Loading...
HomeMy WebLinkAboutAgenda 06_SP-22-013_Stonehedge Dr_City of SB#SP-22-013 1 CITY OF SOUTH BURLINGTON DEPARTMENT OF PLANNING AND ZONING CITY OF SOUTH BURLINGTON – STONEHEDGE DRIVE SITE PLAN APPLICATION #SP-22-013 FINDINGS OF FACT AND DECISION Site plan application #SP-22-013 of the City of South Burlington to amend a previously approved plan for a multi-unit residential complex known as Stonehedge. The amendment consists of redeveloping an existing stormwater swale by removing soil materials within an existing class II wetland and buffer, 0 Stonehedge Drive. The Development Review Board held a public hearing on April 19, 2022. The applicant was represented by Christine Gingras. Based on the plans and materials contained in the document file for this application, the Board finds, concludes, and decides the following: FINDINGS OF FACT 1. The City of South Burlington is seeking to amend a previously approved plan for a multi-unit residential complex known as Stonehedge. The amendment consists of redeveloping an existing stormwater swale by removing soil materials within an existing class II wetland and buffer, 0 Stonehedge Drive. 2. The owner of record of the subject property is Stonehedge South Area Association, Inc. 3. The subject property is located in the Residential 4 Zoning District and the Spear Street-Overlook Park View Protection Overlay District. 4. The application was received on April 1, 2022. 5. The plans submitted consist of: Sheet No. & Title Prepared by Plan Last Revised on: C-1 Title Sheet Dubois & King 03/01/2022 C-2 General Notes Dubois & King 03/01/2022 C-3 Site Plan Dubois & King 03/01/2022 C-4 Details Dubois & King 04/01/2022 C-5 Erosion Control Plan Dubois & King 03/01/2022 W-1 Wetland Impact Plan Dubois & King 04/01/2022 W-2 Wetland Impact Profiles- Section Dubois & King 03/01/2022 6. In 2015, the applicant obtained approval for construction of a stormwater treatment and detention pond located in Stonehedge. This application is to reestablish a conveyance swale to the pond. 7. The swale is located in an existing Class II wetland and wetland buffer. Because the vegetation has grown up over time, the project proposes to reroute the swale around mature trees. #SP-22-013 2 A) ZONING DISTRICT & DIMENSIONAL REQUIREMENTS Setbacks, Coverages & Lot Dimensions No changes affecting compliance with these standards are proposed B) SITE PLAN REVIEW STANDARDS 14.06 General Review Standards A. Relationship of Proposed Structures to the Site. (1) The site shall be planned to accomplish a desirable transition from structure to site, from structure to structure, and to provide for adequate planting, safe pedestrian movement, and adequate parking areas. No changes to structures, planting, pedestrian movement, or parking are proposed. (2) Parking No changes to parking are proposed, B. Relationship of Structures and Site to Adjoining Area. (1) The Development Review Board shall encourage the use of a combination of common materials and architectural characteristics (e.g., rhythm, color, texture, form or detailing), landscaping, buffers, screens and visual interruptions to create attractive transitions between buildings of different architectural styles. (2) Proposed structures shall be related harmoniously to themselves, the terrain and to existing buildings and roads in the vicinity that have a visual relationship to the proposed structures. No changes affecting compliance with these criteria are proposed. 14.07 Specific Review Standards A. Environmental Protection Standards. All proposed development shall be subject to the applicable requirements of Article 12, Environmental Protection Standards. Standards of Article 12 are discussed below. B. Site Design Features. All proposed development shall comply with standards for the placement of buildings, parking and loading areas, landscaping and screening, open space, stormwater, lighting, and other applicable standards related to site design pursuant to these Land Development Regulations. The purpose of this application is to reestablish a previously existing stormwater conveyance swale. No changes to site design features are proposed. C. Access