Loading...
HomeMy WebLinkAboutSP-22-006 - Plans - Non-Record - 1459 Shelburne Road 525 Hercules Drive I Suite Two I Colchester, VT 05446 I Phone: 802.655.5020 I Fax: 802.655.6567 I wiemannlamphere.com List of Drawings C-0.00 Existing Conditions, dated 1/28/22 C-1.00 Proposed Infant Care Facility Site Plan, dated 1/28/22 C2.00 Details, dated 1/28/22 C2.01 Details, dated 1/28/22 C2.02 Details, dated 1/28/22 C2.03 Details, dated 1/28/22 C2.04 Details, dated 1/28/22 Exhibit A - First Floor Plan, dated 1/27/22 Exhibit B - Exterior Elevations & Materials, dated 1/27/22 Exhibit C - The Homestead Preschool Images, dated 10/15/21 Exhibit D – View 1, dated 1/27/22 Exhibit E – View 2, dated 1/27/22 Exhibit F – View 3, dated 1/27/22 Exhibit G – View 4, dated 1/27/22 SL-1A Site Lighting Photometric Calculation Proposed Exterior Light Fixtures THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.00 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 1.THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ALL DISTURBED AREAS BACK TO ORIGINAL CONDITION, INCLUDING BUT NOT LIMITED TO CURBING, SIDEWALKS, ROAD, PARKING AREAS, LANDSCAPING, SITE LIGHTING, ELECTRICAL, AND ETC. ALL ASPHALT SHALL BE SAW-CUT PRIOR TO PAVING. 2.ALL STUMPS, ROCK, AND OTHER NON-APPROVED TRENCH BACKFILL MATERIAL DISCOVERED DURING CONSTRUCTION IS THE EXCLUSIVE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE PROPERTY AND DISPOSED OF IN A STATE APPROVED DISPOSAL LOCATION. ALL EXISTING SOILS REUSED FOR FILL SHALL CONFORM TO ALL APPLICABLE SECTIONS OF VTRANS SPECIFICATIONS SECTION 203-EXCAVATION & EMBANKMENTS.CONTRACTOR SHALL REVIEW SOIL INVESTIGATION REPORT AND SOILS LOGS PRIOR TO BID. ANY SOIL REUSED AS FILL UNDER ROADS AND APPLICABLE CONCRETE SIDEWALKS SHALL PASS A SUBGRADE PROOF ROLL WITH A LOADED TANDEM. FILL SOILS THAT DO NOT PASS A SUBGRADE PROOF ROLL SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 3.ALL PASSING SIEVE, PROCTOR, AND COMPACTION TESTING EXPENSES SHALL BE PAID BY OWNER. TESTING COORDINATION, ALL OTHER REQUIRED TESTING, AND EXPENSES FOR FAILED TESTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. 4.THE CONTRACTOR SHALL CONTACT THE GREEN MOUNTAIN POWER (GMP) PRIOR TO ANY WORK IN THE VICINITY OF THE EXISTING ELECTRIC CONDUITS. 5.THIS PROJECT WILL LIKELY NOT REQUIRE COVERAGE UNDER AN GENERAL CONSTRUCTION STORMWATER DISCHARGE PERMIT. THE CONTRACTOR WILL STILL FOLLOW RULES, REGULATIONS, AND DIRECTION OUTLINED IN THE STATE OF VERMONT "LOW RISK HANDBOOK FOR EROSION PREVENTION AND SEDIMENT CONTROL" FROM FEBRUARY 2020.THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING, MAINTAINING AND REMOVING ALL EROSION AND SEDIMENT CONTROL DEVICES SHOWN ON THE PLANS OR DETAILS AND, TO THE MAXIMUM EXTENT PRACTICAL, TO MINIMIZE POTENTIAL CONTAMINATION OF STORMWATER RUNOFF FROM THE CONSTRUCTION ACTIVITIES. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL "AS-BUILT" MEASUREMENT AND DRAFTING REQUIREMENTS AS OUTLINED ON THE DETAIL SHEETS. ALL TRENCH EXCAVATIONS SHALL REMAIN OPEN UNTIL ALL AS-BUILT SURVEY SHOTS HAVE BEEN TAKEN. PROGRESS RECORD DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER AS INDICATED IN THE RECORD DRAWING SPECIFICATIONS. 7.SEE EROSION CONTROL AND LOGISTICS PLANS FOR LOCATIONS OF STAGING / STORAGE AREAS. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SIGNAGE AND CONSTRUCTION BARRIER/SAFETY FENCING NECESSARY FOR PROVIDING SAFE VEHICULAR AND PEDESTRIAN ACCESS THROUGH OR AROUND THE SITE DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE THIS WITH THE CITY OF SOUTH BURLINGTON AND THE SOUTH BURLINGTON DEPARTMENT OF PUBLIC WORKS. 9.DEFINITION OF "PRECONSTRUCTION EXCAVATION" FOR THESE CONTRACT DOCUMENTS SHALL BE: THE SITE CONTRACTOR SHALL EXPOSE UTILITIES AND OBTAIN ALL NECESSARY INFORMATION, INCLUDING BUT NOT LIMITED TO, INVERT ELEVATION, SIZE, DEPTH, PIPE TYPE, JOINT LOCATION, ETC. CONTRACTOR SHALL TRANSIT SURVEY THE LOCATION AND ELEVATIONS OF THE UTILITY. CONTRACTOR SHALL PROVIDE THE ENGINEER WITH SKETCHES INDICATING HORIZONTAL AND VERTICAL INFORMATION OF PIPE OR CONDUIT TYPE AND SIZE, CROSS-SECTION INFORMATION, CONCRETE ENCASEMENT INFORMATION (TOP AND BOTTOM ELEVATIONS, WIDTH, ETC.), JOINT LOCATION, ETC. OF EACH REQUIRED EXISTING UNDERGROUND UTILITY. ACCURACY OF HORIZONTAL LOCATION IS WITHIN 1 FOOT, AND ACCURACY OF VERTICAL ELEVATION IS WITHIN 0.02 FT. (1/4"). COORDINATE ALL EXCAVATION WITH TOWN, OWNER, AND ENGINEER. PRECONSTRUCTION EXCAVATIONS SHALL OCCUR PRIOR TO ORDERING STRUCTURES AND PRIOR TO UTILITY CONSTRUCTION TO FACILITATE REDESIGN AND/OR DESIGN CONFIRMATION. 10.THE LOCATION OF THE PRECONSTRUCTION EXCAVATION SYMBOLS DOES NOT NECESSARILY INDICATE THE LOCATION OF THE BURIED UTILITY. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIND AND EXPOSE THE UTILITY. 11.CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS OF IMPORTING AND PLACING TOPSOIL AND/OR COMPOST NECESSARY TO COMPLETE THE PROJECT. CONTRACTOR SHALL TEST TOPSOIL FOR APPROVAL BY THE OWNER AND ENGINEER. 12.ALL SEWER AND STORM PIPES SHALL BE PVC SDR 35 UNLESS OTHERWISE NOTED. 13.CORE AND BOOT ALL EXISTING STRUCTURES UNLESS OTHERWISE NOTED. 14.ALL NEW CATCH BASINS AND SANITARY SEWER MANHOLE MUST HAVE ONE 6" PRECAST CONCRETE GRADE RING. 15.ALL WATERLINE PIPE SHALL BE DUCTILE IRON CLASS 52. ALL BENDS AND FITTINGS SHALL HAVE REDI-MIX CAST IN PLACE THRUST BLOCKS 16.TEMPORARY GROUNDWATER, STORMWATER, AND SEWER BY-PASS PUMPING AND/OR DIVERSION IS THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL NECESSARY PUMPS AND EQUIPMENT TO PERFORM THE WORK. OVERNIGHT PUMPING IS NOT ALLOWED. 17.ALL SIDEWALKS SHALL HAVE 2% MAXIMUM CROSS SLOPE. ALL RAMPS AND STAIRS SHALL HAVE A LANDING AT THE BOTTOM WITH A MAXIMUM SLOPE OF 2% FOR 5 FEET. 18.CONTRACTOR TO PIN CONCRETE SIDEWALK/SLABS TO ALL CONTACT POINTS WITH STAIRS, BUILDING, BIKE SLAB, RETAINING WALLS, ETC. 19.CONTRACTOR SHALL MAINTAIN FULL OCCUPANCY AND FIRE DEPARTMENT ACCESS TO ALL SURROUNDING BUILDINGS. COORDINATE ALL TEMPORARY ACCESS WITH THE MUNICIPALITY. 20.BURIED NATURAL GAS IS SHOWN FOR ALIGNMENT PURPOSES ONLY. CONTACT VERMONT GAS SYSTEMS FOR DESIGN AND DETAILS OF NEW GAS LINE. CONTRACTOR SHALL BE RESPONSIBLE FOR THE EXCAVATION, BACKFILL, AND RESTORATION FOR THE CONSTRUCTION OF THE NATURAL GAS LINES. VERMONT GAS SYSTEMS WILL PROVIDE THE PIPING, LABOR TO INSTALL, AND TESTING FOR THE NEW GAS MAIN. COORDINATE WORK AND ALL GAS SHUT DOWN PROCEDURES WITH THE OWNER. 21.REMOVAL OF ALL EROSION CONTROL IS THE RESPONSIBILITY OF THE CONTRACTOR. 22.AT THE END OF THE PROJECT, CLEAN THE SUMPS OF ALL NEW AND EXISTING CATCH BASINS AND STORM MANHOLES WITHIN THE PROJECT LIMITS. 23.ELECTRICAL AND LIGHTING ARE SHOWN FOR ILLUSTRATIVE/COORDINATION PURPOSES ONLY. REFER TO ELECTRICAL PLANS AND SPECIFICATIONS FOR DESIGN. 24.SEE LANDSCAPE AND/OR STRUCTURAL PLANS FOR ALL RETAINING WALLS, UTILITY PADS, STAIRS, EXTERIOR CONCRETE AT DOORS AND SITE INFRASTRUCTURE OVER GARAGE ROOF. 25.REFER TO PLUMBING, MECHANICAL AND/OR FIRE PROTECTION PLANS FOR WATER, SEWER AND STORM DESIGN WITHIN FIVE FEET OF THE BUILDING. GENERAL CONSTRUCTION NOTES: 1.EROSION PREVENTION AND SEDIMENT CONTROL (EPSC) PRACTICES SHALL BE IMPLEMENTED IN ALL AREAS WHERE THERE IS AN INCREASED RISK OF EROSION, AND WHERE THERE IS POTENTIAL FOR DISCHARGE OF STORMWATER RUNOFF (EITHER DIRECT OR INDIRECT) TO A WATER BODY. 2.EPSC MEASURES SHALL BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITIES WITHIN A GIVEN DRAINAGE AREA WITH THE EXCEPTION OF LAND DISTURBANCE THAT MAY RESULT FROM ACCESSING THE AREA(S) WITH EQUIPMENT IN WHICH EPSC MEASURES ARE TO BE INSTALLED. THIS EXCEPTION INCLUDES LAND DISTURBANCE THAT MAY RESULT FROM ACCESS OF EQUIPMENT THAT IS NEEDED FOR:EXPLORATION AND/OR EPSC MEASURE INSTALLATION PHASES OF THE PROJECT. TEMPORARY SEDIMENT BASINS, TEMPORARY SEDIMENT TRAPS, PERIMETER DIKES, TEMPORARY SEDIMENT BARRIERS, AND OTHER TEMPORARY MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE WITH THE EXCEPTION OF THOSE ACTIVITES STATED ABOVE. EARTH DISTURBANCE INCLUDES STUMPING AND GRUBBING OF CLEARED AREAS. 3.EPSC MEASURES SHALL BE INSTALLED PURSUANT TO THE EPSC PLAN, THE 2020 STATE OF VERMONT LOW RISK SITE HANDBOOK FOR EROSION PREVENTION AND SEDIMENT CONTROL, THE 2020 VERMONT EROSION PREVENTION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS, AND/OR ANY OTHER RELEVANT PROJECT PERMITS. 4.ALL PROPOSED CHANGES SHALL BE APPROVED BY THE ON-SITE PLAN COORDINATOR (OSPC) OR HIS/HER DESIGNEE PRIOR TO IMPLEMENTATION. 5.NO CLEARING/LOGGING IS PROPOSED FOR THE PROJECT. 6.PERMISSION MUST BE GRANTED BY VT DEC PRIOR TO USE OF ANY SUPPORT ACTIVITIES OCCURRING OUTSIDE OF THE APPROVED PROJECT BOUNDARIES. 7.ALL PARTIES ASSOCIATED WITH CONSTRUCTION ACTIVITIES WHO MEET EITHER OF THE FOLLOWING TWO CRITERIA OF “PRINCIPAL OPERATOR” MUST OBTAIN COVERAGE UNDER THE CONSTRUCTION STORMWATER DISCHARGE PERMIT FOR THE PROJECT PRIOR TO COMMENCEMENT OF CONSTRUCTION ACTIVITIES BY THAT OPERATOR: A.THE PARTY HAS OPERATIONAL CONTROL OVER CONSTRUCTION PLANS AND SPECIFICATION, INCLUDING BUT NOT LIMITED TO THE ABILITY TO MAKE MODIFICATIONS TO THOSE PLANS AND SPECIFICATIONS; OR B.THE PARTY HAS CONTINUOUS DAY-TO-DAY OPERATIONAL CONTROL OF THOSE ACTIVITIES AT THE PROJECT THAT ARE NECESSARY TO ENSURE COMPLIANCE WITH AN EPSC PLAN FOR THE SITE OR OTHER PERMIT CONDITIONS (E.G., THEY ARE AUTHORIZED TO DIRECT WORKERS AT A SITE TO CARRY OUT ACTIVITIES REQUIRED BY THE EPSC PLAN OR COMPLY WITH OTHER PERMIT CONDITIONS). 1.EXISTING VEGETATION SHALL BE PROTECTED AND MAINTAINED TO THE EXTENT PRACTICABLE. 2.A VEGETATED BUFFER SHALL BE MAINTAINED FOR WATER BODIES WHERE FEASIBLE (E.G., WETLANDS AND STREAMS). 3.TO THE EXTENT PRACTICABLE, SURFACE FLOW SHALL BE DIVERTED AWAY FROM EXPOSED SOILS VIA DIVERSION BERMS, EARTH DIKES, PERIMETER DIKES/SWALES, TEMPORARY SWALES, WATER BARS, AND/OR CHECK DAMS. 4.RESOURCE AREAS (E.G., WETLANDS, STREAMS, RTE PLANT SPECIES) SHALL BE FLAGGED PRIOR TO ANY CONSTRUCTION RELATED ACTIVITIES OCCURRING WITHIN CLOSE PROXIMITY TO THOSE AREAS. 5.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT VIOLATE WATER QUALITY STANDARDS OR CONTRIBUTE TO EROSION. DEWATERING DETAILS SHALL BE REVIEWED AND APPROVED BY OSPC PRIOR TO USE. 6.CONCENTRATED RUNOFF SHALL NOT FLOW DOWN STEEP SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL (SEE DETAILS), FLUME, OR SLOPE DRAIN STRUCTURE. 7.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES, WHERE FEASIBLE, BUT NOT IN RESOURCE AREAS. 8.WHERE FEASIBLE, ALL SEDIMENT REMOVED FROM SEDIMENT CONTROL PRACTICES AS PART OF MAINTENANCE SHALL BE DISPOSED OF IN AN AREA THAT IS AT LEAST ONE OF THE FOLLOWING, WITH IMMEDIATE STABILIZATION FOLLOWING DISPOSAL OF MATERIAL: A. LESS THAN 5±% SLOPE B. AT LEAST 100 FEET FROM ANY DOWNSLOPE WATER BODY OR CONVEYANCE TO A WATER BODY, INCLUDING A DITCH C. VEGETATED 9.DISTURBED AREAS BORDERING OR DRAINING TO EXISTING ROADS SHALL HAVE AN APPROPRIATE SEDIMENT BARRIER (E.G., SILT FENCE) SPANNING THE EDGE OF THE DISTURBANCE TO PREVENT WASHING OF SEDIMENT ONTO ROADWAYS OR INTO ROAD DITCHES. 10.IN ADVANCE OF PREDICTED RAINFALL OR SNOWMELT, ALL EPSC MEASURES THAT ARE LOCATED IN ACTIVE AREAS OF EARTH DISTURBANCE SHALL BE INSPECTED AND REPAIRED, AS NEEDED. IF NECESSARY, THIS SHALL INCLUDE TEMPORARY STABILIZATION OF ALL DISTURBED SOILS ON THE SITE IN ADVANCE OF THE ANTICIPATED RUNOFF PERIOD. 11.DUST CONTROL SHALL BE HANDLED VIA WATER APPLICATION TO ROADWAYS AND OTHER AREAS WHERE DUST MAY BE GENERATED. EPSC GENERAL NOTES: EPSC CONSTRUCTION NOTES: 1.THE METHODS AND MATERIALS OF CONSTRUCTION SHALL CONFORM TO THE LATEST STANDARDS OF THE STATE OF VERMONT AND CITY OF SOUTH BURLINGTON, ALL WORK SHALL BE IN CONFORMANCE WITH ALL PERMITS AND APPROVALS ISSUED FOR THE PROJECT. IN CASE OF CONFLICT, THE MORE STRINGENT SPECIFICATION SHALL APPLY AS DIRECTED BY ENGINEER. ALL WORK SHALL BE DONE IN A WORKMANLIKE MANNER AND COMPLETED IN THE TIME SPECIFIED BY OWNER. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK AND MATERIALS SHOWN AND REQUIRED TO MAKE THE JOB COMPLETE. THESE DRAWINGS DO NOT SHOW EVERY FITTING OR APPURTENANCE. MATERIALS SHALL BE AS SPECIFIED ON THE DRAWINGS. MANUFACTURER'S PRODUCT SPECIFICATIONS SHALL BE SUBMITTED FOR ALL MATERIALS TO THE ENGINEER FOR APPROVAL PRIOR TO INSTALLATION. 3.THE LOCATION AND SIZE OF EXISTING UNDERGROUND UTILITIES IS NOT WARRANTED TO BE EXACT OR COMPLETE. THE CONTRACTOR SHALL FIELD LOCATE ALL UTILITIES AND SHALL CONTACT THE AFFECTED UTILITY COMPANY, THE ENGINEER AND THE MUNICIPALITY PRIOR TO MAKING ANY HOOK UPS. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL EXISTING UTILITIES AND THEIR UNINTERRUPTED SERVICES. ALL OFF-SITE BACKFILL, SHEETING, SHORING, DEWATERING, CLEARING AND GRUBBING, EROSION CONTROL, DUST CONTROL, TRAFFIC CONTROL, GRADING, AND ALL INCIDENTALS SHALL BE INCLUDED AS PART OF THE REQUIRED WORK. 4.REPAIR OF ALL DISTURBED AREAS, GRADING, SEEDING, MULCHING, REPAIR OF ROADS AND CURBS, PAVING, AND OTHER INCIDENTALS ARE INCLUDED AS PART OF THE REQUIRED WORK. ALL DISTURBED AREAS SHALL BE LOAMED AND MULCHED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. 5.THE CONTRACTOR SHALL VERIFY ALL TEMPORARY BENCH MARKS BEFORE USE. 6.THE WORKMEN AND PUBLIC SHALL BE PROTECTED BY THE CONTRACTOR FROM ANY AND ALL HAZARDS CONNECTED WITH THE CONSTRUCTION WORK. OPEN TRENCHES, MATERIALS, OR EQUIPMENT WITHIN THE WORKING LIMITS ARE TO BE GUARDED BY THE USE OF ADEQUATE BARRICADES OR FLAGMEN. ALL BARRICADES LEFT IN POSITION OVERNIGHT ARE TO BE PROPERLY LIGHTED. KEROSENE POTS ARE NOT ACCEPTABLE. WHEN WORK NARROWS THE USABLE PAVEMENT, FLAGMEN SHALL BE EMPLOYED TO AID THE FLOW OF TRAFFIC SO THAT THERE WILL BE NO UNDUE DELAYS. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR THE SAFETY OF ALL WORKMEN, THE GENERAL PUBLIC AND ALL DAMAGES TO PROPERTY OCCURRING FROM OR UPON THE WORK OCCASIONED BY NEGLIGENCE OR OTHERWISE GROWING OUT OF A FAILURE ON THE PART OF THE CONTRACTOR TO PROTECT PERSONS OR PROPERTY FROM HAZARDS OF OPEN TRENCHES, MATERIALS, OR EQUIPMENT AT ANY TIME OF THE DAY OR NIGHT WITHIN THE WORKING AREA. ALL WORK SHALL BE IN CONFORMANCE TO OSHA REGULATIONS, TITLE 19, PARTS 1926.651 AND 1926.652, AND APPLICABLE TO VOSHA REGULATIONS. 7.THE CONTRACTOR SHALL VERIFY ALL UTILITY INTERSECTIONS AND CONTACT ENGINEER AND OWNER WITH CONFLICTS. 8.THE CONTRACTOR SHALL CALL, DIG SAFE PRIOR TO ANY EXCAVATION. 9.THE CONTRACTOR SHALL COORDINATE FINAL LOCATION AND INVERTS FOR WATER, SEWER, AND STORM BUILDING CONNECTIONS WITH THE ARCHITECT, STRUCTURAL ENGINEER, AND MECHANICAL ENGINEER. 10.ALL NEW SANITARY AND STORM PIPES SHALL BE LAID WITH A LASER TO ELEVATION AND SLOPE AS SHOWN ON THE PLANS. ADDITIONAL CONSTRUCTION NOTES 1.ALL AREA DISTURBED AND ALL AREAS WITHIN THE CLEARING LIMITS SHALL BE GRADED AND COVERED WITH A MINIMUM OF 6" OF LOAM TOPSOIL. THE AREAS TO BE LOAMED SHALL BE FREE AND CLEAR OF ROOTS, WASTE MATERIAL AND OTHER DELETERIOUS MATERIAL. TOPSOIL SHALL BE SPREAD AND LIGHTLY COMPACTED TO A DEPTH OF 6". TOPSOIL SHALL BE APPROVED BY THE ENGINEER. ALL SIDE SLOPES ARE TO BE LOAMED. 2.ALL TURF ESTABLISHMENT SHALL BE IN ACCORDANCE WITH SECTION 651 OF THE VT STANDARD SPECIFICATIONS 2018 AND THE MUNICIPALITY SPECIFICATIONS. MULCHING SHALL FOLLOW SEEDING BY NO MORE THAN 24 HOURS. 