Loading...
HomeMy WebLinkAboutSD-22-04 - Supplemental - 0119 Tilley Drive (20)EVEVNew Building OSC 390 391 392 393 394387 387 388 389 390 391 392388389390 395397 398394391392393394 390 394390387W395396396 397 398393 391 390 390 388 387 3 9 4 393EELECELEC 394 387 393 B B BBENCHBENCHBENCHBENCHBENCH BENCH BENCH B +396395 394 393 390387 B FDC CL1 CL1 CL1 CL1 CL2 CL2 CL2 SIGN SIGN SL2 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL3 SL4 SL4 SR1SR1SR1SR1SR1 SR1 SR1 SR1 SR1 SR1 SR1 SR1 SR1 SS1 SS1 SS1 SS1 SW1HH HHOUTPATIENT SURGERY CENTER UVM HEALTH NETWORK LOT 6; TILLEY DRIVE SOUTH BURLINGTON, VT 05403164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com Date: Scale: Job No: 4-26-2022 1" = 40' 20102 Ref Drawing:C-1.1 Drive Design Original Table of Wetland Disturbance = 5640 sf X 395.0 Table of Wetland Buffer Disturbance = 16,990 sf