and Circulation. All proposed development shall comply with site access and circulation standards of Section 15.A.14. No changes affecting compliance with this criterion are proposed. D. Transportation Demand Management (TDM) [reserved] E. Building Form. Development within the City Center Form Based Code District, the Urban Design Overlay District, and other districts with supplemental building form standards shall adhere to the standards contained therein. #SP-22-013 3 Building form standards do not apply to this zoning district. F. Streetscape Improvements. A proposed new construction or extension/expansion of an existing structure exceeding the thresholds listed in either (a) Section 14.09(B) or (b) Section 8.11(D) within the City Center Form Based Code, or Section 3.11(D) in all other zoning districts, shall be required to upgrade adjacent sidewalks, greenbelts, and related street furniture (trees, benches, etc.) to the standards contained within the applicable Street Type and Building Envelope Standard. Nothing in this subsection shall be construed to limit requirements for additional upgrades as necessary to meet the requirements of these Regulations. No modifications to a structure are proposed. G. Access to Abutting Properties. The reservation of land may be required on any lot for provision of access to abutting properties whenever such access is deemed necessary to reduce curb cuts onto an arterial or collector street, to provide additional access for emergency or other purposes, or to improve general access and circulation in the area. No changes affecting compliance with this criterion are proposed. H. Utility Services. Electric, telephone and other wire-served utility lines and service connections shall be underground insofar as feasible and subject to state public utilities regulations. Any utility installations remaining above ground shall be located so as to have a harmonious relation to neighboring properties and to the site. Standards of Section 15.A.18, Infrastructure, Utilities, and Services, shall also be met. No changes affecting compliance with this criterion are proposed. I. Disposal of Wastes. All dumpsters and other facilities to handle solid waste, including compliance with any recycling, composting, or other requirements, shall be accessible, secure and properly screened with opaque fencing to ensure that trash and debris do not escape the enclosure(s). Small receptacles intended for use by households or the public (ie, non-dumpster, non-large drum) shall not be required to be fenced or screened. No changes affecting compliance with this criterion are proposed. C) OTHER 13.04 Landscaping, Screening, and Street Trees I. Landscape Maintenance. Maintenance and responsibility. All planting shown on an approved site plan shall be maintained by the property owner in a vigorous growing condition throughout the duration of the use. Plants not so maintained shall be replaced with new plants at the beginning of the next immediately following growing season. Trees with a caliper of less than 5” may be replaced on an inch-by-inch basis with trees of the same genus of at least 2” caliper each. No permit shall be required for such replacements provided they conform to the approved site plan. Replacement of trees with a caliper of greater than 5” shall require an amendment to the site plan. The applicant is proposing to retain existing trees and shrubs within the project area. The applicant has included tree protection notes to support protection of existing trees. Work within tree protection areas will be supervised by the City Arborist. The Board finds this criterion met. #SP-22-013 4 12.06 Wetland Protection Standards D. Standards for Wetlands Protection. (1) Class I and Class II Wetlands. Development is generally prohibited within Class I wetlands, Class II wetlands, and their associated buffers. All lands within a Class I wetlands, Class II wetlands, and their associated buffers, shall be left in an undisturbed, naturally vegetated condition. However, an applicant may seek approval for a Restricted Infrastructure Encroachment under this section or to modify this standard per the