3.ALL CUT SLOPES SHALL BE NO STEEPER THAN 2.0H ON 1.0V. ALL FILL SLOPES SHALL BE NO STEEPER THAN 2.0H ON 1.0V. 4.THE CONTRACTOR SHALL NOT DISTURB ANY GROUND BETWEEN OCTOBER 15TH BETWEEN APRIL 15TH WINTER MONTHS, UNLESS APPROVED BY THE ENGINEER. 5.TEMPORARY SILT FENCE SHALL BE ERECTED PRIOR TO ANY CLEARING OR CONSTRUCTION. FENCING MAY BE ERECTED IN PHASES, BUT IN NO CASE SHALL GROUND DISTURBANCE PROCEED FENCING. SPECIAL AREAS MAY BE DESIGNATED BY THE OWNER FOR PRESERVATION OF EXISTING TREES. THESE AREAS SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSURE NO DAMAGE IS DONE TO DESIGNATED TREES. 6.EXISTING PLANTINGS ARE LOCATED IN GENERAL AREAS AS SHOWN ON THIS PLAN. CONTRACTOR SHALL PROTECT PLANTINGS SO AS NOT TO DAMAGE THESE OR THEIR ROOT SYSTEMS. 7.SLOPE STABILITY BASED UPON UNSATURATED SOIL CONDITIONS. IF DURING CONSTRUCTION SATURATED SOILS ARE ENCOUNTERED, CONTACT THE ENGINEER IMMEDIATELY. GENERAL GRADING AND SITE WORK NOTES 1.THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL CONSTRUCTION OF WATER MAIN, STORM AND SANITARY SEWER SYSTEMS AS SHOWN ON THE PLANS. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL NECESSARY ADAPTERS, FITTINGS, ETC. TO MAKE CONNECTIONS TO THE EXISTING AND PROPOSED UNITS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK SHOWN OR IMPLIED ON THE PLANS AND/OR REFERENCED IN THE SPECIFICATIONS AND PERMITS. THE CONTRACTOR SHALL SUBMIT, FOR APPROVAL BY THE ENGINEER, ALL TYPES OF MATERIALS AND PRODUCTS USED. 2.THE CONTRACTOR SHALL COORDINATE ALL WORK ON THE WATER SUPPLY SYSTEM WITH THE OWNER, THE CITY OF SOUTH BURLINGTON, SOUTH BURLINGTON PUBLIC WORKS, CHAMPLAIN WATER DISTRICT (CWD), AND THE CIVIL ENGINEER. ALL WATER INSTALLATION WORK AND WATER DISTRIBUTION MATERIALS MUST COMPLY WITH THE CURRENT WPW SPECIFICATIONS. 3.THESE PLANS ARE NOT RESPONSIBLE FOR DESIGN OF WATER AND SEWER SERVICES WITHIN 5 FEET OF THE BUILDING. THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR EXTENDING THE SERVICES TO THE PLUMBING AND/OR FIRE SYSTEM CONNECTION WITHIN THE BUILDING. SEE PLUMBING ENGINEER, MECHANICAL ENGINEER AND/OR FIRE PROTECTION PLANS FOR SCOPE, DESIGN AND SPECIFICATIONS WITHIN 5 FT. OF THE BUILDING. 4.CONTRACTOR SHALL PROVIDE ALL NECESSARY FITTINGS AND APPURTENANCES TO COMPLETE THE WATERLINE CONSTRUCTION WORK. THIS INCLUDES TEMPORARY FITTINGS AND GAUGES NECESSARY TO SAFELY COMPLETE THE FLUSHING ACTIVITIES REQUIRED PRIOR TO MAKING CONNECTIONS WITH BUILDING PLUMBING. 5.THE PROJECT SHALL BE CONSTRUCTED, COMPLETED, MAINTAINED, AND OPERATED IN ACCORDANCE WITH THE APPROVED PLANS. NO CHANGES SHALL BE MADE IN THE PROJECT WITH OUT THE WRITTEN APPROVAL OF THE CITY, CWD, AND THE CIVIL ENGINEER. A COPY OF THE FINAL APPROVED PLANS SHALL BE SUBMITTED TO CWD AND THE CITY PRIOR TO CONSTRUCTION OF THE WATER SYSTEM IMPROVEMENTS. 6.THE TOWN AND CWD SHALL BE NOTIFIED IN ADVANCE TO INSPECT ALL MECHANICAL JOINTS FITTINGS, MAIN LINE TAPS, APPURTENANCES, THRUST BLOCKS, WATER LINE CROSSINGS, AND TESTING PRIOR TO OCCURRENCE OR BACKFILLING. 7.ALL DOMESTIC SERVICES AND FIRE SPRINKLER SYSTEMS THAT ARE CONNECTED TO THE PUBLIC WATER SYSTEM SHALL BE PROTECTED WITH A BACKFLOW PREVENTION ASSEMBLY, AND AN APPROPRIATE THERMAL EXPANSION SYSTEM. THE MECHANICAL CONTRACTOR SHALL COORDINATE APPROVED BACKFLOW PREVENTION WITH THE TOWN AND CWD. WATER MAINS 1.APPLIES TO NEW DOMESTIC WATER MAINS AND SERVICES. 2.THE PIPE FOR WATER MAIN SHALL BE CL52 DOUBLE CEMENT LINED DUCTILE IRON. DUCTILE IRON FITTINGS SHALL CONFORM TO AWWA C110, 350 POUNDS WORKING PRESSURE. VALVES SHALL BE MANUFACTURED TO MEET ALL REQUIREMENTS OF AWWA SPECIFICATION C509 OR C515. FOUR-INCH AND SIX-INCH PIPE SHALL HAVE NO LESS THAN 2 BRASS WEDGES INSTALLED AT EACH JOINT. EIGHT-INCH AND 10" PIPE SHALL HAVE NO LESS THAN 3 WEDGES INSTALLED AT EACH JOINT. 3.ALL PIPE SHALL BE INSTALLED IN ACCORDANCE WITH AWWA C600. THE PIPE SHALL BE KEPT FREE OF FOREIGN MATTER AND DEBRIS DURING INSTALLATION. WHEN THE PROCESS OF PIPE LAYING HAS STOPPED, ANY OPEN ENDS OF PIPE SHALL BE PLUGGED. THERE SHALL BE A MINIMUM OF 6'-0" COVER OVER ALL PIPE AND SERVICE LINES. ANY PIPE DEFLECTION SHALL NOT EXCEED FIFTY (50%) PERCENT OF RECOMMENDED MANUFACTURER'S MAXIMUM DEFLECTION. BACKFILL MATERIALS AND PROCEDURES SHALL BE AS DETAILED ON THE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY AND ALL SHEETING AND/OR SHORING NECESSARY TO COMPLY WITH OSHA - VOSHA REGULATIONS. 4.THE TESTING OF THE WATER MAIN SHALL CONSIST OF THE TESTING OF ALL INSTALLED PIPE, SERVICES AND HYDRANTS IN ACCORDANCE WITH AWWA C600. THE TESTING SHALL CONSIST OF A PRESSURE TEST AND LEAKAGE TEST. ALL TESTING SHALL BE DONE WITH POTABLE WATER AND IN THE PRESENCE OF THE ENGINEER, REPRESENTATIVES FROM THE MUNICIPALITY AND THE MUNICIPALITY PUBLIC WORKS. THE PRESSURE TEST CONSISTS OF MAINTAINING A MINIMUM INTERNAL PIPE PRESSURE OF 200 PSI FOR TWO (2) HOURS. THE TESTING ALLOWANCE SHALL BE DEFINED AS THE MAXIMUM QUANTITY OF MAKEUP WATER THAT IS ADDED INTO A PIPELINE UNDERGOING HYDROSTATIC PRESSURE TESTING, OR ANY VALVED SECTION THEREOF, IN ORDER TO MAINTAIN PRESSURE WITHIN +/- 5 PSI OF THE SPECIFIED TEST PRESSURE (AFTER THE PIPELINE HAS BEEN FILLED WITH WATER AND THE AIR HAS BEEN EXPELLED). NO PIPE INSTALLATION WILL BE ACCEPTED IF THE QUANTITY OF MAKEUP WATER IS GREATER THAN THAT DETERMINED BY THE FOLLOWING FORMULA: 5.CHLORINATING OF THE SYSTEM SHALL BE ACCOMPLISHED AFTER THE WATER MAIN HAS BEEN SUCCESSFULLY PRESSURE TESTED AND THOROUGHLY FLUSHED. DISINFECTING SHALL BE IN ACCORDANCE WITH AWWA C-651. THE DISINFECTING PROCESS SHALL BE DEEMED ACCEPTABLE ONLY AFTER TWO CONSECUTIVE SETS OF ACCEPTABLE SAMPLES, TAKEN FROM THE FLUSHED AND DISINFECTED MAIN 24 HOURS APART, SHOWS NO EVIDENCE OF BACTERIOLOGICAL CONTAMINATION. FOR PROPER DISINFECTION USE MINIMUM 25 MG/L CHLORINE CONCENTRATION FOR 24 HOURS. THE CONCENTRATION MUST REMAIN ABOVE 10 MG/L. TABLET DISINFECTING IS NOT ACCEPTABLE. DECHLORINATION SHALL BE REQUIRED WHILE FLUSHING THE ORIGINAL CHLORINE FROM THE NEW LINE. COORDINATE WITH THE THE MUNICIPALITY AND THE MUNICIPALITY PUBLIC WORKS REGARDING THE THE DISPOSAL OF THE HIGHLY CHLORINATED WATER FLUSHED FROM THE NEW WATERLINE. 6.THE WATER MAIN SHALL BE THOROUGHLY FLUSHED WITH A MINIMUM FLOW VELOCITY OF 2.5 FT/S TO FLUSH FOREIGN MATERIALS OUT OF THE VALVES AND HYDRANTS. AT LEAST 48 HOURS PRIOR TO WATERLINE FLUSHING, THE CONTRACTOR SHALL CONTACT THE OWNER, MUNICIPALITY FIRE DEPARTMENT, THE DISTRICT WATER SUPPLY COMPANY, AND THE ENGINEER. SANITARY SEWER 1.ALL SEWER LINES AND MANHOLES SHALL BE THOROUGHLY TESTED BY THE CONTRACTOR IN ACCORDANCE WITH THE ENVIRONMENTAL PROTECTION RULES (04/12/2019). 2.ALL SANITARY MANHOLES SHALL BE VACUUM TESTED IN THE PRESENCE OF THE ENGINEER. THE STRUCTURE SHALL BE TESTED PRIOR TO BACKFILL WITH THE LOWEST SEAM EXPOSED. TEST PROCEDURES AND PRESSURE SHALL BE DETERMINED JOINTLY BY THE LOCAL APPROVAL AGENCY AND THE ENGINEER. FAILURE OF ANY VACUUM TEST SHALL NECESSITATE REPAIR AND/OR REPLACEMENT OF THE STRUCTURE AND RETEST. WATER TESTING MANHOLES IS NOT ACCEPTABLE. 3.ALL SANITARY MAINS SHALL BE AIR TESTED IN THE PRESENCE OF THE ENGINEER. AT A MINIMUM, THE TEST PRESSURE SHALL BE 4 POUNDS PER SQUARE INCH AT THE HIGHEST POINT ALONG THE TEST FOR 4 MINUTES. 4.UTILITY TESTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING SANITARY TESTING AT A MINIMUM OF 24 HOURS PRIOR TO THE TEST. BASED ON AVAILABILITY OF ENGINEER'S STAFF, THE ENGINEER SHALL ACCOMMODATE THE TESTING SCHEDULE WITHIN 24 HOURS OF THE CONTRACTOR REQUESTED TEST DATE/TIME. 5.THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER IF PRE-SCHEDULED TESTING AND/OR WATER/SEWER CONSTRUCTION IS CANCELED. IF CONTRACTOR DOES NOT CONTACT ENGINEER AND ENGINEER VISITS THE SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENGINEER'S FEES/MILEAGE FOR SITE VISIT. ADDITIONAL NOTES AND TESTING REQUIREMENTS 1.IN ADDITION TO THE ABOVE REQUIREMENTS AND APPLIES TO WATER AND SANITARY SEWER. 2.ALL WATER LINES AND SEWER LINES SHALL BE THOROUGHLY TESTED BY THE CONTRACTOR IN ACCORDANCE WITH THE ENVIRONMENTAL PROTECTION RULES (04/12/2019) AND THE CHAPTER 21 WATER SUPPLY RULES (03/17/2020) (THE MORE STRINGENT RULE SHALL APPLY). 3.ALL PRIVATE OR MUNICIPAL WATERLINES SHALL BE TESTED BY THE CONTRACTOR IN ACCORDANCE WITH THE PROCEDURES OUTLINED IN AWWA C600 AND/OR NFPA 24. 4.NO WATER MAIN SHALL BE CLOSER THAN TEN (10) FEET TO ANY SANITARY SEWER OR SANITARY MANHOLE AND FIVE (5) FEET TO ANY CATCH BASIN OR STORM SEWER LINE. PROVIDE MINIMUM OF 18" VERTICAL SEPARATION BETWEEN WATER MAIN AND STORM/SANITARY SEWER CROSSING. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION AS-BUILTS TO SERVICE LOCATIONS, AND ANY WATER MAIN FITTINGS. AS-BUILTS SHALL BE RECORDED IN ACCORDANCE WITH THE OUTLINED PROCEDURES. 6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ENGINEER AT LEAST 24 HOURS PRIOR TO STARTING CONSTRUCTION ON ANY PORTION OF THE EXTERIOR WATER OR SANITARY SYSTEMS. THIS NOTIFICATION REQUIREMENT SHALL CONTINUE TO THE COMPLETION OF THE WATER AND SANITARY SYSTEMS. 7.UTILITY TESTING. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING WATER AND SANITARY TESTING, WITH THE ENGINEER AND MUNICIPALITY PUBLIC WORKS, AT A MINIMUM OF 24 HOURS PRIOR TO THE TEST. BASED ON AVAILABILITY OF ENGINEER'S STAFF, THE ENGINEER SHALL ACCOMMODATE THE TESTING SCHEDULE WITHIN 24 HOURS OF THE CONTRACTOR REQUESTED TEST DATE/TIME. 8.THE CONTRACTOR SHALL PRE-TEST WATER FOR 2 HOURS. THE CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF PRE-TEST FAILED. 9.THE CONTRACTOR SHALL IMMEDIATELY CONTACT THE ENGINEER IF PRE-SCHEDULED TESTING AND/OR WATER/SEWER CONSTRUCTION IS CANCELED. IF CONTRACTOR DOES NOT CONTACT ENGINEER AND ENGINEER VISITS THE SITE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENGINEER'S FEES/MILEAGE FOR SITE VISIT. 10.THE CONTRACTOR SHALL COORDINATE WATER/SEWER CONSTRUCTION WITH THE MUNICIPALITY. THE CONTRACTOR SHALL LEAVE THRUST BLOCKS AND OTHER REQUIRED SECTIONS OF NEW LINE EXPOSED UNTIL MUNICIPALITY HAS INSPECTED AND APPROVED IT. WATER & SEWER CONSTRUCTION NOTES L = SD√P 148,000 L = TESTING ALLOWANCE (MAKEUP WATER), IN GALLONS PER HOUR S = LENGTH OF PIPE TESTED, IN FEET D = NOMINAL PIPE DIAMETER, IN INCHES P = AVERAGE TEST PRESSURE DURING THE HYDROSTATIC TEST, IN POUNDS PER SQUARE INCH (GAUGE) THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.01 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 CURB SEE SITE PLANS CONCRETE HANDICAP ACCESS 6' OR 3' 2" RADIUS 1/2" REVEAL (MAX) RAMP DOWN 6' OR 3' EDGE OF ROAD N.T.S. CURB TAPER - 6' OR 3' BEGIN CURB TAPER SECTION VIEW FINISH GRADE CURBCURB MATCH EXISTING SUBBASE DEPTHS(18" MINIMUM CRUSHED GRAVEL SUBBASE PER VT STATE SPEC. 704.05, FINE) REPLACEMENT OF EXISTING ROAD SUBBASE AND BITUMINOUS PAVEMENT 1.SET UP AND MAINTAIN SIGNS AND OTHER SAFETY CONTROL DEVICES. 2.RESHAPE HOLE PATCH AREA BY CUTTING WITH A CONCRETE SAW INTO SQUARE OR RECTANGULAR SHAPE AND CUT SIDE FACED VERTICALLY. RESHAPE DOWNWARD SOLID MATERIAL AND AROUND HOLE TO SOUND PAVEMENT. 3.BACKFILL TRENCH IN 6" LIFTS AND COMPACT EACH TO 95% OF MAXIMUM DENSITY OF OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D698 STANDARD PROCTOR. 4.REMOVE ALL LOOSE MATERIAL AND THOROUGHLY SWEEP THE HOLE AREA, CLEAN ANY MUD AND STANDING WATER. 5.APPLY LIQUID ASPHALT TRACK TO VERTICAL FACES IN UNIFORM MANNER. DO NOT PUDDLE TRACK COAT ON BOTTOM HOLE. 6.FILL TOP OF HOLE WITH TYPE IV BITUMINOUS CONCRETE AND COMPACT IN LIFTS NO MORE THAN 2' THICK. EACH LIFT SHOULD BE THOROUGHLY COMPACTED WITH A VIBRATORY PLAT COMPACTOR OR A PORTABLE ROLLER. EXPERIENCE HAS SHOWN THAT 15 TO 20 PASSES WITH THE VIBRATORY ROLLER AND MIX TEMPERATURE ABOVE 250°F (121°C) ARE NECESSARY TO ENSURE GOOD COMPACTION. HAND TAMP SHOULD ONLY BE USED FOR SMALL AREAS LESS THAN 1 S.F. 7.CLEAN UP AREA. DO NOT LEAVE EXCESS FILL OR EXCAVATED MATERIAL ON THE PAVEMENT. REMOVE SAFETY SIGNS. NOTES TRENCH EXCAVATION EXISTING GRAVEL BASE EXISTING BIT. PAVING ON BOTH SIDES. SMOOTH CUT EXISTING BIT. PAVEMENT PRIOR TO PAVING 116" TOLERANCE MATCH EXISTING PAVEMENT THICKNESS (7" MAX) 12" MIN. ALL JOINTS SHALL BE THOROUGHLY CLEANED AND COATED WITH EMULSIFIED ASPHALT PRIOR TO PAVING. 12" MIN. PRIOR TO PAVING, GRIND EXISTING ASPHALT (1-1/2" DEPTH), 12" MINIMUM BEYOND PAVEMENT SAWCUT TO OFFSET PAVEMENT JOINT SMOOTH CUT EXISTING ASPHALT (12" BEYOND LIMIT OF EXCAVATION) PRIOR TO PAVING. ALL JOINTS SHALL BE CLEANED AND THOROUGHLY COATED WITH EMULSIFIED ASPHALT. REPLACED PAVEMENT SHALL BE 1-1/2" TYPE IV - TOP, THE REMAINING EXISTING DEPTH OF PAVEMENT WILL BE TYPE II - BASE. 3" MAXIMUM LIFTS. IF CONCRETE ROAD BASE IS PRESENT, IT MUST BE REPLACED WITH 3,500 PSI CONCRETE TO MATCH EXISTING CONDITIONS. DOWEL EXISTING CONCRETE AND NEW CONCRETE WITH #4 REBAR 18" O.C. EMBED REBAR IN EXISTING AND NEW CONCRETE 9" DEEP. 6" SEE MECHANICAL DRAWINGS FOR COMPLETE DESIGN AND DETAILS OF SPRINKLER SYSTEM, DOMESTIC WATER MUST BE ISOLATED FROM SPRINKLER SYSTEM WITH WATTS SERIES 709DCDA (DOUBLE CHECK DETECTOR ASSEMBLY) OR APPROVED EQUAL. 6" MUNICIPALITY ENTRANCE 6" TO DOMESTIC SUPPLY 6" 6" 1,00015.0 Soft clay55.07.014.0 39.025.018.015.0 8.0 4.010.52.05.0 7.0 4.01.52.53.0 4.5 30.0 Maximum water pressure = 200 PSI (140,620 kg/m^2 ) 1.0 2.0 3.0 4.0 3" 4" 6" 8" 12" Minimum Area of Bearing Surface of Concrete Thrust Block (in square feet) 0.5 0.5 0.5 1.0 0.5 0.5 0.5 1.0 1.0 1.5 1.0 1.0 1.5 1.0 1.0 2.5 1.51.00.5 0.5 1.0 0.5 1.5 2.0 0.5 2.0 2.5 3.5 1.5 2.0 1.0 5.0 4.0 7.5 3.0 3.51.0 0.5 5.51.0 PLUG 20.0 10.0 13.0 1.01.5 4.02.52.00.5 6.5 8.5 13.0 4.5 6.0 9.02.0 1.0 1.5 5.0 3.5 2.5 2.0 7.0 3.5 1.5 Sound shale3.05.5 5.0 4.0 8.0 7.5 18.5 14.0 27.5 15.0 10.0 10,000 4,000 3,000 2,000 6" 2" D D+2' BACKFILL MATERIAL SHALL CONTAIN NO STONES GREATER THAN 3" IN DIAMETER, NO FROZEN LUMPS, CLAY OR ORGANIC MATERIAL. PLACE IN 12" LIFTS AND COMPACT AS INDICATED. 95% standard proctor 90% standard proctor THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA - VOSHA REGULATIONS. PAVED OR TRAVELED AREA UNPAVED MOUND SLIGHTLY PAVING TO MATCH EXISTING 6' MINIMUM COVER FORALL WATER LINESUSE SAND FILL OR 1 4" TO 3 4" CRUSHED STONE AS ORDERED BY ENGINEER ABOVE THE CENTERLINE OF THE PIPE (USE STONE IN ANY AREAS WHERE COARSE BACKFILL MATERIAL COULD DAMAGE PIPE). FOR STORM PIPES USE 1 4" TO 3 4" CRUSHED STONE BELOW CENTERLINE OF PIPE.SEE PLANS FOR ALL PIPE TYPES AND SIZES UNDISTURBED EARTH SUBBASE N.T.S. WATER TRENCH DETAIL PROVIDE 2" RIGID INSULATION OVER WATER MAINS AND SERVICES WHEN THEY ARE BURIED UNDER PAVED OR TRAVELED AREAS. 6" 2" D D+2' BACKFILL MATERIAL SHALL CONTAIN NO STONES GREATER THAN 3" IN DIAMETER, NO FROZEN LUMPS, CLAY OR ORGANIC MATERIAL. PLACE IN 12" LIFTS AND COMPACT AS INDICATED. 95% standard proctor 90% standard proctor THE CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLYING WITH OSHA - VOSHA REGULATIONS. PAVED OR TRAVELED AREA UNPAVED MOUND SLIGHTLY PAVING TO MATCH EXISTING 4' MINIMUM COVER FORALL WATER LINESUSE SAND FILL OR 1 4" TO 3 4" CRUSHED STONE AS ORDERED BY ENGINEER ABOVE THE CENTERLINE OF THE PIPE (USE STONE IN ANY AREAS WHERE COARSE BACKFILL MATERIAL COULD DAMAGE PIPE). FOR STORM PIPES USE 1 4" TO 3 4" CRUSHED STONE BELOW CENTERLINE OF PIPE. SEE PLANS FOR ALL PIPE TYPES AND SIZES. SEE NOTE ABOVE ABOUT REPLACEMENT PIPES UNDISTURBED EARTH SUBBASE N.T.S. SANITARY TRENCH DETAIL PROVIDE 2" RIGID INSULATION OVER WATER MAINS AND SERVICES WHEN THEY ARE BURIED UNDER PAVED OR TRAVELED AREAS. SELECT BACKFILL COMPACTED IN 6" LAYERS, 95% STANDARD PROCTOR DENCITY WATER MAIN 18" MIN. SEWER 1.THE LOCATION OF SEWER MAINS IN RELATION TO WATER MAINS SHALL BE IN ACCORDANCE WITH THE "RECOMMENDED STANDARDS FOR SEWAGE WORKS" SO-CALLED TEN STATE STANDARDS AND WATER SUPPLY RULES. 