Loading...
HomeMy WebLinkAboutSP-22-013 - Supplemental - 0000 Stonehedge Drive (6) DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS NEW ENGLAND DISTRICT 696 VIRGINIA ROAD CONCORD MA 01742-2751 November 8, 2021 CENAE-RDC-62 Regulatory Division File Number: NAE-2010-01133 Mr. Thomas DiPietro Deputy Director of Environmental Services Department of Public Works City of South Burlington 104 Landfill Road South Burlington, Vermont 05403 Dear Mr. DiPietro: The U.S. Army Corps of Engineers (USACE), has reviewed your application to place fill in about 13,083 sq. ft. (0.3 acre) of waters of the United States in conjunction with the construction of a swale to improve an existing stormwater system off Stonehedge Drive in South Burlington, Vermont. The work is shown on the enclosed plans, on two sheets, titled “Project Location” (dated “March 18, 2021”) and “WETLAND IMPACT PLAN” (dated “FEB. 2020”, revised “03.18.21”). Based on the information that you have provided, we verify that the activity is authorized under General Permit #17 of the enclosed December 6, 2017 Federal permit known as the Vermont General Permits (GPs). Please review the enclosed GPs carefully, including the general conditions beginning on page 26, to be sure that you and whoever does the work understand its requirements. A copy of the GPs and this verification letter shall be available at the project site throughout the time the work is underway. Performing work within our jurisdiction that is not specifically authorized by this determination or failing to comply with any special condition(s) provided below or all the terms and conditions of the GPs may subject you to the enforcement provisions of our regulations. You must perform this work in compliance with the terms and conditions of the GPs. You must complete and return the enclosed Work Start Notification to this office before the anticipated starting date. You must also complete and return the enclosed Compliance Certification Form within one month following the completion of the authorized work. This authorization presumes that the work as described above and as shown on your plans noted above is in waters of the U.S. If you wish, you may request an approved jurisdictional determination (which may be appealed), by contacting the Corps district for further instruction. -2- This authorization expires on December 6, 2022. You must commence or be under contract to commence the work authorized herein by December 6, 2022, and complete the work by December 6, 2023. If not, you must contact this office to determine the need for further authorization before beginning or continuing the activity. We recommend that you contact us before this authorization expires to discuss reissuance. Please contact us immediately if you change the plans or construction methods for work in our jurisdiction. We must approve any changes before you undertake them. This authorization does not obviate the need to obtain other Federal, state, or local authorizations required by law. We continually strive to improve our customer service. In order for us to better serve you, we would appreciate your completing our Customer Service Survey located at https://regulatory.ops.usace.army.mil/customer-service-survey. Please contact Michael S. Adams of my staff at (802) 872-2893 if you have any questions. Sincerely, Frank J. DelGiudice Chief, Permits & Enforcement Branch Regulatory Division Enclosures cc: Ms. Tina Heath, VT DEC, tina.heath@vermont.gov Ms. Charlotte Brodie, DuBois & King, cbrodie@dubois-king.com Mr. Thomas DiPietro, City of South Burlington, tdipietro@sburl.com Map created using ANR GIS mapping techology. 8,091 411.0 Natural Resources Atlas Vermont Agency of Natural Resources 6,129 © Vermont Agency of Natural Resources 311.0 1: WGS_1984_Web_Mercator_Auxiliary_Sphere Meters311.00 NOTES LEGEND156.00 vermont.gov DISCLAIMER: This map is for general reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. ANR and the State of Vermont make no representations of any kind, including but not limited to, the warranties of merchantability, or fitness for a particular use, nor are any such warranties to be implied with respect to the data on this map. March 18, 2021 THIS MAP IS NOT TO BE USED FOR NAVIGATION 1" = 511 1cm = 61Ft.Meters Wetland - VSWI Class 1 Wetland Class 2 Wetland Buffer Wetlands Advisory Layer Parcels (standardized) Roads Interstate US Highway; 1 State Highway Town Highway (Class 1) Town Highway (Class 2,3) Town Highway (Class 4) 256256254 2 5 4255256 256257257258 259 259260 260260 261 261 2 6 2262265265265266267268269270271 BUILDINGBUILDINGBUILDINGBUILDINGWE© Copyright 2019 Dubois & King Inc.PROFESSIONAL SEALENGINEERING· PLANNING·MANAGEMENT· DEVELOPMENT6 GREEN TREE DRIVESO. BURLINGTON, VT 05403TEL: (802) 878-7661FAX: (866) 783-7101www.dubois-king.comBRANDON, VTRANDOLPH, VTSPRINGFIELD, VTBEDFORD, NHLACONIA, NHSOUTHBURLINGTON,VERMONTSHEET OF XXXNOT FORCONSTRUCTIONPRELIMINARYPLANSSHEET NUMBER425766FEB. 2020PROJ. ENG.DRAWN BYCHECKED BYD&K ARCHIVE #D&K PROJECT #DATELDCLDCSHEET TITLESTONEHEDGEDRAINAGE SWALEBEGWETLAND IMPACTPLANW1·· -3- WORK START NOTIFICATION FORM ****************************************************************************** * EMAIL TO: michael.s.adams@usace.army.mil * * or * * MAIL TO: U.S. Army Corps of Engineers, New England District * * Vermont Project Office * * 11 Lincoln Street, Room 210 * * Essex Junction, Vermont 05452 * ****************************************************************************** Corps of Engineers File No. NAE-2010-01133 was issued to the City of South Burlington. The permit authorized the permittee to place fill in about 13,083 sq. ft. (0.3 acre) of waters of the United States in conjunction with the construction of a swale to improve an existing stormwater system off Stonehedge Drive in South Burlington, Vermont. The people (e.g., contractor) listed below will do the work, and they understand the permit's conditions and limitations. PLEASE PRINT OR TYPE Name of Contractor/Firm: Business Address: Telephone Numbers: ( ) ( ) Proposed Work Dates: Start Finish Permittee’s Signature: Date: Printed Name: Title: ****************************************************************************** FOR USE BY THE CORPS OF ENGINEERS PM: Michael Adams Submittals Required: __No__ Inspection Recommendation: -4- (Minimum Notice: Permittee must sign and return notification within one month of the completion of work.) COMPLIANCE CERTIFICATION FORM USACE File Number: NAE-2010-01133 Name of Permittee: City of South Burlington Verification Date: November 8, 2021 Please sign this certification and return it to the following address upon completion of the activity and any mitigation required by the permit. You must submit this after the mitigation is complete, but not the mitigation monitoring, which requires separate submittals. ****************************************************************************** * EMAIL TO: michael.s.adams@usace.army.mil * * or * * MAIL TO: U.S. Army Corps of Engineers, New England District * * Vermont Project Office * * 11 Lincoln Street, Room 210 * * Essex Junction, Vermont 05452 * ****************************************************************************** Please note that your permitted activity is subject to a compliance inspection by an U.S. Army Corps of Engineers representative. If you fail to comply with this permit you are subject to permit suspension, modification, or revocation. I hereby certify that the work authorized by the above referenced permit was completed in accordance with the terms and conditions of the above referenced permit, and any required mitigation was completed in accordance with the permit conditions. Signature of Permittee Date Printed Name Date of Work Completion Telephone Number