Loading...
HomeMy WebLinkAboutSP-22-006 - Supplemental - 1459 Shelburne Road (23)Memorandum To: Marla Keene, Development Review Planner From: Jay Nadeau, SBWD Director Date: February 16, 2022 Re: 1459 Shelburne Rd The South Burlington Water Department has reviewed the revised proposed plans for 1459 Shelburne Rd. Please find my comments below. 1. The SBWD provided Record Drawing to the engineer for the Shelburne Rd. water lines in the area of 1459 Shelburne Rd on 2/16/2022. Current project plans must be corrected to show the location of the water main on the west side of Shelburne Rd. 2. Upon request, the SBWD will shut the water off on the service line to the all structures that will be demolished as part of this project and pull each water meter and radio read unit. A final bill will be prepared and sent to the owner of record. 3. When the service lines have been abandoned, they shall be shut off at the corporation and disconnected from the main by the contractor. Locations of the abandoned curb stops shall be included in the As-Builts for this project, to be provided to the SBWD when the project is completed. 4. The water line into the proposed infant care facility shall be Ductile Iron, Class 52, and poly wrapped with V-Bio polyethylene encasement. 5. A domestic water service line, sized appropriately, shall be tapped off the fire sprinkler line outside of the building. A separate curb stop shall be installed on the domestic water service in an accessible location for the department. If the curb stop is placed in a concrete or asphalt area, the curb box shall be installed in the top section of a gate valve box, and a two-inch paving riser shall be installed on the valve box. The service line shall be copper. 6. A note shall be added to the plans stating “All water lines and appurtenances shall be installed in accordance with the Champlain Water District Specifications and Details for the Installation of Water Lines and Appurtenances, current edition, henceforth the CWD Specifications.” 7. Tapping fees and water allocation fees must be paid in accordance with SBWD policies. 8. As this project includes a change of use, a Water Allocation Application, found on the South Burlington Water Department website must be completed and submitted to the SBWD. All fees must be paid prior to restoring the water meter and water service to the new building.