Loading...
HomeMy WebLinkAboutSD-22-04 - Supplemental - 0119 Tilley Drive (26) M E M O R A N D U M To: Marla Keene, City Planner Development Review Board members City of South Burlington, Department of Planning and Zoning From: Gail Henderson-King, Senior Project Manager Date: April 27, 2022 Re: University of Vermont Medical Center – Outpatient Surgery Center Sketch Plan Application Additional Information for May 4th DRB Hearing To follow up on the discussion at the DRB Sketch Plan hearing on April 5th for the University of Vermont Medical Center (UVM Medical Center) Outpatient Surgery Center project, we have prepared the following information in response to questions at the meeting and in the Staff Report dated March 25, 2022. Staff Report Comments 1. If the applicant wishes to conserve the remainder of the site as permanent open space, Staff considers a master plan may not be required, otherwise a master plan should be required. Staff recommends the Board discuss with the applicant. As discussed at the DRB hearing, no further development is planned for the site. The UVM Medical Center agrees to conserve the northern portion of the site as permanent open space. 2. Staff recommends the Board discuss with the applicant locating the site access to the east in order to eliminate natural resource impacts. As discussed at the DRB hearing, having the site access to the east does not physically work. The topography of the site combined with the existing 100 ft Green Mountain Power easement, dictates the site layout. Since zoning requires parking to be behind or beside the building, that necessarily means the parking must be on the northern portion of the site, north UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 2 | Page of the 100 ft GMP easement, and the building must be south of the GMP easement close to Tilley Drive. Patients arriving for surgery must have easy access the facility. This means parking must be in close proximity and have gentle slopes to the front entrance of the building. Due to the higher elevation of the northern portion of the site where the parking must be located, this limits how far downslope the main floor of the building can be. Due to the topography, the south and east sides of the building will be an entire floor level too low to allow the necessary relationship between the parking and the patient entrance. Thus, the entrance must be on the north or west side. Since zoning requires the entrance to face the front or corner the north side does not work as it would turn the back of the building to Tilley Drive. That results in the location of the entrance on the west side where it is at the corner of the building and will be easily seen by arriving patients. Here are some more details: - Patient centric criteria is of utmost importance for the Outpatient Surgery. - There needs to be an easily accessible drop off / pick up area for unloading and helping patients in and out as needed especially if they are using a wheelchair. - The building and entrance need to be easily seen and accessed from Tilley Drive for patients to they know where to go. - The building needs to be oriented to take advantage of natural daylight. - There needs to be Americans with Disabilities Act (ADA) accessible walkways from the parking area to the building. - There needs to be a loading area that is separate from the entrance to the building and is located away from the residential neighbors. - MEP (mechanical, electrical, plumbing) equipment associated with the building is needed in close proximity to the building: chillers, generator, fuel cell, oxygen farm. In addition, there are site restrictions that had to be considered for the layout of the project. - Easements: There is a 100’ Green Mountain Power ROW and 20’ Champlain Water District easement that crosses the middle of the site. An extremely limited grade change is allowed in these ROW and easement. - Topography: The site slopes from northwest to southeast. There is an approximately 26’ grade change from west to east, and approximately 19’ grade change from north to south. The site slopes from high point mid site both northeast and southeast with the lowest grades along east side of property. The lowest part of the site is on the east side where stormwater collection and treatment system need to be located. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 3 | Page - Wetlands: There are two Class III wetlands on site. These wetlands have been delineated and reviewed by Gilman & Briggs. They are isolated, are not connected to each other or to another water source and have minimal functions and values. - Ledge: Ledge exists throughout the site and is visible in the center of the site with exposed pieces. There is substantial ledge under the proposed building location and avoiding impacting it as much as possible is a high priority. - Zoning: The building oriented towards the road, cannot be located on the northern side of the site because parking required on side or rear of building. Setback requirements include an increased buffer from residential zoning district to the west and north. Limited Class III wetlands impacts are allowed. Must handle and treat stormwater on site. All of these factors were carefully considered in locating the building where it is located. The function of the building fits into and takes advantage of the topography of the site and meets patient centric criteria. The building is two story building with main floor operating rooms. The partial lower level is for sterilization, locker and changing rooms, materials handling and storage, shipping, and