2.SEWERS SHALL BE LAID AT LEAST 10 FEET HORIZONTALLY FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IF THIS DISTANCE CANNOT BE OBTAINED, THEN THE PIPES SHALL BE INSTALLED ACCORDING TO EPR, CHAPTER 1, APPENDIX 1A, 11A. 3.18" SEPARATION SHALL BE MAINTAINED WHETHER WATER IS OVER OR UNDER SEWER. IF THIS DISTANCE CANNOT BE OBTAINED, THEN THE PIPES SHALL BE INSTALLED ACCORDING TO EPR CHAPTER 1, 11B. NOTES SEWERS CROSSING WATER MAINS SHALL BE LAID BENEATH THE WATER MAIN WITH AT LEAST 18 INCHES VERTICAL CLEARANCE BETWEEN THE OUTSIDE OF THE SEWER AND THE OUTSIDE OF THE WATER MAIN. WHEN IT IS POSSIBLE TO MAINTAIN THE 18" VERTICAL SEPARATION: 1.THE CROSSING SHALL BE ARRANGED SO THAT ONE FULL LENGTH OF SEWER IS CENTERED ABOVE OR BELOW THE WATER LINE WITH SEWER JOINTS AS FAR AS POSSIBLE FROM WATER JOINTS; 2.THE SEWER PIPE MUST BE CONSTRUCTED TO WATER MAIN STANDARDS FOR A MINIMUM DISTANCE OF 20 FEET EITHER SIDE OF THE CROSSING OR A TOTAL OF THREE PIPE LENGTHS, WHICHEVER IS GREATER; 3.THE SECTION CONSTRUCTED TO WATER STANDARDS MUST BE PRESSURE TESTED TO MAINTAIN 50 PSI FOR 15 MINUTES WITHOUT LEAKAGE PRIOR TO BACKFILLING BEYOND ONE FOOT ABOVE THE PIPE TO ASSURE WATER TIGHTNESS; 4.WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT SHALL BE PROVIDED FOR THE SEWER TO PREVENT DAMAGE TO THE WATER MAIN. CROSSINGS N.T.S. TYPICAL TAPPING SLEEVE AND VALVE THRUST BLOCK EXISTING WATER MAIN NEW WATER MAIN USE A NEW DUCTILE IRON MECHANICAL JOINT TAPPING SLEEVE AND VALVE BY CLOW, MUELLER OF APPROVED EQUAL. 1.WET TAP SHALL BE INSTALLED BY PERSONS APPROVED BY THE LOCAL MUNICIPALITY AND CHAMPLAIN WATER DISTRICT. 2.PRIOR TO TAPPING THE MAIN A 200 PSI HYDROSTATIC TEST SHALL BE PERFORMED ON THE VALVE AND SLEEVE ASSEMBLY. THE TEST PRESSURE SHALL BE MAINTAINED FOR AN ADEQUATE AMOUNT OF TIME TO ENSURE NO LEAKAGE AT THE TAPPING SLEEVE ASSEMBLY. NOTES FINISH GRADE CAST IRON COVER MARKER "WATER"6' MIN. COVERADJUSTABLE IRON CURB BUFFALO STYLE CURB BOX WITH COVER USE 4 MIL. POLYETHYLENE BETWEEN VALVE AND CONCRETE WATER MAIN THRUST BLOCK UNDISTURBED MATERIAL N.T.S. TYPICAL GATE VALVE USE 4 MIL. POLYETHYLENE BETWEEN SLEEVE AND CONCRETE SPRIN K L E R RISE R S TEST HEAD E R BACKFLOW PREVENTION (DOUBLE CHECK DETECTOR) GATE VALVE AND TAMPER SWITCH COMPOUND WATER METER BACKFLOW PREVENTION (DOUBLE CHECK DETECTOR) N.T.S. BACKFLOW PREVENTER SCHEMATIC Cemented gravel & sand Coarse & fine compact sand Medium clay (can be spaded) ENDS & TEES VALV. 90° ELB. REDU. 45° ELB. 22.5° ELB. ENDS & TEES VALV. 90° ELB. REDU. 45° ELB. 22.5° ELB. ENDS & TEES VALV. 90° ELB. REDU. 45° ELB. 22.5° ELB. ENDS & TEES VALV. 90° ELB. REDU. 45° ELB. 22.5° ELB. ENDS & TEES VALV. 90° ELB. REDU. 45° ELB. 22.5° ELB. SAFE BEARING LOAD(PSF) SOIL CONDITION N.T.S. THRUST BLOCK DETAIL 90°, 45°, 221 2 ° & 111 4° BENDTEE VAVLE AND DEAD END REDUCER UNDISTURBED MATERIAL UNDISTURBED MATERIALUNDISTURBED MATERIAL UNDISTURBED MATERIAL NOTE: PLACE 3 MIL. (MINIMUM) POLYETHYLENE SHEET BETWEEN ALL CONCRETE THRUST BLOCKS AND PIPE/OR FITTINGS TO PREVENT BOND. CONCRETE SHALL NOT COVER BOLTS, ETC. OF ALL FITTINGS. USE MEGALUG CONTAINERS MIN. ONE FULL LENGTH OF PIPE BURIED GATE VALVE WITH CONCRETE SUPPORT AND ANCHOR (SEE BURIED GATE VALVE DETAIL ABOVE). 6" MIN. INTO TRENCH WALL, TYP. 1.A THRUST BLOCK SHALL BE INSTALLED AT ALL WATER MAIN BENDS, REDUCERS, END CAPS AND TEES. 2.PRECAST THRUST BLOCKS ARE NOT ACCEPTABLE. 3.REDI-MIX CONCRETE (2,500 PSI MIN) MUST BE USED FOR THRUST BLOCKS. SACRETE IS NOT ACCEPTABLE. 4. 5.USE EBAA MEGA-LUG, SIGMA, OR EQUAL, WEDGE-ACTION MECHANICAL JOINT RESTRAINTS WITH TWIST OFF NUTS AT ALL FITTINGS. NOTES 1.THE CONTRACTOR SHALL CONFIRM ALL VALVE SPECIFICATIONS WITH THE MUNICIPALITY PUBLIC WORKS BEFORE ORDERING. 2.GATE VALVES SHALL BE MEET ALL REQUIREMENTS OF A.W.W.A. C509 AND C515 STANDARDS (LATEST EDITION). VALVES WITH MECHANICAL JOINTS OF SIZES AS REQUIRED ON THE PLANS. 3.ALL VALVES SHALL BE OF CAST OR DUCTILE IRON BODY AND SHALL BE COATED WITH FUSION BONDED EPOXY COMPLYING WITH AWWA C-550 AND BE NSF 61 APPROVED. VALVE SHALL HAVE MANUFACTURER'S NAME, PRESSURE RATING, AND MANUFACTURE DATE CAST ON THE BODY. 4.ALL VALVES SHALL INCLUDE NON-RISING STEM, HIGH STRENGTH BRONZE STEM AND NUT, 100% COATED WEDGE, "O" RING STEM SEALS ABOVE AND BELOW THE THRUST COLLAR, A 2" SQUARE OPERATING NUT, MECHANICAL JOINT ENDS, AND CORROSION RESISTANT STAINLESS STEEL BODY BOLTS AND NUTS. 5.CHECK WITH THE MUNICIPALITY FOR OPENING AND CLOSING ROTATIONS AND MINIMUM WORKING PRESSURE. 6.VALVES SHALL BE EQUIPPED WITH A TWO PIECE, SLIDING TYPE CAST IRON VALVE BOX FOR A MINIMUM 6 FT. OF COVER MATERIAL. NOTES Pipe Size Flow Rate in. mm gpm L/min 4 102 390 1,476 6 152 880 3,331 8 203 1,560 5,905 10 254 2,440 9,235 12 305 3,520 13,323 UNDERGROUND PIPING, FROM THE WATER SUPPLY TO THE SYSTEM RISER, AND LEAD-IN CONNECTIONS TO THE SYSTEM RISER SHALL BE COMPLETELY FLUSHED BEFORE THE CONNECTION IS MADE TO DOWNSTREAM FIRE PROTECTION SYSTEM PIPING. ACCEPTABLE WATER MAIN FLUSHING REQUIREMENTS ARE PROVIDED BELOW. PRIOR TO FLUSHING, THE CONTRACTOR SHALL CONTACT THE OWNER, MUNICIPAL FIRE DEPARTMENT, THE DISTRICT WATER SUPPLY COMPANY, AND THE ENGINEER. THE FLUSHING OPERATION SHALL BE CONTINUED FOR A SUFFICIENT TIME TO ENSURE THOROUGH CLEANING. THE MINIMUM RATE OF FLOW SHALL BE NOT LESS THAN ONE OF THE FOLLOWING: 1.HYDRAULICALLY CALCULATED WATER DEMAND FLOW RATE OF THE SYSTEM, INCLUDING ANY HOSE REQUIREMENTS. (PROVIDED BY THE MECHANICAL/SPRINKLER CONSULTANT) 2.FLOW NECESSARY TO PROVIDE A VELOCITY OF 10 FT/SEC (3.1 M/SEC) IN ACCORDANCE WITH THE TABLE. 3.MAXIMUM FLOW RATE AVAILABLE TO THE SYSTEM UNDER FIRE CONDITIONS. FLOW REQUIRED TO PRODUCE A VELOCITY OF 10 FT/SEC (3 M/S) IN PIPES FIRE SERVICE MAIN N.T.S. WATER AND SEWER CROSSINGS DETAIL 3'-0"BIKE RACK DETAIL 24" NEW CLASSIC U/2 BIKE RACK BY CYCLESAFE OR APPROVED EQUAL WITH CYCLESAFE BLACK PLASTISOL RUBBERIZED COATING 4'-0"7'-0" 4" MIN. 12" THICK GRAVEL SUBBASE (VAOT 704.05, FINE)MIN. FROMEDGE OFPAVEMENTMIN. BETWEENRACKS2'-6"2'JACKET COATING TO EXTEND 1" MIN. BELOW GRADE 9" THICK CONCRETE PAD TO BE POURED FOR SETTING AND ALIGNING BIKE RACK POSTS. SEE NEW CONCRETE SIDEWALK DETAIL FOR CONCRETE DESIGN. 26"26"9" MIRAFI 500X EXISTING OR NEW CONCRETE SIDEWALK 6" N.T.S. 1.TYPICAL CITY OF SOUTH BURLINGTON PARKING SPACE IS 9'-0" CENTER OF LINE TO CENTER OF LINE MARKED WITH 4" WIDE YELLOW OR WHITE PAINT. 2.ADA SPACE IS YELLOW/WHITE STENCIL, YELLOW/WHITE TRIM. COORDINATE EXACT REQUIREMENTS WITH CITY OF SOUTH BURLINGTON. 3.PAINT FOR PAVEMENT MARKINGS SHALL BE HYDROPHAST WATERBORNE TRAFFIC PAINT BY FRANKLIN PAINT COMPANY. IT SHALL BE REFLECTIVE, VOC COMPLIANT FAST DRYING, 100% ACRYLIC WATERBORNE TRAFFIC PAINT. PAINT FOR STOP BARS AND CROSSWALKS SHALL BE WHITE ALL OTHER LINE STRIPING SHALL BE YELLOW. CONFIRM PAINT COLOR WITH CITY OF SOUTH BURLINGTON AND OWNER. 4.TRAFFIC PAINT SHALL BE APPLIED WITH A UNIFORM THICKNESS AND AT A RATE SUCH THAT NO PAVEMENT IS VISIBLE AFTER DRYING. ADDITIONAL PAINT APPLICATION WILL BE REQUIRED IF UNDERLYING PAVEMENT IS VISIBLE. PAVEMENT MARKING NOTES SEE APPROPRIATE CONCRETE DETAIL FOR SUBBASE DESIGN. (1/2") 3" CLEAR (MIN.) 2" CLEAR (MIN.) CONSTRUCTION JOINT DETAIL FOR CONNECTION TO EXISTING CONCRETE EXISTING CONCRETE (6")CONTRACTOR TO USE THIS PINNING DETAIL TO PIN NEW CONCRETE TO EXISTING CONCRETE (WALK TO WALK, WALK TO BUILDINGS, ETC). 9" 2" MIN. 3" MIN. N.T.S. DRILL AND INSERT #4 X 1'-6" LONG EPOXY COATED STEEL DOWELS @ 18" O.C. 9" EMBED DEPTH. DOWELS TO BE LEVEL AND CENTERED IN CONCRETE. INSTALL EXPANSION JOINT AT EDGE OF EXISTING CONCRETE. USE RESILIENT NON-EXTRUDING CELLULAR FIBER JOINT, UNIFORMLY SATURATED WITH ASPHALT, OFFERING A MINIMUM OF 70% RECOVERY AFTER COMPRESSION. NEW MULTI-USE CONCRETE SIDEWALK. (SEE APPROPRIATE DETAIL FOR CONCRETE DESIGN) REINFORCING PVC DOWEL SLEEVE INTERRUPT REINFORCING @ JOINTS. MAINTAIN 3" CLEARANCE CONCRETE BLOCK SUPPORT (PER CSI MANUAL OF STANDARD PRACTICE) (TYP.). 6"6" 2" 2" AS SHOWN ON PLANS 1.BROOM FINISH CONCRETE. CONSTRUCTION JOINTS SHALL BE SPACED MAXIMUM 24' IN ALL DIRECTIONS. SAWCUT CONTROL JOINTS 112" DEPTH AT INTERVALS EQUAL TO WIDTH OF SIDEWALK. 2.APPLY SPECCHEM CURE SHIELD, CURE & SEAL AGENT TO ALL CONCRETE SURFACES IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS. 3.CONCRETE CONSTRUCTION AND CURING SHALL CONFORM TO SECTION 618.03 OF THE CURRENT VAOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 4.CONCRETE MAY NOT BE POURED IF FROST IS PRESENT OR THAWING IN THE SUBGRADE, IF THE TEMPERATURE IS 40° F OR LESS, OR DURING UNSEASONABLE WEATHER CONDITIONS. 5.ALL CONCRETE USED IN THE CONSTRUCTION OF MULTI-USE CONCRETE SHALL BE MADE WITH PORTLAND CEMENT. THE CONCRETE SHALL MEET SECTION 541 OF THE STATE OF VERMONT STANDARD SPECIFICATIONS FOR CONSTRUCTION, HAVE 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI, AND MEET THE FOLLOWING MIX DESIGN. MAX. WATER-CEMENT RATIO (LB./LB.) 0.44 MIN. CEMENT FACTOR (LBS/C.Y.) 660 ENTRAINED AIR CONTENT (%) 5 - 7 SLUMP (INCHES, BEFORE ADDING HRWR) 2 - 4 USE AIR ENTRAINED AGENT CONFORMING TO ASTM C260 WITH 5-7% TOTAL AIR. USE HIGH RANGE WATER REDUCING AGENT CONFORMING TO ASTM C494 IN ALL CONCRETE. 6.CONTRACTOR SHALL POUR AND FINISH ONE SAMPLE PANEL FOR APPROVAL BY OWNER AND ENGINEER. ALL CONCRETE SHALL MATCH THE QUALITY AND APPEARANCE OF THE SAMPLE PANEL. ANY CONCRETE THAT DOES NOT MEET THE STANDARD SHALL BE REMOVED AND REPLACED AT NO COST TO THE OWNER. 7.CONCRETE SHALL BE INSTALLED IN ALTERNATING POURS AT CONSTRUCTION JOINTS. REFER TO CONCRETE CONSTRUCTION JOINT/CONTROL JOINT DETAIL 8.OWNER AND/OR CONTRACTOR IS NOT ALLOWED TO PLACE DEICING MATERIAL ON NEWLY POURED CONCRETE SIDEWALK FOR A PERIOD OF 6 MONTHS. NOTES FOR CONCRETE N.T.S. NEW MULTI-USE CONCRETE SIDEWALK DETAIL MIRAFI 500X, OR APPROVED EQUAL. UNDISTURBED EARTH OR APPROVED FILL MATERIAL COMPACTED TO 95% STANDARD PROCTOR IN 12" LIFTS. 6" THICK CLASS A 4,000 PSI CONCRETE. INSTALL CONTINUOUS 6"X6", 10 10 GAUGE GALVANIZED WWF PLACED 2" ABOVE BOTTOM OF CONCRETE.4" TOPSOIL, SEE SITE PLAN FOR GRADING CONCRETE BLOCK SUPPORT (PER CSI MANUAL OF STANDARD PRACTICE) (TYP.). 12" CRUSHED GRAVEL SUBBASE (704.05, FINE). FOR CONCRETE WALKS 6 FEET WIDE OR LESS 1.ALL CONNECTIONS TO BUILDING, CONTRACTOR SHALL DISCUSS PINNING WITH STRUCTURAL ENGINEER. AT CONNECTIONS TO BUILDING, SUBBASE STONE SPECIFIED IN DETAIL WILL EXTEND TO FULL DEPTH OF FOOTING AND EXTEND OUT FROM BUILDING 5' MINIMUM. NOTES SIDEWALKS SHALL BE CROSS SLOPED TOWARDS THE DISCONNECTION AREAS, MAXIMUM OF 2% CROSS SLOPE. GRADE SURFACES TO DRAIN WITHOUT CONCENTRATING FLOWS 1.EXISTING SEWER CONNECTIONS TO BUILDINGS WILL BE VIDEO INSPECTED TO VERIFY CONDITION, LOCATION, AND DETERMINATION OF POSSIBLE REUSE. 2.EXISTING PIPE SIZE, TYPE AND SLOPE ARE NOT KNOWN AT THIS TIME BUT ASSUMED TO BE 6 INCHES IN DIAMETER. 3.IF PROJECT OWNER DECIDES TO REPLACE THE EXISTING SEWER CONNECTION TO THE BUILDINGS, ALL PIPES AND PIPE CONNECTIONS WILL BE PVC SDR 35 OR APPROVED EQUAL. PIPE SIZE WILL BE DEPENDENT ON EXISTING SLOPES AND WILL FOLLOW THE MINIMUM SLOPE TABLE BELOW. PIPE SIZE WILL NOT BE LESS THAN 6 INCHES IN DIAMETER. SEWER LINE REPLACEMENT NOTES PIPE SIZE (IN.)SLOPE (FT./100 FT.) 6 0.60 8 0.40 PIPE SIZE AND MINIMUM SLOPE TABLE THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.02 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 N.T.S. 1" PIPE BOLLARD DETAIL 6"6"6" 54" 42" SLOPE FILL WITH CONCRETE TAPERED AWAY FROM PIPE PAINT AS DIRECTED BY OWNER CONCRETE ROUNDED SMOOTH 6" OUTSIDE DIAMETER HEAVY DUTY GALVANIZED STEEL PIPE BOLLARD, FILLED WITH CONCRETE FINISH GRADE 1.ALL REFERENCES TO ROAD SHALL APPLY TO PARKING AREAS AS WELL. 2.NEW ROAD SHALL BE CONSTRUCTED TO THE LINE AND GRADE SHOWN ON THE DRAWINGS. THE ROAD AND UTILITY LOCATIONS SHALL BE AS TYPICALLY DETAILED UNLESS OTHERWISE SHOWN. 3.ALL ROAD AND PARKING CONSTRUCTION SHALL BE COMPLETED IN ACCORDANCE WITH THE VERMONT AGENCY OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR CONSTRUCTION" 2018, HEREAFTER CALLED VERMONT HIGHWAY SPECIFICATIONS, SPECIFICATIONS FOUND ON THESE PLANS, AND CITY/TOWN SPECIFICATIONS. IN CASE OF CONFLICT, THE MORE STRINGENT SPECIFICATION SHALL APPLY AS DETERMINED BY THE ENGINEER. ALL GRAVEL AND STORM SEWER STRUCTURES SHALL BE APPROVED BY TOWN ENGINEER. 4.THE CONTRACTOR SHALL FOLLOW VERMONT HIGHWAY SPECIFICATIONS (2018) SECTION 203.11 FOR PLACING AND SPREADING EMBANKMENTS. 5.FILL MATERIAL FOR ROAD EMBANKMENT SHALL BE APPROVED BY THE ENGINEER. FILL SHALL BE PLACED IN 12" LIFTS, WETTED AND COMPACTED WITH SATISFACTORY COMPACTION EQUIPMENT TO 95% OF MAXIMUM DENSITY (STANDARD PROCTOR). 6.ROAD IN FILL SECTIONS SHALL BE PLACED AND COMPACTED A MINIMUM OF 3 FEET ABOVE TOP OF ANY UTILITY TO BE INSTALLED BEFORE TRENCH IS EXCAVATED FOR PIPE PLACEMENT. IN TRENCHES AND CUT SECTIONS, THE CONTRACTOR SHALL PROVIDE ALL NECESSARY SHEETING, SHORING AND BRACING TO MAINTAIN COMPLIANCE WITH ALL OSHA/VOSHA REGULATIONS. 7.METHODS FOR CONSTRUCTION OF SUBGRADE SHALL CONFORM TO VERMONT HIGHWAY SPECIFICATIONS (2018) 203.12 OR AS DETERMINED BY THE ENGINEER. 8.ANY SUBGRADE OR SUBBASE DISTURBED BY CONTRACTOR, OR RENDERED UNSUITABLE BY CONSTRUCTION MACHINERY, SHALL BE REMOVED AND REPLACED WITH APPROVED GRANULAR BACKFILL AT THE CONTRACTOR'S EXPENSE. THE SUBGRADE SHALL BE COMPACTED TO ATTAIN AT LEAST 95% OF THE MAXIMUM DENSITY (STANDARD PROCTOR) BEFORE PLACING ROAD OR EMBANKMENT MATERIALS. 9.THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION OF COMPACTION IN THE ROAD AND UTILITY TRENCHES. 10.SAND FILL SHALL CONFORM TO VERMONT HIGHWAY SPECIFICATIONS (2018) 703.03, TABLE 703.03A. GRANULAR BORROW SHALL CONFORM TO THE VERMONT HIGHWAY SPECIFICATIONS 703.04 GRANULAR BORROW, TABLE 703.04A. 11.GRAVEL SUBBASE FOR PAVEMENT SHALL CONFORM TO VERMONT HIGHWAY SPECIFICATIONS (2018) 704.05, TABLE 704.05A, COARSE. 12.LEVELING COURSE SHALL CONFORM TO VERMONT HIGHWAY SPECIFICATIONS (2018) 704.05, TABLE 704.05A, FINE. SHOULDERS SHALL CONFORM TO SECTION 704.12, AGGREGATE FOR SHOULDERS. 13.BITUMINOUS CONCRETE PAVEMENT SHALL CONFORM TO VERMONT HIGHWAY SPECIFICATIONS (2018) SECTION 404 AND 406. BINDER COURSE SHALL BE TYPE II, AND FINISH WEARING COURSE SHALL BE TYPE III OR IV. BASE COURSE PAVING TO BE PLACED FIRST YEAR, SURFACE COURSE TO BE PLACED THE SECOND OR THIRD YEAR, DETERMINED BY THE ENGINEER. 