  Vermont Stormwater Treatment Standards, latest revision as a guideline.  The test involved  filling the 4” PVC with 24” of water, and monitoring the water level by measuring the drop from  the top of the casing for 30 min.  This procedure was repeated until a stable infiltration rate was  obtained, with the 4” PVC being refilled to be at the initial 24” water level mark.  The results of  the test performed are shown in the following table:    Time Interval Initial Height  from Top of  Casing  Final Height  from Top of  Casing  Measured Drop  per 30 min  Measured  Drop per hour  10:00– 10: 30 3’‐8.5” 4’‐0.75” 4.25” / 30 min. 8.5”/hr  10:30 – 11:00 3’‐8” 3’‐8” 0” / 30 min 0”/hr  11:00‐11:30 3’‐8” 3’‐8.5” 0.5” / 30 min 1”/hr  11:30 – 12:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  12:00 – 12:30 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  12:30 – 1:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  1:00 – 1:30  3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  1:30 – 2:00 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr  2:00 – 2:30 3’‐8.5” 3’‐8.5” 0” / 30 min 0”/hr    Stabilized Average Measured Infiltration Rate = 0” / hr     S:\PROJECTS\0‐2017\17594 So. Burlington Flow Restoration\Project Specific\Lindenwood\Infiltration Feaibility Testing‐Lindenwood.docx