receiving/loading dock. The patient entrance is aligned with the most direct, level approach to building and visible from Tilley Drive. The building placed between GMP and CWD easements / ROW, wetlands, and setbacks, and is positioned to minimize wetland impacts, excavation, and existing ledge removal. The MEP equipment is located in close proximity to the northeast side of building. The drop off area at the front entrance has a canopy overhang for patients. Unlike the lower level, which is largely below ground with limited natural light, the patient level is above grade maximizing natural light. Flipping the building and entrance to occur on the eastern side of the site will not physically work. With the site restrictions: wetlands and topography, patient access and parking would not work. The parking lot would be significantly higher than the east entrance a floor level lower. This would require, at best, a circuitous pedestrian route from parking to entrance to achieve acceptable grades. It would also place the patient level largely below grade with little natural light. The entrance would not be readily visible to patients arriving at the site. Furthermore, there is not enough room to fit both the drop off area and stormwater ponds on east side without moving the building west which would place the building in the wetlands, which is not allowed under zoning. The service entrance and patient access would become intertwined and problematic, and the loading dock would be on upper level near neighbors’ residences and at a high grade at west. Based on this, it is not possible to have the access from the east due to the physical limitations and the functional requirements the UVM Medical Center has for this Outpatient Surgery Center. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 4 | Page 3. Staff considers discussion of minimizing these impacts is necessary if the Board entertains permitting a restricted infrastructure encroachment. We reexamined the design of the driveway entrance to the site in relation to the Class III wetlands impacts and provide the following information. - The Existing Wetlands Plan sheet W-1.0 prepared by Krebs & Lansing shows the two Class III wetlands located on the site. The wetlands were delineated by Gilman & Briggs Environmental, Inc. in 2019. Wetland A has 3,966 sq. ft. and wetland B has 10,249 sq. ft. on Lot 6. - Gilman & Briggs Environmental, Inc. prepared a wetlands analysis report. The report analyzes the wetland functions and values of these wetlands and concluded they have minimal functions and values. - We prepared a concept sketch titled Drive Design Original prepared by Krebs & Lansing showing the proposed plan layout with the Wetland B impacts. The proposed driveway bifurcates Wetland B in a manner which retains a wetland area to the west of the drive as well as a wetland area between the drive and the building. This is proposed to be enhanced with wetland conservation mix with plantings. The layout impacts approximately 5,640 sq. ft. - We prepared a concept sketch titled Drive Design Option #1 prepared by Krebs & Lansing showing a revised driveway layout with the Wetland B impacts. This concept sketch shows the driveway shifted to the east with a retaining wall and guard rail located along the west side. This design option #1 impacts 1,590 sq. ft. Below is a summary of the wetland impacts for each option. Class III Wetlands Impacts - Lot 6 Total Sq. Ft. on Lot 6 Proposed Sq. Ft. Impacts: Original Design Proposed Sq. Ft. Impacts: Design Option #1 Wetland A 3,996 0 0 Wetland B 10,249 5,640 1,590 While the Drive Design Original sketch is preferred as it functions best for the proposed Outpatient Surgery Center, the Drive Design Option #1 appears feasible. We still need the South Burlington fire chief to review the plans and provide input. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 5 | Page 4. The Board should direct the applicant to provide a wetland delineation on Lot 2 in the location of the planned future roadway in order to determine if any part of the future roadway must be accommodated on the subject property (again, in common ownership with Lot 2) or if it may be permitted on Lot 2. Provision of roadways on the official map is a requirement of LDR 15.A.11C and 15.A.14B. Whether the lands are developed or conserved, sufficient space for the future roadway must be retained if the future roadway cannot be accommodated on Lot 2. Lot 2 is not part of this project nor is part the Sketch Plan application for the UVM Medical Center Outpatient Surgery Center. The plan included on page 5 of the Staff Report for the April 5, 2022 DRB meeting includes a wetland map that appears to be the same or similar to what we know of regarding Lot 2. Furthermore, the City already has a 100 ft easement for the future road connection. It was included in a previous approval for Mountain View Business Park. When Pizzagalli Properties received approval for the Tilley II Subdivision, the DRB requested a 100 foot easement across Lots 1 and 2 and labeled as proposed future interstate off ramp. We have attached documents provided by Pizzagalli Properties that includes their engineer’s response to City comments regarding the Tilley II Subdivision permitting along with the official subdivision plan that shows this requested and approved 100 foot easement. Our understanding from Pizzagalli Properties is this is the only official reference to this easement. Nonetheless, as stated at the April 5, 2022 DRB meeting, UVMMC is willing to work with the City in the future to accommodate road connections to points A and/or B on the portion of Lot 6 located north of the proposed parking. 