14.EMBANKMENT FILL FOR ROAD AND PARKING SHALL BE A SIEVE SPECIFICATION AS FOLLOWS: SIEVE % FINER 4" 100 2" 85-100 #4 60-100 #200 12 MAXIMUM 15.IF PROOF ROLL FAILS, CONTRACTOR SHALL REMOVE THE SITE SOIL AND REPLACE IT WITH SAND WITH THE ABOVE SPEC. UNTIL A PROOF ROLE CAN BE PLACED WITHOUT FAILING. ENGINEER WILL JUDGE PASS/FAILURE OF PROOF ROLE, THIS WILL BE PERFORMED WITHOUT FURTHER COSTS TO THE OWNER. ROAD CONSTRUCTION NOTES 1' - 6" 9" 6" 6" 6" 12" SUBBASE MATERIAL SHALL BE PLACED AND COMPACTED IN 12" MAXIMUM LIFTS. THE CONTRACTOR SHALL PREPARE THE SUBGRADE IN CONFORMANCE WITH THE DESIGN GRADES THEN, IN THE PRESENCE OF THE ENGINEER, SHALL PROOF ROLL THE SUBGRADE WITH A LOADED TANDEM DUMP TRUCK. CONDITIONS MAY REQUIRE THE REMOVAL OF UNSUITABLE MATERIAL AND PLACEMENT OF ADDITIONAL SUBBASE. THE OWNER MUST APPROVE ANY WORK INVOLVED WITH THE REMOVAL OF UNSUITABLE MATERIAL AND PLACEMENT OF ADDITIONAL SUBBASE. UNDISTURBED MATERIAL OR COMPACTED FILL (SEE NOTE 14 ROAD CONSTRUCTION NOTES) REMOVE ALL ORGANICS BEFORE PLACING FABRIC. CONTRACTOR SHALL SHAPE AND ROLL SUBGRADE TO REFLECT FINISH GRADE DRAINAGE PRIOR TO INSTALLING MIRAFI 500X. MIRAFI 500X, OR APPROVED EQUAL. OVERLAP MINIMUM OF 2'. LAY FLAT AGAINST SUBGRADE. (NO FOLDS OR WRINKLES) 20" DENSE GRADED CRUSHED STONE (704.06) ALTERNATIVE MATERIALS IDENTIFIED IN SECTION 301 - SUBBASE ARE NOT ALLOWED. 4" LEVELING COURSE (704.05, FINE) 3" BIT. CONC. 1" TYPE IV - TOP 2" TYPE II - BASE IF TOP COURSE PAVEMENT IS NOT LAID IN SAME SEASON AS BASE, THE CONTRACTOR SHALL SWEEP BASE COURSE CLEAN AND APPLY EMULSIFIED ASPHALT TO BASE PAVEMENT PRIOR TO LAYING TOP COURSE. MATCH EXISTING ADJACENT MATERIAL (GRASS, GRAVEL, MULCH, ETC) EXTEND FULL DEPTH OF CRUSHED GRAVEL SUBBASE 12" (MIN.) BEYOND EDGE OF PAVEMENT. N.T.S. WITHOUT CURB BITUMINOUS CONCRETE THE CONTRACTOR SHALL PREPARE THE SUBGRADE IN CONFORMANCE WITH THE DESIGN GRADES THEN, IN THE PRESENCE OF THE ENGINEER, SHALL PROOF ROLL THE SUBGRADE WITH A LOADED TANDEM DUMP TRUCK. CONDITIONS MAY REQUIRE THE REMOVAL OF UNSUITABLE MATERIAL AND PLACEMENT OF ADDITIONAL SUBBASE. THE OWNER MUST APPROVE ANY WORK INVOLVED WITH THE REMOVAL OF UNSUITABLE MATERIAL AND PLACEMENT OF ADDITIONAL SUBBASE. UNDISTURBED MATERIAL OR COMPACTED FILL (SEE NOTE 14 ROAD CONSTRUCTION NOTES) REMOVE ALL ORGANICS BEFORE PLACING FABRIC. CONTRACTOR SHALL SHAPE AND ROLL SUBGRADE TO REFLECT FINISH GRADE DRAINAGE PRIOR TO INSTALLING MIRAFI 500X. MIRAFI 500X, OR APPROVED EQUAL. OVERLAP MINIMUM OF 2'. LAY FLAT AGAINST SUBGRADE. (NO FOLDS OR WRINKLES) 20" DENSE GRADED CRUSHED STONE (704.06) ALTERNATIVE MATERIALS IDENTIFIED IN SECTION 301 - SUBBASE ARE NOT ALLOWED. 4" LEVELING COURSE (704.05, FINE) 3" BIT. CONC. 1" TYPE IV - TOP 2" TYPE II - BASE CONCRETE CURB (TYP.) BITUMINOUS CONCRETE IF TOP COURSE PAVEMENT IS NOT LAID IN SAME SEASON AS BASE, THE CONTRACTOR SHALL SWEEP BASE COURSE CLEAN AND APPLY EMULSIFIED ASPHALT TO BASE PAVEMENT PRIOR TO LAYING TOP COURSE. 1 2" RADIUS N.T.S. WITH CONCRETE CURB N.T.S. TYPICAL ROAD CROSS SECTION DETAILS - WITH CONCRETE CURBS AND WITHOUT CURBS 1.BROOM FINISH CONCRETE, ALL JOINTS TO BE TOOL FINISHED, EXPANSION/CONTRACTION JOINTS EVERY 20' WITH 1/2" JOINT FILLER, SCORE 1/3 TOTAL DEPTH AT 10' INTERVALS 2.APPLY 2 COATS OF EUCLID EVERCLEAR VOX CURE/SEAL COMPOUND TO ALL CONCRETE SURFACES, PER THE MANUFACTURER'S SPECIFICATIONS. 3.CONCRETE MAY NOT BE POURED IF FROST IS PRESENT OR THAWING IN THE SUBGRADE, IF THE TEMPERATURE IS 40° F OR LESS, OR DURING UNSEASONABLE WEATHER CONDITIONS. 4.CONCRETE CURB RADII LESS THAN 200 FT SHALL BE FORMED WITH FLEXIBLE FORMS. ALL CONCRETE USED IN THE CONSTRUCTION OF CONCRETE CURB SHALL BE AIR ENTRAINED AND MADE WITH PORTLAND CEMENT. THE CONCRETE SHALL MEET SECTION 541 OF THE STATE OF VERMONT STANDARD SPECIFICATION FOR CLASS A CONCRETE AND HAVE 28 DAY COMPRESSIVE STRENGTH OF 4,000 PSI. 5.JOINT FILLER SHALL BE RESILIENT NON-EXTRUDING CELLULAR FIBER JOINT, UNIFORMLY SATURATED WITH ASPHALT, OFFERING A MINIMUM OF 70% RECOVERY AFTER COMPRESSION. 6.THE ENGINEER SHALL BE CONTACTED AT LEAST 24 HOURS PRIOR TO FORMING CONCRETE CURB TO REVIEW LAYOUT. NOTES FOR CONCRETE CURB 1.THE CONTRACTOR TO TAKE SIEVE ANALYSIS OF GRAVEL AS SOON IT ARRIVES ON SITE. 2.TRAVEL OVER GRAVEL WITH ANY VEHICLE TRACKING SOIL PRIOR TO PLACEMENT OF PAVEMENT IS PROHIBITED. 3.IF GRAVEL IS CONTAMINATED AFTER PLACEMENT, THE SITE CONTRACTOR SHALL BE RESPONSIBLE REMOVAL OF ALL CONTAMINATED GRAVEL AND PAYING FOR ALL RECOMMENDED SIEVE ANALYSIS AS DETERMINED BY THE ENGINEER. GRAVEL NOTES SUBBASE MATERIAL SHALL BE PLACED AND COMPACTED IN 12" MAXIMUM LIFTS. ADJACENT SURFACE MATERIAL VARIES - SEE SITE PLANS CONTRACTOR SHALL MATCH EXISTING SUBBASE AND PAVEMENT DEPTHS. COORDINATE WITH THE CITY OF SOUTH BURLINGTON. SEE APPROPRIATE DETAIL FOR SUBBASE DESIGN.(6")(1/2") CONTRACTOR TO USE THIS PINNING DETAIL TO PIN NEW CONCRETE TO NEW CONCRETE (WALK TO WALK, WALK TO BUILDINGS, WALK TO RETAINING WALLS, STAIRS, ETC). 3" CLEAR (MIN.) 2" CLEAR (MIN.) REINFORCING 3/4" X 1'-6" LONG SMOOTH, EPOXY COATED STEEL DOWELS @ 18" O.C., 9" EMBED DEPTH. CENTER IN CONCRETE. CONTROL JOINT: SAW-CUT 1-1/2" DEEP JOINT. NO TOOLING ALLOWED. NEW MULTI-USE CONCRETE SIDEWALK. (SEE APPROPRIATE DETAIL FOR CONCRETE DESIGN) PVC DOWEL SLEEVE CONCRETE BLOCK SUPPORT (PER CSI MANUAL OF STANDARD PRACTICE) (TYP.). FORMED EXPANSION JOINT. USE RESILIENT NON-EXTRUDING CELLULAR FIBER JOINT, UNIFORMLY SATURATED WITH ASPHALT, OFFERING A MINIMUM OF 70% RECOVERY AFTER COMPRESSION. INTERRUPT REINFORCING @ JOINTS. MAINTAIN 3" POUR SLABS ON SEPARATE DAYS SEE APPROPRIATE DETAIL FOR SUBBASE DESIGN. N.T.S. NEW CONCRETE CONSTRUCTION JOINT/CONTROL JOINT DETAIL 6"6" 2" 3" TO BE USED FOR CONCRETE SIDEWALK THAT IS NOT HEAVY DUTY AND THAT IS WIDER THAN 6'. 1.BROOM FINISH CONCRETE. CONSTRUCTION JOINTS SHALL BE SPACED MAXIMUM 24' IN ALL DIRECTIONS. SAWCUT CONTROL JOINTS 11 2" DEPTH AT INTERVALS EQUAL TO WIDTH OF SIDEWALK. 2.CONCRETE SHALL BE WET CURED FOR A MINIMUM OF 7 DAYS WITH WATER AND HYDRACURE S16, OR APPROVED EQUAL, WET CURING COVERS. CURING COVER NEEDS TO BE "SECURED" TO PREVENT TRIPPING HAZARD BY PEDESTRIAN USE. 3.APPLY 2 COATS OF CHEMSTOP WB SILOXANE/SILANE WATER REPELLANT TO ALL CONCRETE SURFACES, PER THE MANUFACTURER'S SPECIFICATIONS. PRODUCT SHALL BE APPLIED AFTER 7 DAY CURING IS COMPLETE. 4.CONCRETE CONSTRUCTION AND CURING SHALL CONFORM TO SECTION 618.03 OF THE CURRENT VAOT STANDARD SPECIFICATIONS FOR CONSTRUCTION. 5.CONCRETE MAY NOT BE POURED IF FROST IS PRESENT OR THAWING IN THE SUBGRADE, IF THE TEMPERATURE IS 40° F OR LESS, OR DURING UNSEASONABLE WEATHER CONDITIONS. 6.ALL CONCRETE USED IN THE CONSTRUCTION OF MULTI-USE CONCRETE SHALL BE MADE WITH PORTLAND CEMENT. THE CONCRETE SHALL MEET SECTION 541 OF THE STATE OF VERMONT STANDARD SPECIFICATIONS FOR CONSTRUCTION, HAVE 28 DAY COMPRESSIVE STRENGTH OF 5,000 PSI, AND MEET THE FOLLOWING MIX DESIGN. MAX. WATER-CEMENT RATIO (LB./LB.) 0.44 MIN. CEMENT FACTOR (LBS/C.Y.) 705 ENTRAINED AIR CONTENT (%) 5 - 7 SLUMP (INCHES, BEFORE ADDING HRWR) 2 - 4 USE AIR ENTRAINED AGENT CONFORMING TO ASTM C260 WITH 5-7% TOTAL AIR. USE HIGH RANGE WATER REDUCING AGENT CONFORMING TO ASTM C494 IN ALL CONCRETE. 7.CONTRACTOR SHALL POUR AND FINISH ONE SAMPLE PANEL FOR APPROVAL BY OWNER AND ENGINEER. ALL CONCRETE SHALL MATCH THE QUALITY AND APPEARANCE OF THE SAMPLE PANEL. ANY CONCRETE THAT DOES NOT MEET THE STANDARD SHALL BE REMOVED AND REPLACED AT NO COST TO THE OWNER. 8.CONCRETE SHALL BE INSTALLED IN ALTERNATING POURS AT CONSTRUCTION JOINTS. REFER TO CONCRETE CONSTRUCTION JOINT/CONTROL JOINT DETAIL 9.OWNER AND/OR CONTRACTOR IS NOT ALLOWED TO PLACE DEICING MATERIAL ON NEWLY PORED CONCRETE SIDEWALK FOR A PERIOD OF 6 MONTHS. NOTES FOR CONCRETE N.T.S. NEW MULTI-USE CONCRETE SIDEWALK DETAIL CONCRETE BLOCK SUPPORT (PER CSI MANUAL OF STANDARD PRACTICE) (TYP.). 6" THICK 5,000 PSI CONCRETE. INSTALL EPOXY COATED GRADE 60 #4 BARS @ 12" O.C. E.W. PLACED 2" (MIN.) CLEAR FROM TOP OF CONCRETE. 4" TOPSOIL, SEE SITE PLAN FOR GRADING MIRAFI 500X, OR APPROVED EQUAL. UNDISTURBED EARTH OR APPROVED FILL MATERIAL COMPACTED TO 95% STANDARD PROCTOR IN 12" LIFTS.REFER TO CONCRETE CONSTRUCTION JOINT/CONTROL JOINT DETAIL. 18" THICK CRUSHED GRAVEL SUBBASE (704.05, FINE). SUBBASE SHALL BE FROM NATURAL GRAVELS AND CRUSHED QUARRIED ROCK ONLY. BLENDED CONCRETE OR RECYCLED ASPHALT IS NOT ALLOWED. HOLD REINFORCING BACK 3" FROM ALL SIDES. CONCRETE OR RECYCLED ASPHALT IS NOT ALLOWED. PROVIDE EXPANSION JOINT AND SEALER WHERE CONCRETE IS AGAINST CURB OR OTHER CONCRETE FOUNDATION. BLANK 3B. 1. 6. 7. 2. 5. 4.8. 3. 1. 3A. NOTE: BLANKET SHALL BE USED ON SLOPES 3:1 OR STEEPER EROSION CONTROL BLANKET NORTH AMERICAN GREEN S75BN MATERIAL SPECIFICATIONS: ·EROSION CONTROL BLANKET SHALL BE A MACHINE-PRODUCED MAT OF 100% AGRICULTURAL STRAW. ·THE BLANKET SHALL BE OF CONSISTENT THICKNESS WITH THE STRAW EVENLY DISTRIBUTED OVER THE ENTIRE AREA OF THE MAT. THE BLANKET SHALL BE COVERED ON THE TOP SIDE WITH 100% BIODEGRADABLE WOVEN NATURAL ORGANIC FIBER NETTING HAVING AN APPROXIMATE 1/2" X 1" MESH AND BE SEWN TOGETHER WITH BIODEGRADABLE THREAD. ·STRAW EROSION CONTROL BLANKET SHALL BE S75BN AS MANUFACTURED BY NORTH AMERICAN GREEN, INC. (812-867-6632) OR EQUIVALENT. EROSION CONTROL BLANKET SHALL HAVE THE FOLLOWING PROPERTIES: MATERIAL CONTENT: ·STRAW: 100% (0.50 lbs/sq.yd.)(0.27 kg/m2) ·NETTING: ONE SIDE ONLY, LENO WOVEN 100% BIODEGRADABLE NATURAL ORGANIC FIBER (APPROX. WEIGHT 9.3 lbs./100 sq. ft.) ·THREAD: BIODEGRADABLE PHYSICAL SPECIFICATIONS (ROLL): ·WIDTH: 6.67 feet (2.03 m) ·LENGTH: 108 feet (32.92 m) ·WEIGHT: 46.4 lbs. ± 10% (21.05 kg) ·AREA: 80 sq. yd. (50 m2) SIDEWALKS SHALL BE CROSS SLOPED TOWARDS THE DISCONNECTION AREAS, MAXIMUM OF 2% CROSS SLOPE. GRADE SURFACES TO DRAIN WITHOUT CONCENTRATING FLOWS THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.03 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 TEMPORARY SEED MIX SHALL BE USED BETWEEN 9/16 AND 5/14 AND SHALL MEET THE FOLLOWING CRITERIA: PERMANENT SEED MIX SHALL BE USED AS EARLY AS PRACTICABLE BETWEEN 5/15 AND 9/15 AND SHALL MEET THE FOLLOWING CRITERIA: SEED % WEIGHT RED FESCUE 50% SHEEP FESCUE 25% RED TOP 5% WHITE CLOVER 10% ANNUAL RYE 10% FLOW SLOPE A A TO BE INSTALLED AT THE LIMITS OF THE CONSTRUCTION AREA. SEE PLANS.4' MIN.1.ACCEPTABLE EPSC MEASURE DETAILS ARE PROVIDED BELOW. 2.AT A MINIMUM, EPSC MEASURES MEET VT DEC STANDARDS AND SPECIFICATIONS FOR EROSION PREVENTION AND SEDIMENT CONTROL OR PREVIOUSLY APPROVED INTERCHANGEABLE PRACTICES. 3.LIMITS OF DISTURBANCE (OR "CONSTRUCTION DEMARCATION") SHALL BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITIES. 4.BARRIER TAPE/ROPE: FOR USE WHERE PROPOSED DISTURBANCE BORDERS NON-WOODED, VEGETATED AREAS MORE THAN 100 FT FROM THE NEAREST WATER RESOURCE (STREAM, BROOK, LAKE, POND, WETLAND, ETC.). BARRIER TAPE IS HIGH VISIBILITY FIBERGLASS TAPE, MINIMUM 3" IN WIDTH COMMONLY USED IN SKI AREAS FOR DEMARCATING CLOSED AREAS. BARRIER TAPE AND ROPE SHOULD BE ATTACHED TO STAKES, AT A MINIMUM HEIGHT OF 4 FT FROM THE GROUND. 5.MINIMUM 1 TO 2 ROWS OF MESH BARRIER TAPE TO BE INSTALLED ALONG CONSTRUCTION PERIMETER. 6.EACH ROW OF BARRIER TAPE TO BE 3" WIDE MINIMUM. 7.BARRIER TAPE TO BE ORANGE. 8.SECURE BARRIER TAPE TO STAKES OR EXISTING TREE TRUNKS WITH BOTTOM ROW AT 4' DISTANCE FROM GROUND SURFACE (MINIMUM). 9.MAINTAIN AND REPLACE AS NEEDED. REMOVE AT COMPLETION OF PROJECT PER OSPC. 10.IN EVENT THE OSPC DETERMINES BARRIER TAPE IS NOT SUFFICIENT, REPLACE WITH ORANGE CONSTRUCTION FENCE OR SNOW FENCE. 20" MIN. 16" MIN. 10' MAX. 1.AT A MINIMUM, EPSC MEASURES MEET VT DEC STANDARDS AND SPECIFICATIONS FOR EROSION PREVENTION AND SEDIMENT CONTROL OR PREVIOUSLY APPROVED INTERCHANGEABLE PRACTICES. 2.PERIMETER CONTROLS SHALL BE UTILIZED IN SMALL AREAS < 1 ACRE. IN AREAS > 1 ACRE, TEMPORARY SEDIMENT TRAPS OR TEMPORARY SEDIMENT BASINS ARE TO BE UTILIZED. 3.PERIMETER CONTROLS SHALL BE INSTALLED ON DOWNSLOPE SIDE OF PLANNED EARTH DISTURBANCE. 4.PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO ANY EARTH DISTURBING ACTIVITIES WITHIN UPSLOPE CONTRIBUTING AREA. 5.SILT FENCE SHALL NOT BE USED AS CONSTRUCTION DEMARCATION. 6.SILTSOXX CAN BE USED AS A SILT FENCE ALTERNATIVE, WITH PRIOR APPROVAL OF THE ENGINEER. SEE DETAIL. 7.IF SILT FENCE IS INSTALLED WHEN GROUND IS FROZEN, A GRAVEL, SHOT ROCK, OR SAND BALLAST MUST BE USED. 1.CONTRACTOR SHALL STABILIZE CONSTRUCTION ENTRANCE AS REQUIRED TO PREVENT TRACKING OF SEDIMENT OFF-SITE. 2.CONTRACTOR TO USE MIRAFI 500X UNDER STONE FOR TEMPORARY CONSTRUCTION ROADS. 3.CRUSHED STONE SHALL BE ADDED OR REPLACED WHEN 80% OF THE VOIDS ARE FILLED WITH SEDIMENT. 4.STONE SIZE SHALL BE 1-4". 5.ALL SURFACE WATER FLOWING OR DIVERTED TOWARD CONSTRUCTION ENTRANCE SHALL BE PIPED BENEATH ENTRANCE. IF PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES IS ALLOWED. 12' MIN. 8" min GUIDE TO MULCH MATERIALS, RATES, AND USES QUALITY STANDARDS PER 1000 SQ. FT.PER ACRE DEPTH OF APPLICATION REMARKS WOOD CHIPS OR SHAVINGS AIR-DRIED. FREE OF OBJECTIONABLE COARSE MATERIAL 500-900 LBS 10-20 TONS 2 - 7"USED PRIMARILY AROUND SHRUB AND TREE PLANTINGS AND RECREATION TRAILS TO INHIBIT WEED COMPETITION. RESISTANT TO WIND BLOWING. DECOMPOSES SLOWLY. WOOD FIBER CELLULOSE (PARTLY DIGESTED WOOD FIBERS) MADE FROM NATURAL WOOD USUALLY WITH GREEN DYE AND DISPERSING AGENT 50 LBS 2,000 LBS.-APPLY WITH HYDROMULCHER. NO TIE DOWN REQUIRED. LESS EROSION CONTROL PROVIDED THAN 2 TONS OF HAY OR STRAW. GRAVEL, CRUSHED STONE OR SLAG WASHED; SIZE 2B OR 3A - 112"9 CU. YDS.405 CU. YDS.3"EXCELLENT MULCH FOR SHORT SLOPES AND AROUND PLANTS AND ORNAMENTALS. USE 2B WHERE SUBJECT TO TRAFFIC. (APPROXIMATELY 2,000 LBS./CU. YD.). FREQUENTLY USED OVER FILTER FABRIC FOR BETTER WEED CONTROL. HAY OR STRAW AIR-DRIED; FREE OF UNDESIRABLE SEEDS & COARSE MATERIALS 90-100 LBS 2-3 BALES 2 TONS (100-120 BALES) COVER ABOUT 90% SURFACE USE SMALL GRAIN STRAW WHERE MULCH IS MAINTAINED FOR MORE THAN THREE MONTHS. SUBJECT TO WIND BLOWING UNLESS ANCHORED. MOST COMMONLY USED MULCHING MATERIAL. PROVIDES THE BEST MICRO-ENVIRONMENTAL FOR GERMINATING SEEDS. COMPOST UP TO 3" PIECES, MODERATELY TO HIGHLY STABLE 3-9 CU. YDS.134-402 CU. YDS.1 - 3"COARSER TEXTURED MULCHES MAY BE MORE EFFECTIVE IN REDUCING WEED GROWTH AND WIND EROSION. EROSION CONTROL MIX WELL-GRADED MIXTURE OF PARTICLE SIZES. ORGANIC CONTENT BETWEEN 80-100%, DRY WEIGHT. PARTICLE SIZE SHALL PASS 6" SCREEN (100%) * SLOPES 3(HZ.):1(VERT.) OR FLATTER = 2 INCH DEPTH PLUS ADDITIONAL 1/2 INCH DEPTH PER 20 FT. OF SLOPE UP TO 100 FT. ** SLOPES BETWEEN 3(HZ.):1(VERT.) AND 2(HZ.):1(VERT.) = 4 INCH DEPTH PLUS ADDITIONAL 1/2 INCH PER 20 FT. OF SLOPE UP TO 100 FT. *** SLOPES STEEPER THAN 2(HZ.):1(VERT.) USE OF EROSION CONTROL MIX AND MULCH DEPTH TO BE REVIEWED AND APPROVED PRIOR TO USE BY OSPC OR EPSC SPECIALIST COMPRISED OF SHREDDED BARK, STUMP GRINDINGS, COMPOSTED BARK, OR ACCEPTABLE MANUFACTURED PRODUCTS. MAY CONTAIN ROCK < 4" IN DIAMETER. ORGANICS SHALL BE FIBROUS AND ELONGATED. NO LARGE PORTIONS OF SILTS, CLAYS OR FINE SANDS. 10' MIN. 5"-12" 1.CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF SILTSOXX IN ALL LOCATIONS SHOWN ON THE PLANS. SILTSOXX MAY BE LEFT IN PLACE IF THE CONTRACTOR SEEDS AND MULCHES OVER SILTSOXX FOR GROWTH POST CONSTRUCTION. 2.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND ADDITIONAL WATTLES WILL BE ADDED WHEN SEDIMENT REACHES HALF OF PRODUCT HEIGHT. 3.WHEN INSTALLING LENGTHS OF SILTSOXX, LENGTHS WILL OVERLAP BY MINIMUM 18" WHEN TRANSITIONING TO A NEW LENGTH OF SILTSOXX. 4.CONTRACTOR SHALL REFER TO ALL MANUFACTURES SPECIFICATIONS AND DETAILS. 5.SILTSOXX IS A SPECIFIC MANUFACTURER, OTHER MANUFACTURERS WITH EQUAL PRODUCTS MAY BE USED IF APPROVED BY ENGINEER. 