HomeMy WebLinkAboutSP-22-006 - Supplemental - 1459 Shelburne Road (55)Memorandum
To: Marla Keene, Development Review Planner
From: Jay Nadeau, SBWD Director
Date: February 16, 2022
Re: 1459 Shelburne Rd
The South Burlington Water Department has reviewed the revised proposed plans for 1459 Shelburne
Rd. Please find my comments below.
1. The SBWD provided Record Drawing to the engineer for the Shelburne Rd. water lines in the
area of 1459 Shelburne Rd on 2/16/2022. Current project plans must be corrected to show the
location of the water main on the west side of Shelburne Rd.
2. Upon request, the SBWD will shut the water off on the service line to the all structures that will
be demolished as part of this project and pull each water meter and radio read unit. A final bill
will be prepared and sent to the owner of record.
3. When the service lines have been abandoned, they shall be shut off at the corporation and
disconnected from the main by the contractor. Locations of the abandoned curb stops shall be
included in the As-Builts for this project, to be provided to the SBWD when the project is
completed.
4. The water line into the proposed infant care facility shall be Ductile Iron, Class 52, and poly
wrapped with V-Bio polyethylene encasement.
5. A domestic water service line, sized appropriately, shall be tapped off the fire sprinkler line
outside of the building. A separate curb stop shall be installed on the domestic water service in
an accessible location for the department. If the curb stop is placed in a concrete or asphalt
area, the curb box shall be installed in the top section of a gate valve box, and a two-inch paving
riser shall be installed on the valve box. The service line shall be copper.
6. A note shall be added to the plans stating “All water lines and appurtenances shall be installed in
accordance with the Champlain Water District Specifications and Details for the Installation of
Water Lines and Appurtenances, current edition, henceforth the CWD Specifications.”
7. Tapping fees and water allocation fees must be paid in accordance with SBWD policies.
8. As this project includes a change of use, a Water Allocation Application, found on the South
Burlington Water Department website must be completed and submitted to the SBWD. All fees
must be paid prior to restoring the water meter and water service to the new building.