5. The Board should direct the applicant to provide a 50 or 60-ft ROW on the subject property (dimension to be determined based on development plan for the northern portion of the parcel) from the O’Brien roadway to the planned north south roadway in a location that is viable given the topography. If master plan is required, it should include the roadway connection. As stated at the April 5th DRB hearing, the UVM Medical Center is happy to work with the City and O’Brien Eastview development on the location of a future roadway A connection through the northern end of Lot 6. The exact location can be determined at a later date once it is decided whether the City wants to make the connection and where it should be located. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 6 | Page 6. Staff recommends the Board should direct the applicant to provide a driveway connection from the site to the north-south official map roadway. Staff notes that if the site were accessed via the east, this objective would be addressed. The UVM Medical Center is overly concerned if they provide a driveway connection to the future roadway B that vehicles from the residential neighborhoods and others will use it as a cut through. In addition, having vehicles entering the site from future roadway B could impact the entry to the Outpatient Surgery Center. 7. Further pursuant to access and circulation, Staff recommends the Board discuss with the applicant what the general traffic patterns will be for the site. The applicant has provided a loading dock. Does the applicant’s proposed site configuration minimize conflicts between passenger vehicles, larger vehicles, and pedestrians? The proposed layout and circulation of the site has been designed to avoid conflicts between vehicles, pedestrians, and delivery vehicles. Patient access to the main floor of the building is separate from the loading docks at lower level. The delivery area has been designed so trucks will not access the parking lot. Deliveries are planned to predominantly occur before or after operating hours. These deliveries mostly consist of loading supplies: clean and dirty linens, etc. 8. Since this is a large number of new trips, and since the applicant may instead opt to use site-specific studies to estimate trip generation, Staff recommends the Board invoke third- party technical review of the applicant’s traffic study, including traffic safety, at this time to enable it to be fully reviewed prior to the site plan hearing. The UVM Medical Center has retained a traffic engineer who is preparing a traffic study for the project. We will provide the traffic study as part of the site plan application and understand a third party technical review will be required. 9. Staff recommends the Board discuss with the applicant what a setback and buffer containing a recreational path might look like were it designed in a way to meet the applicable regulations. We considered the option of a recreational path in the setback and buffer area to the west of the parking area. However, several issues came to light regarding grading and stormwater runoff in addition to the neighbors having concerns about a recreation path too close to their properties. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 7 | Page The UVM Medical Center will commit to working cooperatively with neighbors and City as to where a recreation path could be located. However, it is important to not hold up this project while a location and design is worked out. 10. Staff recommends the Board discuss with the applicant what placement and screening would be considered adequate for the proposed equipment. We will provide appropriate landscape screening for the proposed MEP equipment along the eastern property line to include evergreen trees. 11. Staff recommends the Board direct the applicant to include a front or corner-facing entry, as the existing standards support this configuration, standards likely to be in effect at the time of application will state this more strongly, and the site configuration supports this layout. The proposed main patient entry of the building is corner facing, located as close to the southwest corner of the building as it can be. Moving it any further south would make the grade from Tilley Drive to the entry too steep. The south facing portion of the entrance has considerable glass helping address the street and allowing patients and visitors to see it clearly from a distance. On the north side of the canopy is the exit door for patients following surgery. The driveway leading to the main entry with the canopy extension allows patients to be dropped off and the driver to continue to the parking area. Patients can easily access the handicapped and patient parking. This layout meets the patient centric design criteria that the UVM Medical Center uses for its facilities. We looked at keeping the entry vestibule in its present location but moving the door from the west side to the south side of the vestibule. A concept sketch titled Partial Site Plan with south Entry Option shows this layout. The canopy would need to be extended with the front entry shifted to the south façade. It would involve the reduction of several handicapped parking spaces which are critical to have at the entry. There would be circulation and cuing issues at the drop off as vehicles would stop when they see the entry and possibly block circulation. After people park their cars to come into the Outpatient Surgery Center, they would see the exit door before seeing the entry causing wayfinding issues. This option is not patient centric and would create several potential conflicts with vehicular and pedestrian traffic. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 8 | Page We prefer the west facing entrance on the proposed illustrative site plan over this concept for the functionality of the site and building entry. Other  Staff recommends the Board discuss with the applicant whether the provided front parking represents the minimum necessary. The proposed handicapped parking spaces shown in the front yard represent the minimum necessary. The handicapped parking spaces shown on the plan are required to meet ADA and need to be located closest to the main entry of the building. The illustrative plan highlights the location of the patient parking on the site and there are only a few spaces located at the main entry. UVM Medical Center – Outpatient Surgery Center Memorandum: Sketch Plan Application Additional Information for May 4th DRB Hearing April 27, 2022 9 | Page Attachments The following attachments that are referred to above are included with this memorandum. 1. Tilley II Subdivision Overall Site Plan – Record Drawing prepared by Hamlin Engineering dated 05/26/2004 2. Tilley II Subdivision Hamlin Engineering letter to City of South Burlington dated 11/02/2004 3. UVMMC Lot 6 Tilley Drive Existing Wetland Plan Sheet W-1.0 prepared by Krebs & Lansing dated 08/02/2021 4. Gilman & Briggs Environmental, Inc. Wetlands Analysis dated 07/28/2021 5. Outpatient Surgery Center Drive Design Original sketch prepared by Krebs & Lansing dated 04/26/2022 6. Outpatient Surgery Center Drive Design Option #1 sketch prepared by Krebs & Lansing dated 04/26/2022 7. Outpatient Surgery Center Partial Site Plan with South Entry Option sketch prepared by e4h dated 04/13/2022 8. Outpatient Surgery Center Illustrative Site Plan 2.03 dated 04/26/2022 9. Outpatient Surgery Center Exterior View at Drop Off prepared by e4h dated 04/26/2022 Please Reply to: P.O. Box 9 Essex Junction Vermont 05453 November 2, 2004 Mr. Raymond J. Belair City of South Burlington 57 5 Dorset Street South Burlington, Vermont 05403 Re: Tilley II Subdivision Dear Mr. Belair: DONALD L. HAMLIN CONSULTING ENGINEERS, INC. ENGINEERS AND LAND SURVEYORS 136 Pearl Street Essex Junction, Vermont 05452 Tel. (802) 878-3956 (802) 878-5123 Fax (802) 878-2679 We are writing on behalf of Pizzagalli Properties to provide a summary of the revisions made to the plans for the above referenced project, in response to the comments and approval conditions received from the City of South Burlington. For your convenience, we have presented the City's numbered comment in italics, followed by a brief discussion in response to the comment. South Burlington Development Review Board Conditions of Approval, dated August 9. 2004 1. All previous approvals and stipulations shall remain in fall effect, except as amended herein. No response necessary. 2. This project shall be completed as shown on the plans submitted by the applicant, as amended by this decision, and on file in the South Burlington Department of Planning & Zoning. No response necessary. 3. The plat plans shall be revised to show the following changes and shall require approval from the Administrative Officer. Four (4) copies of the approved revised plat plans shall be submitted to the Administrative Officer prior to recording: 3a) The plans shall be revised to comply with the requests of South Burlington Water Department, as outlined in the memorandum from Jay Nadeau, dated July 14, 2004. See below. 3b) The plans shall be revised to comply with the requests of the City Engineer, as outlined in his memorandum dated July 8, 2004. See below. 3c) The plans shall be revised to comply with the requests of the City Arborist, as outlined in his memorandum dated July 2 7, 2004. The requests of the City Arborist will be addressed by the landscaping consultant for this project. WATER SUPPLY AND DISTRIBlITION SUBDIVISIONS SKILIFfS TRAFFIC STUDIES PERMITTING ASSISTANCE LAND SURVEYING WASTE WATER COLLECTION AND TREATMENT STREETS AND HIGHWAYS AIRPORTS RECREATION AND INDUSTRIAL PLANNING SOIL BORINGS Engineering -"The link between what we have and what we need" SOLID WASTE MANAGEMENT Page2 3d) The plans shall be revised to account for the necessary traffic mitigation measures (left & right turn lanes on Hinesburg Road), as determined by the applicant's traffic engineer, the consulting firm performing the technical review, and staff, prior to recording of the final plat plans. A Preliminary Site Plan for the left and right turn lanes on Hinesburg Road have been submitted to your office. 3e) The plans shall be revised to depict the easement running north across the subject property, from I-89 to the property to the north, at a width of 100 '. The plans have been revised to increase the width of this easement from 80' to 100' throughout its length. 31) The survey plat shall be revised to depict an 80' wide access easement extending from Tilley Drive to the easterly property boundary. The plat has been revised in response to this comment. 3g) The plans shall be revised to show the location and details of the proposed street lights. The number and location of the street lights shall be approved by the City Engineer. The installation of street lights was discussed with the City Engineer at meeting on 07/22/04. At that time, the City Engineer concurred that the installation of street lights is not required as part of this approval. Power will be installed along the roadway as part of the construction, which will be available to support future street lights, as appropriate. 