6.SILTSOXX CAN BE USED AS A SILT FENCE ALTERNATIVE, WITH PRIOR APPROVAL OF THE ENGINEER. NOTES SEED % WEIGHT %GERMINATION WINTER RYE 80% MIN.85% MIN. RED FESCUE (CREEPING)4% MIN.80% MIN. PERENNIAL RYE GRASS 3% MIN.90% MIN. RED CLOVER 3% MIN.90% MIN. OTHER CROP GRASS 0.5% MAX. NOXIOUS WEED SEED 0.5% MAX. INERT MATTER 1% MAX. SEEDING SPECIFICATIONS NOTES PROVIDE APPROPRIATE TRANSITION BETWEEN STABILIZED CONSTRUCTION ENTRANCE AND EXISTING EDGE OF TRAVELED WAY 50' MIN. SEE SITE PLAN EXISTING ROAD EXISTING ROAD PUBLIC RIGHT OF WAY 50' MIN. SEE SITE PLAN 4" MINUS CRUSHED STONE 12' MIN. EXISTING GROUND EXISTING GROUND PROFILE PLAN N.T.S. STABILIZED CONSTRUCTION ENTRANCE NOTES 5" TO 12" DIAMETER SILTSOXX, OR APPROVED EQUAL, MAY BE USED IN LOCATIONS SHOWN ON PLANS OR AS AN ALTERNATE TO SILT FENCE ONLY WITH PRIOR APPROVAL FROM ENGINEER. SIZE OF SILTSOXX WILL BE BASED ON APPLICATION, CHECK WITH ENGINEER FOR SIZE.OVERLAP BETWEEN WATTLE LENGTHS, 18" MIN. WATTLES SHALL BE STAKED WITH TYPICAL WOOD STAKES AT 10 FT. ON CENTER. N.T.S. TYPICAL SILTSOXX SEDIMENT CONTROL 36" STAKES DRIVEN ON DOWNSLOPE SIDE OF FENCE SLOPE FILTER FABRIC ATTACHED TO STAKES ON UPSLOPE SIDE. 36" MIN. STAKE FILTER FABRIC FORM 6" MIN. DEEP TRENCH. LAY FABRIC IN BOTTOM COVER WITH COMPACTED SOIL OR STONE BALLAST SECTION A-A SILT FENCE SPACING CHART SPACINGSLOPE 5% TO 10% 10% TO 20% > 20%15 FT. OR LESS 25 FT. OR LESS 50 FT. OR LESS NOTES N.T.S. TYPICALTEMPORARY SILT FENCE FASTEN FENCE TO STAKE WOODEN STAKE ORANGE POLYESTER MESH WEBBING BY WORLD CUP SUPPLY OR APPROVED EQUAL. (3" WIDE MIN.) A A N.T.S. TYPICAL CONSTRUCTION LIMIT BARRIER SECTION A-A INCORRECT SILT FENCE INSTALLED PARALLEL TO SLOPE (PERPENDICULAR TO CONTOUR) IN ONE, LONG RUN 30° NOTE: J-HOOKS SHALL BE USED WHENEVER THE SILT FENCE LINE IS INSTALLED AT AN ANGLE OF 30 DEGREES OR GREATER FROM PARALLEL TO THE CONTOURS CORRECT SILT FENCE INSTALLED IN SHORTER RUNS WITH J-HOOKS TO AVOID CONCENTRATION OF FLOWS AT ONE LOCATION BY TRAPPING RUNOFF AT MULTIPLE POINTS ALONG A SLOPE. 1. PROPER INSTALLATION OF J-HOOKS PROVIDES SILT FENCE THE ABILITY TO TEMPORARILY POND RUNOFF, ALLOWING TIME FOR SEDIMENTS TO SETTLE. 2. LONG RUNS OF SILT FENCE BETWEEN J-HOOKS SHOULD BE AVOIDED REFER TO ADJACENT TABLE FOR PROPER SPACING OF J-HOOKS. 3. J-HOOKS SHOULD BE BUILT ALONG CONTOUR IN A "SMILE" SHAPE WITH A MINIMUM WIDTH OF 20 FEET AND MINIMUM DEPTH OF 10 FEET. 4. ALONG A NARROW RIGHT OF WAY, NARROWER J-HOOKS CAN BE USED WITH A HIGHER SPACING FREQUENCY. 20' 10' SLOPE STEEPNESS MAXIMUM SPACING BETWEEN SILT FENCE J-HOOKS (FT.) 2:1 SLOPE (50%) 3:1 SLOPE (33%) 4:1 SLOPE (25%) 5:1 SLOPE OR FLATTER (50%) 25 50 75 100 NOTES SLOPE SLOPE SILT FENCE SILT FENCELIMITS OF CLEARING LIMITS OF CLEARING AVOID LARGE GAPS BETWEEN BOTTOM OF ABOVE GRADIENT J-HOOK AND THE NEXT SILT FENCE LINE. (6" MAXIMUM) N.T.S. TYPICAL SILT FENCE "J-HOOK" CONSTRUCTION CATCH BASIN BOTTOM OF DEPRESSION SHOULD BE 2 FT. MIN. FROM EDGE OF CATCH BASIN RIM. SEE SITE PLAN FOR SIZE OF RIP RAP INLET PROTECTION. SHALLOW DEPRESSION AROUND GRATE INLET GRATE CRUSHED STONE, VAOT 704.17 5' 12" 8" 12" 2' MIN. N.T.S. STONE LINED SUMP INLET PROTECTION CRUSHED STONE, VAOT 704.17 1.FOR INLET PROTECTION IN PAVEMENT AREAS CONTRACTOR MAY ALSO USE SECURED "MARCH MAT OR APPROVED EQUAL, COIR INLET FABRIC OVER CATCH BASIN. 2.TYPICAL FOR ALL INLET GRATES ON SITE. 3.MAINTAIN SHALLOW DEPRESSION AROUND GRATE UNTIL PAVING AND/OR FINAL STABILIZATION HAS OCCURRED. NOTES BOTTOM OF DEPRESSION SHOULD BE 2 FT. MIN. FROM EDGE OF CATCH BASIN RIM. SHALLOW DEPRESSION AROUND GRATE INLET GRATE INSTALL "MARSH MAT", OR APPROVED EQUAL, COIR INLET FILTER OVER CATCH BASIN GRATE. INSTALL 2" MINIMUM CRUSHED GRAVEL OVER FABRIC. MOUND GRAVEL IN CENTER OF STRUCTURE TO DRAIN AWAY FROM CATCH BASIN. NEW CATCH BASIN FRAME AND GRATE. SEE TYPICAL CATCH BASIN DETAIL. IMPERMEABLE STABILIZATION FABRIC, MIRAFI 500X OR EQUAL. INSTALL OVER CATCH BASIN.EXTEND FABRIC 12" MINIMUM BEYOND THE EDGES OF THE CATCH BASIN FRAME & GRATE N.T.S. TEMPORARY IMPERMEABLE CATCH BASIN COVER DETAIL ORANGE POLYESTER MESH WEBBING BY WORLD CUP SUPPLY OR APPROVED EQUAL. (3" WIDE MIN.) WOODEN STAKE AREA TO BE PROTECTED WORK AREA FLOW 5" TO 12" DIAMETER SILTSOXX, OR APPROVED EQUAL. SIZE OF SILTSOXX WILL BE BASED ON APPLICATION, CHECK WITH ENGINEER FOR SIZE. CONCRETE BLOCKS OR SAND BAGS FOR SUPPORT FOR SILTSOXX, 10' ON CENTER. IF SLOPES PERMIT SILTSOXX MAY NOT NEED SUPPORT. AREA TO BE PROTECTED PLAN SECTION N.T.S. TYPICAL SILTSOXX INSTALLATION ON PAVEMENT 1.CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF SILTSOXX IN ALL LOCATIONS SHOWN ON THE PLANS. 2.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND ADDITIONAL SILTSOXX WILL BE ADDED WHEN SEDIMENT REACHES HALF OF PRODUCT HEIGHT. 3.WHEN INSTALLING LENGTHS OF SILTSOXX, LENGTHS WILL OVERLAP BY MINIMUM 2' WHEN TRANSITIONING TO A NEW LENGTH OF WATTLE. 4.CONTRACTOR SHALL REFER TO ALL MANUFACTURES SPECIFICATIONS AND DETAILS. 5.SILTSOXX IS A SPECIFIC MANUFACTURER, OTHER MANUFACTURERS WITH EQUAL PRODUCTS MAY BE USED IF APPROVED BY ENGINEER. NOTES CATCH BASIN N.T.S. SILTSOXX INLET PROTECTION WIRE TIES STORM GRATE 5" TO 12" DIAMETER SILTSOXX, OR APPROVED EQUAL. SIZE OF SILTSOXX WILL BE BASED ON APPLICATION, CHECK WITH ENGINEER FOR SIZE. DRAIN INLET PLAN CURBSIDE OPTION A CURBSIDE OPTION B 5" TO 12" DIAMETER SILTSOXX, OR APPROVED EQUAL. SIZE OF SILTSOXX WILL BE BASED ON APPLICATION, CHECK WITH ENGINEER FOR SIZE. STORM GRATE MATERIAL TO BE DRAWN IN AND TIED OFF TO WOODEN STAKECURB CURB CATCH BASIN 5" TO 12" DIAMETER SILTSOXX, OR APPROVED EQUAL. SIZE OF SILTSOXX WILL BE BASED ON APPLICATION, CHECK WITH ENGINEER FOR SIZE. CURB MATERIAL TO BE DRAWN IN AND TIED OFF TO WOODEN STAKE SECURE TO GRATE WITH TIE DOWNS DRAIN INLET SECTION CURBSIDE SECTION 1.CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION, MAINTENANCE, AND REMOVAL OF SILTSOXX IN ALL LOCATIONS SHOWN ON THE PLANS. 2.MAINTENANCE SHALL BE PERFORMED AS NEEDED AND ADDITIONAL SILTSOXX WILL BE ADDED WHEN SEDIMENT REACHES HALF OF PRODUCT HEIGHT. 3.WHEN INSTALLING LENGTHS OF SILTSOXX, LENGTHS WILL OVERLAP BY MINIMUM 2' WHEN TRANSITIONING TO A NEW LENGTH OF WATTLE. 4.CONTRACTOR SHALL REFER TO ALL MANUFACTURES SPECIFICATIONS AND DETAILS. 5.SILTSOXX IS A SPECIFIC MANUFACTURER, OTHER MANUFACTURERS WITH EQUAL PRODUCTS MAY BE USED IF APPROVED BY ENGINEER. NOTES 5 FT. BLANK THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.04 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 2:1 MAX. 2: 1 1 2 2 11'-6" MIN.FLOW FROM SURFACES TO BE TREATED BERM BETWEEN FOREBAY AND TREATMENT PRACTICE. PROVIDE LOW SPOT APPROXIMATELY 3" LOWER THAN BERM FOR APPROXIMATELY 5' IN WIDTH. BASE OF SEDIMENT FOREBAY WILL BE TOPSOILED, SEEDED AND MULCHED. MAINTAIN AS GRASS. SEDIMENT FOREBAY DETAIL N.T.S. SEE TREATMENT BEST MANAGEMENT PRACTICE DETAIL TREATMENT BMP SEDIMENT FOREBAY IS DESIGNED TO CONTAIN A MINIMUM OF 10% WQv, SEE PLANS FOR EXACT DIMENSIONS AND GRADING DETAILS. INSTALL FIXED VERTICAL SEDIMENT DEPTH MARKER TO MEASURE DEPOSITED SEDIMENT 1.APPLY SEED AND MULCH. APPLY UNIFORMLY OVER AREA. 2.CROSS-SECTION SHALL BE EXCAVATED TO NEAT LINES AND GRADES. OVER-EXCAVATED AREAS SHALL BE BACKFILLED WITH MOIST SOIL COMPACTED TO DENSITY OF SURROUNDING MATERIAL. 3.ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHALL BE SPREAD OR DISPOSED OF IN APPROVED UPLAND AREA (PER OSPC) SUCH THAT IT DOES NOT INTERFERE WITH FUNCTIONING OF SWALE. ALL EXCAVATED SOIL SHALL REMAIN ON SITE. NOTES SOIL RETENTION: RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. SOIL QUALITY: ALL AREAS SUBJECT TO THE STANDARD SHALL DEMONSTRATE THE FOLLOWING: A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 4% DRY WEIGHT IN PLANTING BEDS AND TURF AREAS. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF 4 INCHES, EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. COMPOST AND OTHER MATERIALS SHALL BE USED THAT MEET THE FOLLOWING REQUIREMENTS: ·THE COMPOST OR OTHER MATERIALS SHALL HAVE A CARBON TO NITROGEN RATIO BELOW 25:1. ·COMPOST SHALL MEET THE DEFINITION OF “COMPOST” IN THE AGENCY'S SOLID WASTE MANAGEMENT RULES OR SHALL MEET THE CONTAMINANT STANDARDS IN THE VERMONT SOLID WASTE MANAGEMENT RULES §6-1104(G)(6- 7), §6-1105(E)(8-9), AND §6-1106(E)(7-9). COMPOST OR OTHER ORGANIC MATERIALS MAY BE AMENDED TO MEET THE FOREGOING REQUIREMENTS. ·EXCEPTIONAL QUALITY BIOSOLIDS (EQ BIOSOLIDS) MAY BE USED AS A SOIL AMENDMENT, AT A MAXIMUM PROPORTION OF 35% OF THE TOTAL SOIL VOLUME, AND SHALL BE WELL MIXED WITH EXISTING SOIL BEFORE OR DURING APPLICATION. ·THE RESULTING SOIL SHALL BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. THE SOIL QUALITY REQUIREMENTS SHALL BE MET BY USING ONE OR A COMBINATION OF THE FOLLOWING METHODS: ·OPTION 1: LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. FAILURE TO ESTABLISH AND MAINTAIN EXCLUSIONARY CONTROLS AROUND THESE AREAS DURING THE CONSTRUCTION PHASE MAY TRIGGER THE REQUIREMENT TO RESTORE SOILS PER ONE OF THE FOLLOWING OPTIONS. ·OPTION 2: AMEND EXISTING SITE TOPSOIL OR SUBSOIL IN PLACE. a.SCARIFY OR TILL SUBSOILS TO 4 INCHES OF DEPTH OR TO DEPTH NEEDED TO ACHIEVE A TOTAL DEPTH OF 8 INCHES OF UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS ADDED. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; b.AMEND SOIL TO MEET ORGANIC CONTENT REQUIREMENTS: 1.PRE-APPROVED RATE: PLACE 1 INCH OF COMPOSTED MATERIAL WITH AN ORGANIC MATTER CONTENT BETWEEN 40 AND 65% AND ROTOTILL INTO 3 INCHES OF SOIL, OR 2.CALCULATED RATE: PLACE CALCULATED AMOUNT OF COMPOSTED MATERIAL OR APPROVED ORGANIC MATERIAL AND ROTOTILL INTO DEPTH OF SOIL NEEDED TO ACHIEVE 4 INCHES OF SETTLED SOIL AT 4% ORGANIC CONTENT. *CONTRACTOR TO PROVIDE CALCULATION AND SITE SKETCH INDICATING AREAS USED FOR CALCULATIONS. c.RAKE BEDS TO SMOOTH AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER; AND d.WATER OR ROLL TO COMPACT SOIL IN TURF AREAS TO 85% OF MAXIMUM DRY DENSITY. ·OPTION 3: REMOVE AND STOCKPILE EXISTING TOPSOIL DURING GRADING. a.STOCKPILE SOIL ON SITE IN A DESIGNATED CONTROLLED AREA, AT LEAST 50 FEET FROM SURFACE WATERS, WETLANDS, FLOODPLAINS, OR OTHER CRITICAL RESOURCE AREAS; b.SCARIFY OR TILL SUBGRADE TO A DEPTH OF 4 INCHES. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; c.STOCKPILED TOPSOIL SHALL ALSO BE AMENDED, IF NEEDED, TO MEET THE ORGANIC CONTENT REQUIREMENTS: 1.PRE-APPROVED RATE: COMPOST SHALL BE INCORPORATED WITH AN ORGANIC MATTER CONTENT BETWEEN 40 AND 65% INTO THE TOPSOIL AT A RATIO 1:3, OR 2.CALCULATED RATE: INCORPORATE COMPOSTED MATERIAL OR APPROVED ORGANIC MATERIAL AT A CALCULATED RATE TO ACHIEVE 4 INCHES OF SETTLED SOIL AT 4% ORGANIC CONTENT;* d.REPLACE STOCKPILED TOPSOIL PRIOR TO PLANTING, SCREEN TOPSOIL, AND; e.RAKE TO LEVEL, AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER. f.OPTION 4: IMPORT TOPSOIL MIX, OR OTHER MATERIALS FOR MIXING, INCLUDING COMPOST, OF SUFFICIENT ORGANIC CONTENT AND DEPTH. g.SCARIFY OR TILL SUBGRADE TO A DEPTH OF 4 INCHES. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; h.PLACE 4 INCHES OF IMPORTED TOPSOIL MIX ON SURFACE. THE IMPORTED TOPSOIL MIX SHALL CONTAIN 4% ORGANIC MATTER. SOILS USED IN THE MIX SHALL BE SAND OR SANDY LOAM AS DEFINED BY THE USDA; SHOP DRAWING SUBMITTAL IS REQUIRED. FIND USDA SIEVE FOR SAND AND SANDY LOAM. i.RAKE BEDS TO SMOOTH AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER; j.WATER OR ROLL TO COMPACT SOIL IN TURF AREAS TO 85% OF MAXIMUM DRY DENSITY. SOIL MANAGEMENT ·IDENTIFIES AREAS ON THE SITE SUBJECT TO THE STANDARD; ·SOIL DEPTH AND QUALITY SHALL BE ESTABLISHED TOWARDS THE END OF CONSTRUCTION AND ONCE ESTABLISHED, PROTECTED FROM COMPACTION, SUCH AS FROM LARGE MACHINERY, VEHICLE TRAFFIC, AND FROM EROSION; ·AFTER SOIL AMENDMENTS AND PLACEMENT IS COMPLETE, AND PRIOR TO SEEDING AND MULCHING, CONTRACTOR SHALL PERFORM VERIFICATION SAMPLING IN LOCATIONS INDICATED ON SAMPLING PLAN. VERIFICATION SAMPLING SHALL INCLUDE NINE, 8 INCH DEEP (MIN) TEST HOLES PER ACRE OF AREA SUBJECT TO THE STANDARD. TEST HOLES SHALL BE EXCAVATED USING ONLY A SHOVEL DRIVEN SOLELY BY INSPECTOR'S WEIGHT AND SHALL BE AT LEAST 50 FEET APART FROM EACH OTHER. ·A DENSE AND VIGOROUS VEGETATIVE COVER SHALL BE ESTABLISHED OVER TURF AREAS. POST-CONSTRUCTION SOIL DEPTH AND QUALITY NOTES A.GRASS-LINED SWALE: LOCATED ALONG ALL DRIVEWAYS. 1.INSPECT REGULARLY FOR ACCUMULATION OF SEDIMENT OR DEBRIS, PARTICULARLY AFTER LARGE STORM EVENTS. 2.INSPECT AND REPAIR ANY EROSION AND RE-SEED BARE SPOTS AS NEEDED. 3.REMOVE SEDIMENT AND RESHAPE SWALE WHEN 6 INCHES OF SEDIMENT HAS ACCUMULATED. B.FOREBAY PRE-TREATMENT AREAS: 1.MONITOR FOR ACCUMULATION OF SEDIMENT. CLEAN WHEN 50% FULL OR AS NEEDED. 2.INSPECT AND REPAIR ANY NOTED EROSION. C.DRY SWALE/ BASIN WITH UNDERDRAIN 1.INSPECT FOR EROSION AND ACCUMULATED SEDIMENT WITHIN POND. REMOVE SEDIMENT AND REPAIR ANY EROSION AS NECESSARY. 2.REMOVE ALL TRASH FROM THE BASIN. 3.INSPECT UNDERDRAIN OUTFALL AND ORIFICE CAP, REMOVE ANY OBSTRUCTIONS STOPPING FLOW FROM CAP, KEEP AREA FREE OF DEBRIS/VEGETATION D.BROAD CRESTED WEIRS: LOCATED IN PONDS AND FOREBAYS FOR OVERFLOWS. 1.INSPECT REGULARLY FOR SIGNS OF EROSION OR DISPLACEMENT OF STONE. REPAIR AS NEEDED. 2.INSPECT FOR DEBRIS/TRASH ACCUMULATION AND REMOVE AS NEEDED. 3.MONITOR FOR EVIDENCE OF CONCENTRATED FLOW CHANNELS OR EROSION AT OUTLET. LEVEL STONE IF NEEDED TO RESTORE EVEN FLOW DISTRIBUTION. STORMWATER MAINTANCE NOTES 1.SOIL DEPTH AND QUALITY SHALL BE ESTABLISHED TOWARDS THE END OF CONSTRUCTION, AND ONCE ESTABLISHED, BE PROTECTED FROM COMPACTION. 2.THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF THE POST CONSTRUCTION SOIL DEPTH AND QUALITY. 3.VERIFICATION SHALL BE VIA A SAMPLING SCHEME THAT INCLUDES NINE 8" DEEP TEST HOLES PER ACRE OF AREA SUBJECT TO THE STANDARD. 4.TEST HOLES SHALL BE EXCAVATED USING ONLY A SHOVEL DRIVEN SOLELY BY THE INSPECTOR'S WEIGHT AND SHALL BE AT LEAST 50 FEET APART FROM EACH OTHER. 5.ALL DISTURBED AREAS WITHIN THE PROJECT LIMITS (LOD) ARE SUBJECT TO THE POST-CONSTRUCTION SOIL DEPTH AND QUALITY STANDARD 6.THERE IS NO PROPOSED EXCAVATION OR RE-GRADING ANTICIPATED WITHIN THE SOLAR ARRAY BEYOND WHAT IS NECESSARY FOR SETTING POSTS AND INSTALLING CONDUIT. IT IS ANTICIPATED THAT SOME GROUND DISTURBANCE WILL OCCUR WITHIN THE ARRAY FROM FREQUENT TRACKING OF EQUIPMENT. THE CONTRACTOR AND ENGINEER SHALL EVALUATE GROUND DISTURBANCE WITHIN THE SOLAR ARRAY AND EITHER: ··CONFIRM THAT SOILS HAVE NOT BEEN EXCESSIVELY COMPACTED VIA TEST PITS AND PHOTO DOCUMENTATION. ··IMPLEMENT THE MEASURES OUTLINED IN THE "POST CONSTRUCTION SOIL DEPTH & QUALITY STANDARD" IF EXCESSIVE COMPACTION HAS OCCURRED. 2:12: 1 VARIES SEE PLANS VARIES SEE PLANS1 4 2 1 GRASS SWALE DETAIL 1.TYPICAL GRASS SWALE CROSS SECTION. SEE PLAN VIEW FOR LOCATIONS. 2.MAXIMUM SIDE SLOPES INTO SWALE SHALL BE 2:1. 3.DURING CONSTRUCTION TEMPORARILY SEEDED AND HEAVILY MULCHED. POST CONSTRUCTION CONTRACTOR SHALL RE-GRADE ANY EROSION, REMOVE BUILD UP SEDIMENTS, PERMANENT SEED AND HEAVILY RE-MULCH. 4.CROSS-SECTION SHALL BE EXCAVATED TO NEAT LINES AND GRADES. OVER-EXCAVATED AREAS SHALL BE BACKFILLED WITH MOIST SOIL COMPACTED TO DENSITY OF SURROUNDING MATERIAL. 5.ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHALL BE SPREAD OR DISPOSED OF IN APPROVED UPLAND AREA (PER OSPC) SUCH THAT IT DOES NOT INTERFERE WITH FUNCTION. 