regulations in Section 12.06(F). The applicant is seeking to modify this standard per 12.06F(1)(c). (3) Landscaping and Fencing. Landscaping and/or fencing shall be installed along the outside perimeter of the wetlands buffer to clearly identify and protect wetlands buffer. The DRB may waive this requirement, if petitioned by the applicant, if there is existing forest and/or landscaping along the border of wetland buffer or other clear, existing demarcation. The design and installation of any such landscaping or fencing must accommodate wildlife passage. The Board finds this standard to be waived since no new uses are proposed of the wetland or wetland buffer. (4) Pre-existing gardens, landscaped areas/lawns, structures and impervious surfaces. (a) Gardens, landscaped areas/lawns, structures, and impervious surfaces located within a wetlands buffer that were legally in existence as of the effective date of these regulations shall be considered non-conforming development. Non-conforming development within a wetlands buffer may not be expanded. No expansion of pre-existing features is proposed. (5) Restricted Infrastructure Encroachment. Restricted Infrastructure Encroachment may be allowed within Class I, Class II, or Class III wetlands, and their associated buffers, without a waiver or modification provided that the applicant demonstrates the project’s compliance with Section 12.02 and the following supplemental standards: (a) Roadway paved surfaces shall be no wider than necessary for the intended functional road classification for the roadway and in no case shall the roadway paved surfaces be wider than 24 feet; and, (b) Roads that bifurcate a wetland or wetland buffer shall propose appropriate mitigation, such as reduction or elimination of curbing and installation of cross culverts, to enable wildlife passage. No roadways are proposed. F. Modifications. (1) Types of Development. An applicant may request a modification, in writing, from the rules of this section for any development in the following areas only: (a) Development in a Class II wetland and associated buffer within the Form-Based Code Zoning Districts. (b) Re-development of a pre-existing garden, landscaped area/lawn, public infrastructure, structure, and impervious surface within a Class II wetland buffer in any zoning district, provided the relocated area is of equal or smaller size. #SP-22-013 5 (c) Installation of low-impact development stormwater practices consistent with wetland functions and plantings with a Class II or Class III wetland buffer. (d) Development in a Class III wetland exceeding 5,000 square feet in area and associated buffer within all zoning districts. The applicant is proposing development consistent with modification (c). (2) Modification Standards. The Development Review Board may grant a modification from the rules of this Section only if a modification application meets all of the following standards: (a) The modification shall be the minimum required to accommodate the proposed development; The proposed swale is 1 foot deep (average) and 23 feet wide. The project will permanently impact 6,330 sf of existing class II wetland and 343 sf of associated buffer. Required excavation and removal of ~253 yards of fill on the Stonehedge parcel is estimated. The Board finds this criterion met. (b) The proposed development will not have an undue adverse effect on the planned character of the area, as defined by the purpose statement of the zoning district within which the project is located, or on public health and safety; The purpose of the zoning district is as follows. A residential 4 District is hereby formed in order to encourage residential use at moderate densities that are compatible with existing neighborhoods and undeveloped land adjacent to those neighborhoods. The Board finds the proposed development represents an improvement to public health and safety. (c) The proposed development will not have an undue adverse effect on the ability of the property to adequately treat stormwater from the site; and, The purpose of the project is to improve stormwater treatment. The Board finds this criterion met. (d) The proposed