4. The proposed project shall adhere to standards for erosion control as set forth in Section 16.03 of the South Burlington Land Development Regulations. In addition, the grading plan shall meet the standards set forth in Section 16.04 of the South Burlington Land Development Regulations. No plan revisions were required in response to this comment. We believe the project plans conform to the referenced standards of the South Burlington Land Development Regulations. 5. Pursuant to Section 15. 13(E) of the Land Development Regulations, any new utility lines, services, and service modifications shall be underground. All utilities related to this project will be underground. 6. The applicant shall post a landscape bond for $31, 000 for street trees prior to the start of road construction. This bond shall remain in effect for three (3) years to assure that the landscaping has taken root and has a good chance of surviving. The applicant will post the required landscape bond prior to the start of the road construction. 7. Pursuant to Section 15.17 of the South Burlington Land Development Regulations, prior to issuance of the first zoning permit or start of utility or road construction, the applicant shall submit all appropriate legal documents including easements (e.g. irrevocable offer of dedication and warranty deed for proposed public roads, utility, sewer, drainage, water, and recreation paths, etc.) to the City Attorney for approval and recorded in the South Burlington Land Records. The appropriate legal documents will be submitted to the City Attorney for approval and recorded in the land records prior to the start of construction. DONALD L. HAMLIN Page 3 8. Prior to the start of construction of the improvements described in condition #7 above, the applicant shall post a bond which covers the cost of said improvements. The applicant will post a bond for the roadway improvements prior to the start of construction. 9. Pursuant to Section 15.14(£)(2) of the South Burlington Land Development Regulations, within 14 days of the completion of required improvements (e.g. roads, water mains, sanitary sewers, storm drains, etc.) the developer shall submit to the City Engineer, "as-built" construction drawings certified by a licensed engineer. Record drawings will be submitted to the City Engineer upon completion of the roadway construction work. 10. Prior to recording the final plat plans and pursuant to Section 15.17 of the South Burlington Land Development Regulations, the applicant shall submit a Certificate of Title showing the ownership of all property and easements to be dedicated or acquired by the City, and said Certificate of Title shall be approved by the City Attorney. A Certificate of Title will be submitted to the City for approval prior to recording of the final plat plans. 11. The left and right turn lanes on Hinesburg Road shall be constructed prior to occupancy of the first building constructed in this subdivision, unless the applicant can demonstrate, using traffic counts and projections, that the lanes are not warranted at that time. As part of the first building project, the turning lane warrant analysis will be updated to reflect current traffic counts and projections. If the turning lanes are warranted and the analysis approved by VTrans, construction of the turning lanes will be completed prior to occupancy of the first building project in this subdivision. 12. A trip generation and traffic impact analysis including turning movement analysis shall be conducted as part of the review of the fourth building in this development. This work will be performed as part of the fourth building project in this development. 13. The applicant shall comply with the requests of the South Burlington Natural Resources Committee, derived at their March 4, 2004 meeting, as follows: l 3a) The proposed parking spaces should be reduced to the greatest extent allowable by the Development Review Board, in order to minimize wetland impacts; This matter will be taken into consideration during the design of the individual lot developments. 13b) There should be no mowing in the wetlands or their associated buffers and the area should remain in a natural state; No response necessary. 13c) There should be no pesticides applied to the wetlands or their associated buffers; No response necessary. 13d) All disturbed earth shall be stabilized and seeded; AND No response necessary. 13e) Vegetation in the wetlands or their associated buffers shall not be removed, with the exception of a three (3) foot buffer along the interior fence-line for maintenance purposes. No response necessary. DONALD L. HAMLIN Page4 14. Any changes to the final plat plans shall require approval of the South Burlington Development Review Board. No response necessary. 15. The final plat plans (survey plat) shall be recorded in the land records within 90 days or this approval is null and void. The plans shall be signed by the Board Chair or Clerk prior to recording. Prior to recording of the final plat plans, the applicant shall submit a copy of the survey plats in digital format. The format of the digital information shall require approval of the Director of Planning & Zoning. This information has previously been submitted to your office. South Burlington Water Department comments, dated July 14, 2004 1. At this time the City of South Burlington does not have sufficient water storage for any new project requiring more than 1,000 gallons per day (gpd) in this water service area. No construction shall be permitted that may restrict or encumber water supply and storage for the City's current customers until additional storage has been made available. No response necessary. 