Loading...
HomeMy WebLinkAboutZP-22-165 - 0435 Community Drive 5/13/2022Property Owners Name:Greenfield Capital, LLC Property Location:435 Community Drive (OnLogic #SP-21-046) Amount:402,460.20$ Payment Type:Checks #7816 Date:5/10/2022 & #7810 Code Zoning Permit (Non-Residential)ZP-22-165 zp Recording fee 13.00$ plus 139,012 0.35$ per sq. ft.48,654.20$ plus After-the fact of 50%[no NOV]or 100%[NOV]-$ Zoning Permit Total 48,667.20$ Sewer Allocation Fee WWA-21-159 #204 9,668 g.p.d x 13.06$ 126,264.08$ Bartlett Bay X Airport Parkway Road Impact Fee #221 196 VTE pm peak 195,972.56$ per #SP-21-046 Fire Impact Fee #203 -$ Police Impact Fee #222 31,493.36$ Dorset Street Waterline Fee #230 -$ Sewer Connection Inspection WW-22-19 ww 63.00$ 63.00$ Total (Impact Fees + Permit)402,460.20$ Planning & Zoning Invoice Non-Residential Impact & Permit Fees Amount Due sq. ft building at 4"X4" VAOT CONCRETEMONUMENT 1.5' A.G. LEANING NORTHERLY 1/2" REBAR FOUND W/ METAL CAP MARKED"TCE" 0.2' B.G. 1/2" REBAR FOUNDWITH NO CAP & LOOSE LOCATED AT BASE CALCULATED POINT MAP SLIDE #514 CALCULATED POINT MAP SLIDE #637 1/2" REBAR FOUND WITH CAP MARKED "TCE" CONCRETE MONUMENTFOUND W/ REBAR IN CENTER FLUSH 1/2" REBAR FOUNDFLUSH 1' SOUTH OF SIDEWALK 1" REBAR FOUNDWITH ALUMINUM CAP MARKED "TCE LAND SURVEYING" 0.4' A.G. 1" REBAR 0.5' A.G.W/ ALUMINUM CAP MARKED "TCE LAND SURVEYING LLS 732" 4"X4" VAOT CONCRETE MONUMENT FOUND 1.3' A.G. LEANING SOUTHERLY LOCATED AT BASE 2" IRON PIPE FOUNDLAYING ON GROUND IN FENCE LINE 4"X4" VAOT CONCRETE MONUMENT FOUND 1.6' A.G. SHOT ON TOP CALCULATED POINT MAP SLIDE #637 S 76°08'09" E 335.08'N 7°45'49" W920.07'N 77°04'52" E 81.94'N 10°45'59" E867.10'N 81°29'11" E 123.47' N 79°03'53" W 279.50' "20'' WIDE SEWER EASEMENT TO CITY OF SO. BURLINGTONV. 131 P.134" COMMUNITY DRIVE WETLAND WETLAND WETLAND BUFFER(CLASS II) WETLAND CONCRETE PAD TRANSFORMER PAD ELECTRIC UTILITY ELECTRIC UTILITY WHALES TAILS PAT H WHALES TAILS PATH ENEN ENEN EN ENENBATTERY STORAGE BUILDING ENEN OHDOHD2' LD2' LD4' LD4' LD22 ' 20'R 20'R 88'R100'R20'R20'R 24' 30'R40'R 40 ' R 24'30'R 30'R 20'R20'R20'R 100'R20'R 30'R100'R37'R300'R 100'R 100'R100'R6'R 5'R BUILDING FOOTPRINT: 77,580 SQ. FT. PARKING PARKING PARKING EXTERIOR SERVICE AND DOCK AREA PARKING BUILDING FFE 350.00 PARKING FFE 350.00 FFE 350.00 PARKING PARKING 400 - PARKING SPACES PARKING PARKING FULLY ENCLOSED TRASH AND RECYCLING DUMPSTERS BUILDING FOOTPRINT: PROPOSED: 77,580 SQ. FT. (CLASS III) SoBu WETLAND BUFFER (CLASS III) SoBu WETLANDBUFFER (CLASS III) SoBu WETLAND BUFFER (CLASS III)SNOW STORAGESNOW STORAGESNOW STORAGE SNOW STORAGE ENEN 6'R 5'R (TYP) 22' ONE STORY/HIGH BAY AREA OF WAREHOUSE TWO STORY AREA OF WAREHOUSE ONE STORY OFFICE AREA THREE STORY OFFICE BUILDING of Project Number Sheet Drawing Number Drawing Title Issued for Checked byDesigned by Appvd.DateRevisionNo.Saved Thursday, January 20, 2022 9:45:06 AM JZWEBER Plotted Thursday, January 20, 2022 11:07:34 AM Chris Hale-Sills\\vhb\gbl\proj\SBurlington\58550.01 OnLogic Facility\cad\ld\Planset\5855001-LM.dwg vhb.comDate 40 IDX Dr Building 100 Suite 200 South Burlington, VT 05403 802.497.6100 OnLogic Facility Technology Park, Lots 11, 12 & 13 South Burlington, VT 05403 Permit Review Only October 28, 2021 34 58550.01 Architect: P&Z Staff Review Comments 12/06/2021 JZ/MW1 Additional Changes for P&Z and L. Dock 12/29/2021 JZ2 Parking Fingers/ Remove Depict Abutter Wetlands 1/3/2022 JZ3 E. Driveway / FD Comments / Refine Grade & SW 1/20/2022 JZ4 Feet10050025 Site Plan 3 C-2.10 CHS/ERK/WAF JRZ 6" CONCRETE CURB LEGEND