6" LAYER OF ON-SITE SOIL AND/OR IMPORTED TOPSOIL. MIRAFI 140N DRAINAGE FABRIC OVER ROCK SUBGRADE. NOTES N.T.S. WINTER EROSION CONTROL NARRATIVE: OBJECTIVE - ANY SITE WORK PERFORMED LATER THAN OCTOBER 15TH WILL RESULT IN EXPOSED SOIL THROUGH THE WINTER. THIS PRESENTS A POTENTIAL FOR EROSION THROUGH THE WINTER. THE WINTER EROSION CONTROL MEASURES ARE INTENDED TO PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION ZONE DURING THAWS AND RAINSTORMS. WINTER EROSION CONTROL SEQUENCE: ON-SITE COORDINATOR - THE ON-SITE COORDINATOR SHALL BE SURE ALL EROSION CONTROL MEASURES REQUIRED FOR WINTER CONSTRUCTION ARE INSTALLED BY OCTOBER 15TH AND PRIOR TO GROUND FREEZING. IF A PERMITTED AREA CAN BE LEFT UNDISTURBED UNTIL THE SPRING THE CONTRACTOR SHALL MAKE EVERY EFFORT TO LIMIT THESE AREAS OF DISTURBANCE. THE CONTRACTOR SHALL STABILIZE ANY PORTION OF THE SITE THAT IS BEING WORKED AND DISTURBED PRIOR TO BEGINNING CONSTRUCTION AT ANOTHER AREA OF THE SITE. AT NO TIME DURING WINTER CONSTRUCTION SHALL THERE BE MORE THAN 1 ACRE OF EXPOSED SOIL ON SITE. ANTICIPATED WINTER CONSTRUCTION ACTIVITIES WILL INCLUDE ALL ASPECTS OF THE PROJECT PROPOSED DURING SUMMER CONSTRUCTION. THIS IS A CONTINUATION OF WORK WHICH WAS NOT COMPLETED DURING THE SUMMER. MAJOR GRADING IS EXPECTED TO BE COMPLETE BEFORE OCTOBER 15TH. LIMITS OF DISTURBANCE - LOD WILL BE MOVED AND/OR REPLACED TO REFLECT THE BOUNDARY OF WINTER WORK. CONTRACTOR WILL MAINTAIN A MINIMUM 25' BUFFER FROM PERIMETER CONTROLS TO ALLOW FOR SNOW CLEARING AND MAINTENANCE. SNOW STORAGE ON SITE - CONTRACTOR WILL CREATE A SNOW MANAGEMENT PLAN. PLAN WILL IDENTIFY LOCATIONS FOR ADEQUATE SNOW STORAGE AND CONTROL SNOW MELT. SNOW STORAGE WILL BE DOWN GRADIENT OF ALL DISTURBED AREAS AND WILL NOT PROHIBIT THE FUNCTION OF ALL PERMANENT STORMWATER TREATMENT STRUCTURES. CONTRACTOR SHALL KEEP ALL DRAINAGE STRUCTURES OPWN AND FREE OF SNOW AND ICE DAMS. INSTALL SILT FENCE - SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF THE WINTER CONSTRUCTION AREAS AND SOIL STOCKPILE AREAS, AS SHOWN ON THE PLAN, BY OCTOBER 15TH. IF THE GROUND IS UNFROZEN THE SILT FENCE SHALL BE DUG IN AS NORMAL. IF THE GROUND IS FROZEN CONTACT THE ENGINEER FOR ALTERNATE OPTIONS (STONE BERM, FILTREXX SILT SOXX, STRAW WATTLES, ETC.). STABILIZED CONSTRUCTION ENTRANCE - THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL STABILIZED CONSTRUCTION ENTRANCES TO PREVENT SEDIMENT TRACKING OFF SITE. CONTRACTOR SHALL ENLARGE THE WIDTH OF ACCESS TO PROVIDE ADDITIONAL ROOM FOR SNOW STOCKPILING, IF NEEDED. ADDITIONAL STONE SHALL BE ADDED OR THE LENGTH SHALL BE INCREASED, IF ICE AND SNOW LIMITS CONSTRUCTION ENTRANCE'S ABILITY TO HOLD SEDIMENTS ON SITE. WINTER STABILIZATION ALL DISTURBED AREAS NOT INVOLVED IN WINTER CONSTRUCTION SHALL BE AT LEAST TEMPORARILY STABILIZED BY OCTOBER 15. AFTER OCTOBER 15TH, ALL AREAS DISTURBED DURING WINTER CONSTRUCTION SHALL BE STABILIZED DAILY TO PREVENT EXPOSURE FROM RAIN EVENTS AND ACCUMULATION OF SNOWFALL (SEE EXCEPTIONS BELOW). CONTRACTOR SHALL ADD ADDITIONAL STONE, AS NECESSARY, TO PROVIDE STABILIZATION THROUGH WINTER CONSTRUCTION ON ALL AREAS WHERE CONSTRUCTION TRAFFIC IS ANTICIPATED. EXCEPTIONS: ·HYDROSEEDING AFTER OCTOBER 15TH AND BEFORE APRIL 15TH MUST BE STABILIZED WITH STRAW MULCH OR EROSION CONTROL MATTING.* ·SNOW AND/OR ICE MUST BE REMOVED TO, AT MOST, ONE INCH PRIOR TO APPLYING MULCH OR EROSION CONTROL STABILIZATION MATTING. ·IF NO PRECIPITATION, WITHIN 24 HOURS, IS FORECASTED AND WORK WILL RESUME IN THE SAME DISTURBED AREA WITHIN 24 HOURS, DAILY STABILIZATION IS NOT NECESSARY. ·DISTURBED AREAS THAT COLLECT AND RETAIN RUNOFF, SUCH AS OPEN UTILITY TRENCHES, REQUIRE STABILIZATION AT THE END OF EACH WORK WEEK. MAINTENANCE - ALL DISTURBED AREAS SHALL BE MONITORED BY THE CONTRACTOR AND THE ON-SITE PLAN COORDINATOR IN ACCORDANCE WITH THE INSPECTION REQUIREMENT OUTLINED IN THE INDIVIDUAL CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR AND ON-SITE PLAN COORDINATOR SHALL EVALUATE THE SITE AFTER A THAW OR RAINSTORM. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL NOTIFY THE ENGINEER IF ANY EROSION CONTROL MEASURES APPEAR TO BE INADEQUATE. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL IMMEDIATELY (WITHIN THE SAME BUSINESS DAY) IMPLEMENT ANY FURTHER EROSION CONTROL MEASURES SPECIFIED BY THE ENGINEER. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL ADD MULCH, AS NECESSARY, THROUGHOUT THE WINTER AFTER THAWS OR RAINSTORMS. THE MULCH DEPTH SHALL BE BROUGHT UP TO 2". THE MULCH AND SILT FENCE SHALL BE MAINTAINED UNTIL A PERMANENT GROUND COVER (70% STABILIZATION) IS ESTABLISHED IN THE SPRING. THE SITE SHALL BE REMULCHED AND RESEEDED, IN THE SPRING, AS REQUIRED TO ESTABLISH A VIGOROUS PERMANENT GROUND COVER. INSPECTION - THE ON-SITE COORDINATOR SHALL BE RESPONSIBLE FOR, AT A MINIMUM, DAILY WRITTEN INSPECTIONS WHILE THE SITE IS DISTURBED OR WEEKLY IF EVERYTHING IS STABILIZED BUT CONSTRUCTION IS ON-GOING. IF, DURING WINTER CONSTRUCTION, EARTH DISTURBANCE ACTIVITIES TEMPORARILY CEASE AND THE SITE HAS BEEN FULLY STABILIZED, INSPECTION AND MONITORING REQUIREMENTS FOR THE ON-SITE COORDINATOR MAY BE REDUCED TO ONCE PER MONTH MINIMUM. ALL INSPECTION SHEETS SHALL BE KEPT ON SITE AND BE AVAILABLE UPON REQUEST. (FOR ANY EARTH WORK PERFORMED BETWEEN OCTOBER 15TH AND APRIL 15TH) WINTER EROSION CONTROL PROCEEDURES MINIMUM 18" OF BIORETENTION SOIL LAYER, OR TO SURFACE SHOWN ON PLANS. SEE DETAIL FOR SOIL SPECIFICATIONS. WIDTH VARIES TO FIT WITHIN SITE CONSTRAINTS DRY SWALE/BASIN WITH UNDERDRAIN N.T.S. 4" PERFORATED PVC PIPE. DAYLIGHT PIPE DOWN SLOPE, PIPE SHALL BE SOLID AFTER LEAVING SWALE/BASIN. INSTALL CAP AT THE END OF PIPE, DRILL 1" HOLE INTO END CAP. PROVIDE STONE STROMWATER OUTFALL TO LIMIT PIPE GETTING CLOGGED BY DEBRIS OR VEGETATION. 12" 12" OF STONE UNDER PIPE FOR ADDITIONAL CAPACITY BOTTOM OF STONE MUST BE 2' OR GREATER ABOVE THE SHGWT, IF CONTRIBUTING IMPERVIOUS IS GREATER THAN 50%. IF LESS THAN 50% SEPARATION CAN BE REDUCED TO 1'. ELEVATION OF OBSERVED SEASONAL HIGH GROUNDWATER TABLE (SHGWT) VARIES 8" 2: 1 M A X . 1 2 CPV LEVEL WQV LEVEL 3/4" WASHED CRUSHED STONE OR BANK RUN GRAVEL SURROUND STONE IN FILTER FABRIC TO MINIMIZE FINES FROM FILLING IN STONE. OVERLAP FABRIC BY A MINIMUM OF 12" PROVIDE BROAD CRESTED WEIR OVERFLOW FOR LARGER STORM. SEE NOTES AND DETAILS FOR SPECIFICATIONS AND ELEVATIONS. BOTH THE WATER QUALITY STORM AND CHANNEL PROTECTION STORM WILL REMAIN WITHIN THE SWALE/BASIN WITHOUT USE OF THE OVERFLOW BROAD CRESTED WEIR. INFILL SPILLWAY WITH CRUSHED GRAVEL (704.05A, COARSE). SEE SITE PLAN FOR LOCATION. TOTAL WIDTH = 13' 2 1 1 2 6" 6"6"18"CHANNEL WIDTH = 10' INVERT ELEVATION OF WETLAND SPILLWAY, SEE PLANS FOR POND SPECIFIC ELEVATIONS. CHANNEL SHALL BE FLAT AND 5.5' WIDE. PROVIDE 4" MIN. TOPSOIL AND ESTABLISH DENSE GRASS ALONG THE REMAINING RIM OF THE GRAVEL WETLAND. INSTALL MIRAFI 140N FILTER FABRIC (OR EQUAL) UNDER AND TO THE SIDES OF STONE. EMERGENCY SPILLWAY CROSS SECTION DETAIL FOR DRY SWALE/BASIN N.T.S. EXTEND STONE DOWN BOTH SIDE SLOPES, 4' BEYOND THE LEVEL SPILLWAY ON THE OUTFALL SIDE AND 2' INTO THE GRAVEL WETLAND. INFILL WEIR WITH CRUSHED GRAVEL (704.05A, COARSE). SEE SITE PLAN FOR LOCATION. 2 1 1 2 6" 6"6"18"WEIR CHANNEL WIDTH = 10' PROVIDE 4" MIN. TOPSOIL AND ESTABLISH DENSE GRASS ALONG THE REMAINING RIM OF THE FOREBAY. INSTALL MIRAFI 140N FILTER FABRIC (OR EQUAL) UNDER AND TO THE SIDES OF STONE. STONE WEIR CROSS SECTION DETAIL FOR TRANSITION FROM FOREBAY TO WETLAND N.T.S. EXTEND STONE DOWN BOTH SIDE SLOPES, TO THE BOTTOM OF BOTH THE GRAVEL WETLAND AND FOREBAY. TOTAL WIDTH =13' INVERT ELEVATION OF WEIR, SEE PLANS FOR POND SPECIFIC ELEVATIONS. WEIR CHANNEL SHALL BE FLAT AND 4' WIDE. ADDITIONAL SOILS RESTORATION SEED SWALE/BASIN WITH A A WETLAND SEED MIX, OR APPROVED EQUAL . PARAMETER VALUE BIORETENSION PLANTING SOIL CHARACTERISTICS PH RANGE 5.2 to 7.00 ORGANIC MATTER MAGNESIUM PHOSPHORUS (P2O5 ) Potassium (K2O) SOLUBLE SALTS FINES (CLAYS/SILTS) SAND 50% - 70% LESS THAN 10% 500 PPM 85 LBS./ACRE MIN. 75 LBS./ACRE MIN. 35 LBS./ACRE MIN. 10% - 20% 6' LONG 1' 4"6' WIDE AT END OF OUTFALLMIRAFI 500X FABRIC UNDER AND TO SIDES OF STONE STORM WATER FLOW FROM DRY SWALE/BASIN PLAN 4" STORMWATER OUTFALL FROM DRY SWALE/BASIN. SEE NOTES ABOVE REGARDING END CAP. 6" MIN. 6" MIN. PROVIDE LIP LEVEL SPREADER AT END OF OUTFALL. CROSS SECTION OUTFALL DETAIL FOR 4" PIPE FROM DRY SWALE/BASIN N.T.S. PROVIDE SOLID CAP AT THE END OF PIPE, DRILL 1" HOLE (ORIFICE) INTO CAP.HAVE PIPE SIT A MINIMUM OF 3" ABOVE STONE OUTFALL TO MINIMIZE CLOGGING OF ORIFICE FROM DEBRIS AND VEGETATION 12" DEPTH OF STONE PER VT. SPEC. 706.01. OR APPROVED EQUAL. MULTI-PURPOSE PLAY ROOM 111 STOR. 110 RR 106 RR 107 HALL 105 K'ETTE/STAFF 112 INFANT 1 102 INFANT 2 104 NAP ROOM 103 MUDROOM 101 TODDLER 1 117 TODDLER 2 114 STOR. 115 RR 116 VEST. 100 W/D 118 MOTHER'S ROOM 108 MECH/ELEC 113 COVERED ENTRY PORCH COVERED ENTRY PORCHOwnership of Instruments of ServiceAll reports, drawings, specifications, computer files, field data, notes and other documents and instruments prepared by the Consultant as instruments of service shall remain the property of the Consultant. The Consultant shall retain all common law, statutory and other reserved rights, including the copyright thereto.1/27/2022 12:36:43 PMC:\Users\kdesroches\Documents\2021046_THE HOMESTEAD_R21_ARCH_KDesRoches.rvt1/27/2022 12:36:43 PM THE HOMESTEAD INFANT & TODDLER SCHOOL2021046 | Printed:FIRST FLOOR PLAN SHELBURNE RD, SOUTH BURLINGTON, VT SD-0 1/4" = 1'-0" 1 FIRST FLOOR PLAN (PRESENTATION) E111C D D A FIRST FLOOR 100' -0" D C2 D FIRST FLOOR 100' -0" SNOW GUARDS E117 E114 E111A WOOD COLUMN B1B2B2 E E WOOD COLUMN FIRST FLOOR 100' -0"12'-0"E100 C1 C1PRINCIPLE BUILDING HEIGHT21'-0"Ownership of Instruments of ServiceAll reports, drawings, specifications, computer files, field data, notes and other documents and instruments prepared by the Consultant as instruments of service shall remain the property of the Consultant. The Consultant shall retain all common law, statutory and other reserved rights, including the copyright thereto.1/27/2022 12:35:46 PMC:\Users\kdesroches\Documents\2021046_THE HOMESTEAD_R21_ARCH_KDesRoches.rvt1/27/2022 12:35:46 PM THE HOMESTEAD INFANT & TODDLER SCHOOL2021046 | Printed:EXTERIOR ELEVATIONS & MATERIALS SHELBURNE RD, SOUTH BURLINGTON, VT SD-2 3/16" = 1'-0" 1 EAST ELEVATION (FRONT) SD-2 3/16" = 1'-0" 2 NORTH ELEVATION (SIDE) SD-2 3/16" = 1'-0" 3 SOUTH ELEVATION (SIDE) SD-2 3/16" = 1'-0" 4 WEST ELEVATION (REAR) OPTION 1: STANDING SEAM METAL ROOF EXTERIOR MATERIALS COMPOSITE SHAKE SIDING COMPOSITE CLAPBOARD SIDING WOOD T&G CEILINGS @ ENTRY PORCHES WOOD COLUMNS @ ENTRY PORCHES OPTION 2: ARCHITECTURAL ASPHALT SHINGLES ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-0.00 EXISTING CONDITIONS 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com STANDARD GRAPHIC SCALE (1" = 20') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 10'20'40'60' STAMP: CALCULATIONS: EXISTING CONDITIONS: ·BUILDING COVERAGE: ±3,450 S.F. (0.08 ACRES) (11.3%) ·OVERALL IMPERVIOUS: ±10,550 S.F. (0.24 ACRES) (33.8%) ·FRONT YARD COVERAGE: ±2,450 S.F. (FRONT YARD AREA = 2,985 S.F.) (82.1%) ·±12 PARKING SPOTS LOCATION MAP SCALE: 1" = 1 2 MILE 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM VERMONT USGS, GIS FIGURES, AND AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY DATED APRIL 2018. ASPECTS FROM 1475 SHELBURNE ROAD ARE DERIVED FROM PERMIT PLANS AND HAVE NOT BEEN FIELD VERIFIED. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.THE UTILITIES ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. 4.THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. PROPERTY LINES HAVE BEEN ADJUSTED BASE ON MONUMENTATION FOUND IN THE FIELD AND EVIDENCE IN AERIAL PHOTOGRAPHY. THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) PLAN NOTES:LEGEND IRON PIPE / CONCRETE MONUNMENT FOUND PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF SURVEY CONTROL POINT EXISTING SIGN APPROXIMATE EASEMENTS EXISTING GAS LINE/VALVE SITE LAT: N44° 25' 53.8" LONG: W73° 12' 42.1" APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 1 THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.00 PROPOSED INFANT CARE FACILITY SITE PLAN ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) LEGEND IRON PIPE / CONCRETE MONUNMENT FOUND 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF SURVEY CONTROL POINT EXISTING SIGN PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED GAS LINE/VALVE PROPOSED SEWER LINE/MANHOLE PROPOSED UNDERGROUND POWER PROPOSED WATER LINE/HYDRANT/VALVE/SHUTOFF STANDARD GRAPHIC SCALE (1" = 20') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 10'20'40'60' STAMP: APPROXIMATE EASEMENTS PROPOSED FORCE MAIN PROPOSED UNDERGROUND COMMUNICATIONS EXISTING GAS LINE/VALVE APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 CALCULATIONS: EXISTING CONDITIONS: ·BUILDING COVERAGE: ±3,450 S.F. (0.08 ACRES) (11.3%) ·OVERALL IMPERVIOUS: ±10,550 S.F. (0.24 ACRES) (33.8%) ·FRONT YARD COVERAGE: ±2,450 S.F. (FRONT YARD AREA = 2,985 S.F.) (82.1%) ·±12 PARKING SPOTS PROPOSED CONDITIONS: ·BUILDING COVERAGE: ±4,480 S.F. (0.10 ACRES) (14.5%) ·OVERALL IMPERVIOUS: ±14,300 S.F. (0.33 ACRES) (46.2%) ·FRONT YARD COVERAGE: ±500 S.F. (FRONT YARD AREA = 2,985 S.F.) (16.8%) ·15 PARKING SPOTS 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM VERMONT USGS, GIS FIGURES, AND AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY DATED APRIL 2018. ASPECTS FROM 1475 SHELBURNE ROAD ARE DERIVED FROM PERMIT PLANS AND HAVE NOT BEEN FIELD VERIFIED. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.THE UTILITIES ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. 4.THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. PROPERTY LINES HAVE BEEN ADJUSTED BASE ON MONUMENTATION FOUND IN THE FIELD AND EVIDENCE IN AERIAL PHOTOGRAPHY. PLAN NOTES: EXISTING WATER/WASTEWATER DESIGN FLOW: ·THERE IS NO EXISTING WW PERMIT FOR THE PROPERTY. PROPERTY HOUSES AN EXISTING BUSINESS DENSMORE MONUMENTS. BELOW ARE ASSUMED FLOWS BASED ON THE WW SUPPLY RULES. ·5 EMPLOYEES * 15 GPD PER EMPLOYEE = 75 GPD ·10 PATRONS PER DAY * 4 GPD PER PATRON = 40 GPD ·TOTAL = 115 GPD STATE OF VERMONT PROPOSED WASTEWATER/WATER DESIGN FLOWS: ·PROPOSED USE IS A CHILD CARE FACILITY WHICH DOES NOT SERVE MEALS ON SITE. TOTAL AMOUNT OF EMPLOYEES AND CHILDREN WHICH WILL USE THE PROPOSED FACILITY EQUALS 10 EMPLOYEES AND 32 CHILDREN ·42 EMPLOYEES & CHILDREN * 13 GPD PER PERSON WITHOUT MEALS = 546 GPD BASIS OF DESIGN FOR POTABLE WATER AND WASTEWATER DESIGN FLOW ALL VALUES CALCULATED BELOW WERE GENERATED USING VALUES PUBLISHED BY THE "INSTITUTE OF TRANSPORTATION ENGINEERS (ITE) TRIP GENERATION MANUAL, 10TH EDITION". VALUES ARE LISTED AS VEHICLE TRIP ENDS (VTE) BASED ON SPECIFIC USES IN THE MANUEL. MANUEL USE ANALYZED IS DAY CARE CENTER BASED ON STUDENT POPULATION (MANUAL #565). BELOW IS THE EVALUATION. STUDENTS FOR TRAFFIC CALCULATIONS: ·TOTAL STUDENTS FOR THE PROPOSED FACILITY ON 1459 SHELBURNE ROAD ·TOTAL OF 32 STUDENTS ANALYSIS:TRAFFIC VALUES: ·WEEKDAY AVERAGE VTE = 32 STUDENTS * 4.09 VTE/PER STUDENT = 131 VTE ·WEEKDAY AM PEAK HOUR VTE = 32 STUDENTS * 0.79 VTE/PER STUDENT = 26 VTE ·WEEKDAY PM PEAK HOUR VTE = 32 STUDENTS * 0.81 VTE/PER STUDENT = 26 VTE IN BOTH EVALUATIONS THE EFFECT ON TRAFFIC TO THE PROPOSED CHANGE IN USE HAS REMAINED RELATIVELY THE SAME OR WITH A SLIGHT DECREASE. PROJECT TRAFFIC 2 >>>>>>>>>>>>>>>>THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.01 PROPOSED STORMWATER PLAN ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) LEGEND IRON PIPE / CONCRETE MONUNMENT FOUND 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF SURVEY CONTROL POINT EXISTING SIGN PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED GAS LINE/VALVE PROPOSED SEWER LINE/MANHOLE PROPOSED UNDERGROUND POWER PROPOSED WATER LINE/HYDRANT/VALVE/SHUTOFF STANDARD GRAPHIC SCALE (1" = 20') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 10'20'40'60' STAMP: APPROXIMATE EASEMENTS PROPOSED FORCE MAIN PROPOSED UNDERGROUND COMMUNICATIONS EXISTING GAS LINE/VALVE APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM VERMONT USGS, GIS FIGURES, AND AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY DATED APRIL 2018. ASPECTS FROM 1475 SHELBURNE ROAD ARE DERIVED FROM PERMIT PLANS AND HAVE NOT BEEN FIELD VERIFIED. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.THE UTILITIES ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. 4.THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. PROPERTY LINES HAVE BEEN ADJUSTED BASE ON MONUMENTATION FOUND IN THE FIELD AND EVIDENCE IN AERIAL PHOTOGRAPHY. PLAN NOTES: PRE-DEVELOPMENT PEAK FLOWS (CFS) ANALYSIS POINT 10-YEAR 24-HOUR STORM EVENT (QP10) 25-YEAR 24-HOUR STORM EVENT (QP25) SN001 1.43 2.38 100-YEAR 24-HOUR STORM EVENT (QP100) 3.24 3.57 1-YEAR 24-HOUR STORM EVENT (CPv) POST-DEVELOPMENT PEAK FLOWS (CFS) ANALYSIS POINT 1" STORM EVENT (WQv) 10-YEAR 24-HOUR STORM EVENT (QP10) 25-YEAR 24-HOUR STORM EVENT (QP25) SN001 0.04 0.05 0.42 100-YEAR 24-HOUR STORM EVENT (QP100) 2.30 3.34 1-YEAR 24-HOUR STORM EVENT (CPv) 1.SEE ALL NOTES, DETAILS, SPECIFICATIONS, AND REQUIREMENTS ON DETAIL PAGES C-2.00, C-2.01, C-2.02, C-2.03, AND C-2.04 ADDITIONAL STORMWATER NOTES 2 THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.02 EROSION PREVENTION AND SEDIMENT CONTROL PLAN ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) LEGEND IRON PIPE / CONCRETE MONUNMENT FOUND 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF SURVEY CONTROL POINT EXISTING SIGN PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED GAS LINE/VALVE PROPOSED SEWER LINE/MANHOLE PROPOSED UNDERGROUND POWER PROPOSED WATER LINE/HYDRANT/VALVE/SHUTOFF STANDARD GRAPHIC SCALE (1" = 20') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 10'20'40'60' STAMP: APPROXIMATE EASEMENTS PROPOSED FORCE MAIN PROPOSED UNDERGROUND COMMUNICATIONS EXISTING GAS LINE/VALVE APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM VERMONT USGS, GIS FIGURES, AND AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY DATED APRIL 2018. ASPECTS FROM 1475 SHELBURNE ROAD ARE DERIVED FROM PERMIT PLANS AND HAVE NOT BEEN FIELD VERIFIED. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.THE UTILITIES ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. 4.THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. PROPERTY LINES HAVE BEEN ADJUSTED BASE ON MONUMENTATION FOUND IN THE FIELD AND EVIDENCE IN AERIAL PHOTOGRAPHY. PLAN NOTES: 1.THE DIFFERENCE BETWEEN EXISTING GRADE AND PROPOSED GRADE AS SHOWN ON THE PLANS RESULTS IN THE FOLLOWING CUT/FILL VALUES. ·CUT = ±300 C.Y. ·FILL = ±500 C.Y. 2.THESE VALUES DO NOT INCLUDE THE MATERIAL NEEDED FOR OR GENERATED FROM ROADWAY INSTALLATION, STORMWATER BEST MANAGEMENT PRACTICES, EXCAVATION FOR BUILDING FOOTINGS, CONCRETE, ASPHALT, ETC. THE NUMBERS ABOVE ARE A STRAIGHT COMPARISON BETWEEN SURFACES. 3.GRADES WILL BE ADJUSTED THROUGHOUT CONSTRUCTION TO LIMIT THE NEED FOR OFFSITE FILL. THE INTENT IT TO HAVE THE SITE BE BALANCED SITE. CUT/FILL NOTES PROPOSED EROSION PREVENTION AND SEDIMENT CONTROL SILT FENCE PERIMETER CONTROLS AND CONSTRUCTION LIMIT BARRIER FENCE AREAS WHERE WATER DOES NOT FLOW OFFSITE NEED ONLY CONSTRUCTION LIMIT BARRIER FENCE 1.SEE ALL NOTES, DETAILS, SPECIFICATIONS, AND REQUIREMENTS ON DETAIL PAGES C-2.00, C-2.01, C-2.02, C-2.03, AND C-2.04 ADDITIONAL EPSC NOTES 2 THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-1.03 PROPOSED LANDSCAPING PLAN ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 APPROXIMATE PROPERTY LINES EXISTING GRADE CONTOUR LINES (5 FOOT INTERVALS) EXISTING TREELINE EXISTING GRADE CONTOUR LINES (1 FOOT INTERVALS) LEGEND IRON PIPE / CONCRETE MONUNMENT FOUND 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% EXISTING SEWER LINE/MANHOLE EXISTING STORM LINE/MANHOLE/BASIN EXISTING OVERHEAD ELECTRIC LINE/POWER POLE EXISTING UNDERGROUND POWER EXISTING WATER LINE/HYDRANT/VALVE/SHUTOFF SURVEY CONTROL POINT EXISTING SIGN PROPOSED GRADE CONTOUR LINES (5 FOOT INTERVALS) PROPOSED GRADE CONTOUR LINES (1 FOOT INTERVALS) PROPOSED GAS LINE/VALVE PROPOSED SEWER LINE/MANHOLE PROPOSED UNDERGROUND POWER PROPOSED WATER LINE/HYDRANT/VALVE/SHUTOFF STANDARD GRAPHIC SCALE (1" = 20') VALID WHEN PLOTTED ON 24" BY 36" MEDIA 0' 0"1"2"3" 10'20'40'60' STAMP: APPROXIMATE EASEMENTS PROPOSED FORCE MAIN PROPOSED UNDERGROUND COMMUNICATIONS EXISTING GAS LINE/VALVE APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 1.ASPECTS OF PLAN ARE APPROXIMATE AND DERIVED FROM VERMONT USGS, GIS FIGURES, AND AERIAL PHOTOGRAPHY. AERIAL PHOTOGRAPHY DATED APRIL 2018. ASPECTS FROM 1475 SHELBURNE ROAD ARE DERIVED FROM PERMIT PLANS AND HAVE NOT BEEN FIELD VERIFIED. 2.THE HORIZONTAL COORDINATE SYSTEM IS BASED ON NAD83 VERMONT STATE PLANE 4400 (US SURVEY FEET). ELEVATIONS ARE BASED ON THE NAVD88 (US SURVEY FEET). 3.THE UTILITIES ARE NOT WARRANTED TO BE COMPLETE. CONTRACTOR SHALL CONTACT DIG SAFE BEFORE BEGINNING ANY EXCAVATION. 4.THIS IS IN NO WAY A BOUNDARY SURVEY. PROPERTY LINES SHOWN ON THIS PLAN ARE FROM TAX MAP INFORMATION PROVIDED BY THE CITY. PROPERTY LINES HAVE BEEN ADJUSTED BASE ON MONUMENTATION FOUND IN THE FIELD AND EVIDENCE IN AERIAL PHOTOGRAPHY. PLAN NOTES: LANDSCAPING SCHEDULE QUANTITY COMMON NAME PURCHASE SIZE MATURE SIZE APPROX. COST PER PLANT TOTAL COST 2 AUTUMN GOLD GINKO BILOBA 2-3 INCH CALIPER 20' - 30' HIGH $400 PER PLANT $800 2 NEW HORIZON ELM 2-3 INCH CALIPER 30' - 40' HIGH $600 PER PLANT $1,200 2 MARMO FREEMAN MAPLE 2-3 INCH CALIPER 40' - 50' HIGH $600 PER PLANT $1,200 21 HUMMINGBIRD SUMMERSWEET 3 GALLON 3' - 5' DIAMETER $100 PER PLANT $2,100 16 DWARF FRAGRANT SUMAC 1 GALLON 2' - 3' DIAMETER $50 PER PLANT $800 12 SWAMP AZALEA 3 GALLON 3' - 5' DIAMETER $100 PER PLANT $1,200 $7,300 NOTE: REMOVE ALL NON-BIODEGRADABLE MATERIAL FROM PLANT PIT TREE SUPPORT ANCHOR CUT AND REMOVE ANY WIRE, ROLL BURLAP BACK FROM TOP 1/3 OF ROOTBALL BEFORE BACKFILLING; UNTIE ROPE FROM TRUNK EXISTING SUBGRADE 6" COMPACTED PLANTING MIXTURE FINISH GRADE PLANTING MIXTURE TEMPORARY LANDSCAPE SOIL SAUCER REINFORCED RUBBER HOSE TREE TO BE SET PLUMB SHREDDED BARK MULCH, 3" MIN. DEPTH TRUNK TRANSITION GUYING MATERIAL (GUYING WIRE, 3 PER TREE) CROWN TO BE PRUNED AS DIRECTED BY ARCHITECT - DO NOT CUT LEADER SMALL SHRUBS SHALL BE INSTALLED USING SIMILAR SUBBASE MATERIAL, MAY NOT NEED TREE SUPPORT. TREE PLANTING IN LANDSCAPE DETAIL N.T.S. H NOTE: COSTS OF LANDSCAPING PLANS ABOVE ARE APPROXIMATE AND MAY VARY AT TIME OF CONSTRUCTION. INSTALLATION COSTS, ADDITIONAL DECORATIVE MULCHING, PROVIDING GRASSED AREA, FLOWERS, AND HARDSCAPE AROUND THE SITE WILL INCREASE THE TOTAL LANDSCAPING COSTS TO $20,000 REQUIRED BY THE CITY OF SOUTH BURLINGTON 2 THE HOMESTEAD SCHOOL 1459 Shelburne Road (VT Route 7) South Burlington, Vermont OWNER: ISSUED FOR PERMIT REVIEW NOT FOR CONSTRUCTION C-2.04 DETAILS ANTHONY SOCINSKI TRUST 533 TANNER ROAD JEFFERSONVILLE, VERMONT 05464 164 Main Street, Suite 201 P: (802) 878-0375 Colchester, Vermont 05446 www.krebsandlansing.com PROPERTY INFORMATION: ADDRESS: 1459 SHELBURNE ROAD PARCEL ID: 1540-01459 SPAN: 600-188-15810 GRANDLIST ACREAGE: 0.71 ACRES ZONING: COMMERCIAL 2 (C2) FRONT YARD BUILDING SETBACK: 30' BACK YARD BUILDING SETBACK: 30' SIDE YARD BUILDING SETBACK: 10' MAXIMUM BUILDING COVERAGE:40% MAXIMUM TOTAL LOT COVERAGE: 70% STAMP: APPLICANT: REPERIO PROPERTIES, LLC P.O. BOX 1133 WILLISTON, VERMONT 05495 3:1 MAX. 2: 1 1 2 3 11'-6" MIN.FLOW FROM SURFACES TO BE TREATED BERM BETWEEN FOREBAY AND TREATMENT PRACTICE. PROVIDE LOW SPOT APPROXIMATELY 3" LOWER THAN BERM FOR APPROXIMATELY 5' IN WIDTH. BASE OF SEDIMENT FOREBAY WILL BE TOPSOILED, SEEDED AND MULCHED. MAINTAIN AS GRASS. SEDIMENT FOREBAY DETAIL N.T.S. SEE TREATMENT BEST MANAGEMENT PRACTICE DETAIL TREATMENT BMP SEDIMENT FOREBAY IS DESIGNED TO CONTAIN A MINIMUM OF 10% WQv, SEE PLANS FOR EXACT DIMENSIONS AND GRADING DETAILS. INSTALL FIXED VERTICAL SEDIMENT DEPTH MARKER TO MEASURE DEPOSITED SEDIMENT 1.APPLY SEED AND MULCH. APPLY UNIFORMLY OVER AREA. 2.CROSS-SECTION SHALL BE EXCAVATED TO NEAT LINES AND GRADES. OVER-EXCAVATED AREAS SHALL BE BACKFILLED WITH MOIST SOIL COMPACTED TO DENSITY OF SURROUNDING MATERIAL. 3.ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHALL BE SPREAD OR DISPOSED OF IN APPROVED UPLAND AREA (PER OSPC) SUCH THAT IT DOES NOT INTERFERE WITH FUNCTIONING OF SWALE. ALL EXCAVATED SOIL SHALL REMAIN ON SITE. NOTES SOIL RETENTION: RETAIN, IN AN UNDISTURBED STATE, THE DUFF LAYER AND NATIVE TOPSOIL TO THE MAXIMUM EXTENT PRACTICABLE. SOIL QUALITY: ALL AREAS SUBJECT TO THE STANDARD SHALL DEMONSTRATE THE FOLLOWING: A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF 4% DRY WEIGHT IN PLANTING BEDS AND TURF AREAS. THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF 4 INCHES, EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. COMPOST AND OTHER MATERIALS SHALL BE USED THAT MEET THE FOLLOWING REQUIREMENTS: ·THE COMPOST OR OTHER MATERIALS SHALL HAVE A CARBON TO NITROGEN RATIO BELOW 25:1. ·COMPOST SHALL MEET THE DEFINITION OF “COMPOST” IN THE AGENCY'S SOLID WASTE MANAGEMENT RULES OR SHALL MEET THE CONTAMINANT STANDARDS IN THE VERMONT SOLID WASTE MANAGEMENT RULES §6-1104(G)(6- 7), §6-1105(E)(8-9), AND §6-1106(E)(7-9). COMPOST OR OTHER ORGANIC MATERIALS MAY BE AMENDED TO MEET THE FOREGOING REQUIREMENTS. ·EXCEPTIONAL QUALITY BIOSOLIDS (EQ BIOSOLIDS) MAY BE USED AS A SOIL AMENDMENT, AT A MAXIMUM PROPORTION OF 35% OF THE TOTAL SOIL VOLUME, AND SHALL BE WELL MIXED WITH EXISTING SOIL BEFORE OR DURING APPLICATION. ·THE RESULTING SOIL SHALL BE CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. THE SOIL QUALITY REQUIREMENTS SHALL BE MET BY USING ONE OR A COMBINATION OF THE FOLLOWING METHODS: ·OPTION 1: LEAVE UNDISTURBED NATIVE VEGETATION AND SOIL, AND PROTECT FROM COMPACTION DURING CONSTRUCTION. FAILURE TO ESTABLISH AND MAINTAIN EXCLUSIONARY CONTROLS AROUND THESE AREAS DURING THE CONSTRUCTION PHASE MAY TRIGGER THE REQUIREMENT TO RESTORE SOILS PER ONE OF THE FOLLOWING OPTIONS. ·OPTION 2: AMEND EXISTING SITE TOPSOIL OR SUBSOIL IN PLACE. a.SCARIFY OR TILL SUBSOILS TO 4 INCHES OF DEPTH OR TO DEPTH NEEDED TO ACHIEVE A TOTAL DEPTH OF 8 INCHES OF UNCOMPACTED SOIL AFTER CALCULATED AMOUNT OF AMENDMENT IS ADDED. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; b.AMEND SOIL TO MEET ORGANIC CONTENT REQUIREMENTS: 1.PRE-APPROVED RATE: PLACE 1 INCH OF COMPOSTED MATERIAL WITH AN ORGANIC MATTER CONTENT BETWEEN 40 AND 65% AND ROTOTILL INTO 3 INCHES OF SOIL, OR 2.CALCULATED RATE: PLACE CALCULATED AMOUNT OF COMPOSTED MATERIAL OR APPROVED ORGANIC MATERIAL AND ROTOTILL INTO DEPTH OF SOIL NEEDED TO ACHIEVE 4 INCHES OF SETTLED SOIL AT 4% ORGANIC CONTENT. *CONTRACTOR TO PROVIDE CALCULATION AND SITE SKETCH INDICATING AREAS USED FOR CALCULATIONS. c.RAKE BEDS TO SMOOTH AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER; AND d.WATER OR ROLL TO COMPACT SOIL IN TURF AREAS TO 85% OF MAXIMUM DRY DENSITY. ·OPTION 3: REMOVE AND STOCKPILE EXISTING TOPSOIL DURING GRADING. a.STOCKPILE SOIL ON SITE IN A DESIGNATED CONTROLLED AREA, AT LEAST 50 FEET FROM SURFACE WATERS, WETLANDS, FLOODPLAINS, OR OTHER CRITICAL RESOURCE AREAS; b.SCARIFY OR TILL SUBGRADE TO A DEPTH OF 4 INCHES. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; c.STOCKPILED TOPSOIL SHALL ALSO BE AMENDED, IF NEEDED, TO MEET THE ORGANIC CONTENT REQUIREMENTS: 1.PRE-APPROVED RATE: COMPOST SHALL BE INCORPORATED WITH AN ORGANIC MATTER CONTENT BETWEEN 40 AND 65% INTO THE TOPSOIL AT A RATIO 1:3, OR 2.CALCULATED RATE: INCORPORATE COMPOSTED MATERIAL OR APPROVED ORGANIC MATERIAL AT A CALCULATED RATE TO ACHIEVE 4 INCHES OF SETTLED SOIL AT 4% ORGANIC CONTENT;* d.REPLACE STOCKPILED TOPSOIL PRIOR TO PLANTING, SCREEN TOPSOIL, AND; e.RAKE TO LEVEL, AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER. f.OPTION 4: IMPORT TOPSOIL MIX, OR OTHER MATERIALS FOR MIXING, INCLUDING COMPOST, OF SUFFICIENT ORGANIC CONTENT AND DEPTH. g.SCARIFY OR TILL SUBGRADE TO A DEPTH OF 4 INCHES. EXCEPT FOR WITHIN THE DRIP LINE OF EXISTING TREES, THE ENTIRE SURFACE SHALL BE DISTURBED BY SCARIFICATION; h.PLACE 4 INCHES OF IMPORTED TOPSOIL MIX ON SURFACE. THE IMPORTED TOPSOIL MIX SHALL CONTAIN 4% ORGANIC MATTER. SOILS USED IN THE MIX SHALL BE SAND OR SANDY LOAM AS DEFINED BY THE USDA; SHOP DRAWING SUBMITTAL IS REQUIRED. FIND USDA SIEVE FOR SAND AND SANDY LOAM. i.RAKE BEDS TO SMOOTH AND REMOVE SURFACE ROCKS LARGER THAN 2 INCHES IN DIAMETER; j.WATER OR ROLL TO COMPACT SOIL IN TURF AREAS TO 85% OF MAXIMUM DRY DENSITY. SOIL MANAGEMENT ·IDENTIFIES AREAS ON THE SITE SUBJECT TO THE STANDARD; ·SOIL DEPTH AND QUALITY SHALL BE ESTABLISHED TOWARDS THE END OF CONSTRUCTION AND ONCE ESTABLISHED, PROTECTED FROM COMPACTION, SUCH AS FROM LARGE MACHINERY, VEHICLE TRAFFIC, AND FROM EROSION; ·AFTER SOIL AMENDMENTS AND PLACEMENT IS COMPLETE, AND PRIOR TO SEEDING AND MULCHING, CONTRACTOR SHALL PERFORM VERIFICATION SAMPLING IN LOCATIONS INDICATED ON SAMPLING PLAN. VERIFICATION SAMPLING SHALL INCLUDE NINE, 8 INCH DEEP (MIN) TEST HOLES PER ACRE OF AREA SUBJECT TO THE STANDARD. TEST HOLES SHALL BE EXCAVATED USING ONLY A SHOVEL DRIVEN SOLELY BY INSPECTOR'S WEIGHT AND SHALL BE AT LEAST 50 FEET APART FROM EACH OTHER. ·A DENSE AND VIGOROUS VEGETATIVE COVER SHALL BE ESTABLISHED OVER TURF AREAS. POST-CONSTRUCTION SOIL DEPTH AND QUALITY NOTES A.GRASS-LINED SWALE: LOCATED ALONG ALL DRIVEWAYS. 1.INSPECT REGULARLY FOR ACCUMULATION OF SEDIMENT OR DEBRIS, PARTICULARLY AFTER LARGE STORM EVENTS. 2.INSPECT AND REPAIR ANY EROSION AND RE-SEED BARE SPOTS AS NEEDED. 3.REMOVE SEDIMENT AND RESHAPE SWALE WHEN 6 INCHES OF SEDIMENT HAS ACCUMULATED. B.FOREBAY PRE-TREATMENT AREAS: 1.MONITOR FOR ACCUMULATION OF SEDIMENT. CLEAN WHEN 50% FULL OR AS NEEDED. 2.INSPECT AND REPAIR ANY NOTED EROSION. C.BIORETENTION SWALE/ BASIN WITH UNDERDRAIN 1.INSPECT FOR EROSION AND ACCUMULATED SEDIMENT WITHIN POND. REMOVE SEDIMENT AND REPAIR ANY EROSION AS NECESSARY. 2.REMOVE ALL TRASH FROM THE BASIN. 3.INSPECT UNDERDRAIN OUTFALL AND ORIFICE CAP, REMOVE ANY OBSTRUCTIONS STOPPING FLOW FROM CAP, KEEP AREA FREE OF DEBRIS/VEGETATION D.BROAD CRESTED WEIRS: LOCATED IN PONDS AND FOREBAYS FOR OVERFLOWS. 1.INSPECT REGULARLY FOR SIGNS OF EROSION OR DISPLACEMENT OF STONE. REPAIR AS NEEDED. 2.INSPECT FOR DEBRIS/TRASH ACCUMULATION AND REMOVE AS NEEDED. 3.MONITOR FOR EVIDENCE OF CONCENTRATED FLOW CHANNELS OR EROSION AT OUTLET. LEVEL STONE IF NEEDED TO RESTORE EVEN FLOW DISTRIBUTION. STORMWATER MAINTANCE NOTES 1.SOIL DEPTH AND QUALITY SHALL BE ESTABLISHED TOWARDS THE END OF CONSTRUCTION, AND ONCE ESTABLISHED, BE PROTECTED FROM COMPACTION. 2.THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF THE POST CONSTRUCTION SOIL DEPTH AND QUALITY. 3.VERIFICATION SHALL BE VIA A SAMPLING SCHEME THAT INCLUDES NINE 8" DEEP TEST HOLES PER ACRE OF AREA SUBJECT TO THE STANDARD. 