2. Please complete the Application for Water Allocation and return it to the South Burlington Water Department as soon as possible. As your project continues, the Application for Water Allocation will need final approval, which will be contingent upon construction of additional water storage volume serving this section of the City. Final engineering and construction is underway and the estimate on line date for the new tank is November 2004. An Application for Water Allocation has been submitted to the South Burlington Water Department. 3. All domestic services and fire sprinkler systems that are connected to the public water system shall be protected with a backjlow prevention assembly, and an appropriate thermal expansion system in compliance with the Ordinance For The Control OF Cross Connections Within The Water System Of the City O[South Burlington. Please contact this department for more information on backjlow protection devices. This comment will be taken into consideration during the design of the individual buildings. 4. The City of South Burlington Water Ordinance states that the property owner shall be responsible for constructing the main to the property's farthest property line for continuation to adjoining properties. This City requirement must be considered in design of the proposed future connector road. At that time the owner may be required to install a water line extension to the farthest property line. If required, the extension of the water line to the furthest property line (to the east) will be incorporated into the design of a future road extension. 5. Typical Hydrant and Gate Valve Detail: All hydrant drains shall be plugged prior to installation. Mechanical joint restraints shall have twist off nuts (i.e. Mega-Lug) or approved grip rings. The Typical Hydrant and Gate Valve Detail has been revised in response to this comment. 6. Typical Trench Detail: A detectable underground marking tape is not required as the DI pipe shall have no less then three brass wedges installed at each pipe joint. The typical trench detail has been revised in response to this comment. DONALD L. HAMLIN Page 5 7. Eight-inch Ductile Iron (DI) water pipe shall have no less than three (3) brass wedges installed at each joint. Bury depth to the new main shall be six feet (6) to the top of the pipe. This comment has been addressed. 8. All hydrants shall meet the aforementioned specifications, and a hydrant flag shall be supplied with each hydrant. Hydrant drains shall have all drains plugged prior to installation. Waterous Pacer fire hydrants must be ordered with a "Boston " operating nut installed before placing the water line in service. The plans and specifications have been revised in response to this comment. 9. No underground utility lines or structures shall be installed within four feet from the water main on either side, from the top of the main to the finish grade, with the exception of storm sewer and sanitary sewer lines as stated in the above referenced Specifications. Trees shall not be placed over any water main or service line, nor placed within 20' of any appurtenance, including fire hydrants. Generally other underground utilities shall be placed on the opposite side of the road from proposed or existing water mains. No response necessary. 10. Separation between the water main and service line and nearby sanitary and storm sewer lines shall comply with the VT WSR requirements and the above referenced Specifications. No response necessary. 11. The South Burlington Water Department ordinance states that "All water lines and appurtenances not located in the City right-of-way or public grounds shall be considered private pursuant to the ordinance and others of the City," and; All of the water lines and appurtenances located in the City right-of-way are intended to be publicly owned and maintained. 12. "The Department shall not maintain any water lines that have not formally been accepted by the City, except in subdivisions that are designed to Department specifications and are intended to be accepted,: and; See Item #11 above. 13. "All water lines and appurtenances located within an area so designated as restricted or private by the developer shall be considered private." See Item #11 above. 14. At this time private fire hydrants are assessed a $100 per hydrant annual fee. All hydrants installed as part of this project are intended to be publicly owned and maintained. 15. Prior to any building construction, the building contractor must contact this Department to discuss City requirements for meter sizing, meter settings, and backflow protection. No response necessary. 16. The SBWD shall be sent any future hard copy plans involving this project for review independent from those plans sent to the Planning and Zoning Department. A set of final plans will be submitted to the SBWD. DONALD L. HAMLIN Page6 17. The SBWD shall be notified prior to baclifilling to inspect all fittings, main line taps, appurtenances, water line crossings, and testing. No response necessary. 18. Further review changes may be required as this project proceeds through the permit process. The SB WD shall be provided a final plat for this project prior to recording for final review and approval. No response necessary. 19. A hard copy set of As-Bui/ts as well as one electronic copy in Auto-CAD.DWG Version 14 Format or newer shall be supplied to this department upon completion of the water system improvements. No response necessary. Citv Engineer comments, dated Julv 8, 2004 On July 22, 2004 we met with the City Engineer to review and address the comments. 