development will not have an undue adverse effect upon specific wetland functions and values identified in the field delineation. The project obtained Vermont Wetlands Individual Permit 2007-469.04 on November 22, 2021, which specifically states “the proposed amendment will not result in an undue adverse effect to any of the functions provided by the Class Two wetland or the adjacent 50-ft buffer zone located at Stonehedge Drive, South Burlington, Vermont.” The Board finds this criterion met. DECISION Motioned by __, seconded by __, to approve site plan application #SP-22-013 of The City of South Burlington, subject to the following conditions: 1. All previous approvals and stipulations shall remain in full effect except as amended herein. 2. This project shall be completed as shown on the plan submitted by the applicant and on file in the South Burlington Department of Planning and Zoning as conditioned herein. #SP-22-013 6 3. The applicant must regularly maintain all stormwater treatment and conveyance infrastructure. 4. All exterior lighting must be installed or shielded in such a manner as to conceal light sources and reflector surfaces from view beyond the perimeter of the area to be illuminated. 5. The applicant shall obtain a zoning permit within six (6) months pursuant to Section 17.04 of the Land Development Regulations or this approval is null and void. 6. The applicant must obtain a Certificate of Occupancy from the Administrative Officer prior to use of the new uses. 7. Any change to the site plan shall require approval by the South Burlington Development Review Board or the Administrative Officer as allowed by the Land Development Regulations. Dan Albrecht Yea Nay Abstain Not Present Mark Behr Yea Nay Abstain Not Present Frank Kochman Yea Nay Abstain Not Present Jim Langan Yea Nay Abstain Not Present Quin Mann Yea Nay Abstain Not Present Dawn Philibert Yea Nay Abstain Not Present Stephanie Wyman Yea Nay Abstain Not Present Motion carried by a vote of _ - _ - _ . Signed this ____ day of April, 2022, by _____________________________________ Dawn Philibert, Chair Please note: An appeal of this decision may be taken by filing, within 30 days of the date of this decision, a notice of appeal and the required fee by certified mail to the Superior Court, Environmental Division. See V.R.E.C.P. 5(b). A copy of the notice of appeal must also be mailed to the City of South Burlington Planning and Zoning Department at 575 Dorset Street, South Burlington, VT 05403. See V.R.E.C.P. 5(b) (4)(A). Please contact the Environmental Division at 802-828-1660 or http://vermontjudiciary.org/GTC/environmental/default.aspx for more information on filing requirements, deadlines, fees and mailing address. D) The applicant or permittee retains the obligation to identify, apply for, and obtain relevant state permits for this project. Call 802.477.2241 to speak with the regional Permit Specialist TITLE SHEETC-1PROJECTLOCATIONGENERALLOCATION© Copyright 2022 Dubois & King Inc.PROFESSIONAL SEALENGINEERING · PLANNING ·MANAGEMENT · DEVELOPMENT6 GREEN TREE DRIVESO. BURLINGTON, VT 05403TEL: (802) 878-7661FAX: (866) 783-7101www.dubois-king.comBRANDON, VTRANDOLPH, VTSPRINGFIELD, VTBEDFORD, NHLACONIA, NHSOUTHBURLINGTON,VERMONTSHEET OF 7NOT FORCONSTRUCTIONPRELIMINARYPLANSSHEET NUMBER425766MAR. 2022PROJ. ENG.DRAWN BYCHECKED BYD&K ARCHIVE #D&K PROJECT #DATELDCLDCSHEET TITLESTONEHEDGEDRAINAGE SWALEBEGgneignreenialpgninntnemeganampdeveolemtn1 256254 256257258 259 260 260261 2 6 2262 264265265265265266266267267268269269270270271WETLAND BBUILDINGBUILDING© Copyright 2022 Dubois & King Inc.PROFESSIONAL SEALENGINEERING · PLANNING ·MANAGEMENT · DEVELOPMENT6 GREEN TREE DRIVESO. BURLINGTON, VT 05403TEL: (802) 878-7661FAX: (866) 783-7101www.dubois-king.comBRANDON, VTRANDOLPH, VTSPRINGFIELD, VTBEDFORD, NHLACONIA, NHSOUTHBURLINGTON,VERMONTSHEET OF 7NOT FORCONSTRUCTIONPRELIMINARYPLANSSHEET NUMBER425766MAR. 2022PROJ. ENG.DRAWN BYCHECKED BYD&K ARCHIVE #D&K PROJECT #DATELDCLDCSHEET TITLESTONEHEDGEDRAINAGE SWALEBEGSITE PLANC-33 