Loading...
HomeMy WebLinkAboutSD-21-19 - Supplemental - 0600 Spear Street (18)Transmittal 767 Centerville Road, East Wallingford, VT 05472 Page 1 of 4 PROJECT:Von Turkovich-600 Spear St.-S. Burlington 19-268 DATE:5/24/2021 SUBJECT:600 Spear Street Preliminary Plat Plan Set TRANSMITTAL ID:00004 PURPOSE:For your review and comment VIA:Info Exchange FROM NAME COMPANY EMAIL PHONE Lucy Thayer 767 Centerville Road East Wallingford, VT 05472 TCE Lucy.Thayer@tcevt.com 802-879- 6331,,108 TO NAME COMPANY EMAIL PHONE mkeene@sburl.com mkeene@sburl.com pconner@sburl.com pconner@sburl.com REMARKS:Hi Marla, Please use the link to download the 600 Spear Street Preliminary Plan set that includes the outstanding items you mentioned, also noted below. Application Requirement Notes TCE Notes Plans provided as individual sheets and named to include sheet number and latest revision date must be submitted. File names do not include dates Date of plans is provided in the file names Boundaries and area of existing subject property(ies), proposed property lines, continues properties, boundaries of all zoning districts, transects, and overlay districts, and all designations on the City's Official Map, and lots within the proposed subdivision numbered. Interstate highway overlay district not shown Interstate highway district is shown in the Location Map A written plan to preserve and protect significant It would be OK to show this on the EPSC This is included in the EPSC plan Transmittal DATE:5/24/2021 TRANSMITTAL ID:00004 Page 2 of 4 existing vegetation during and after construction. Such plan will be of sufficient detail that the City of South Burlington will be able to inspect the site during construction to ensure that existing vegetation is protected as per the plan. plan but the EPSC plan doesn’t cover the whole site, and there are existing trees to be retained outside the area of the EPSC plan. EPSC details omitted so tree protection method is unknown. (C2-01, B and C5- 01); a tree protection detail is included in LA2- 01 Plans showing the location, size and invert elevations of existing and planned sanitary sewers, storm water drains, and fire hydrants and location and size of water, gas, electricity and any other utilities or structures. Electric and gas are not shown These are shown on the plans, see C3-01 Location and design of all utility distribution facilities This refers to things like transformers and electric cabinets and are not shown These are shown on the plans, see C3-01 Utility Plan Overview Preliminary designs of any bridges or culverts which may be required. At this preliminary plat stage, this can be covered with detail sheets for how culverts will be constructed See the included detail sheets Let us know if you need anything else. Thanks, Lucy tcevt.com Lucy Thayer, PLA Landscape Architect e. Lucy.Thayer@tcevt.com p. 802.879.6331 x108 | c. 802.236.3932 478 Blair Park Road, Williston, VT 05495 42 Mapleville Depot, St. Albans, VT 05478 Transmittal DATE:5/24/2021 TRANSMITTAL ID:00004 Page 3 of 4 DESCRIPTION OF CONTENTS QTY DATED TITLE NOTES 1 5/24/2021 C0-00 Cover_2021 0514.pdf 1 5/24/2021 C1-00 Legend & Notes_2021 0514.pdf 1 5/24/2021 C1-01 Existing Conditions_2021 0514.pdf 1 5/24/2021 C2-00 Overall Site Plan_2021 0514.pdf 1 5/24/2021 C2-01 Entrance Plans_2021 0514.pdf 1 5/24/2021 C2-02 Layout & Materials Plan_2021 0514.pdf 1 5/24/2021 C2-03 Grading Plan_2021 0514.pdf 1 5/24/2021 C3-01 Utility Plan Overview_2021 0514.pdf 1 5/24/2021 C3-02 Wastewater and Water Utility Plan_2021 0514.pdf 1 5/24/2021 C3-03 Stormwater Utility Plan_2021 0514.pdf 1 5/24/2021 C3-04 Utility Crossing Plan_2021 0514.pdf 1 5/24/2021 C4-01 Pre DA Plan_2021 0514.pdf 1 5/24/2021 C4-02 Post DA Plan_2021 0514.pdf 1 5/24/2021 C5-01 Overall EPSC Plan_2021 0514.pdf 1 5/24/2021 C6-01 Plan and Profile_2021 0514.pdf 1 5/24/2021 C6-02 Plan and Profile_2021 0514.pdf 1 5/24/2021 C8-401 Stormwater Details_2021 0514.pdf 1 5/24/2021 C8-402 Stormwater Details_2021 0514.pdf 1 5/24/2021 C8-501 Erosion Details_2021 0514.pdf 1 5/24/2021 C10-01 Emergency Vehicle Diagram_2021 0514.pdf 1 5/24/2021 LA1-01 Landscape Plan_2021 0514.pdf 1 5/24/2021 LA1-02 Landscape Plan_2021 0514.pdf 1 5/24/2021 LA2-01 Landscape Details_2021 0514.pdf 1 5/24/2021 LI1-01 Lighting Plan_2021 0514.pdf 1 5/20/2021 Location Map_2021 0520.pdf 1 8/14/2020 Natural Resources Map_2020 0814.pdf 1 5/24/2021 S1-02 PUD Plat_2021 0514.pdf 1 5/24/2021 600 Spear PP_Transmittal_2021 0524.pdf 1 5/11/2021 A1 First Floor Plan_2021 0221.pdf 1 5/11/2021 A2 Second Floor Plan_2021 0221.pdf 1 5/11/2021 A3 Elevations_2021 0221.pdf 1 5/11/2021 A4 Elevations_2021 0221.pdf Transmittal DATE:5/24/2021 TRANSMITTAL ID:00004 Page 4 of 4 COPIES: Frank Von Turkovich (Von Turkovich, Frank) Abby Dery (TCE)