1. Bike path shall be constructed one foot from the street north R. 0. W The plans have been revised to show the bike path one foot from the right-of-way on the north side of the roadway prior to the culvert crossing. At the box culvert crossing, the bike path is shown closer to the roadway, in order to minimize impacts to the wetlands. This concept was agreed upon at our meeting with the City Engineer. 2. Bench marks shall be noted on the plans. The plans have been revised to include a bench mark. 3. Roadway in vicinity of the box culvert shall have a guardrail on both sides of the street. The plans have been revised to include guardrail on both sides of the roadway in the vicinity of the box culvert. 4. Sewage pumping station design data shall be noted on the plans. The station will be owned and maintained by an association of users. The design of the station shall be reviewed and approved by City Water Pollution Control Superintendent. At our meeting, we indicated that, as the roadway is to be turned over to the City, we envision that the sewage forcernain and pump station will also be turned over to the City. The City Engineer was going to check on this matter with the Water Pollution Control Department and let us know ifthere is any further action required by the applicant. To date, we have not heard back from either the City Engineer or the Water Pollution Control Department regarding this matter. 5. Design data for the emergency sewage storage tank shall be noted on the plans. The plans have been revised to include this information. 6. Curb cuts to serve lots shall have depressed concrete curbs. The plans have been revised to show depressed concrete curbs at proposed curb cuts. 7. Barrier concrete curbing shall be continuous around the cul-de-sac. At our meeting, we indicated that we were proposing to install curbing around the inside of the cul-de-sac only. The pavement surface around the cul-de-sac is proposed to slope away from the center and therefore no curbing is proposed around the outside. The City Engineer found this to be acceptable. DONALD L. HAMLIN Page 7 8. Sewage pumping station controller shall be placed close to the wet well opening. The pump station specifications state that the pump controls are to be installed in a location adjacent to the pump station. South Burlington Water Department comments, dated September 14, 2004 l. This Department has received your Application for Water Allocation requesting 9, 990 gpd. A conditional water allocation letter is attached to this plan review. As your project continues, the Application for Water Allocation will need final approval, which will be contingent upon construction of additional water. storage volume serving this section of the City. Final engineering and construction is underway and the estimated on line date for the new tank is November 2004. No response necessary. 2. The proposed fire hydrants shall be spaced approximately 500' apart from the last existing fire hydrant in Phase 1, with the last hydrant located near the end of the proposed water main. The last hydrant shall be installed just prior to the last 8" gate valve with end cap and thrust block, and after the last 6" service line near station 28+ 70. After speaking with Mr. Nadeau on 10/15/04, we have made the following changes to the plans; the hydrant at station 21 +50 has been relocated to station 23+95, the hydrant at station 27+ 15 will remain, and a new blow-off has been provided at the end of the water line. 3. The 8" gate valve near station 25+20 can be removed, as there is a gate valve at station 24+00 and one at station 26+80. The plans have been revised in response to this comment. 4. All water mains shall be polyethylene encased. The Typical Trench Detail for Ductile Iron Waterline has been revised in response to this comment. 5. All domestic services and fire sprinkler systems that are connected to the public water system shall be protected with a backflow prevention assembly, and an appropriate thermal expansion system in compliance with the Ordinance For The Control Of Cross Connections Within The Water System Of the City of South Burlington. Pi ease contact this department for more information on backflow protection devices. This comment will be taken into consideration during the design of the individual buildings. 6. Typical Hydrant and Gate Valve Detail: All hydrants drains shall be plugged prior to installation. Mechanical joint restraints shall have twist off nuts (i.e. Mega-Lug) or approved grip rings. The Typical Hydrant and Gate Valve Detail has been revised in response to this comment. 7. Typical Trench Detail: A detectable underground marking tape is not required, as the DI pipe shall have no less then three brass wedges installed at each pipe joint. The typical trench detail has been revised in response to this comment. 