DETAILSC-4©Copyright2022Dubois&KingInc.PROFESSIONALSEALENGINEERING•PLANNING•MANAGEMENT•DEVELOPMENT6GREENTREEDRIVESO.BURLINGTON,VT05403TEL:(802)878-7661FAX:(866)783-7101www.dubois-king.comBRANDON,VTRANDOLPH,VTSPRINGFIELD,VTBEDFORD,NHLACONIA,NHSOUTHBURLINGTON,VERMONTSHEETOF7NOTFORCONSTRUCTIONPRELIMINARYPLANSSHEETNUMBER425766MAR.2022PROJ.ENG.DRAWNBYCHECKEDBYD&KARCHIVE#D&KPROJECT#DATELDCLDCSHEETTITLESTONEHEDGEDRAINAGESWALEBEG4 WETLAND BBUILDINGBUILDING© Copyright 2022 Dubois & King Inc.PROFESSIONAL SEALENGINEERING · PLANNING ·MANAGEMENT · DEVELOPMENT6 GREEN TREE DRIVESO. BURLINGTON, VT 05403TEL: (802) 878-7661FAX: (866) 783-7101www.dubois-king.comBRANDON, VTRANDOLPH, VTSPRINGFIELD, VTBEDFORD, NHLACONIA, NHSOUTHBURLINGTON,VERMONTSHEET OF 7NOT FORCONSTRUCTIONPRELIMINARYPLANSSHEET NUMBER425766MAR. 2022PROJ. ENG.DRAWN BYCHECKED BYD&K ARCHIVE #D&K PROJECT #DATELDCLDCSHEET TITLESTONEHEDGEDRAINAGE SWALEBEGEROSIONCONTROL PLANC-5 256256254 2 5 4255256 256257257258 259 259260 260260 261 261 2 6 2262265265265266267268269270271 BUILDINGBUILDINGBUILDINGBUILDINGWE©Copyright2022Dubois&KingInc.PROFESSIONALSEALENGINEERING•PLANNING•MANAGEMENT•DEVELOPMENT6GREENTREEDRIVESO.BURLINGTON,VT05403TEL:(802)878-7661FAX:(866)783-7101www.dubois-king.comBRANDON,VTRANDOLPH,VTSPRINGFIELD,VTBEDFORD,NHLACONIA,NHSOUTHBURLINGTON,VERMONTSHEETOF7NOTFORCONSTRUCTIONPRELIMINARYPLANSSHEETNUMBER425766MAR.2022PROJ.ENG.DRAWNBYCHECKEDBYD&KARCHIVE#D&KPROJECT#DATELDCLDCSHEETTITLESTONEHEDGEDRAINAGESWALEBEG••WETLANDIMPACTPLANW-16 © Copyright 2022 Dubois & King Inc.PROFESSIONAL SEALENGINEERING · PLANNING ·MANAGEMENT · DEVELOPMENT6 GREEN TREE DRIVESO. BURLINGTON, VT 05403TEL: (802) 878-7661FAX: (866) 783-7101www.dubois-king.comBRANDON, VTRANDOLPH, VTSPRINGFIELD, VTBEDFORD, NHLACONIA, NHSOUTHBURLINGTON,VERMONTSHEET OF 7NOT FORCONSTRUCTIONPRELIMINARYPLANSSHEET NUMBER425766MAR. 2022PROJ. ENG.DRAWN BYCHECKED BYD&K ARCHIVE #D&K PROJECT #DATELDCLDCSHEET TITLESTONEHEDGEDRAINAGE SWALEBEGWETLAND IMPACTPROFILES - SECTIONW-27 Memo To: South Burlington Development Review Board From: Christine Gingras, Public Works Project Manager CC: Marla Keene, Development Review Planner Date: March 8, 2022 Re: Stonehedge South Area Association Site Plan Application Stonehedge South Area Association proposes to redevelop a 321 LF stormwater swale to connect stormwater infrastructure in the neighborhood with a stormwater pond in Szymanski Park. When the adjacent condominiums were originally constructed, a drainage swale was installed between the K and L clusters. Since then, sediment deposition and growth of a thick root mat of giant reed have clogged the historic channel. Flow out of the neighborhood is currently impeded, resulting in flooding and safety (ice related) issues for residents in the L cluster. The City is proposing to restore positive drainage within the swale by performing maintenance to clear out accumulated material. As vegetation has grown up within this swale area, the City is proposing to rework the swale around mature trees. The proposed work would allow the swale to drain 6.9 acres of impervious surface from a total 34.9 acre drainage area located to the north of the proposed swale. Straddling two parcels, 78% of the project is on Stonehedge South Area Association property. The other 22% of the project is on the Szymanski Park parcel, owned by the City of South Burlington. The proposed project would have no impact on current uses, buildings, or impervious areas. Construction activities (project wide) will have the following impacts on class II wetlands: 8,115 SF of permanent ("other," non-fill) impact to wetland, 4968 SF of temporary impact to wetland, 440 SF of permanent impact to buffer (excavation/non-fill) and 1453 SF of temporary impact to buffer. On the Stonehedge parcel, the proposed project will permanently impact 6,330 SF of existing class II wetland and 343 SF of associated buffer. Construction will include excavation of the ditch in wetland, a temporary construction stabilization pad in the buffer, and tracked equipment access from Stonehedge Drive and turn-around space in the wetland and buffer. Required excavation and removal of approximately 253 yards of fill on the Stonehedge parcel is estimated. This material will be hauled offsite. Impacts to wetland and buffer are