4.TEST HOLES SHALL BE EXCAVATED USING ONLY A SHOVEL DRIVEN SOLELY BY THE INSPECTOR'S WEIGHT AND SHALL BE AT LEAST 50 FEET APART FROM EACH OTHER. 5.ALL DISTURBED AREAS WITHIN THE PROJECT LIMITS (LOD) ARE SUBJECT TO THE POST-CONSTRUCTION SOIL DEPTH AND QUALITY STANDARD 6.THERE IS NO PROPOSED EXCAVATION OR RE-GRADING ANTICIPATED WITHIN THE SOLAR ARRAY BEYOND WHAT IS NECESSARY FOR SETTING POSTS AND INSTALLING CONDUIT. IT IS ANTICIPATED THAT SOME GROUND DISTURBANCE WILL OCCUR WITHIN THE ARRAY FROM FREQUENT TRACKING OF EQUIPMENT. THE CONTRACTOR AND ENGINEER SHALL EVALUATE GROUND DISTURBANCE WITHIN THE SOLAR ARRAY AND EITHER: ··CONFIRM THAT SOILS HAVE NOT BEEN EXCESSIVELY COMPACTED VIA TEST PITS AND PHOTO DOCUMENTATION. ··IMPLEMENT THE MEASURES OUTLINED IN THE "POST CONSTRUCTION SOIL DEPTH & QUALITY STANDARD" IF EXCESSIVE COMPACTION HAS OCCURRED. 2:12: 1 VARIES SEE PLANS VARIES SEE PLANS1 4 2 1 GRASS SWALE DETAIL 1.TYPICAL GRASS SWALE CROSS SECTION. SEE PLAN VIEW FOR LOCATIONS. 2.MAXIMUM SIDE SLOPES INTO SWALE SHALL BE 2:1. 3.DURING CONSTRUCTION TEMPORARILY SEEDED AND HEAVILY MULCHED. POST CONSTRUCTION CONTRACTOR SHALL RE-GRADE ANY EROSION, REMOVE BUILD UP SEDIMENTS, PERMANENT SEED AND HEAVILY RE-MULCH. 4.CROSS-SECTION SHALL BE EXCAVATED TO NEAT LINES AND GRADES. OVER-EXCAVATED AREAS SHALL BE BACKFILLED WITH MOIST SOIL COMPACTED TO DENSITY OF SURROUNDING MATERIAL. 5.ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHALL BE SPREAD OR DISPOSED OF IN APPROVED UPLAND AREA (PER OSPC) SUCH THAT IT DOES NOT INTERFERE WITH FUNCTION. 6" LAYER OF ON-SITE SOIL AND/OR IMPORTED TOPSOIL. MIRAFI 140N DRAINAGE FABRIC OVER ROCK SUBGRADE. NOTES N.T.S. WINTER EROSION CONTROL NARRATIVE: OBJECTIVE - ANY SITE WORK PERFORMED LATER THAN OCTOBER 15TH WILL RESULT IN EXPOSED SOIL THROUGH THE WINTER. THIS PRESENTS A POTENTIAL FOR EROSION THROUGH THE WINTER. THE WINTER EROSION CONTROL MEASURES ARE INTENDED TO PREVENT SEDIMENT FROM LEAVING THE CONSTRUCTION ZONE DURING THAWS AND RAINSTORMS. WINTER EROSION CONTROL SEQUENCE: ON-SITE COORDINATOR - THE ON-SITE COORDINATOR SHALL BE SURE ALL EROSION CONTROL MEASURES REQUIRED FOR WINTER CONSTRUCTION ARE INSTALLED BY OCTOBER 15TH AND PRIOR TO GROUND FREEZING. IF A PERMITTED AREA CAN BE LEFT UNDISTURBED UNTIL THE SPRING THE CONTRACTOR SHALL MAKE EVERY EFFORT TO LIMIT THESE AREAS OF DISTURBANCE. THE CONTRACTOR SHALL STABILIZE ANY PORTION OF THE SITE THAT IS BEING WORKED AND DISTURBED PRIOR TO BEGINNING CONSTRUCTION AT ANOTHER AREA OF THE SITE. AT NO TIME DURING WINTER CONSTRUCTION SHALL THERE BE MORE THAN 1 ACRE OF EXPOSED SOIL ON SITE. ANTICIPATED WINTER CONSTRUCTION ACTIVITIES WILL INCLUDE ALL ASPECTS OF THE PROJECT PROPOSED DURING SUMMER CONSTRUCTION. THIS IS A CONTINUATION OF WORK WHICH WAS NOT COMPLETED DURING THE SUMMER. MAJOR GRADING IS EXPECTED TO BE COMPLETE BEFORE OCTOBER 15TH. LIMITS OF DISTURBANCE - LOD WILL BE MOVED AND/OR REPLACED TO REFLECT THE BOUNDARY OF WINTER WORK. CONTRACTOR WILL MAINTAIN A MINIMUM 25' BUFFER FROM PERIMETER CONTROLS TO ALLOW FOR SNOW CLEARING AND MAINTENANCE. SNOW STORAGE ON SITE - CONTRACTOR WILL CREATE A SNOW MANAGEMENT PLAN. PLAN WILL IDENTIFY LOCATIONS FOR ADEQUATE SNOW STORAGE AND CONTROL SNOW MELT. SNOW STORAGE WILL BE DOWN GRADIENT OF ALL DISTURBED AREAS AND WILL NOT PROHIBIT THE FUNCTION OF ALL PERMANENT STORMWATER TREATMENT STRUCTURES. CONTRACTOR SHALL KEEP ALL DRAINAGE STRUCTURES OPWN AND FREE OF SNOW AND ICE DAMS. INSTALL SILT FENCE - SILT FENCE SHALL BE INSTALLED ON THE DOWNHILL SIDE OF THE WINTER CONSTRUCTION AREAS AND SOIL STOCKPILE AREAS, AS SHOWN ON THE PLAN, BY OCTOBER 15TH. IF THE GROUND IS UNFROZEN THE SILT FENCE SHALL BE DUG IN AS NORMAL. IF THE GROUND IS FROZEN CONTACT THE ENGINEER FOR ALTERNATE OPTIONS (STONE BERM, FILTREXX SILT SOXX, STRAW WATTLES, ETC.). STABILIZED CONSTRUCTION ENTRANCE - THE SITE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL STABILIZED CONSTRUCTION ENTRANCES TO PREVENT SEDIMENT TRACKING OFF SITE. CONTRACTOR SHALL ENLARGE THE WIDTH OF ACCESS TO PROVIDE ADDITIONAL ROOM FOR SNOW STOCKPILING, IF NEEDED. ADDITIONAL STONE SHALL BE ADDED OR THE LENGTH SHALL BE INCREASED, IF ICE AND SNOW LIMITS CONSTRUCTION ENTRANCE'S ABILITY TO HOLD SEDIMENTS ON SITE. WINTER STABILIZATION ALL DISTURBED AREAS NOT INVOLVED IN WINTER CONSTRUCTION SHALL BE AT LEAST TEMPORARILY STABILIZED BY OCTOBER 15. AFTER OCTOBER 15TH, ALL AREAS DISTURBED DURING WINTER CONSTRUCTION SHALL BE STABILIZED DAILY TO PREVENT EXPOSURE FROM RAIN EVENTS AND ACCUMULATION OF SNOWFALL (SEE EXCEPTIONS BELOW). CONTRACTOR SHALL ADD ADDITIONAL STONE, AS NECESSARY, TO PROVIDE STABILIZATION THROUGH WINTER CONSTRUCTION ON ALL AREAS WHERE CONSTRUCTION TRAFFIC IS ANTICIPATED. EXCEPTIONS: ·HYDROSEEDING AFTER OCTOBER 15TH AND BEFORE APRIL 15TH MUST BE STABILIZED WITH STRAW MULCH OR EROSION CONTROL MATTING.* ·SNOW AND/OR ICE MUST BE REMOVED TO, AT MOST, ONE INCH PRIOR TO APPLYING MULCH OR EROSION CONTROL STABILIZATION MATTING. ·IF NO PRECIPITATION, WITHIN 24 HOURS, IS FORECASTED AND WORK WILL RESUME IN THE SAME DISTURBED AREA WITHIN 24 HOURS, DAILY STABILIZATION IS NOT NECESSARY. ·DISTURBED AREAS THAT COLLECT AND RETAIN RUNOFF, SUCH AS OPEN UTILITY TRENCHES, REQUIRE STABILIZATION AT THE END OF EACH WORK WEEK. MAINTENANCE - ALL DISTURBED AREAS SHALL BE MONITORED BY THE CONTRACTOR AND THE ON-SITE PLAN COORDINATOR IN ACCORDANCE WITH THE INSPECTION REQUIREMENT OUTLINED IN THE INDIVIDUAL CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR AND ON-SITE PLAN COORDINATOR SHALL EVALUATE THE SITE AFTER A THAW OR RAINSTORM. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL NOTIFY THE ENGINEER IF ANY EROSION CONTROL MEASURES APPEAR TO BE INADEQUATE. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL IMMEDIATELY (WITHIN THE SAME BUSINESS DAY) IMPLEMENT ANY FURTHER EROSION CONTROL MEASURES SPECIFIED BY THE ENGINEER. THE CONTRACTOR OR ON-SITE PLAN COORDINATOR SHALL ADD MULCH, AS NECESSARY, THROUGHOUT THE WINTER AFTER THAWS OR RAINSTORMS. THE MULCH DEPTH SHALL BE BROUGHT UP TO 2". THE MULCH AND SILT FENCE SHALL BE MAINTAINED UNTIL A PERMANENT GROUND COVER (70% STABILIZATION) IS ESTABLISHED IN THE SPRING. THE SITE SHALL BE REMULCHED AND RESEEDED, IN THE SPRING, AS REQUIRED TO ESTABLISH A VIGOROUS PERMANENT GROUND COVER. INSPECTION - THE ON-SITE COORDINATOR SHALL BE RESPONSIBLE FOR, AT A MINIMUM, DAILY WRITTEN INSPECTIONS WHILE THE SITE IS DISTURBED OR WEEKLY IF EVERYTHING IS STABILIZED BUT CONSTRUCTION IS ON-GOING. IF, DURING WINTER CONSTRUCTION, EARTH DISTURBANCE ACTIVITIES TEMPORARILY CEASE AND THE SITE HAS BEEN FULLY STABILIZED, INSPECTION AND MONITORING REQUIREMENTS FOR THE ON-SITE COORDINATOR MAY BE REDUCED TO ONCE PER MONTH MINIMUM. ALL INSPECTION SHEETS SHALL BE KEPT ON SITE AND BE AVAILABLE UPON REQUEST. (FOR ANY EARTH WORK PERFORMED BETWEEN OCTOBER 15TH AND APRIL 15TH) WINTER EROSION CONTROL PROCEEDURES WIDTH VARIES TO FIT WITHIN SITE CONSTRAINTS BIORETENTION SWALE/BASIN WITH UNDERDRAIN N.T.S. 4" PERFORATED PVC PIPE. DAYLIGHT PIPE DOWN SLOPE, PIPE SHALL BE SOLID AFTER LEAVING SWALE/BASIN. INSTALL CAP AT THE END OF PIPE, DRILL 1" HOLE INTO END CAP. PROVIDE STONE STROMWATER OUTFALL TO LIMIT PIPE GETTING CLOGGED BY DEBRIS OR VEGETATION. 12" 12" OF STONE UNDER PIPE FOR ADDITIONAL CAPACITY BOTTOM OF STONE MUST BE 2' OR GREATER ABOVE THE SHGWT, IF CONTRIBUTING IMPERVIOUS IS GREATER THAN 50%. IF LESS THAN 50% SEPARATION CAN BE REDUCED TO 1'. ELEVATION OF OBSERVED SEASONAL HIGH GROUNDWATER TABLE (SHGWT) VARIES 8" 3: 1 M A X . CPV LEVEL WQV LEVEL 3/4" WASHED CRUSHED STONE OR BANK RUN GRAVEL SURROUND STONE IN FILTER FABRIC TO MINIMIZE FINES FROM FILLING IN STONE. OVERLAP FABRIC BY A MINIMUM OF 12" PROVIDE BROAD CRESTED WEIR OVERFLOW FOR LARGER STORM. SEE NOTES AND DETAILS FOR SPECIFICATIONS AND ELEVATIONS. BOTH THE WATER QUALITY STORM AND CHANNEL PROTECTION STORM WILL REMAIN WITHIN THE SWALE/BASIN WITHOUT USE OF THE OVERFLOW BROAD CRESTED WEIR. 2 1 1 2 6" 6"6" BROAD CRESTED WEIR CROSS SECTION DETAIL N.T.S.INVERT ELEVATION OF WEIR, SEE PLANS FOR POND SPECIFIC ELEVATIONS. WEIR CHANNEL SHALL BE FLAT. ADDITIONAL SOILS RESTORATION SEED SWALE/BASIN WITH A A WETLAND SEED MIX, OR APPROVED EQUAL. ADD SWITCH GRASS TO MIX 6' LONG 1' 4"6' WIDE AT END OF OUTFALLMIRAFI 500X FABRIC UNDER AND TO SIDES OF STONE STORM WATER FLOW FROM BIORETENTION SWALE/BASIN PLAN 4" STORMWATER OUTFALL FROM BIORETENTION SWALE/BASIN. SEE NOTES ABOVE REGARDING END CAP. 6" MIN. 6" MIN. PROVIDE LIP LEVEL SPREADER AT END OF OUTFALL. CROSS SECTION OUTFALL DETAIL FOR 4" PIPE FROM BIORETENTION SWALE/BASIN N.T.S. PROVIDE SOLID CAP AT THE END OF PIPE, DRILL 1" HOLE (ORIFICE) INTO CAP. PUSH CAP ONTO PIPE WITHOUT PVC CEMENT. HAVE PIPE SIT A MINIMUM OF 3" ABOVE STONE OUTFALL TO MINIMIZE CLOGGING OF ORIFICE FROM DEBRIS AND VEGETATION 12" DEPTH OF STONE PER VT. SPEC. 706.01. OR APPROVED EQUAL. 1 FLOW VARIES S E E PLAN AND DETAI L S FLOW VARIES SEE PLAN AND DETAILS IMPERVIOUS SURFACE VEGETATED FILTER STRIP OR EXISTING VEGETATION, SEE PLANS AND DETAILS. 1' MIN.1' MIN.CONTRACTOR SHALL INSTALL A LAYER OF NON-WOVEN FABRIC BETWEEN STONE AND EXISTING SOIL 11 2" MINUS WASHED CRUSHED STONE, TAMPED IN PLACE NOT COMPACTED. TOP OF STONE WILL BE INSTALLED FLAT AND WILL NOT HAVE ANY GRADE TO IT. 1.CONTRACTOR WILL INSTALL STONE DIAPHRAGM AT THE END OF CONSTRUCTION AFTER IMPERVIOUS HAS BEEN INSTALLED. CONTRACTOR MAY INSTALL EARLIER IF THEY CAN ENSURE THE DIAPHRAGM WILL NOT BE FILLED WITH SEDIMENTS FROM CONSTRUCTION. CONTRACTOR MUST REQUEST THIS AND PROVIDE PLAN/DETAIL FOR EARLY INSTALLATION. NOTES STONE DIAPHRAGM DETAIL N.T.S. 6" OF PEASTONE FILTER LAYER 3" LOW PHOSPHORUS COMPOST OR MULTCH 9" SAND WITH MINIMAL FINES PRACTICE SIDE OF BERM OUTFALL SIDE OF BERM PROVIDE 4" MIN. TOPSOIL AND ESTABLISH DENSE GRASS ON BASIN SIDE SLOPES AND ALONG THE RIM OF THE BASIN EXTEND GRAVEL FILTER LAYER TO FINISH ELEVATION OF SPILLWAY TOP OF BERM ELEVATION VARIES, SEE PLANS AND DETAILS TOP OF BROAD CRESTED WEIR SPILLWAY, ELEVATION VARIES, SEE PLANS AND DETAILS. 12" 6" GRAVEL LOCKING FILTER LAYER, STONE TO MEET SPECIFICATIONS OF 704.05B CRUSHED GRAVEL SUBBASE. 6" 12" 12" STONE TO MEET SPECIFICATIONS OF 706.04(A) TYPE I.EXTEND STONE CROSS SECTION DOWN OUTFALL SIDE SLOPE UNTIL THE INTERSECTION WITH EXISTING GRADE. EXTEND STONE SLIGHTLY PAST INTERSECTION AT EXISTING GRADE. UNDISTURBED SOIL OR COMPACTED FILL BEST MANAGMENT PARCTICE EARTH EMBANKMENT OR TOP OF BERM, 3' MIN. WIDTH. ELEVATION VARIES, SEE PLANS BROAD CRESTED WEIR, DEPTH AND WIDTH VARY SEE PLANS AND DETAILS. A A UNDISTURBED AREA CROSS SECTION A-A EXTEND STONE CROSS SECTION DOWN OUTFALL SIDE SLOPE UNTIL THE INTERSECTION WITH EXISTING GRADE. EXTEND STONE SLIGHTLY PAST INTERSECTION AT EXISTING GRADE. TOP WEIR WIDTH (VARIES) SEE ADDITIONAL DETAILS FOR BROAD CRESTED WEIR SPILLWAY SUBBASE MATERIAL PROVIDE 4" MIN. TOPSOIL AND ESTABLISH DENSE GRASS ON BASIN SIDE SLOPES AND ALONG THE RIM OF THE BASIN WEIR WIDTH (VARIES) 430'1-WAYEON-WAYEON-WAYEON)2handicapped(paces5SENTANDSNOWSTORAGEMEAFORSWMANAGEARENT AND SNOW STORAGEMEA FOR SW MANAGEAR XISTINGECTTOENDPLAYGROUNDANDCONNEXTEENTANDSNOWSTORAGEMEAFORSWMANAGEARTBACKE0'FRONTYARDS2TBACKEYARDS30'BACKTBACKEYARDSE0'SID1'12TBACKEYARDSE0'SID1-WAY EON 5'1'22ered porchvcokalwconcreteside ka l wc o n c r e t e s i d epatiokbric/stoneTWO-WAY F0S8±4,4FACILITYEDINFANTCAREPROPOSDDDDDSSGGSL5WSL5WDD2.31.64.53.35.34.15.14.44.94.74.74.94.34.93.64.31.72.12.72.62.52.82.82.72.82.92.82.72.93.12.72.83.02.72.83.02.83.12.92.92.82.72.60.80.82.72.62.50.90.92.42.41.00.92.32.22.21.01.00.92.12.12.01.11.01.01.91.91.91.21.11.11.81.81.81.21.21.11.61.61.61.31.21.21.51.51.51.31.31.21.31.41.41.51.41.31.31.21.31.41.51.61.31.31.21.31.41.51.61.71.71.31.31.41.51.61.71.71.81.92.02.12.11.31.31.51.61.71.81.92.02.02.12.22.42.52.62.72.72.91.31.31.81.92.02.12.22.42.52.62.72.82.93.13.13.12.92.72.62.51.31.32.72.82.93.12.93.03.03.12.82.72.52.32.22.01.91.71.61.51.31.32.92.82.72.62.42.22.01.91.71.61.51.41.31.31.31.41.82.63.71.71.61.51.41.31.21.31.41.72.53.61.31.72.43.53.43.34.14.23.23.40.00.00.00.00.00.00.00.20.60.91.21.31.31.10.90.60.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.71.21.92.12.11.71.30.80.40.10.10.10.10.10.10.10.10.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.81.42.32.62.01.61.30.80.60.50.50.40.51.10.40.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.81.42.32.62.21.91.61.31.11.00.90.71.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.71.21.82.12.02.02.02.02.01.71.61.21.00.90.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.20.50.91.21.31.31.92.22.72.52.31.51.42.70.20.00.00.00.00.00.00.00.00.00.00.00.00.00.10.30.50.60.70.81.21.71.61.43.70.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.20.20.10.30.81.31.82.32.42.21.41.20.40.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.20.50.91.21.51.61.41.10.90.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.30.50.70.80.90.90.70.50.40.20.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.20.20.30.40.30.20.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.10.10.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.00.40.30.51.01.42.00.80.50.92.64.62.35.63.81.10.60.92.85.0LuminaireScheduleQtyLabelArrangementLumensInputWattsLLFBUGRatingDescription7DSINGLE6289.10.850B1-U0-G0LIGHTOLIERS5R830K7-FINISH/RECESSEDINCEILING2GSINGLE630100.850B0-U0-G0PILFOCUS+ZERO-SA-830-070457/INGROUND2SSINGLE1212160.850N.A.BARNLIGHTBLE-G-WHS12-XXX-G22-NA-NA-NA-NA-LED16-3000K-DL/MOUNTED@8FTAFGTOBOF2SL5WSINGLE939572.90.850B4-U0-G2GARDCOECF-S-32L-700-WW-G2-AR-5W-UNV-BL-IMRI3-FINISH/MOUNTEDTOPOLE@12FTCalculationSummaryLabelGridHeightAvgMaxMinAvg/MinMax/MinBACKCANOPY03.935.31.62.463.31CONCRETESIDEWALK01.983.70.82.484.63FRONTCANOPY03.604.23.21.131.31SITE00.313.70.0N.A.N.A.STONEBRICKPATIO01.955.60.36.5018.67MOUNTINGHEIGHT:SEELUMINAIRESCHEDULEAPPS:LCSALES:DCJOBNAME:THEHOMESTEADAPEXLIGHTINGSOLUTIONSWORKPLANE/CALCPLANE:@FINISHGRADESCALE : DATE:DRAWN BY:SHEET:SL-1A1"=20’-0"LCSomedifferencesbetweenmeasuredvaluesandcalculatedresultsmayoccurduetoNOTETOREVIEWER:TotalLightLossFactor(LLF)appliedattimeofdesignisdeterminedbyapplyingtheLampLumenDepreciation(LLD)fromcurrentlampmanufacturer'scatalog,aLuminaireDirtDepreciationFactor(LDD)basedonIESrecommendedvaluesandaBallastFactor(BF)fromcurrentballastspecificationsheets.ApplicationofanincorrectLightLossFactor(LLF)willresultinforecastsofperformancethatwillnotaccuratelydepictactualresults.inputdata,differenceswilloccurbetweenmeasuredvaluesandcalculatedvalues.thelightingcalculations.Iftherealenvironmentconditionsdonotmatchthedimensions,reflectances,furnitureandarchitecturalelementssignificantlyaffectvariations.Inputdatausedtogeneratetheattachedcalculationssuchasroommeasurementtechniquesandfieldconditionssuchasvoltageandtemperaturetolerancesincalculationmethods,testingprocedures,componentperformance,*LLFDeterminedUsingCurrentPublishedLampDataForpropercomparisonofphotometriclayouts,itisessentialthatyouinsistalldesignersusecorrectLightLossFactors.GENERALDISCLAIMER:CalculationshavebeenperformedaccordingtoIESstandardsandgoodpracticeDRAWING TITLE:PROJECT TITLE:THE HOMESTEADSITE LIGHTINGPHOTOMETRIC CALCULATION1/11/22FILE NAME: SL-1A THE HOMESTEAD 01-11-2022 LC.dwgwww.apexlightingsolutions.comtelephone 860.632.8766