8. Eight-inch Ductile Iron (DI) water pipe shall have no less than three (3) brass wedges installed at each joint. Bury depth to the new main shall be six feet (6 ') to the top of the pipe. This comment has been addressed. DONALD L. HAMLIN TNEW SMH 8-1NEW SS1EX SMHNEW SS2NEW 6" INV.385.00POND OUTLET 1EX CBNEW SD1NEW SD2POND OUTLET 2EVEVT5+00SWR3+00SWR4+00SWRWetland B 2019 Wetland A 2019 REVIEW AREA - Lot 6 - Total Area = 13.53 acres / 589,413 sf. Wetland A: Total Area = 4,111sf. Area on Lot 6 = 3,966 sf Wetland B: Total Area = 10,862 sf. Area on Lot 6 = 10,249 sf CIVIL ENGINEER SCALE: REVISED: DRAWN BY: PROJECT NO: DATE: CONTENT: Project Phase W-1.0 TJB CONCEPT DRAWINGS UVMMC LOT 6 TILLEY DRIVE Tilley Drive, South Burlington, VT. NO. DESCRIPTION DATE 21202/12223 1" = 50' Existing Wetland Plan PERMIT REVIEW ONLY 164 Main Street, Suite 201, Colchester, VT 05446 T: (802) 878-0375 F: (802) 878-9618 email@krebsandlansing.com Vermont State Plane Grid North (NAD83) 8/02/21Tilley DriveHinesburg Road / Route 116 REVIEW AREA LOT 6 Mountain View Business Park Gilman & Briggs Environmental, Inc. 1 Conti Circle, Suite 5 Barre, Vermont 05641 Tel: (802) 479-7480; FAX: (802) 476-7018 team@gbevt.com Two wetlands have been identified in the vicinity of Mountain View Business Park Lot 6 off Tilley Drive in South Burlington. These wetlands are shallow depressions on formerly agricultural lands. They were originally delineated in April 2006 using the methodology found in the 1987 U.S. Army Corps of Engineers Wetland Delineation Manual, and re-delineated in October 2019 using the Manual and the 2009 Regional Supplement as required by the Vermont Wetland Rules . Neither wetland is shown on the Vermont Significant Wetlands Inventory, and because of their size, location and lack of functional value, they were determined to be Class III by the Vermont Department of Environmental Conservation on 28 October 2019. These wetlands occupy areas mapped as poorly drained Covington silty claw and are dominated by reed canary-grass (Phalaris arundinacea), meadow foxtail (Alopecurus pratensis), as sedge (probably Carex crawfordii), creeping bent (Agrostis stolonifera) and water-pepper (Persicaria hydropiper). They would be classified as seasonally saturated emergent (PEME) wetlands. I performed an analysis of these wetlands’ functions and values, and per Art. 12.02 D(1) of the Regulations, we submit the following report: Water Storage for Flood Water and Storm Storage: These wetlands are very small, not contiguous to streams and not part of a collection of small wetlands that that provide this function collectively. Additionally, there is minimal storage capacity in these wetlands. Surface and Ground Water Protection. These wetlands are very small, not contiguous to streams and not part of a collection of small wetlands that that provide this function collectively, therefore their capacity to perform this function is limited, and because there is no evidence of pollutant or sediment input, they also lack the opportunity to perform the function. Fish Habitat. There is no open water associated with these wetlands and no connection to wetlands that may contribute to the function, therefore they do not provide fish habitat. Wildlife Habitat. Wetland hydrology and character in these wetlands are at the drier end of the scale and do not support wetland dependent species, and current use results in frequent cutting and mowing. We did not note the presence of any wetland dependent species in either of these wetlands. Exemplary Wetland Natural Community. These wetlands meet none of the physical and vegetative characteristics that denote exemplary wetland natural communities. Rare, Threatened, and Endangered Species Habitat. No rare, threatened, or endangered species are associate with these wetlands. Education and Research in Natural Sciences. These wetlands lack any characteristics that would contribute to this function. Recreational Value and Economic Benefits. These wetlands lack any characteristics that would contribute to this function. Open Space and Aesthetics. Although these wetlands are readily visible from either Tilley Drive or Old Farm Road, they are more likely to be perceived as merely part of a hayfield than wetlands. Neither wetland has any special or unique aesthetic quality. Erosion Control Through Binding and Stabilizing the Soil. There are no erosive forces associated with these wetlands and therefore no opportunity to perform this function. Based on the foregoing, I conclude that encroachment into the wetlands and their buffer zones will not adversely affect the ability of the property to carry or store flood water adequately (Art. 12.02 E(3)(a), will not adversely affect the ability of the proposed stormwater treatment system to reduce sedimentation according to state standards (Art. 12.02 E(3)(b). and because the wetlands have minimal functions and values, Art. 12.02 E(3)(c) of the Land Development Regulations does not apply. Sincerely, Errol C. Briggs 28 July 2021 EVEVNew Building OSC 390 391 392 393 394387 387 388 389 390 391 392388389390 395397 398394391392393394 390 394390387W395396396 397 398393 391 390 390 388 387 3 9 4 393EELECELEC 394 387 393 B B BBENCHBENCHBENCHBENCHBENCH BENCH BENCH B +396395 394 393 390387 B FDC CL1 CL1 CL1 CL1 CL2 CL2 CL2 SIGN SIGN SL2 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL4 SL4 SR1SR1SR1SR1SR1 SR1 SR1 SR1 SR1 SR1 SR1 SR1 SR1 SS1 SS1 SS1 SS1 SW1HH HHOUTPATIENT SURGERY CENTER UVM HEALTH NETWORK LOT 6; TILLEY DRIVE SOUTH BURLINGTON, VT 05403164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com Date: Scale: Job No: 4-26-2022 1" = 40' 20102 Ref Drawing:C-1.1 Drive Design Original Table of Wetland Disturbance = 5640 sf X 395.0 Table of Wetland Buffer Disturbance = 16,990 sf EVEVNew Building OSC WEELECELECB B BBENCHBENCHBENCHBENCHBENCH BENCH BENCH B B FDCHH HHOUTPATIENT SURGERY CENTER UVM HEALTH NETWORK LOT 6; TILLEY DRIVE SOUTH BURLINGTON, VT 05403164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com Date: Scale: Job No: 4-26-2022 1" = 40' 21202 Drive Design Option #1 Table of Wetland Disturbance = 1590 sf 3' wide shoulder with guardrail and retaining wall 20102\dwgs\WB67 in OSC Entrance.dwg x 395.0 Table of Wetland Buffer Disturbance = 14,500 sf