required in order to restore the historic flow pattern, allowing stormwater from the culverts outleting on the south side of Stonehedge Drive to drain to the stormwater treatment pond below. Avoidance of wetland impact to construct the swale is not feasible, since the problem is localized to the area between the culvert outlets and stormwater pond below. Alignment of the proposed swale was set to limit impact on existing trees and plants to the greatest extent possible. As avoidance could not be achieved for the project, the minimization criteria was utilized instead. The proposed swale is the minimum size necessary to restore positive drainage, with an average cross-sectional depth of 1 foot. This will enable positive drainage without having a major impact on the subsurface hydrology of the site. The hydrology of the wetland is primarily associated with landscape-scale groundwater discharge from the hill above. Restoration of the wetland will be accomplished by the planting of a wetland seed mix over the disturbed area, and the swale is expected to return to a functioning wetland as vegetation establishes. The State of Vermont Department of Environmental Conservation and Army Core of Engineers have both issued permits for this project. We are submitting this project to the South Burlington DRB for review as a site plan application due to the proposed class II wetland impacts and the amount of fill that will be removed and relocated on site. Included with this application, please find final project plans, a copy of the ACOE wetland permit, VT ANR wetland permit, 1983 Site and Utilities Plan for Stonehedge Condos Cluster L, 2018 Record Drawings for the stormwater treatment pond in Szymanski Park, and Stonehedge abutters list. If you have any questions, please contact me at (802) 658–7961 x6111 or cgingras@southburlingtonvt.gov. VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION INDIVIDUAL WETLAND PERMIT MAJOR AMENDMENT In the matter of: City of South Burlington, c/o Tom DiPietro 104 Landfill Road South Burlington, VT 05403 Stonehedge Drive, South Burlington File #: 2007-469.04 DEC ID #: EJ14-0071 Date of Amendment: November 22, 2021 Decision: Amended The Vermont Agency of Natural Resources (Agency) received a request dated June 17, 2021 from City of South Burlington, c/o Tom DiPietro (permittee) seeking an amendment to an Individual Wetland Permit for a project involving activities in a wetland and associated buffer zone located in South Burlington, Vermont. This amendment is for the construction of a stormwater swale in association with an existing detention basin permitted under 2007-469.02, with additional impacts to 13,083 square feet of wetland and 1,497 square feet of buffer zone. Total impacts for the project are 31,579 square feet of wetland and 35,892 square feet of buffer zone. The Permittee will purchase mitigation credits for the Vermont in-lieu fee program, administered by Ducks Unlimited, Inc. for Vermont, as compensation for unavoidable impacts which would result from Project execution. The credit amounts are to be calculated based on 30,949 square feet of wetland impacts and are to be paid prior to construction commencement. DocuSign Envelope ID: 67B4B7F5-A3A9-416D-AEE8-EF54FE570BA9 2 of 2 City of South Burlington, c/o Tom DiPietro 2007-469.04 The Agency of Natural Resources finds that the proposed amendment will not result in an undue adverse effect to any of the functions provided by the Class Two wetland or the adjacent 50-foot buffer zone located at Stonehedge Drive, South Burlington, Vermont. Other than the revisions described in this amendment, all other aspects of this project, such as the expiration date or reporting requirements, shall be carried out consistent with the original proposal and conditions listed in Vermont Wetlands Individual Permit 2007-469.04. Peter Walke, Commissioner Department of Environmental Conservation by: ________________________________ Laura Lapierre, Program Manager Wetlands Program Watershed Management Division Dated at Montpelier, Vermont this twenty-second day of November 2021 PW/LVPL/TH DocuSign Envelope ID: 67B4B7F5-A3A9-416D-AEE8-EF54FE570BA9